N-5NSPI (Natural Forces) RIR 1 to 7 1 passage
Peak Load Hour 2035-01-09 18:00 p. p. 10
Peak Load Hour 2035-01-09 18:00 Installed Capacity (MW) 2035-01-08 6:00 0 144 700 0 0 80 0 56 218 0 0 0 0 0 575 1774 26.1 2035-01-08 7:00 0 144 550 0 0 106 2 71 573 0 0 0 0 0 575 2021 0.0 2035-01-08 8:00 0 144 550 0 0 318 4 75 705 0 192 0...

AI summary The document presents a table showing installed capacity (in MW) and related metrics across various time intervals, focusing on peak load hours. The data includes multiple columns, such as demand-side management (DSM) and integrated resource plan (IRP), but the primary content is a detailed breakdown of capacity and load values for different hours on January 8, 2035.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →