Topic/Matter Intersection

Topic:"Project Schedule" in M12591

Matter: Nova Scotia Power Inc. - CI C0032664 – Energy Control Centre – Optimization Tools - $7,486,068
2 passages 2 documents

Project Schedule across all matters →

N-1Application 1 passage
Document No: XXX-XX-XXXX-XXXX p. p. 6
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Equipment Replacement Required fields: Estimate Classification Project Name: Energy Control Centre - Optimization Tools - C0032664 Started or Prelimina...

AI summary The document outlines a project cost estimate input checklist and maturity matrix for the Energy Control Centre - Optimization Tools project (C0032664). It details the project's scope, location, requirements, technology selection, and planning, with a focus on deliverables and their maturity levels. The project is at a defined or complete stage for most categories, with high percentages of deliverables completed.

N-2NSPI (NSEB) RIRs 1-20 - Redacted 1 passage
NON-CONFIDENTIAL p. p. 117
NON-CONFIDENTIAL 1 Request IR-18: 2 3 In "Why do this project now?", NS Power noted that 4 5 The project was deemed to be in service in March 2025 when the first 6 technology implementation (the Outage Request Platform) went live. The 7 Fi...

AI summary The document discusses an update on the status of a project by NS Power, noting that the project was deemed in service in March 2025 and that the Final Cost Date is set for September 2026. The response confirms that the project has already commenced and provides an update on the progress of the remaining technology solutions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →