Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Transmission Line Infrastructure Required fields: Estimate Classification Project Name: 83V L-5017 and L-5046 Rebuild Tap Started or Preliminary Class 5 Class 4 Class 3 Class 2 Class 1 Maturity Level of Projec...

AI summary The document outlines the details of a transmission line infrastructure project, including its scope, capacity, location, requirements, technology selection, strategy, and planning. It provides information on project maturity levels, classification of estimates, and various deliverables required for the project.

N-3NSPI (NSEB) RIR 2 to 3 - Redacted 1 passage
Preamble p. p. 6
- 1: Days are to be considered working days. - 2: Timeline of engineering kick off meeting will be scheduled by CIMA+ based on NSPI availability. - 3: Timelines to be re-evaluated upon if any other received POs from NSPI.

AI summary The document outlines scheduling and timeline considerations for engineering kick-off meetings and project timelines, dependent on NSPI's availability and receipt of additional POs.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →