Home›Prudency Reviews›M12780›Evidence
Topic/Matter Intersection

Topic:"Prudency Reviews" in M12780

Matter: EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application
5 passages 5 documents

Prudency Reviews across all matters →

E-12E1 (NSEB) RIRs 1-66 - Redacted 1 passage
p. p. 139
r>rpo se s. re w wa s n en ou g o c orr ec e r ev e c ns w as Ma ste r T ke rac r ide nti fie d i Th for the is let ed in ch th. A lon ith th ss ue s. ere e, re co mp ea m on g w e lcu lat ion vie ca re w ten tia l fo nid tifi ed s i n t h...

AI summary The text discusses the identification of issues related to the Master Takeover, including potential errors in calculations and the need for timely identification of program responses. It references the BER-IR and BER-AR, and mentions the need for detailed information and correction of errors.

E-16E1 (Synapse) RIRs 1-90 1 passage
System Operating and Maintenance Risks p. p. 10
System Operating and Maintenance Risks The safe and reliable operation of electric generation transmission and distribution systems is critical to NSPI's operations. There are a variety of hazards and operational risks inherent in operatin...

AI summary The document highlights the operational and maintenance risks faced by NSPI in managing its electric generation, transmission, and distribution systems, including mechanical failures, natural disasters, and cyberattacks. These risks could negatively impact public safety, infrastructure, and customer confidence, with potential financial implications that may not be fully recoverable through insurance or regulatory mechanisms.

101899NSEB (E1) IR 1 to 66 1 passage
1 i. Does E1 agree that there are risks associated with the proposed 2027-2031
measures such as building envelope upgrades, heat pump installations, and 1 i. Does E1 agree that there are risks associated with the proposed 2027-2031 30 reviews to ensure that the organization's key controls are operating effectively 31...

AI summary The document discusses risks associated with the proposed 2027-2031 measures, including building envelope upgrades and heat pump installations. It also references diversity in program delivery and the need for reviews to ensure effective controls and accurate reporting of financial and energy savings.

103543Closing Submission - E1 1 passage
14.5 CONCLUSION p. pp. 69-70
14.5 CONCLUSION The record establishes that the Preferred Plan is achievable. It builds on E1's decade-plus delivery record and projected achievement of all four current-Plan targets (2023–2026), focusing on proven services and established...

AI summary The record establishes that the Preferred Plan is achievable, building on E1's decade-plus delivery record and projected achievement of all four current-Plan targets (2023–2026). E1 submits that the Board should find the Preferred Plan prudent and achievable and approve it as amended by Schedule A.

103635Reply Submission - SNS 1 passage
DEMAND RESPONSE
DEMAND RESPONSE - 10. E1 says further residential demand-response spending would be imprudent before the current program is cost-effective. [E1 Closing, p. 33] Integrating efficiency and demand-response delivery offers an alternative worth...

AI summary The discussion focuses on the prudence of residential demand-response spending, the integration of efficiency and demand-response delivery, and the cost-effectiveness of adding demand-response capabilities during the installation of heat pumps and other equipment. NS Power and the Industrial Group support scalable demand-response solutions like smart thermostats, while E1 emphasizes the need for cost-effectiveness analysis before further investment.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →