Home›Rate Base›M06319›Evidence
Topic/Matter Intersection

Topic:"Rate Base" in M06319

Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
188 passages 56 documents

Rate Base across all matters →

N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 14 passages
1 2.3 Energy Ventures Analysis Testimony
1 2.3 Energy Ventures Analysis Testimony 2 5 11 21 24 3 Energy Ventures Analysis, Inc. (EVA) has been engaged by Nova Scotia Power, 4 Inc. (NSPI) to provide testimony in its 2007 Rate Application (2007 Application). 6 The 2007 Rate Applica...

AI summary Nova Scotia Power Inc. (NSPI) is seeking a rate increase due to rising solid fuel costs, particularly from higher HFO costs and decreased gas resale margins. Energy Ventures Analysis, Inc. (EVA) provides testimony on fuel market trends, procurement practices, and the impact of credit ratings on fuel expenses. The example of Tennessee Valley Authority (TVA) is cited to illustrate similar challenges faced by other utilities.

Preamble
5 1 2 3 As outlined in Figure 4.12, costs for Executive Management will decrease by $200,000 or 11 percent between 2006C and 2007, due to reduced labour and consulting costs. 6 7 8 9 10 11 12 13 The Executive group is responsible for provi...

AI summary The document discusses a reduction in Executive Management costs for NSPI by $200,000 or 11% between 2006C and 2007, primarily due to reduced labour and consulting costs. This change is attributed to the realignment of the Executive group and the exclusion of certain Emera executives from NSPI's Executive group.

19 Summary
19 Summary 20 21 22 23 24 25 26 27 28 1) My assessment of NSPI's investment risk relative to other Canadian utilities is that business risk is above average, regulatory risk has increased slightly and lies slightly above that of other util...

AI summary The assessment concludes that NSPI's investment risk is above average due to higher business and regulatory risks. A higher allowed ROE and stronger balance sheet are required to offset these risks. The current deemed capital structure of 37.5% common equity is considered too low, and a 40-45% ratio is recommended. A fair ROE for NSPI is suggested to be in the range of 9.6% to reflect its higher risk profile.

II. Capital Structure
II. Capital Structure 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 In order to establish the reasonableness of the Company's requested deemed capital structure consisting of 37.5 percent common equ...

AI summary The document discusses the evaluation of Nova Scotia Power Inc.'s requested deemed capital structure of 37.5 percent common equity. It examines imputed ratios by regulators, actual capital structures of Canadian and U.S. energy utilities, and bond rating agency benchmarks to determine the reasonableness of the proposed structure.

Section 192
6 7 8 9 10 11 12 13 14 This is a fairly unusual way of as far as Canadian utilities are concerned of presenting a regulatory balance sheet. Essentially what Nova Scotia Power does is present their statements in such a way that they tie the...

AI summary Nova Scotia Power presents its regulatory balance sheet in a manner tied to its corporate financial statements, which is uncommon for Canadian utilities. The rate base methodology used minimizes the impact of unregulated activities on revenue requirements, and only regulated financial statements are included in Appendix A.

Figure 6.1
Figure 6.1 Average Rate Base 2006C ($M) 2007 ($M) Average capital assets $2,390 $2,360 Average cash working capital allowance $12 $24 Average materials and supplies inventory $81 $78 $63 $47 Average deferred charges & credits $295 $263 Tot...

AI summary Figure 6.1 presents the average rate base for 2006C and 2007, including components such as capital assets, cash working capital allowance, materials and supplies inventory, and deferred charges and credits. The total rate base decreased slightly from $2,841 million in 2006C to $2,772 million in 2007.

Average Capital Assets
Average Capital Assets 16 17 18 19 20 21 22 Average Capital Assets reflect NSPI' s actual capital asset balances as of December 31, 2005. The Assets also include the 2006 Annual Capital Expenditure (ACE) Plan and the projected capital prog...

AI summary The document discusses Average Capital Assets for NSPI as of December 31, 2005, including the 2006 Annual Capital Expenditure (ACE) Plan and projected capital programs for 2007. The assets are adjusted for accumulated depreciation and depreciation expected in 2006-2007 per UARB directives. The 2007 test year rate base is valued at $2,360 million, a decrease of $30 million from 2006.

Materials and Supplies Inventory
Materials and Supplies Inventory Fuel and supplies inventory is based on the projected monthly average for 2007, consistent with the methodology used in the 2006 Rate Application. It consists primarily of coal and oil inventory as well as...

AI summary The 2007 materials and supplies inventory, primarily coal, oil, transformers, and cabling, is based on the 2006 Rate Application methodology. The average inventory included in the 2007 test year rate base is $78 million, a $3 million decrease from 2006 Compliance.

Deferred Charges and Credits
Deferred Charges and Credits NSPI's methodology for calculating deferred charges and credits is consistent with the 2006 Rate Application. NSPI's approach was confirmed by the UARB in the 2006 Rate Decision where all components of the defe...

AI summary NSPI's methodology for calculating deferred charges and credits aligns with the 2006 Rate Application and was confirmed by the UARB in the 2006 Rate Decision. Deferred charges include costs such as pension plan funding and debt transaction costs, which are included in the rate base calculation.

Defeasance and Finance Charges
Defeasance and Finance Charges Defeasance costs are included in average rate base as approved in the 2006 Rate Decision. The reduction of $13 million in the average is due to amortizations on the defeasance deferred charges. These deferred...

AI summary Defeasance costs are included in the average rate base as approved in the 2006 Rate Decision. A $13 million reduction in the average rate base is due to the amortization of defeasance deferred charges, which are being amortized over the life of new debt as per the 1993 UARB Rate Decision.

Section 21 and 2005 Ql Taxes
Section 21 and 2005 Ql Taxes 1 2 3 4 5 6 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 In the 2006 Rate Decision, the Board approved the inclusion of the Section 21 taxes in rate base. In this Application, the amortization...

AI summary The document discusses the amortization of Section 21 taxes, including their inclusion in the rate base and the deferral of these taxes for 2005 and 2006, with amortization over an 8-year period starting in 2007. It also references a previous approval of tax deferral and the impact on deferred balances.

8.0 COST OF SERVICE
8.0 COST OF SERVICE 2 3 1 8.1 Overview 4 5 6 7 8 9 In the development of new rates, revenue-to-cost ratios are an important consideration. These are determined using NSPI's Cost of Service Study (COSS) which the Company has prepared for th...

AI summary The document discusses updates to NSPI's Cost of Service Study (COSS) in response to UARB directives, including methodology changes, the development of a replacement rate for ELIIR, adjustments to cost bases for Additional Energy and Unrnetered classes, and updates to street light rates and their components.

8.5 Summary
8.5 Summary The COSS methodology remams the same as previously approved by the Board. Changes in structure are as follows: - The COSS methodology now uses average rate base rather than year-end; - There has been a modification to the A TL...

AI summary The Cost of Service Study (COSS) methodology remains unchanged, but structural modifications include using average rate base, adjusting ATL class structure with ELIIR-2, separating transmission costs for 138,000 volts and above, correcting BMPC's Additional Energy load costs, and reducing Unmetered class customer service costs.

12 11.2 Ql Fuel Deferral
12 11.2 Ql Fuel Deferral 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 In this Application, NSPI seeks new rates effective April 1, 2007. With a filing in early October, 2006 the hearing processes will no...

AI summary NSPI seeks to defer the increased 2007 fuel expenses for the first quarter of 2007, estimating the cost at $18.3 million. The deferral would allow recovery of these costs over a twelve-month period starting in 2008, ensuring NSPI can maintain its allowed return. Failure to recover these costs could have a significant financial impact on the company.

N-1-aAppendix D - Credit Rating Reports (Large File - 12 MB) 3 passages
Rationale
a moderate financial profile, absence of a timely fuel cost recovery mechanism for NSPI, some exposure to higher risk activities such as energy trading, and a strategy for growth through acquisition. Emera is a utility holding company base...

AI summary The text outlines the financial profile of Emera, a utility holding company, noting its reliance on regulated cash flows from Nova Scotia Power Inc. (NSPI) and Bangor Hydro-Electric Co. (BHEC). NSPI provides monopoly electricity services in Nova Scotia, while BHEC provides transmission and distribution in Maine. The document highlights the regulatory framework supporting these entities, including specific return on equity (ROE) targets and equity layer limits, while also noting risks such as energy trading and the lack of a timely fuel cost recovery mechanism for NSPI.

Ontario smart meters initiative
Ontario smart meters initiative The provincial government of Ontario's C$1 billion smart meter initiative presents potential financing and operational challenges for electricity LDCs. The LDCs rated by Standard & Poor's are generally viewe...

AI summary The text analyzes the financial and operational risks associated with Ontario's C$1 billion smart meter initiative for local distribution companies (LDCs). While larger LDCs may have the capacity to manage these risks, smaller utilities face significant liquidity strains due to high capital outlays and lack of market access. Key concerns include the unresolved tariff recovery mechanisms, potential stress on credit metrics, technology implementation failures, and the increased workload on customer care systems, which could lead to billing errors and financial losses.

Issuer Review
Issuer Review issuel IV South Neview A-/Stable/ A-/Stable/ BBB+/Stable/ Nicole Martin Nicole Martin Laurie Conheady Laurie Conheady In the fall of 2005 Hydro Ottawa Ltd., the regulated distribution subsidiary of HOHI, applied to the OEB fo...

AI summary The text provides a credit and issuer review for several utilities. It notes that Hydro Ottawa Ltd. applied for a 2.4% distribution rate increase in 2006, while LHI applied for a 3% increase. Key financial metrics for HOHI show improvement following a 2005 rate increase. The review also covers Maritime Electric, noting its rating is tied to its parent, Fortis Inc., and highlights the progress of a 50-MW combustion turbine facility in Charlottetown, PEI.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 13 passages
Allocation
Allocation The fourth and final step is the allocation procedure. This step involves applying the allocation factors, determined in step 3, to the classified plant and operating expenses from step 2, to determine the overall cost assigned...

AI summary The text describes the final step of a cost allocation procedure within a Cost of Service Study. This process involves applying specific allocation factors to classified plant and operating expenses to determine the total cost assigned to each service class for a test period. The document references several exhibits detailing rate base analyses, operating costs, depreciation, revenue analysis, allocation factors, and sales/demand data to support the proposed rate structure.

1.2 Methodology
1.2 Methodology The method of cost assignment utilized is the Load Factor/3 Coincident Peak (LF/3 CP) method, as approved by the DARB in its September 29, 1995 Order NSPI-864. This method considers both the demand and energy requirements o...

AI summary The document describes the cost assignment methodology used to allocate generation and transmission responsibilities among different customer classes. It utilizes the Load Factor/3 Coincident Peak (LF/3 CP) method, as approved by the DARB. This approach balances energy requirements (based on system peak load factor) and demand requirements (based on coincident peak demands during the winter months). Additionally, environmental and fuel conversion assets within the rate base are specifically classified as 100% energy-related.

1.2.1 Rate Base
1.2.1 Rate Base Exhibit 2 contains the net plant investment in the various asset categories, allowance for working capital and allowance for materials and supplies. In keeping with the Board's decision from the 2005 Rate Application, dated...

AI summary The document describes the methodology for determining and allocating the rate base for the proceeding. It identifies specific components included in the net plant investment, such as construction work in progress (CWIP), deferred charges, and allowances for working capital and materials. The text outlines the process for calculating allocation factors across customer classes based on energy sales, customer numbers, and demand contributions, utilizing both coincident and non-coincident peak demands and load factors.

FUNCTIONALIZATION OF AVERAGE RATE BASE
FUNCTIONALIZATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) (4) (5) (6) DIRECT COMPANY GENERATION TRANSMISSION DISTRIBUTION RETAIL CAPITAL PRODUCTION PLANT ( 1) STEAM $1,052,506 $1,052,506 $0 $0 $0 $0 ( 2) HYDRO 258,158 240,242 0 0 0 17,916 (...

AI summary The document presents a detailed functionalization of the average rate base, categorizing assets into generation, transmission, distribution, and retail components. It provides a breakdown of specific production plants (steam, hydro, wind, gas turbines), transmission infrastructure, and distribution assets such as poles, fixtures, and substations. Additionally, the table accounts for working capital, deferred charges (including financing, taxes, and pensions), and asset retirement obligations (ARO), culminating in a total average rate base of approximately $2,772,240.

CLASSIFICATION OF AVERAGE RATE BASE
CLASSIFICATION OF AVERAGE RATE BASE (1) (2) (3) INITIAL CLASSIFICATION (4) TOTAL COMPANY DEMAND RELATED PLANT ENERGY RELATED PLANT CUSTOMER RELATED PLANT GENERATION FUNCTION ( 1) STEAM PLANT ( 2) HYDRO PLANT ( 3) WIND PLANT ( 4) LM6000 PLA...

AI summary The document provides a detailed financial classification of the average rate base for the company, broken down into Generation and Transmission functions. It categorizes assets into Demand Related Plant, Energy Related Plant, and Customer Related Plant. The data includes specific values for various generation types (Steam, Hydro, Wind, LM6000, and Gas Turbine), general property plant in service, and various working capital and deferred charges/credits, including fuel-related items and Asset Retirement Obligations (ARO).

CLASSIFICATION OF RATE BASE
CLASSIFICATION OF RATE BASE (1) (2) (3) (4) INITIAL CLASSIFICATION DEMAND ENERGY CUSTOMER TOTAL RELATED RELATED RELATED COMPANY PLANT PLANT PLANT RETAIL FUNCTION DISTRIBUTION PLANT: ( 1) SERVICES 0 0 0 0 ( 2) METERS Q Q Q Q ( 3) TOTAL RETA...

AI summary The document presents a table detailing the initial classification of the rate base for the retail function. It categorizes costs into Demand Related, Energy Related, and Customer Related plant components, as well as Working Capital and Deferred Charges/Credits. The total average rate base is calculated as $2,754,194, with specific breakdowns for various retail plant services, meters, general property plant, and deferred charge financing, taxes, and pensions.

CLASSIFICATION OF AVERAGE RATE BASE
CLASSIFICATION OF AVERAGE RATE BASE INITIAL R/B CLASSIFIC ATION FURTH ER CLASSIFICA ATION FULLY CLASSIFIED RATE BASE DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER PLANT PLANT PLANT PLANT PLANT PLANT PLANT PLANT PLANT...

AI summary The document provides a detailed financial breakdown of the average rate base, specifically focusing on the classification of various generation assets and working capital components. It outlines the transition from initial demand and energy plant figures to fully classified rate base values. Key assets included are steam, hydro, wind, and gas turbine plants, alongside working capital items such as fuel cash, materials, and deferred charge financing and taxes.

ALLOCATION OF AVERAGE RATE BASE
ALLOCATION OF AVERAGE RATE BASE (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCAT...

AI summary The document provides a detailed breakdown of the allocation of the average rate base across various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Large Industrial, Extra Large Interruptible, Municipal, Unmetered, and other categories. It itemizes costs associated with generation functions (including steam, hydro, wind, and gas plants), transmission functions, working capital, and various deferred charges and credits, such as Asset Retirement Obligations (ARO) and pension costs.

ALLOCATION OF AVERAGE RATE BASE
ALLOCATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL UNMETE...

AI summary The document presents a detailed table outlining the allocation of the average rate base for a utility company. It breaks down costs into transmission plant assets (over 69kV), general property plant, and working capital components such as cash, materials, supplies, and deferred charges (financing, tax, pension, and other). The allocation factors are categorized by customer classes, including Domestic, General, Large, Industrial, Municipal, and Unmetered, as well as specific categories for Interr 2 and Extra Large loads.

ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE
ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL (7) MEDIUM INDUSTRIAL INDUSTRIAL INDUSTRIAL (8) LARGE (9) EXTRA L1 INTERR 2 (10) MUNICIPAL (11) UNMETERED...

AI summary The document presents a detailed table illustrating the allocation of the average distribution rate base across various customer classes in Nova Scotia. It breaks down costs associated with infrastructure components—such as land, easements, substations, poles, fixtures, and lines—for categories including Domestic, Small General, General, General Large, Small, Medium Industrial, Large, Municipal, and Unmetered customers. The table provides specific dollar amounts and allocation factors (e.g., P-1, P-2, D-1) to demonstrate how distribution costs are distributed among different service types.

ANALYSIS OF AVERAGE DISTRIBUTION SUBSTATION RATE BASE
ANALYSIS OF AVERAGE DISTRIBUTION SUBSTATION RATE BASE (1) TOTAL PLANT (2) DIST. BULK PWR. (3) DIST. OED. BULK PWR. (4) DIST. GENERAL (5) DIST. OED. GENERAL ( 1) TOT. DIST. SUBSTATIONS $29,362 $26,403 $847 $1,969 $143 ALLOCATION ( 2) DOMEST...

AI summary The document presents a detailed breakdown of the average distribution substation rate base, totaling $29,362. It categorizes these costs across five primary categories: Distribution Bulk Power, Distribution OED. Bulk Power, Distribution General, and Distribution OED. General. The data further allocates these costs to various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Industrial Large, Municipal, and Unmetered, while identifying specific allocation factors such as D-2 and Direct.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (...

AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s allocation factors for the year ending December 31, 2007. It provides a tabular analysis of cost responsibilities across various customer classes, including Domestic, Small General, General, General Large, Industrial (Small, Medium, and Large), Extra Large Interconnect, Municipal, and Unmetered. The data quantifies the rate base for distribution plant, retail plant, and various transmission and distribution components, calculating the percentage of responsibility for each customer category.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31 , 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31 , 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL...

AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s allocation factors for the year ending December 31, 2007. It provides a comprehensive table detailing the distribution of the rate base, generation and distribution operating expenses, and transmission operating expenses across various customer classes, including Domestic, Small General, General, General Large, and various Industrial categories. The data highlights the percentage of responsibility for each cost component relative to the total company costs.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 1 passage
Energy Portion of Base Load Fixed Costs:
Energy Portion of Base Load Fixed Costs: The annual energy related portion of fixed costs as determined based on the total of the following: - 1. The annual energy portion of depreciation, return, interest, taxes, grants and fixed O&M on N...

AI summary The text outlines the methodology for determining the annual energy-related portion of fixed costs for Nova Scotia Power Inc. (NSPI). This includes depreciation, return, interest, taxes, grants, and fixed O&M for base load units (e.g., Tuft's Cove, Lingan) and the 138 kV and above transmission network. The energy component is derived using a forecast system load factor, which is locked in at the time of a new customer's subscription. Non-standard accounting treatments that do not benefit the rate are excluded.

N-1-aAppendix A - Financial Tables - REDACTED 5 passages
Section 30
15 1) Figures presented reflect whole numbers which may cause $0.1 M in rounding differences on some line items. 16 2) Calculation based on 2007 Test Year Forecast. 17 3) Short-term debt cost factor includes account receivable securization...

AI summary The document provides a supporting schedule for Nova Scotia Power Inc.'s average rate base, specifically detailing capital assets for the years ending December 31st. It includes technical notes regarding rounding differences, the 2007 Test Year Forecast basis, and the treatment of short-term debt cost factors and pre-tax equity costs. The data is intended to support the 2007 Financial Outlook.

Table 14
Table 14 (1) (2) (3) (4) Proposed Rates Test Year 2 Forecast 2006 Forecast 2007 Average 2007 Reference 3 Net Regulated Plant in Service 4 Net Regulated Plant in Service, beginning balance $2,340.0 Table 3, line 4 5 Add: Asset additions 120...

AI summary Table 14 provides a financial breakdown of the Net Regulated Plant in Service for the 2007 Test Year. It details the beginning balance of $2,340.0 million, asset additions of $120.5 million, and subsequent adjustments to arrive at the net figure. The table also identifies depreciation expenses and asset retirement obligations as factors influencing the regulated plant value.

Section 32
Nova Scotia Power Inc. Average Rate Base Supporting Schedule - Deferred Charges & Credits Years Ended December 31st Millions of dollars

AI summary This document is a supporting schedule for Nova Scotia Power Inc. regarding its Average Rate Base. Specifically, it details deferred charges and credits for the fiscal years ending December 31st, presented in millions of dollars.

Table 15
Table 15 2007 Financial Outlook (1) (2) (3) (4) Proposed Rates Test Year Forecast Forecast Average 2 ~2~00~6~=20~0~7 ~2=0~0~7~R~e~re=r~e~nc=e~ 3 Deferred Charges - Financing 4 Defeasance 5 Beginning balance 6 ~ 137.5 7 Ending balance 8 Fin...

AI summary The document provides financial data for Nova Scotia Power Inc. regarding its 2007 Financial Outlook. It includes detailed schedules for deferred charges, including financing, tax, pension, and steam plant costs, as well as asset retirement obligations (ARO). Additionally, it presents a monthly breakdown of fuel and materials inventory allowances, highlighting the average allowance for materials and supplies for the year.

Nova Scotia Power Inc. Average Rate Base Supporting Schedule -Allowance for Working Capital Years Ended December 31st Millions of dollars
Nova Scotia Power Inc. Average Rate Base Supporting Schedule -Allowance for Working Capital Years Ended December 31st Millions of dollars Category Lag Days (a) Net Lag Days (b) [42.1 days- (a)] %of Year (c) [(b) /365] Annual Cost (d) ewe [...

AI summary This document presents a supporting schedule for Nova Scotia Power Inc.'s average rate base regarding the allowance for working capital. It breaks down annual costs and weighted average net lag days across various categories, including Labour, Non-Labour Operating expenses, Fuel & Purchased Power, Grants In Lieu of Taxes, and Income Taxes. The calculation determines the net lag days, percentage of the year, and the resulting weighted average cost (ewe) to determine the total allowance, adjusted for consumer deposits.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 2 passages
Nova Scotia Power Inc. Section 21 Tax Deferral - Amortization Schedule Thousands of dollars
Nova Scotia Power Inc. Section 21 Tax Deferral - Amortization Schedule Thousands of dollars (1) (2) (3) (4) (5) (6) (7) (8) Amortization (1 ,251) (1,258) (1,265) (1 ,272) (1,279) (1 ,286) (1 ,293) (1,300) (1 ,307) (1,314) (1 ,321) (1,328)...

AI summary The document presents an amortization schedule for Nova Scotia Power Inc. Section 21 Tax Deferral, detailing the amortization costs, tax costs, carrying costs, and net revenue requirements over a period of time, along with the weighted average cost of capital and other financial metrics.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-33: Reference Page 72-73 Board Directive No. 10 of the Board Order of April 12, 2006 (P-882) directs NSPI to carry out the operations review. The Board approved the Terms of R...

AI summary The UARB responds to NSPI regarding the scheduling of an operations review, explaining that the study was delayed due to the need for revisions to the Terms of Reference and the unavailability of the consultant. The study was anticipated to be completed by the first quarter of 2007.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB REDACTED Question IR-58: Reference: Rate Base Provide a continuity schedule of net plant in service including additions, asset retirements, and amortization by major asset class for the y...

AI summary The Utility and Rate Board (UARB) issued an Information Request (IR-58) to Nova Scotia Power Inc. (NSPI) regarding the Rate Base. The Board requested a continuity schedule of net plant in service, specifically asking for details on additions, asset retirements, and amortization categorized by major asset class for the period spanning 2005A through 2007F. NSPI responded by directing the Board to a Confidential Attachment.

Preamble
f. By selling a portion of the receivables and using the proceeds to reduce short-term debt on the balance sheet, NSPI's taxable capital base is reduced, thereby reducing the amount of Large Corporation Tax included in the income tax line...

AI summary The text describes Nova Scotia Power Inc.'s (NSPI) securitization program, where selling receivables to reduce short-term debt lowers the taxable capital base and the associated Large Corporation Tax. While NSPI incurs fees comparable to short-term interest costs, these charges are reported as deductions to Other Revenues for accounting purposes. For the 2006 revenue requirement calculation, these securitization costs are treated as financing costs and integrated into the weighted average cost of capital.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: DARB Question IR-60: Appendix A, Table 3 a. Line 39, explain the increase for 2007F over actuals. b. Line 41, why is there no "income taxes payable" for 2007F? Response IR-60: - a. NSPI calcul...

AI summary Nova Scotia Power Inc. (NSPI) responded to an information request regarding its 2007 financial forecasts. The response explains that the 2007 increase in accounts payable and reduction in short-term debt reflects an expectation that actual working capital will exceed cash working capital, based on a lead-lag study. Additionally, NSPI clarified that no income taxes payable are forecasted for 2007 because the company expects its tax installments to equal the total tax provision for that year, unlike in 2006.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 6 passages
d. Allowance for Funds Used during Construction
d. Allowance for Funds Used during Construction Accounting for the impact of rate regulation: In accordance with accounting policies determined by UARB, NSPI provides for the cost of financing construction work in progress by including an...

AI summary Nova Scotia Power Incorporated (NSPI) explains its accounting treatment for the Allowance for Funds Used during Construction (AFUDC) as mandated by the Nova Scotia Utility and Review Board (NSUARB). The company includes the cost of financing construction work in progress as an addition to the cost of constructed property using a weighted average cost-of-capital. This amount is capitalized in financial reporting and recovered through depreciation over the assets' service lives, reflecting both interest and equity components.

Deferred charges and credits comprise the following:
Deferred charges and credits comprise the following: millions of dollars 2005 2004 Deferred charges Regulatory assets Pre-2003 income tax liability and related interest $146.7 $150.0 Deferred restructuring costs 0.1 2.0 Deferral of taxes n...

AI summary The document provides a detailed financial breakdown of the deferred charges and credits for the years 2004 and 2005. It categorizes these into regulatory assets, which include pre-2003 income tax liabilities, restructuring costs, and tax deferrals, and non-regulatory assets such as unamortized debt financing, pension benefits, and hedging premiums. It also lists deferred credits, primarily consisting of unearned revenue.

Pre-2003 Income Tax Liability and Related Interest
Pre-2003 Income Tax Liability and Related Interest NSPI has a $146.7 million regulatory asset related to pre-2003 income taxes that have been paid, but not yet recovered from customers. This circumstance arose when NSPI claimed capital cos...

AI summary Nova Scotia Power Incorporated (NSPI) holds a $146.7 million regulatory asset representing pre-2003 income taxes paid but not yet recovered from customers. This liability originated from capital cost allowance (CCA) deductions that were subsequently disallowed by the Supreme Court of Canada. The Nova Scotia Utility and Review Board (UARB) approved the amortization and recovery of this asset over an eight-year period starting in 2007, preventing the costs from being expensed immediately.

Other Income
Other Income During 2005, Nova Scotia Power received a payment of $10.5 million, less $2.5 million of associated costs, from a gas supplier as part of renegotiation of certain contractual matters. In accordance with ratemaking regulations...

AI summary Nova Scotia Power Inc. (NSPI) reports on its 2005 financial performance and 2006 outlook. Key points include a $10.5 million payment from a gas supplier, the use of the taxes-payable method for income tax accounting, and the management of a $146.7 million regulatory asset for disallowed pre-2003 taxes. NSPI anticipates lower electricity load in 2006 due to weather and industrial shutdowns, while forecasting higher fuel costs due to commodity prices and environmental regulations.

Property, Plant and Equipment
Property, Plant and Equipment Property, plant and equipment represents 80% of total assets recognized on the company's balance sheet. Included in property, plant and equipment are the generation, transmission and distribution and other ass...

AI summary Nova Scotia Power Inc. (NSPI) reports that property, plant, and equipment (PP&E) constitute 80% of its total assets, spanning generation, transmission, and distribution. Because of the scale of these assets, changes in depreciation rates significantly impact depreciation expenses. The company utilizes a straight-line depreciation method based on formal studies. Following a 2002 study and a 2003 settlement agreement with intervenors, NSPI is currently executing a four-year phase-in of new depreciation rates, with the 2006 application including Year 2 rates.

Preamble
The UARB agreed to allow NSPI to defer taxes not reflected in rates for the period January 1, 2005 until April1 , 2005, the date when new rates became effective. In Q1 2005, NSPI deferred a portion of provincial and federal grants and taxe...

AI summary The UARB approved NSPI's request to defer certain provincial and federal taxes and grants that were not previously reflected in rates for the period between January 1, 2005, and April 1, 2005. While the deferral was granted, the specific amortization period for these costs remains subject to UARB approval.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 6 passages
INCOME TAXES
INCOME TAXES In accordance with ratemaking regulations established by the UARB, NSPI uses the taxes-payable method of accounting for income taxes. NSPI is subject to provincial capital tax (0.288%), large corporations tax (0.175%), corpora...

AI summary The Nova Scotia Public Utilities Regulatory Board (NSPI) utilizes the taxes-payable method of accounting for income taxes, as established by the UARB. NSPI is subject to various provincial and corporate taxes, including a 38.12% corporate income tax. The text discusses a $146.7 million regulatory asset for pre-2003 disallowed tax deductions, which is being amortized over eight years. Additionally, NSPI deferred $12.2 million in federal capital and income taxes for the first quarter of 2005, with the amortization period awaiting approval.

1. SUJ\1MARY <H SIGNIFICANT ACCOUNTING POLICIES
1. SUJ\1MARY <H SIGNIFICANT ACCOUNTING POLICIES Emera Inc. ("Emera" or the Company), incorporated in the Province of Nova Scotia, through its principal subsidiaries, Nova Scotia Power Inc. ("Nova Scotia Power" or "NSPI") and Bangor Hydro-E...

AI summary The document provides an overview of the significant accounting policies and regulatory framework for Emera Inc., specifically its subsidiaries Nova Scotia Power Inc. (NSPI) and Bangor Hydro-Electric Company (BHE). It highlights NSPI's role as the primary electricity supplier in Nova Scotia, regulated by the Utility and Rate Board (UARB) under the Public Utilities Act. NSPI operates under a cost of service model, where rates are set to recover prudently incurred costs while providing a regulated return on equity (ROE) to investors.

e. Regulatory Amortization
e. Regulatory Amortization Accounting for the impact of rate regulation: In accordance with the regulations of the UARB, significant assets of Nova Scotia Power, wh ich are not currently being used and are not expected to provide service t...

AI summary The document outlines regulatory amortization policies for two utilities. Nova Scotia Power (NSPI) amortizes significant unused assets, specifically the Glace Bay generating station, over five years as approved by the UARB to maintain rate stability. The amortization amount allows for flexibility to support rate consistency. Conversely, Bangor Hydro records and amortizes regulatory assets and liabilities—including decommissioning costs and contract restructuring—over varying lives expiring through 2018, as per MPUC orders.

Deferred charges and cred its, including the impact of rate-regulated accounting policies, include the following:
Deferred charges and cred its, including the impact of rate-regulated accounting policies, include the following: millions of dollars 2005 2004 Deferred charges: Regulatory assets: Pre-2003 income tax liability and related interest $ 146.7...

AI summary The document provides a detailed breakdown of deferred charges and credits for the years 2004 and 2005. It categorizes these into regulatory assets—such as pre-2003 income tax liabilities, power contract restructuring costs, and decommissioning costs for Maine Yankee and the Seabrook nuclear project—and non-regulatory assets like unamortized debt financing and pension benefits. It also lists regulatory and non-regulatory liabilities, including accrued pension obligations and unearned revenue.

Pre-2003 Income Tax Liability and Related Interest
Pre-2003 Income Tax Liability and Related Interest NSPI has a $146.7 million regulatory asset related to pre-2003 in come taxes that have been paid, but not yet recovered from customers. This circumstance arose when NSPI cla imed capital c...

AI summary Nova Scotia Power Inc. (NSPI) maintains a $146.7 million regulatory asset representing pre-2003 income taxes paid but not yet recovered from customers. This liability originated from capital cost allowance (CCA) deductions that were subsequently disallowed by the Supreme Court of Canada. The Utility Analysis Review Board (UARB) approved the amortization and recovery of this asset over an eight-year period starting in 2007. Without this regulatory approval, the costs would have been treated as expenses rather than recoverable assets.

Accounting for the impact of rate regulation:
Accounting for the impact of rate regulation: Any difference between the amount approved by the regulator of Nova Scotia Power as depreciation expense and the amount that would have been calculated under the accounting standard for asset r...

AI summary The text describes the accounting treatment for the discrepancy between regulator-approved depreciation expenses for Nova Scotia Power Inc. and the amounts calculated under standard accounting for asset retirement obligations. This difference is recognized as a regulatory asset. The document notes that without this specific deferral mechanism, net earnings for the year 2005 would have been $2.7 million lower than the previous year.

N-2-cRIRs 1 to 39 - CA to NSPI - REDACTED (Large File - 14 MB) 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA REDACTED Question IR-17: NSPI seeks the opportunity to include in its 2007 revenue requirement costs that have not yet been specifically enumerated, including a. DSM, b. Point Tupper Marine...

AI summary In response to an Information Request (IR-17), the Canada Nova Scotia Electricity Corporation (CA) addresses Nova Scotia Power Inc.'s (NSPI) request to include non-enumerated costs in its 2007 revenue requirement. CA clarifies that costs related to Demand Side Management (DSM) are addressed in a separate information request (IR-51d) and cannot be estimated until a Board decision is reached. Additionally, CA confirms that the Point Tupper Marine Terminal is not being requested for inclusion in the 2007 rate base.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-22: With respect to residential time of day rates, please explain the allocation of the revenue requirement to the three time periods, with particular attention to the peak peri...

AI summary Canada Nova Scotia Electricity Corporation (CA) clarifies the structure of residential time of day (TOD) rates in response to an information request. CA explains that TOD rates are linked to standard residential rates and are not modeled as a separate class in the Cost of Service Study. The response details the historical evolution of rate components from 1996 to 1998, noting adjustments made to increase customer acceptance, and describes the methodology for allocating the total residential revenue requirement across different time periods.

N-2-dRIR 40 to 75 - CA to NSPI - REDACTED (Large File - 23 MB) 4 passages
Response IR-44 : (cont'd)
Response IR-44 : (cont'd) Per UARB direction, NSPI is undertaking a more detailed review of its corporate structure. The terms of reference for this study can be found in CA IR-38. NSPI also benchmarks its OM&G performance against other Ca...

AI summary NSPI is reviewing its corporate structure and benchmarking its OM&G performance against other Canadian utilities. OM&G costs have decreased in constant dollars and remained unchanged on a per GWh basis in current dollars. These costs have been reviewed in recent rate applications.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-53: Reference Appendix B (confidential), p.22-23, Thermal OM&G, please explain in more detail why the cost for Materials was considerably higher in the 2006C amount than in 2005...

AI summary The response explains that the higher material costs in 2006C compared to 2005 actual, 2006 forecast, and 2007 forecast were due to increased maintenance and plant outage costs for reliability, timing adjustments after Rate Case approval, and changes in contract costs at Tufts Cove and Trenton. Lower material costs in 2007 were attributed to fewer planned outages.

Company distribution by their pension plans' equity level
Company distribution by their pension plans' equity level Since the assumption for expected long-term return on assets is based on asset allocation and expectations for future growth of these assets, we have compared the rate of return on...

AI summary The analysis compares the expected long-term return on assets of pension plans with their equity levels. Despite expectations that higher equity levels would correlate with higher return assumptions, results show similar rates of return across varying equity levels, with some variation observed in plans with equity between 60% and 65%.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-67: Please explain in further detail the increase in administrative overhead associated with increased capital spending, Appendix B, p. 43. Response IR-67: The increase in the a...

AI summary The response explains that the increase in administrative overhead is due to a higher percentage of labor attributed to capital work, as determined by the Public Utilities Board in 1982. Administrative overhead is based on direct labor costs and applies to various departments including Customer Service and Information Technology.

N-2-dRIRs 1 to 46 - CME to NSPI - REDACTED (Large File - 18 MB) 3 passages
Strengths:
Strengths: - A supportive regulatory environment with cost-of-service regulation mitigates most operating risks. - A dominant industry position due to monopoly service franchise, geographic isolation, and limited interconnections presently...

AI summary The document outlines the strengths of the utility's current operating position. It highlights a supportive regulatory environment that mitigates operating risks and a dominant market position secured by a monopoly franchise and geographic isolation. Additionally, the text notes that market capacity exceeds demand and that the company possesses sufficient operating cash flows to support maintenance-oriented capital expenditures over the next three to five years.

Weaknesses:
Weaknesses: • Earnings pressures are expected to slowly increase from electricity industry restructuring and the introduction of natural gas as an energy alternative, creating the possibility for stranded assets. - Comparatively weak marke...

AI summary The text identifies several financial and market weaknesses facing the utility. Key concerns include potential stranded assets resulting from electricity industry restructuring and the rise of natural gas as a competitive alternative. The document notes that low-growth market conditions may intensify competitive pressures. Furthermore, while most power costs are recovered through rates, the utility must hedge against commodity risks. Finally, financial measures are constrained by regulatory guidelines regarding deemed equity.

Rationale
ructuring will involve open access to the transmission grid to allow for wholesale competition. Wholesale customers account for less than 2% of energy sales and gross revenues so the initial effect of this first stage is not expected to be...

AI summary The text outlines the rationale for a restructuring plan involving open access to the transmission grid to foster wholesale competition. While the initial impact on retail customers is expected to be minimal due to the small share of wholesale sales, a competitive bidding process for new generation capacity will follow. Nova Scotia Power's new generation will remain regulated on a cost-of-service basis. Additionally, Standard & Poor's assesses Emera's liquidity as adequate, noting sufficient cash flows to cover capital expenditures, dividends, and the C$350 million Capital Project program.

N-2-fRIRs 50 to 81 - Liberty to NSPI - REDACTED (Large File - 16 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Response IR-69: (cont'd) view that this is not an appropriate methodology to employ for rate-making purposes. Therefore, despite the appeal of "actual" results over the projections and...

AI summary The document discusses a response to an information request by Liberty to NSPI, rejecting the use of January filings for rate-making and suggesting a Fuel Adjustment Mechanism (FAM) to recover actual fuel expenses. The Board has opted to use the original December 2001 filing and notes that adjustments had no net effect on revenue.

N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 9 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-71: Please provide all supporting workpapers and calculations used in developing all weighting factors used in Exhibit SA of Appendix G. Response IR-71: The weighting factors u...

AI summary The response to Information Request IR-71 explains that weighting factors in Exhibit 8A were developed by Ernst and Ernst in 1977 and approved by the Board. The ELIIR-2 class factor was set equal to the Large Industrial Class, and the Unmetered Class factor was revised from five to two based on a customer service cost function review filed in 2006.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-88: For each of the items shown in Appendix A, Table 1, Lines 8 through 15, please provide the following: a. A detailed description of each of those items. - b. Any su...

AI summary The response provides a detailed description of various financial and accounting items listed in Appendix A, Table 1, Lines 8 through 15, including financing charges, tax charges, pension charges, steam plant charges, and other deferred credits. These items are related to rate base considerations and include details such as unamortized discounts, tax deferrals, and asset retirement obligations.

Question IR-91: The following questions pertain to Appendix G:
Question IR-91: The following questions pertain to Appendix G: - a. Reference Exhibit 2B, page 1, line 25. The fully classified energy-related rate base shows an amount of $42,844. However, on Exhibit 3, page 3, line 25, the total energy-r...

AI summary The document contains a series of questions (IR-91) related to discrepancies in the fully classified energy-related rate base and other figures across different exhibits. The questions ask for reconciliation of the discrepancies, an explanation of the allocation method, and the provision of corrected cost of service studies if needed.

Response IR-91: (cont'd)
Response IR-91: (cont'd) Function Percentage Generation 36.0 Transmission 11.0 Distribution 26.0 Customer/Retail 27.0 Total 100.0 This functionalization was produced using the business judgement of the various corporate head office groups.

AI summary The functionalization of costs is divided into Generation (36.0%), Transmission (11.0%), Distribution (26.0%), and Customer/Retail (27.0%), determined through the business judgment of corporate head office groups.

FUNCTIONALIZATION OF AVERAGE RATE BASE
FUNCTIONALIZATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) (4) (5) (6) DIRECT COMPANY GENERATION TRANSMISSION DISTRIBUTION RETAIL CAPITAL PRODUCTION PLANT ( 1) STEAM $1,052,506 $1,052,506 $0 $0 $0 $0 ( 2) HYDRO ( 3) WIND 258,158 3,023 240,24...

AI summary The document presents a detailed breakdown of the average rate base for Nova Scotia Power, including production plant, transmission, distribution, and working capital components, with figures categorized by generation, transmission, distribution, and retail segments.

CLASSIFICATION OF AVERAGE RATE BASE
CLASSIFICATION OF AVERAGE RATE BASE (1) (2) (3) INITIAL CLASSIFICATION (4) TOTAL COMPANY DEMAND RELATED PLANT ENERGY RELATED PLANT CUSTOMER RELATED PLANT GENERATION FUNCTION ( 1) STEAM PLANT ( 2) HYDRO PLANT ( 3) WIND PLANT ( 4) LM6000 PLA...

AI summary The document presents a classification of the average rate base for Nova Scotia Power, dividing it into demand-related, energy-related, and customer-related plant categories. It details financial data for various plant types and working capital components.

CLASSIFICATION OF AVERAGE RATE BASE
CLASSIFICATION OF AVERAGE RATE BASE INITIAL R/B CLASSIFICATION DEMAND ENERGY CUSTOMER PLANT PLANT PLANT CUSTOMER FURTHI DEMAND PLANT ER CLASSIFICA ENERGY PLANT ATION CUSTOMER PLANT FULLY CI DEMAND PLANT LASSIFIED RAT ENERGY PLANT E BASE CU...

AI summary The document presents a detailed classification of the average rate base, including various categories such as transmission plant, general property plant, and deferred charges. It outlines financial figures and classifications for different components of the rate base.

NOVA SCOTIA POWER INC. ALLOCATION OF AVERAGE RATE BASE
NOVA SCOTIA POWER INC. ALLOCATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION DISTRIBUTION FUNCTION (15) DISTRIBUTION PLANT 352,079 197,617 13,041 87,19...

AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s allocation of average rate base across various categories, including distribution plant, general property plant, and deferred charges/credits. It provides numerical data and references to exhibits and pages for further details.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (...

AI summary The document presents allocation factors for Nova Scotia Power Inc. for the year ending December 31, 2007, with percentages of responsibility and total rate base figures categorized across various customer classes and infrastructure types.

N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB) 3 passages
Preamble
In the Nova Scotia Utility and Review Board's March 10, 2006 Decision (NSUARB-NSPI-P-882), the Board directed NSPI to conduct a cost of service study with respect to the Unrnetered Class. The Decision stated: 5 6 7 8 9 1 2 3 4 "This study...

AI summary Nova Scotia Power Inc. (NSPI) submitted a report in response to a 2006 Nova Scotia Utility and Review Board directive requiring a cost of service study for the Unmetered Class. NSPI proposes reducing the C-3 weighting factor from 5.0 to 2.0. The report also asserts that the current unmetered rate base is accurate, as it only includes assets owned and paid for by the company, and provides the requested breakdown of costs and assets by municipality.

3.0 UNMETERED CLASS RATE BASE
3.0 UNMETERED CLASS RATE BASE With respect to the unmetered rate base, HRM's concern during NSPI's 2006 Rate Hearing appears to have centered on its belief that developers pay for streetlights in the capital contributions they provide when...

AI summary Nova Scotia Power Inc. (NSPI) addresses concerns raised by the Halifax Regional Municipality (HRM) regarding the inclusion of streetlights in the unmetered rate base. NSPI clarifies that developers do not contribute to streetlight capital costs, and customer-owned area lights are excluded from the rate base. NSPI asserts that its rate base correctly reflects only assets owned and paid for by the company. Additionally, NSPI notes it lacks the granular data required to provide a breakdown of streetlight costs by specific municipality.

CAPITAL COST
CAPITAL COST Gross Plant Value (including installation costs) less Retirements of Street Lighting Equipment as of December 31, 2005

AI summary The document provides a heading for 'CAPITAL COST' and specifies the calculation method for the Gross Plant Value. It indicates that the value includes installation costs but excludes the Retirements of Street Lighting Equipment as of December 31, 2005.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 6 passages
Powerful Investment Opportunities
Powerful Investment Opportunities Strategic opportunities for investment in Maritime Canada's energy future include: - Regional electricity generation - Renewable generation - Environmental investment in rate base - Regulated transmission...

AI summary The text highlights strategic investment opportunities within the Maritime Canada energy sector. Key areas for investment include regional electricity generation, renewable energy sources, environmental investments integrated into the rate base, and the expansion of regulated transmission assets.

Bangor Hydro Electric
Bangor Hydro Electric - Regulated Transmission & Distribution utility in restructured market - Transmission FERC regulated - Distribution regulated by Maine Public Utilities Commission under Alternative Rate Plan - Significant stranded cos...

AI summary The text provides an overview of Bangor Hydro Electric, a regulated transmission and distribution utility operating in a restructured market. While its transmission assets are FERC regulated, its distribution is governed by the Maine Public Utilities Commission under an Alternative Rate Plan. The utility holds a significant stranded cost rate base and serves 115,000 customers with $580M in assets. Since its acquisition, Emera (EMA) has streamlined its cost structure and improved its regulatory relationship.

Powerful Potential
Powerful Potential Strategic opportunities for investment: - Low risk generation - Transmission electricity and gas - Renewable generation - Environmental investment in rate base - Regulated transmission and distribution

AI summary The document highlights strategic investment opportunities within the utility sector, focusing on low-risk generation, transmission of electricity and gas, and renewable energy sources. It emphasizes the importance of environmental investments within the rate base and the stability of regulated transmission and distribution infrastructure as key areas for growth and strategic opportunity.

Strengths
Strengths - Strong earnings base supports dividend - Opportunities to invest in rate base - Attractive allowed ROE - Outstanding operator

AI summary The document highlights the financial and operational strengths of the utility, noting a robust earnings base that supports dividend payments. It identifies significant opportunities for investment within the rate base and emphasizes an attractive allowed return on equity (ROE). Additionally, it acknowledges the company's status as an outstanding operator.

Bangor Hydro Overview
Bangor Hydro Overview - Regulated Transmission & Distribution utility in restructured market - Transmission FERC regulated - Distribution regulated by Maine Public Utilities Commission under Alternative Rate Plan - Significant stranded cos...

AI summary The document provides an overview of Bangor Hydro, a regulated Transmission & Distribution utility operating within a restructured market. Its transmission assets are regulated by FERC, while its distribution services are regulated by the Maine Public Utilities Commission under an Alternative Rate Plan. The utility holds $580M in assets and serves 115,000 customers. Notably, it possesses a significant stranded cost rate base. Following its acquisition, Emera (EMA) has worked to streamline the utility's cost structure and improve its regulatory relationships.

Powerful Potential
Powerful Potential Strategic opportunities for investment: - Low risk generation - Transmission electricity and gas - Environmental investment in rate base - Renewable generation - Regulated transmission and distribution

AI summary The document outlines strategic investment opportunities for the utility, highlighting low-risk generation and transmission for both electricity and gas. It emphasizes environmental investments within the rate base, specifically focusing on renewable generation, as well as regulated transmission and distribution infrastructure.

N-10Comments filed by Allan F. Smith 1 passage
Working With Customers and Other Stakeholders
Working With Customers and Other Stakeholders On page 4 of the introduction, line 13, the company suggests it must actively manage its costs. But stops short on what that means. They talk about rate of return, a fair rate of return, and a...

AI summary The text criticizes NSPI for not fully addressing cost management and for taking a restrictive approach in its application process. It highlights a lack of stakeholder collaboration and calls for the Board to introduce conservation requirements and eliminate the base rate. The author argues that the base rate is seen as unfair and urges a more cooperative effort to reduce peak demand and high winter consumption.

N-13Evidence of Robert D. Greneman on behalf of HRM 1 passage
Schedule 6 - Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Non-Labour
Schedule 6 - Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Non-Labour Rate Class Total Accounts Percent of Accounts Meter Reading Processing Billing Inquires Large accounts requiring manual effort Unmete...

AI summary Schedule 6 - Table 2 provides a breakdown of accounts related to modified unmetered accounts with more than 10 lights and LED TCL conversions, detailing FTEs, operating budgets, and percentages across various rate classes.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 3 passages
Q. WHAT WAS YOUR OPINION OF THOSE ARRANGEMENTS?
Q. WHAT WAS YOUR OPINION OF THOSE ARRANGEMENTS? - A. As detailed in our testimony last year, Liberty was troubled by a number of aspects of the early-2004 arrangements. They were not consistent with good utility practice, with the Company'...

AI summary The witness expressed concerns about early-2004 arrangements, stating they were inconsistent with utility practices and the Board's 2002 Rate Case Order. Recommendations included competitive bidding for gas sales, an audit of affiliate transactions, and a study on in-house gas sales functions.

Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS?
Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS? 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A. Q. A. Q. A. Q. A. Yes. WHAT HAS HAPPENED IN RESPONSE TO YOUR RECOMMENDATION FOR ANOTHER COMPETITIVE SOLICITATION? NSPl retained a co...

AI summary The Board adopted recommendations, including conducting competitive solicitations for excess gas. NSPI retained a consultant to administer two competitions, both won by the affiliate. However, the Board found these competitions insufficient in terms of arm's-length dealing. Discussions with NSPI focused on evaluating term-sale offerings and market penetration strategies for natural gas.

Commission-Sponsored Studies
Commission-Sponsored Studies Served as a Lead Consultant in an audit of the fuel and purchased-power procurement practices and costs of Arizona Public Service Company for the Arizona Corporation Commission. Responsible for examining all as...

AI summary The text outlines various consulting roles undertaken by Liberty in audits related to fuel and energy procurement practices for multiple utility companies across different states and regions, including Arizona, Nova Scotia, Ohio, and Kentucky.

N-20Direct Testimony and Exhibit - Alan Rosenberg on behalf of SEB - REDACTED (Large File - 20 MB) 4 passages
10 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING?
10 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING? - 11 A I am appearing on behalf of Stora Enso Port Hawkesbury Limited and Bowater - 12 Mersey Paper Company Limited, collectively SEB. These are NSPI's two largest - 13 customers a...

AI summary The witness appears on behalf of Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited, collectively SEB, and discusses six issues related to NSPI's 2007 rate proposal, including comparative analysis, fuel inclusion principles, rate base normalization, rejection of deferred fuel costs, rejection of a 'true up' for ELI-2P RTP rates, and results of a Cost of Service Study.

Section 36
6 It should also be noted that NSPI acknowledges that it has not had any trouble 7 to date in securing capital and it has not had to post any letters of credit in order to 8 purchase fuel. 9 Furthermore, while I do agree that, all other th...

AI summary NSPI acknowledges it has not faced challenges in securing capital or posting letters of credit for fuel purchases. The Board emphasizes that NSPI's financial health should not override ratepayer interests, citing a past decision where $15.7 million in fuel costs were disallowed. The Board questions whether NSPI can address concerns about potential deviations between actual fuel costs and those used in rate calculations.

8 4. RATE BASE ADJUSTMENT
8 4. RATE BASE ADJUSTMENT 9 Q DO YOU HAVE ANY CHANGES TO NSPI'S PROPOSED RATEMAKING RATE 10 BASE? 11 A Yes. I recommend that the Board reduce the that 12 NSPI has included in rate base from $47.5 million to $9.3 million. 13 Q HOW DID NSPI...

AI summary The document discusses a recommendation to reduce Nova Scotia Power Inc.'s (NSPI) proposed rate base from $47.5 million to $9.3 million, arguing that using the 2007 forecast is more appropriate as the new rates will take effect in April 2007. Additionally, the recommendation opposes NSPI's request to retroactively defer fuel costs, citing issues with regulatory fairness and precedent.

In Rate Base
In Rate Base Line Million 1 NSPI $47.5 2 SEB 9.3 3 Rate Base Reduction $38.2 4 Pre-Tax ROR 10.76% 5 Rev Req Impact $4.1 NSPI Proposed Cost Of Capital ~ Ratio Cost WatCost Tax Factor WatCost 6 Debt 52.90% 7.84% 4.15% 1.000 4.15% 7 Preferred...

AI summary The document presents a rate base analysis with line items including NSPI, SEB, and a rate base reduction. It also outlines NSPI's proposed cost of capital, including debt, preferred, and common equity components with associated percentages and tax factors.

N-22Direct Testimony and Exhibit - Michael Gorman (on behalf of Stora Enso/ Bowater) 1 passage
Preamble
~ 6 In August of 1989, I accepted a position with Merrill-Lynch as a financial 7 consultant. After receiving all required securities licenses, I worked with individual 8 investors and small businesses in evaluating and selecting investment...

AI summary The individual has extensive experience in financial consulting, utility analysis, and energy supply evaluation. They have worked with various firms, including Merrill-Lynch and Brubaker & Associates, Inc., and have conducted analyses on cost of capital, utility mergers, and energy supply agreements.

N-37RIR 1 to 11 - NSPI to John Stutz [Board Counsel Consultant] 1 passage
IR-11 Reference part 6, pages 19 to 20
IR-11 Reference part 6, pages 19 to 20 - a) In Section 11 of its Application, NSPI requests the Board include in the 2007 revenue requirement any additional investment the Board directs during the general rate increase application that ari...

AI summary NSPI requests the Board to include additional investment costs in the 2007 revenue requirement. Dr. Stutz argues that such investments should be rate base items, recoverable in future rate cases, but not necessarily between-rate-case expenses. The Board emphasizes that cost recovery requests require exceptional justification. NSPI has not yet provided evidence on specific costs from section 11.1.

N-40RIRs 1 to 13 - Dr. Alan Rosenberg [SEB] to NSPI 2 passages
Response:
Response: The information requested is provided in Attachment SEB-NSPI-3. However, Dr. Rosenberg cannot agree that this Attachment is as relevant as Schedule 1 because the standard cost of ELIIR-2, that is the take-or-pay portion of the ra...

AI summary Dr. Rosenberg argues that Attachment SEB-NSPI-3 is less relevant than Schedule 1 because the standard cost of ELIIR-2 is based on a load factor greater than 90 percent, not less than, as assumed in Schedule 1.

Question No. IR-8:
Question No. IR-8: - a. Please provide copies of testimony by this consultant in other proceedings and jurisdictions, if any, in which: - i. The consultant has suggested that a fuel forecast be reduced to account for "a tendency to oversta...

AI summary The document requests information on a consultant's past testimony regarding fuel forecasts, normalization adjustments in ratemaking, examples of regulator decisions reducing test year expenses, and the application of normalization when future expense increases are anticipated.

N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB) 1 passage
ATTACHMENT A (continued)
ATTACHMENT A (continued) - (4) The Carrying Charge Rate shall be the authorized rate of return on rate base most recently approved for SWEPCO by the APSC in a non-appealable final order. The initial Carrying Charge Rate shall be 6.82%. - (...

AI summary The document outlines the methodology for calculating the Energy Cost Recovery Rider (Rider ECR) for Southwestern Electric Power Company. It specifies that the Carrying Charge Rate is based on the authorized rate of return on the rate base most recently approved by the Arkansas Public Service Commission, starting at 6.82%. It also defines formulas for Estimated Energy Costs based on historical data and establishes the methodology for determining loss correction factors using a composite loss factor for the Arkansas jurisdiction.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 1 passage
- 18.6.9. Credits shall be applied to bills the month after such credits are earned.
- 18.6.9. Credits shall be applied to bills the month after such credits are earned. AKKANSA 45 PUBL IC SE KVICI - 00 DIVINISSION 16.4. (1) (2) (3) (4) NOTES TO FORMULA: The initial effective value of the EAF shall be 0.0311. The Energy Co...

AI summary The document outlines the formulaic components and notes for a specific electric service rate schedule (Schedule 16) for The Empire District Electric Company. It specifies the application of credits, the initial effective value of the Energy Cost Factor (EAF), and the methodology for calculating True-up Adjustments (TUA). It also defines the Carrying Charge Rate based on the authorized rate of return on the rate base and establishes the projected Energy Cost Period starting April 1 of the filing year.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 1 passage
DEFINITIONS
DEFINITIONS - 1) For all Plans, E(m) = [(RB/12) (ROR + (ROR DR) (TR / (1 TR))] + OE - a) Where RB is the Total Environmental Compliance Rate Base. - b) Where ROR is the Rate of Return on Environmental Compliance Rate Base, designated as th...

AI summary This document provides formal definitions for calculating the Environmental Compliance Rate Base [E(m)] and related revenue components for an electric utility. It outlines the mathematical formulas for determining the revenue requirement based on the Rate of Return (ROR), Debt Rate (DR), Composite Income Tax Rate (TR), and Operating Expenses (OE). It also defines the methodology for jurisdictional allocation of environmental costs and the calculation of average monthly revenue [R(m)] for the purpose of environmental surcharge billing.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 4 passages
NOVA SCOTIA POWER INC. FUNCTIONALIZATION OF AVERAGE RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
NOVA SCOTIA POWER INC. FUNCTIONALIZATION OF AVERAGE RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL (2) (3) (4) (5) (6) DIRECT COMPANY GENERATION TRANSMISSION DISTRIBUTION RETAIL CAPITAL DD 45 NOTION BY...

AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s average rate base for the year ending December 31, 2007, categorized by generation, transmission, distribution, and retail components, along with working capital and deferred charges.

NOVA SCOTIA POWER INC. ALLOCATION OF RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
NOVA SCOTIA POWER INC. ALLOCATION OF RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (B) LARGE INDUS...

AI summary The document presents the allocation of Nova Scotia Power Inc.'s rate base for the year ending December 31, 2007, categorized by demand classification and generation function, with figures provided in thousands of dollars.

FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) (11) UNMETERED...

AI summary The document presents a financial summary and allocation of bad debt expenses and production data across various company segments and classifications for the year ending December 31, 2007, including details on steam, hydro, and gas turbine production.

DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) (2) Pole & Wire Inv Demand % Responsibility (1) TOTAL COMPANY 147,218 100,00% (2) DOMESTIC 87,119 59,18% (3) SMALL GENERAL 5,749 3,91% (4...

AI summary The text presents a detailed breakdown of allocation factors for various infrastructure and customer categories for the year ending December 31, 2007, with percentages of responsibility attributed to different customer segments and infrastructure components.

N-44RIRs 76 to 136 - CA to NSPI - REDACTED (Large File - 19 MB) 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-91: Referring to page 5, define and further explain the statement "providing increased transparency to cost attribution." Response IR-91: NSPI and Emera have established clearly...

AI summary The response to Information Request IR-91 explains that NSPI and Emera use three mechanisms for cost attribution: direct charge expense, cost attribution via service level agreements, and cost allocation using UARB-approved methodologies as defined in the Code of Conduct.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-107: Referring to page 15, for each system discussed on this page (i.e., WMS, CMS, WPI & CIS), what were the specific issues that led to the conclusion 5 that these systems shou...

AI summary NSPI has conducted technical reviews of several systems, including the Customer Information System (CIS), and found that while CIS currently meets business needs, its performance is degrading due to data accumulation and lack of flexibility. The system is rated as medium risk due to outdated software and limited adaptability to changing requirements.

N-46Rebuttal Evidence of NSPI - REDACTED (Large File - 31 MB) 1 passage
Section 54
2 3 4 5 6 7 8 In this section, NSPI presents the Rebuttal Evidence of Dr. Roger Morin in respect of return on equity (ROE). NSPI also responds to issues raised by consultants in regard to pension, depreciation, rate base and OM&G. The impo...

AI summary NSPI presents Dr. Roger Morin's rebuttal evidence regarding return on equity (ROE) and responds to issues raised by consultants on pension, depreciation, rate base, and OM&G. The section emphasizes the importance of maintaining the financial health of the utility by allowing an appropriate ROE and timely cost recovery.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 6 passages
Commercial Paper RATING UPDATE
Commercial Paper RATING UPDATE Nova Scotia Power Inc. (NSPI or the Company) continues to perform relatively well and is expected to benefit from the generally positive regulatory decision by the Nova Scotia Utility and Review Board (UARB),...

AI summary Nova Scotia Power Inc. (NSPI) maintains a positive credit outlook following a favorable 2006 rate decision by the Nova Scotia Utility and Review Board. While 2005 metrics were pressured by high fuel costs, 2006 saw recovery due to lower expenses and a favorable natural gas contract settlement. The UARB approved substantial recovery of 2006 projected fuel costs, despite some 'imprudently incurred' costs being disallowed. NSPI's rating is supported by stable cash flows, a regulated capital structure, and favorable load growth, though the lack of a fuel adjustment mechanism remains a key risk.

Section 46
Long-term debt maturities over the next five years are manageable and well spread out. - All preferred shares are redeemable at the Company's option. - The Series C and D preferred shares are treated as 70% equity equivalents (both are con...

AI summary Nova Scotia Power Inc. (NSPI) describes its long-term debt profile, noting that maturities over the next five years are well-distributed and manageable. The text details the redemption and conversion options for Series C and D preferred shares, which are treated as 70% equity equivalents. Additionally, it notes a remaining $150 million capacity on a shelf prospectus for medium-term notes and discusses a specific $40 million debt extension to 2029 with an increased interest rate, which was factored into the 2006 Rate Application.

Nova Scotia Power Inc.
Nova Scotia Power Inc. Dalance Sheet 1 tova Scott a rower inc • Degree day deficiency (% normal) n/a 93.6% 102.0% -2.9% 97.1% 94.6% 92.2% 84.9% Rate base ($ millions) n/a 2,878 2,850 2,832 2,807 2,832 2,752 2,756 Growth in rate base n/a 1....

AI summary The document presents a financial summary table for Nova Scotia Power Inc., detailing key operational and financial metrics. It includes data on degree day deficiency percentages, rate base values, and growth rates. Additionally, it provides a cost structure for self-generation, broken down into components such as OM&A (Operations, Maintenance, and Administration), fuel costs, and variable costs, expressed in cents per net generation rated kWh sold.

Weaknesses:
Weaknesses: - Partial exposure to fuel price risk - Intermediate financial profile - Significant regulatory assets with delayed recovery prospects

AI summary The document identifies three primary financial and structural weaknesses regarding the entity's position. These include partial exposure to fuel price risk, an intermediate financial profile, and the presence of significant regulatory assets that face delayed prospects for recovery. These factors collectively suggest potential risks to the entity's financial stability and its ability to recoup costs efficiently within the regulatory framework.

Electricity generation costs could hurt competitiveness
Electricity generation costs could hurt competitiveness Emera's transmission and distribution activities are monopolies and do not face direct competition. Nevertheless, expected increases to NSPI's cost to generate electricity could put p...

AI summary The document discusses how rising electricity generation costs for Nova Scotia Power Inc. (NSPI) may impact its cost competitiveness against independent power producers and neighboring utilities. It notes that a significant portion of residential load remains exposed to competition from oil and wood heating. While new generation capacity is not immediately required, NSPI may participate in competitive bidding for future capacity, which would then fall under cost-of-service regulation. Additionally, the text clarifies that current wholesale market restructuring is limited and does not pose a significant risk to credit ratings.

Confirmation of Revenue Request
Confirmation of Revenue Request NSPI confirmed that the revenue request being applied for was the revenue requestfiledwith its evidence of October 10, 2006. It has not been amended and will not be amended by NSPI. The Board is certainly pr...

AI summary Nova Scotia Power Industrial (NSPI) confirmed that its revenue request remains unchanged from its October 10, 2006, filing. The Board indicated a willingness to approve the program provided that ongoing annual costs are included in future rate applications, a matter to be addressed in a subsequent hearing. Additionally, NSPI submitted responses to the Board's inquiries regarding the Liberty Consulting Group's report on distribution system vegetation management spending.

N-48Minutes of Settlement - Public Utilities Act and Application by NSPI for Approval of Revisions to Rates, Charges and Regulations 1 passage
Section 3
preclude NSPI or any of the parties from taking any positions in future regulatory proceedings. AGREED, and signed by legal Counsel or other authorized representative, THIS 21st DAY OF JANUARY, 2007. Nova Scotia Power Inc. Per: Rene Gallan...

AI summary This agreement outlines various terms and conditions related to Nova Scotia Power Inc.'s (NSPI) regulatory proceedings, including the application of excess earnings, withdrawal of fuel cost deferral requests, and the adoption of a revenue to cost ratio methodology. It also states that the agreement does not prevent any parties from taking positions in future proceedings.

N-51NSPI Counsel Statement 1 passage
Section 2
utilities throughout the Province; and - UARB staff and their consultants, Dr. Stutz and Liberty Consulting; And now, Stora Enso and Bowater (SEB) have joined this group and support the Settlement. The parties supporting the settlement are...

AI summary The Settlement Agreement proposes a resolution to the proceeding, excluding constitutional issues related to low-income customers. It involves multiple stakeholders and requires NSPI to forgo 2007 earnings to establish a fuel adjustment mechanism by 2008. The Agreement is seen as a balanced approach to competing interests and is supported by various parties including Stora Enso and Bowater.

N-52N-52.pdf 1 passage
Dear Ms Bowes,
Dear Ms Bowes, The Utility and Review Board (UARB) forwarded your e-mail of October 12th regarding our 2007 rate application. We certainly understand your concerns about higher electricity rates. We assure you that we are working hard to k...

AI summary Nova Scotia Power Inc. (NSPI) explains a 2007 rate application due to rising fuel costs and uncontrollable energy price increases. They mention an independent study of operating costs and a review of executive compensation. The letter also addresses concerns about power outages and mentions a customer service manager, Judy O'Leary, will follow up.

N-54Direct Testimony - Consumer Advocate Witnesses - Michael J. McGarry and Rudolph C. Krizan 6 passages
Utility Management and Operational Audits
Utility Management and Operational Audits He has conducted over twenty five comprehensive management and operational audits of investor-owned energy and telecommunications utilities. These audits have included capital and operating budget...

AI summary The text discusses an individual's experience conducting over 25 comprehensive management and operational audits for investor-owned energy and telecommunications utilities, covering areas such as budget processes, operations, rate case adjustments, and affiliate transactions.

Oregon Public Utilities Commission
Oregon Public Utilities Commission Docket No. UP205 Examination of NW Natural's Rate Base and Affiliated Interests Issues Co-sponsored between NW Natural, Staff, Northwest Industrial Gas Users, Citizens Utility Board. August 2005-January 2...

AI summary This document discusses a management audit of NW Natural Gas conducted by a team that evaluated rate base issues, including financial instruments, deferred taxes, tax credits, distribution system costs, and affiliate transactions. The audit aimed to ensure compliance with OPUC regulations, company policy, and GAAP.

Before the Public Service Commission of the District of Columbia
Before the Public Service Commission of the District of Columbia Case No. 1032 In the Matter of the Investigation into Potomac Electric Power Company's Distribution Service Rates On Behalf of the DCPSC, January 2005-March 2005 Project Mana...

AI summary The Public Service Commission of the District of Columbia reviewed Potomac Electric Power Company's compliance filings related to distribution service rates, evaluating class cost of service and revenue requirements. Analysis was conducted on 23 designated issues and 13 proposed adjustments, with a settlement anticipated for a full rate case effective August 8, 2007.

Before the Missouri Public Service Commission
Before the Missouri Public Service Commission Consultant to Ameren UE. Conducted revenue requirement analysis in preparation of Missouri Public Service Commission compliance filing to un-bundle utility's rate tariffs. Prepared the .. NS UA...

AI summary A consultant for Ameren UE prepared a revenue requirement analysis for the Missouri Public Service Commission compliance filing, focusing on unbundling the utility's rate tariffs and supporting schedules for generation, transmission, and distribution allocations.

Before the New York Public Service Commission
Before the New York Public Service Commission • ' .( Case: 96-M-0858 Prudence Investigation into the Scrap Handling Practices in the Western Division of Niagara Mohawk Power Company Commission Staff and Testifying Witness. Litigated procee...

AI summary This document discusses a prudence investigation into the scrap handling practices of Niagara Mohawk Power Company's Western Division, initiated due to allegations of bribery and corruption involving a vendor. The case involved quantifying excessive payments to the vendor and resulted in a settlement with ratepayers receiving bill credits.

Before the New York Public Service Commission
Before the New York Public Service Commission 20 2 Case: 87003 Operational Audit of the Homer City Coal Cleaning Plant Commission Staff. Comprehensive operational audit to determine effectiveness of ratepayer funds spent on the constructio...

AI summary This document outlines a comprehensive operational audit of the Homer City Coal Cleaning Plant, jointly owned by NYSEG and Penelec, conducted by Commission Staff to assess the effectiveness of ratepayer funds spent on its construction and evaluate costs, alternatives, and contracting practices.

57960Board Decision 1 passage
MR. MERRICK
MR. MERRICK Yes, Mr. Chair, I just want to make it clear on the record that while there is a provision in paragraph 4 relating to the development at some point of a FAM, it is agreed and understood that the reading of paragraph 4 of the mi...

AI summary The Consumer Advocate clarifies that while a FAM is mentioned in the minutes of settlement, it is not yet appropriate to implement one, but discussions on it may continue. SEB's consent to the Settlement Agreement is conditional on the Board ensuring that retroactive rate adjustments are not allowed and that a full review process for a FAM is conducted.

57962Board Decision - Supplementary 2 passages
CA
CA [9] The CA, while endorsing Avon's position, has requested additional information on the Compliance Filing, including the cost of service study, provision for further information requests and disclosure of various calculations and assum...

AI summary The CA supports Avon's request for more transparency in NSPI's Compliance Filing, including disclosure of cost allocation scenarios, R/C ratios, and the steps taken from the initial revenue allocation to the final exhibit. This is necessary for intervenors to understand and challenge the revenue allocation process and ensure accuracy in the settlement adjustments.

NSPI
NSPI [1 0] NSPI indicated that it has no specific objection to the proposals for changes to the Compliance Filing process, but expressed concern regarding possible delays in the implementation of the Board's decision which could result fro...

AI summary NSPI has no objection to changes in the Compliance Filing process but is concerned about potential delays in implementing the Board's decisions and maintaining confidentiality. It emphasizes the importance of timely rate implementation and preserving confidentiality through standard procedures.

57965Board Order 2 passages
Preamble
AND WHEREAS, pursuant to s. 45(1) of the Public Utilities Act, the Board approves the average Rate Base of $2,776.3 million and the Rate of Return on average Rate Base of 8.25% as set out in Appendix 2, Table 1 of NSPI's Compliance Filing;

AI summary The Board approves the average Rate Base of $2,776.3 million and a Rate of Return of 8.25% on the Rate Base, as outlined in Appendix 2, Table 1 of NSPI's Compliance Filing, under s. 45(1) of the Public Utilities Act.

IT IS ORDERED that:
IT IS ORDERED that: 1. NSPI's proposed revenue requirement as identified in the Board's February 5, 2007 Decision, which according to NSPI's Compliance Filing, totals $1,159.5 million, is approved; Document: 127123 - 2. The above-the-line...

AI summary The Board approves NSPI's revenue requirement of $1,159.5 million, sets the common equity ratio at 37.5%, and fixes the rate of return on common equity at 9.55%. It also establishes procedures for future settlement agreements, compliance filings, and addresses outstanding directives from prior rate decisions.

57966Supplementary Board Order 3 passages
OP - Organization Profile
OP - Organization Profile - 1 . Latest regulated annual reports of NSPI and EMERA. - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organiz...

AI summary The document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, including financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and compliance with emissions targets.

FO - Financial Outlook
FO - Financial Outlook - 1 . Regulated statement of earnings. - 2. Regulated balance sheet. - 3. Regulated statement of retained earnings. - 4. Regulated statement of cash flows. - 5. Electric revenue details. - 6. Gwh production and sales...

AI summary The document outlines the financial outlook for a regulated entity, including earnings statements, balance sheets, revenue details, operating expenses, capital costs, and rate base calculations. It provides a comprehensive overview of financial data and metrics relevant to regulatory proceedings.

RB - Rate Base
RB - Rate Base 1. Plant in service continuity schedule (by function) including beginning balance, additions, asset retirements, ending balance, accumulated depreciation beginning balance, depreciation/accretion expense, retirements, accumu...

AI summary The document outlines requirements for providing detailed schedules related to the rate base, including plant in service continuity, plant held for future use, construction work-in-progress, and various financial and regulatory items such as deferred income taxes, regulatory assets, and rate of return calculations.

57968Amended Board Order (and attached Schedules A to C) 9 passages
Preamble
AND WHEREAS, pursuant to s. 45(1) of the Public Utilities Act, the Board approves the average Rate Base of $2,776.3 million and the Rate of Return on average Rate Base of 8.25% as set out in Appendix 2, Table 1 of NSPI's Compliance Filing;

AI summary The document states that the Board has approved the average Rate Base of $2,776.3 million and a Rate of Return of 8.25% on that base, as outlined in Appendix 2, Table 1 of NSPI's Compliance Filing, under section 45(1) of the Public Utilities Act.

IT IS ORDERED that:
IT IS ORDERED that: 1. The Minutes of Settlement dated the 21st day of January, 2007, attached hereto as Schedule "C", are approved and the terms are adopted by the Board as part of this Order; Document: 127640 - 2. NSPI's proposed revenue...

AI summary The Board approves the Minutes of Settlement from January 2007, NSPI's revenue requirement of $1,159.5 million, and new rates effective April 1, 2007. The Board also sets the common equity ratio at 37.5% and the rate of return on common equity at 9.55%. A separate hearing is established for constitutional and human rights challenges.

INTERRUPTffiLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25)
INTERRUPTffiLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25) Customers who qualify for interruptible service will receive a $3.43 per month per kilovolt ampere reduction in demand charge for billed interruptible demand. The billed in...

AI summary The interruptible rider to the large industrial tariff (Rate Code 25) provides a $3.43 per month per kilovolt ampere reduction in demand charge for qualified customers. The credit is based on the difference between contracted firm demand and billing demand, with no credit if billing demand is less than contracted demand.

Use of Self-Generation
Use of Self-Generation Unless existing customer-owned generation is to be retired, for purposes of determining forecast CBL energy, the continued use of such generation is to be appropriately accounted for in the customer's CBL energy requ...

AI summary The document states that existing customer-owned generation should continue to be used normally when determining forecast CBL energy requirements, unless it is to be retired. Customers are expected to use their own generation as they see fit.

3.5 STREET AND AREA LIGHTING
3.5 STREET AND AREA LIGHTING The Company may on request supply and maintain standard street and area lighting units including fixtures, automatic switch, all electric energy and any brackets and hardware required for regular mounting of th...

AI summary The document outlines the terms and conditions for street and area lighting services, including customer responsibilities, cost structures, and the Company's rights regarding replacement and repairs. Customers are responsible for additional costs and easements, and the Company may delay replacements if the existing lighting is fully depreciated but still has useful life.

7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES
7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES 4.0 Analysis and Reporting See Charge per Billing Period Base Package Load profile for peak day billing period plus times and magnitude of six highest peaks 33.00 O...

AI summary This section outlines the schedule of load research monitoring, reporting, and analytical charges, detailing various analysis and reporting options with associated costs. It includes base package items, specialized analysis, and hourly rates for services related to load profiling and data analysis.

NUNUTESOFSETTLEMENT
tes for 2008. - 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSP...

AI summary This settlement agreement outlines the resolution of various matters related to NSPI's 2007 and 2008 earnings, deferrals, and regulatory proceedings. Key points include the application of excess earnings to an unamortized balance, the withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology with specific modifications.

Section 273
- 7. NSPI's request for a deferra] of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary The document outlines various withdrawn and deferred requests by NSPI, including fuel cost deferral and true-up for the 2P-RTP rate. It also confirms the adoption of the Revenue to Cost ratio methodology with modifications. The agreement does not prevent future regulatory positions.

Section 275
- 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Applicatio...

AI summary The text outlines several decisions and agreements related to Nova Scotia Power Inc. (NSPI) in a regulatory proceeding. It includes the application of excess earnings to an unamortized balance, withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology. The agreement does not preclude future regulatory positions and allows for a potential rate adjustment proceeding for 2008.

57960Board Decision 1 passage
3.7 Findings
ss-examination of witnesses in an environment which can often be aggressive and adversarial; and, except when confidential information is being discussed, the proceeding is open to the general public. [32] While approval of this Settlement...

AI summary The approval of the Settlement Agreement sets NSPI's fuel costs for 2007 but does not eliminate the need for NSPI to justify its fuel procurement policies to the Board. The Board will consider a Fuel Adjustment Mechanism (FAM) in a separate proceeding. Intervenors retain the ability to challenge NSPI's FAM proposal and other issues, with these matters being addressed outside the context of a general rate case.

57964Notice - NSPI 2007 Rate Application - Final Issues List 1 passage
5. Financial Issues:
5. Financial Issues: - Pensions; - Credit ratings; - Return on equity; - Capital structure; - Rate base and return on rate base. - 6. Existing Regulations and Proposed Changes. - 7. Above the Line Rates: - Revenue to cost ratios; - Miscell...

AI summary The text outlines various financial issues including pensions, credit ratings, return on equity, capital structure, rate base, and compliance filings. It also references existing regulations, proposed changes, and legal interpretations related to the Public Utilities Act and its potential conflict with the Human Rights Act and Canadian Charter of Rights and Freedoms.

57965Board Order 1 passage
Preamble
AND WHEREAS, pursuant to s. 45(1) of the Public Utilities Act, the Board approves the average Rate Base of $2,776.3 million and the Rate of Return on average Rate Base of 8.25% as set out in Appendix 2, Table 1 of NSPI's Compliance Filing;

AI summary The Board approves the average Rate Base of $2,776.3 million and the Rate of Return on average Rate Base of 8.25% as outlined in NSPI's Compliance Filing, under s. 45(1) of the Public Utilities Act.

57966Supplementary Board Order 2 passages
FO - Financial Outlook
FO - Financial Outlook - 1 . Regulated statement of earnings. - 2. Regulated balance sheet. - 3. Regulated statement of retained earnings. - 4. Regulated statement of cash flows. - 5. Electric revenue details. - 6. Gwh production and sales...

AI summary The document outlines the financial outlook section of a regulatory proceeding, including financial statements, revenue details, production and sales data, operating expenses, and capital cost information. It provides a comprehensive overview of the regulated entity's financial position and performance.

RB - Rate Base
RB - Rate Base 1. Plant in service continuity schedule (by function) including beginning balance, additions, asset retirements, ending balance, accumulated depreciation beginning balance, depreciation/accretion expense, retirements, accumu...

AI summary The document outlines requirements for providing detailed schedules related to the rate base, including plant in service continuity, plant held for future use, construction work-in-progress, and various financial and regulatory items such as deferred income taxes, regulatory assets, and rate of return calculations.

57968Amended Board Order (and attached Schedules A to C) 5 passages
Preamble
AND WHEREAS, pursuant to s. 45(1) of the Public Utilities Act, the Board approves the average Rate Base of $2,776.3 million and the Rate of Return on average Rate Base of 8.25% as set out in Appendix 2, Table 1 of NSPI's Compliance Filing;

AI summary The document references the approval of the average Rate Base and Rate of Return by the Board under the Public Utilities Act, as detailed in NSPI's Compliance Filing.

IT IS ORDERED that:
IT IS ORDERED that: 1. The Minutes of Settlement dated the 21st day of January, 2007, attached hereto as Schedule "C", are approved and the terms are adopted by the Board as part of this Order; Document: 127640 - 2. NSPI's proposed revenue...

AI summary The Board approves the Minutes of Settlement from January 2007, NSPI's revenue requirement of $1,159.5 million, and sets the common equity ratio at 37.5% and the rate of return on common equity at 9.55%. The Order also outlines procedures for future settlement agreements and compliance filings, and establishes a separate hearing for constitutional and human rights challenges.

INTERRUPTffiLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25)
INTERRUPTffiLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25) Customers who qualify for interruptible service will receive a $3.43 per month per kilovolt ampere reduction in demand charge for billed interruptible demand. The billed in...

AI summary The interruptible rider to the large industrial tariff (Rate Code 25) provides a $3.43 per month per kilovolt ampere reduction in demand charge for customers who qualify for interruptible service. The credit is based on the difference between contracted firm demand and billing demand, with specific rules for when the credit applies.

NUNUTESOFSETTLEMENT
tes for 2008. - 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSP...

AI summary This agreement outlines the resolution of various issues related to NSPI's financial and regulatory matters for 2007 and 2008, including the handling of excess earnings, deferral of fuel costs, and adoption of the Revenue to Cost ratio methodology, while noting that certain directives and studies remain pending.

Section 273
- 7. NSPI's request for a deferra] of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary The document outlines various decisions and agreements related to NSPI's regulatory proceedings, including the withdrawal of a fuel cost deferral request, no changes to rate base and return on equity, deferral of a true-up for the ELI 2P-RTP rate, and adoption of the Revenue to Cost ratio methodology with modifications.

57969Notice - NSPI 2007 Rate Application - Preliminary Issues List 1 passage
PRELIMINARY ISSUES LIST
PRELIMINARY ISSUES LIST The following issues will be dealt with in the public hearing on Nova Scotia Power Inc. 's ("NSPI") 2007 Rate Application, set to begin January 22, 2007: - 1. Fuel Related Issues (including experience since 2000): -...

AI summary The preliminary issues list for Nova Scotia Power Inc.'s 2007 Rate Application includes topics such as fuel costs, compliance with directives, deferred items, OM&G costs, financial issues, and existing regulations. The hearing will address deferred fuel costs, tax deferrals, depreciation, pension costs, credit ratings, return on equity, and regulatory changes.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 19 passages
Preamble
a future proceeding if actual 2007 gas margin is less than $4 7 million. 32 33 3. The third year of the phase in of depreciation rates is deferred for recovery in the next general rate application. This reduces 2007 depreciation expense by...

AI summary The document outlines several financial and regulatory matters related to Nova Scotia Power Inc. (NSPI), including the deferral of depreciation rates, the agreement on establishing a Fuel Adjustment Mechanism (FAM), and the withdrawal of a fuel cost deferral request. It also mentions the application of excess earnings to an unamortized balance and the requirement for NSPI to provide updated cost forecasts.

MINUTES OF SETTLEMENT
hanges for 2008. - Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - There are no further changes to NSPI's...

AI summary The document outlines various agreements and decisions from a regulatory proceeding involving NSPI. It mentions the application of excess earnings to an unamortized balance, withdrawal of a fuel cost deferral request, and deferral of a true-up request for the 2P-RTP rate to an annual review. It also notes the adoption of a revenue-to-cost ratio methodology with modifications.

Section 24
- 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&O, regulatory amortizations and in...

AI summary NSPI has withdrawn its request to defer first quarter 2007 fuel costs and made no further changes to its application. The UARB directive regarding the study of NSPI's OM&G remains incomplete. The Revenue to Cost ratio methodology will be adopted with modifications. The agreement does not prevent future regulatory positions.

Section 26
- 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary NSPI has withdrawn its request to defer first quarter 2007 fuel costs and made no further changes to its application. The UARB directive regarding the study of NSPI's OM&G remains incomplete. The Revenue to Cost ratio methodology will be adopted with modifications. This agreement does not prevent future regulatory positions.

Section 28
- 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral offrrst quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application...

AI summary The document outlines agreements and decisions made in a regulatory proceeding involving NSPI, including the application of excess earnings, withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology. It also addresses ongoing obligations related to OM&G studies and future regulatory positions.

Compliance Filing- 2007 Rate Case
Compliance Filing- 2007 Rate Case Millions of Dollars 1 2 3 Net Regulated Plant in Service 4 Plus: Construction work in ~regress 5 Net Utility Fixed Assets 6 Add: 7 Deferred Charges & Credits 8 Financing Charges 9 Tax Charges 10 Pension Ch...

AI summary The document presents a compliance filing related to the 2007 rate case, including financial figures such as Regulated Rate Base, Total Revenue Requirement, and Proposed Rates. It outlines changes in various financial line items, such as operating costs, depreciation, and income taxes, between the test year and forecast for 2007.

Section 54
13 15 1) Figures presented reflect whole numbers which may cause $0.1 M in rounding differences on some line items. 16 2) Calculation based on 2007 Test Year Compliance Rates Forecast. 17 3) Short-term debt cost factor includes account rec...

AI summary The text presents financial data from Nova Scotia Power Inc.'s 2007 Rate Case, including net regulated plant in service, construction work in progress, and depreciation expenses. It also notes rounding differences and references other tables and schedules for additional details.

Section 55
ed expense 23 Asset retirement obligation 25 Depreciation, net (per above) 14 Notes: 15 1) Figures presented reflect whole numbers which may cause $0.1M in rounding differences on some line items. Nova Scotia Power Inc. Average Rate Base S...

AI summary The text provides financial details related to Nova Scotia Power Inc.'s rate base, including deferred charges and credits, asset retirement obligations, and depreciation. It outlines various financial line items and balances for the years ending December 31st, with references to compliance filings and forecasts.

Section 57
Nova Scotia Power Inc. Average Rate Base Supporting Schedule ·Allowance for Working Capital Years Ended December 31st Millions of dollars

AI summary The document presents Nova Scotia Power Inc.'s average rate base supporting schedule, focusing on the Allowance for Working Capital over several years, with data measured in millions of dollars.

FUNCTIONALIZATION OF AVERAGE RATE BASE
FUNCTIONALIZATION OF AVERAGE RATE BASE (1) (2) (3) (4) (5) (6) TOTAL COMPANY GENERATION TRANSMISSION DISTRIBUTION RETAIL DIRECT CAPITAL PRODUCTION PLANT ( 1) STEAM $1,053,843 $1,053,843 $0 $0 $0 $0 ( 2) HYDRO 258,490 240,574 0 0 0 17,916 (...

AI summary This document presents a detailed breakdown of the average rate base for a utility company, categorizing costs into generation, transmission, distribution, and other components. It includes figures for production plants, transmission and distribution infrastructure, working capital, and deferred charges and credits, with a focus on the total average rate base.

CLASSIFICATION OF AVERAGE RATE BASE
CLASSIFICATION OF AVERAGE RATE BASE (1) (2) (3) (4) TOTAL COMPANY DEMAND RELATED PLANT INITIAL CLASSIFICATION ENERGY RELATED PLANT CUSTOMER RELATED PLANT GENERATION FUNCTION ( 1) STEAM PLANT ( 2) HYDRO PLANT ( 3) WIND PLANT ( 4) LM6000 PLA...

AI summary The document presents a classification of the average rate base for a company, categorizing it into demand-related, energy-related, and customer-related plant, with detailed breakdowns of generation, transmission, and working capital components.

CLASSIFICATION OF RATE BASE
CLASSIFICATION OF RATE BASE (1) (2) (3) (4) TOTAL COMPANY DEMAND RELATED PLANT INITIAL CLASSIFICATION ENERGY RELATED PLANT CUSTOMER RELATED PLANT RETAIL FUNCTION DISTRIBUTION PLANT: ( 1) SERVICES ( 2) METERS ( 3) TOTAL RETAIL PLANT 0 Q 0 0...

AI summary The document presents a classification of the rate base, breaking down various components such as distribution plant, working capital, and deferred charges across different categories like demand-related plant, energy-related plant, and customer-related plant. The total average rate base is reported as $2,758,294.

NOVA SCOTIA POWER INC. CLASSIFICATION OF AVERAGE RATE BASE
NOVA SCOTIA POWER INC. CLASSIFICATION OF AVERAGE RATE BASE INITIAL R/B CLASSIFIC ATION FURTH ER CLASSIFICA ATION FULLY CI ASSIFIED RAT E BASE DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER PLANT PLANT PLANT PLANT PLAN...

AI summary This document outlines the classification of the average rate base for Nova Scotia Power Inc., detailing the breakdown of generation and transmission functions, including plant classifications, working capital, deferred charges, and credits across various categories such as fuel, financing, tax, and pensions.

ALLOCATION OF AVERAGE RATE BASE
ALLOCATION OF AVERAGE RATE BASE (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION FACTO...

AI summary The document presents a detailed allocation of the average rate base across various classifications, including generation, transmission, and working capital, with specific figures for different customer and industrial categories. The table includes allocation factors and various financial elements such as deferred charges and credits.

ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE
ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALL...

AI summary The document presents a detailed breakdown of the allocation of the average distribution rate base across various categories and customer segments. It includes line items for demand, customer-related costs, and retail components, with figures and allocations for different classes of customers and infrastructure components.

CLASSIFICATION OF OPERATING EXPENSES
CLASSIFICATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DEMAND EXPENSES (3) ENERGY EXPENSES (4) CUSTOMER EXPENSES GENERATION FUNCTION ( 1) FUEL $431,429 $0 $431,429 $0 ( 2) PURCHASED POWER - FIXED 14,267 4,654 9,613 0 ( 3) PURCHASED POW...

AI summary The document presents a detailed breakdown of operating expenses categorized into total company, demand expenses, energy expenses, and customer expenses, with specific figures for various functions such as generation, transmission, and depreciation. It includes costs related to fuel, purchased power, operations and maintenance, depreciation, interest, taxes, and other revenues.

about these many tenth from these tenth about these about these through these tenth throw the tenth throw the
about these many tenth from these tenth about these about these through these tenth throw the tenth throw the (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LAR...

AI summary The document presents a detailed financial breakdown of various categories, including distribution, retail, and customer expenses, with allocation factors and references to exhibits and pages. It includes figures for operating and maintenance costs, depreciation, interest, corporate taxes, and other revenue streams, categorized by customer classification and distribution types.

FOR THE YEAR ENDING DECEMBER 31, 2007
FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION (28) % RESPONSIBILITY 100.00% 90.18% 4.91% 2.36% 0.00% 0.48% 0.05% 0.01% 0.00% 0.00% 2.01%...

AI summary The text presents a table with various percentages and figures related to customer responsibility, average customers, weighting factors, and weighted totals for the year ending December 31, 2007. The table includes different categories such as small, medium, large, and extra large, as well as various percentages and allocations.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (...

AI summary The document outlines the allocation factors for Nova Scotia Power Inc. for the year ending December 31, 2007, providing percentages of responsibility and total rate base figures across various categories such as domestic, industrial, and municipal sectors.

57985NSPI Correspondence - Re: 2007 Rate Application proceedings [and attachments] 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-33: Reference Page 72-73 Board Directive No. 10 of the Board Order of April12, 2006 (P-882) directs NSPI to carry out the operations review. The Board approved the Terms of Re...

AI summary NSPI was directed by the UARB in 2006 to conduct an operations review. The review was initially scheduled for completion by July 31, 2006, but the Board requested revisions to the Terms of Reference, which caused a delay. NSPI anticipated completing the review by the first quarter of 2007 due to the delay in starting the process and re-engaging the consultant after filing a rate application in October 2006.

58003Participant responses to Preliminary Issues List for P-886 2 passages
General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule and suggests narrowing the issues list to avoid duplication of recent reviews. The Company highlights ongoing and completed reviews by the Board and third-party consultants, such as Liberty and Accenture, and notes that many aspects of its operations have already been addressed.

Section 44
- 6. the extra volatility experienced in fuel prices from the international market in recent years; - 7. the introduction of substantial quantities of wind power, and the prospect of further large increases in wind power as the Province ro...

AI summary The text discusses factors contributing to increased volatility in fuel prices, the impact of wind power integration, and the move toward a partially competitive market. It also highlights concerns about the current COS Study's methodology, which disproportionately affects high load factor customers, as demonstrated by Dr. Rosenberg's testimony.

58136Reply Submission - Avon Valley et al. (AVON) 1 passage
REPLY SUBMISSION ON BEHALF OF:
REPLY SUBMISSION ON BEHALF OF: Avon Valley Greenhouses Ltd. Canadian Salt Company Limited Crown Fibre Tube Inc. Halifax Grain Elevator Limited High Liner Foods Incorporated Imperial Oil Limited J.D. Irving Ltd., Saw Mills Division Lafarge...

AI summary The intervenors represented in this submission support the proposed settlement but request greater transparency in the Board's Compliance Filing process, including access to revenue allocation scenarios and related communications prior to the Board's final order to ensure administrative fairness and due process.

58140Final Submission - Ecology Action Centre 1 passage
Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Demand Side Management?
in principle, that a utility can avoid costs by making investments in energy efficiency and that energy efficiency is 'cost-effective' if the cost of these investments are less than the avoided costs. - 11. The experience in the jurisdicti...

AI summary The text argues that Nova Scotia Power Inc. (NSPI) is not acting reasonably or prudently by continuing to invest in fossil fuels rather than energy efficiency, which is presented as a less costly alternative. It references Vermont's experience, where energy efficiency was a least-cost resource, and criticizes NSPI for discontinuing Demand Side Management (DSM) programs that could have led to long-term savings for ratepayers.

58243Comments on Preliminary Issues List - Halifax Regional Municipality (HRM) 1 passage
Renewable Energy:
Renewable Energy: There are numerous outstanding issues surrounding the future and current impact on electricity pricing. Stakeholders and intervenors such as HRM have been and are continuing to consume considerable resources to effectivel...

AI summary The text discusses the complexity of current and future electricity pricing issues, highlighting the numerous regulatory proceedings involving NSPI and the need for a consolidated approach. It emphasizes the importance of addressing renewable energy as part of the overall electricity management strategy, noting the rising costs of wind turbines and the need for timely decision-making on transmission and distribution system costs.

58244Comments on Preliminary Issues List - NSPI 2 passages
General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule, emphasizing the need to focus on material issues affecting the 2007 test year and avoid duplication of previous reviews. NSPI highlights that many aspects of its operations have already been or will be reviewed, and suggests narrowing the issues list accordingly.

Specific Proposed Issues
Specific Proposed Issues NSPI offers the following comments in respect of the specific issues contained in the proposed list: - 1. Fuel Related Issues Each of the proposed items in this topic arise in the NSPI Application Evidence. NSPI no...

AI summary NSPI responds to the proposed issues in the rate proceeding, supporting most items on the list while requesting clarification on certain topics. It notes that affiliate transactions are under review by Liberty, and that some deferred items previously decided by the Board should not be reconsidered. NSPI also highlights that the DSM and IRP are being addressed in another regulatory process and that 2006 financial results will not be publicly available during the hearing due to a securities blackout period.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 4 passages
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

FO - Financial Outlook
FO - Financial Outlook - 1. Regulated statement of earnings - 2. Regulated balance sheet - 3. Regulated statement of retained earnings - 4. Regulated statement of cash flows - 5. Electric revenue details - 6. Gwh production and sales - 7....

AI summary The Financial Outlook section outlines the financial statements and details relevant to the regulated operations of the utility, including earnings, balance sheets, revenue, production, expenses, and capital costs, providing a comprehensive view for regulatory analysis.

RB - Rate base:
RB - Rate base: 1. Plant in service continuity schedule (by function) including beginning balance, additions, asset retirements, ending balance, accumulated depreciation beginning balance, depreciation/accretion expense, retirements, accum...

AI summary The document discusses the rate base, specifically focusing on the Plant in service continuity schedule, which includes details such as beginning and ending balances, additions, retirements, and depreciation.

RB Rate Base cont'd:
RB Rate Base cont'd: For the following provide a schedule showing last year actual, current year forecast, current year compliance, test year present rates, and test year proposed rates - 2. Plant held for future use - 3. Construction work...

AI summary The text requests a schedule detailing various financial and accounting items related to the rate base, including plant held for future use, construction work-in-progress, customer deposits, pension charges, and rate of return calculations.

86475Board Letter - Re: NSPI Future Filing Requirements - Strawman Proposal - April 10, 2007 4 passages
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizat...

AI summary This document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, covering financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and emissions compliance.

FO - Financial Outlook
FO - Financial Outlook - 1. Regulated statement of earnings - 2. Regulated balance sheet - 3. Regulated statement of retained earnings - 4. Regulated statement of cash flows - 5. Electric revenue details - 6. Gwh production and sales - 7....

AI summary The document outlines the financial outlook for the regulated entity, including earnings statements, balance sheets, revenue details, operating expenses, rate increases, capital costs, and supporting schedules related to the rate base and deferred charges.

RB - Rate base:
RB - Rate base: 1. Plant in service continuity schedule (by function) including beginning balance, additions, asset retirements, ending balance, accumulated depreciation beginning balance, depreciation/accretion expense, retirements, accum...

AI summary The document discusses the Plant in service continuity schedule, including details such as beginning balance, additions, asset retirements, ending balance, accumulated depreciation, and depreciation/accretion expense.

RB - Rate Base cont'd:
RB - Rate Base cont'd: For the following provide a schedule showing last year actual, current year forecast, current year compliance, test year present rates, and test year proposed rates - 2. Plant held for future use - 3. Construction wo...

AI summary The document requests a schedule detailing various financial and operational components related to the rate base, including plant held for future use, construction work-in-progress, and other financial items such as regulatory assets, tax charges, and pension charges. This is part of an ongoing rate base discussion.

86476Letter - Re: Standard Filing Requirements 1 passage
1. Implications of a FAM Proceeding
1. Implications of a FAM Proceeding Dr. Stutz's suggestion to standardize filing requirements was made prior to any discussion and agreement in principle that the Board should approve a FAM. The FAM process is ongoing and during 2007 the B...

AI summary The text discusses the implications of a FAM (Fuel Adjustment Mechanism) proceeding, including the standardization of filing requirements, the impact on general rate applications, and the resolution of past concerns about fuel cost explanations. The FAM aims to increase transparency and regularity in fuel cost reporting, potentially eliminating the need for fuel matters to be addressed in general rate applications.

86477Submission - Re: Rate Hearing Future Filing Requirements 5 passages
Re: Rate Hearing Future Filing Requirements: Board File P-886.2
Re: Rate Hearing Future Filing Requirements: Board File P-886.2 Please find attached the Submission of Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited ("SEB") with respect to the above noted matter. Although the...

AI summary Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited (SEB) submit comments on future rate case filing requirements, emphasizing the need for transparency, electronic formatting of documents, and the provision of complete work papers and calculations. They reference the Board's 2007 Rate Case Order and highlight concerns with NSPI's reluctance to provide electronic versions of the Cost of Service model.

(b) Most Recent Emera Proxy Statement
(b) Most Recent Emera Proxy Statement 19. In P-886, SEB IR-143 requested "a copy of the most recent proxy statement for Emera shareholders." SEB submits: that NSPI should file with its Application Emera's most recent proxy statement to sha...

AI summary SEB requested a copy of Emera's most recent proxy statement, arguing that it is relevant to Capital Structure and Financing issues, specifically SPI's approved Rate of Return.

(d) Average Capital and Cost of Capital
(d) Average Capital and Cost of Capital 21. In P-886, NSPI included Table 13 in Appendix 1 of its direct evidence. This table sets out the forecasted Average Capital and Cost of Capital for the test period. SEB submits: that in addition to...

AI summary The document discusses the need for NSPI to provide a rate of return schedule, including capital structure and cost components, to support its financial assumptions for the test year, as requested by SEB in P-886.

(c) Plant Maintenance I Depreciation I Additions I Retirement Information
(c) Plant Maintenance I Depreciation I Additions I Retirement Information 34. In P-886, UARB IR-3 asked for "the Power Production unit maintenance schedule used for the 2007 test year ( as a Gant chart and with start and end dates)." In P-...

AI summary The UARB requested information on NSPI's maintenance schedule and depreciation rates for the 2007 test year. SEB argues that NSPI should provide this information to properly analyze its forecasted depreciation rates and the reasonability of its maintenance schedule, as well as identify assumptions on retirement dates and future additions to the generating fleet.

SUMMARY OF SEB RECOMMENDATIONS
on any fuel supply or transportation studies that have been conducted. This information may play an essential role in the evaluation of the prudency of NSPI's current fuel transportation arrangements. - 15. SEB submits: that NSPI be requir...

AI summary SEB recommends that NSPI provide detailed information on fuel transportation costs, legislative requirements, emissions targets, force majeure provisions, and financial presentations to ensure transparency and prudence in its operations and financing arrangements.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →