Matter: P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2023
1 passage 1 document

Rate Base across all matters →

N-1Report 1 passage
Section 134
1 The scope of the study included the assessment of the following four options: 2 3 Option #1 ‐ Restore L-5531, L-5532, L-5535, and L-5541 to 50ºC Temperature Rating 4 Option #2 ‐ Upgrade L-5531, L-5532, L-5535, and L-5541 to 80ºC Temperat...

AI summary The study evaluates six options for upgrading or replacing existing 69 kV infrastructure with higher capacity lines or new 138 kV circuits. The scope was expanded to consider electrification impacts but was paused due to the Rate Base Procurement (RBP) process and subsequent System Impact Study requests. Work will resume once these studies are completed.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →