1 The scope of the study included the assessment of the following four options: 2 3 Option #1 ‐ Restore L-5531, L-5532, L-5535, and L-5541 to 50ºC Temperature Rating 4 Option #2 ‐ Upgrade L-5531, L-5532, L-5535, and L-5541 to 80ºC Temperat...
AI summary The study evaluates six options for upgrading or replacing existing 69 kV infrastructure with higher capacity lines or new 138 kV circuits. The scope was expanded to consider electrification impacts but was paused due to the Rate Base Procurement (RBP) process and subsequent System Impact Study requests. Work will resume once these studies are completed.