The project was initially included in NS Power's 2025 Annual Capital Expenditure Plan (ACE Plan) as a project for subsequent submission. The project was deferred to 2026 and included in the 2026 ACE Plan as a project for subsequent submiss...
AI summary NS Power's 138 kV L6043 transmission line project was initially included in the 2025 ACE Plan with a $1.35 million budget. The project was deferred to 2026 with a revised budget of $2.46 million and later updated to $3.6 million due to increased scope and costs. The Board approved the project with the revised budget and timeline extending to August 2027.