Matter: Nova Scotia Power Inc. - 2027 Annually Adjusted Rates (AARs)
2 passages 1 document

Rate Base across all matters →

N-1Application - Redacted 2 passages
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 p. p. 37
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 System Coincident Load Factor 51.81% Rate Base Average 2026 2027 Steam Plant $ 458,622 $ 419,903 $ 497,342 Steam Plant - CWIP Steam Environmental & Fuel Conversio...

AI summary The text provides a detailed breakdown of the Rate Base for various power generation assets, including Steam, Hydro, Wind, Gas Turbine, and LM6000 plants, as well as ECEI Batteries. It presents financial figures for the average period, 2026, and 2027, specifically highlighting the capital values and Construction Work in Progress (CWIP) for each facility. Additionally, it notes the system's coincident load factor of 51.81% and the annual energy requirement for ATL.

Section 216 p. p. 37
Rate Base Factors Applicable to Base Cost of Fuel Classification 48.191% 51.809%

AI summary The document provides a specific percentage breakdown for the rate base factors applicable to the base cost of fuel classification, split into two components of 48.191% and 51.809% respectively.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →