Home›Rate Design›M06319›Evidence
Topic/Matter Intersection

Topic:"Rate Design" in M06319

Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
566 passages 79 documents

Rate Design across all matters →

N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 27 passages
Preamble
Appendix C – Operating Maintenance and General Expense 5 Year Forecast Appendix D – Credit Rating Reports Appendix E - Dr. Roger A. Morin Exhibits Appendix F – Load Forecast Report Appendix G - Cost of Service Study Appendix H - Proposed T...

AI summary The document outlines various appendices related to a regulatory proceeding, including operating maintenance forecasts, credit rating reports, load forecasts, cost of service studies, proposed tariffs, and regulation changes.

22 2.2 Responding to the UARB
22 2.2 Responding to the UARB NSPI has worked diligently to be responsive to the Board's fuel directives. The Company has listened to the Board and its customers and is addressing the issues brought forth in recent Rate Decisions. On March...

AI summary NSPI has been working to comply with the UARB's fuel directives, improving its fuel procurement strategy and addressing recommendations from the 2006 Rate Decision. The company has made significant progress, including updating its fuel portfolio strategy and initiating an Integrated Resource Planning process to meet emissions control requirements.

Cost Control Strategies
Cost Control Strategies NSPI continues to control costs in all aspects of its business. The four primary strategies to control OM&G costs are as follows: - Matching of resources to the work required; - Ensuring that the most competitive so...

AI summary NSPI outlines its cost control strategies, including resource matching, competitive sourcing, long-term investment, and performance tracking. The company has restructured its operations, consolidating customer service functions and implementing governance changes, including new leadership appointments.

5.0 CAPITAL STRUCTURE AND FINANCING
5.0 CAPITAL STRUCTURE AND FINANCING 2 3 5.1 Overview 4 5 6 7 8 1 On June 21, 2006 Standard & Poor's (S&P) downgraded NSPI's credit rating from BBB+ to BBB. As a result of this action, NSPI has the lowest credit rating of any regulated elec...

AI summary This section discusses the downgrade of Nova Scotia Power Inc.'s (NSPI) credit rating by Standard & Poor's in 2006 and its implications for the company's financial position and customers. The downgrade highlights concerns over NSPI's cash flow and fuel risk, and the potential long-term cost implications for customers. The Board acknowledges the importance of maintaining a financially strong utility to ensure access to capital and provide reliable service.

1 Approach
1 Approach 2 13 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3 On March 2005, the Board authorized a ROE of 9.55 percent, with a range of 4 9.3 percent - 9.8 percent, and a deemed common equity ratio of 37.5 percent. 5 This decision was...

AI summary The document discusses the determination of a fair rate of return on common equity (ROE) for Nova Scotia Power Inc. (NSPI) based on changes in capital market conditions, investment risk, and availability of comparable investment alternatives since the 2005 Board decision.

Business Risk
Business Risk To the extent that budgeted forecasts are made prior to regulatory determination of its rates, NSPI's principal source of business risk is forecasting risk. Potential deviations from expected profitability can occur due to un...

AI summary NSPI faces significant business risks due to forecasting inaccuracies, economic cycles, weather variability, and competition from alternative energy sources. These factors contribute to volatility in revenue and operating income, particularly due to high fixed costs and exposure to coal price fluctuations.

1 Risk-Free Rate
1 Risk-Free Rate To assess whether NSPI's currently allowed ROE of 9.55 percent is reasonable, I examined the behaviour of both of these components since the Board issued its Decision in March 200578 • I also examined the currently allowed...

AI summary The analysis evaluates whether NSPI's allowed ROE of 9.55% is reasonable by comparing interest rates from 2005 and current projections. The risk-free rate has slightly increased, suggesting the allowed ROE should not be lowered and may even be raised slightly.

3 7.1 Overview
3 7.1 Overview 4 5 6 7 8 9 Peak demand and customer energy requirements have a significant effect on the costs associated with running NSPI. Growth in peak demand can affect fixed costs over the long-term, while growth in electric energy c...

AI summary The document discusses how peak demand and customer energy requirements significantly impact NSPI's costs, with growth in peak demand affecting long-term fixed costs and increased energy consumption raising variable operating costs, particularly fuel costs. Accurate load forecasting is essential for determining future costs and allocating them by customer class in the cost-of-service model.

Figure 7.3
Figure 7.3 The residential forecast model is an end-use/econometric hybrid. The end-use model incorporates changes to household appliance loads based on appliance average use, maturity rates, efficiency improvements, market saturation and...

AI summary The residential forecast model combines end-use and econometric methods to predict appliance usage and heating trends. It considers factors such as appliance efficiency, market saturation, and fuel price ratios. The model forecasts increasing use of electric space and water heating, and uses retail sales data as an economic indicator for forecasting.

1 7.5.2 Non-Firm Coincident Peak
1 7.5.2 Non-Firm Coincident Peak 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 28 29 30 31 32 Certain industrial customers who meet specific criteria may contract to have their electricity supply interrupted on short n...

AI summary The document discusses non-firm coincident peak demand, which refers to electricity that can be interrupted to maintain system stability. It outlines non-firm rate classes, notes that non-firm coincident peaks are typically around 400 MW, and explains that forecasted demand will remain stable unless there are major changes to the rate structure.

8.0 COST OF SERVICE
8.0 COST OF SERVICE 2 3 1 8.1 Overview 4 5 6 7 8 9 In the development of new rates, revenue-to-cost ratios are an important consideration. These are determined using NSPI's Cost of Service Study (COSS) which the Company has prepared for th...

AI summary The document discusses updates to NSPI's Cost of Service Study (COSS) in response to UARB directives, including methodology changes, the development of a replacement rate for ELIIR, adjustments to cost bases for Additional Energy and Unrnetered classes, and updates to street light rates and their components.

8.2 New Rate Replacing ELIIR and 2P-RTP
8.2 New Rate Replacing ELIIR and 2P-RTP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 29 30 In its March 10, 2006 Rate Decision, the UARB directed NSPI to consult with its customers and by June 30, 2006, submit a new rate to replac...

AI summary The document discusses the replacement of the ELIIR rate by NSPI following a UARB decision in 2006. NSPI was directed to consult with customers and submit a new rate by June 30, 2006, leading to hearings and a decision in September 2006. ELIIR-2 was proposed but not finalized at the time of the application, with revisions pending based on the Board's order.

9.0 REVENUE FORECAST AND PROPOSED RATES
9.0 REVENUE FORECAST AND PROPOSED RATES 2 1 3 9.1 Overview 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26 25 27 28 29 From a cost-of-service methodology perspective, NSPI's customers fall into two broad categories, BTL and ATL...

AI summary The document discusses the revenue forecast and proposed rates for NSPI, distinguishing between BTL and ATL customer categories. It explains how cost increases impact both rate classes and outlines the methodology for calculating the proposed ATL revenue increase, referencing a 2006 UARB decision regarding ELIIR-2.

9.2 Below-The-Line Classes
9.2 Below-The-Line Classes 20 21 These rates are normally prepared in the fall of each year and are submitted to the UARB for approval to be applied in the subsequent year. 23 24 25 26 22 As a result ofthe UARB's 2006 Rate Decision issued...

AI summary The document discusses the preparation and submission of Below-The-Line (BTL) rates to the UARB for approval, referencing past decisions and adjustments to rates such as the ELIIR and 2P-RTP. It also outlines forecast sales and revenue for BTL classes in 2007, highlighting the impact of rate changes on BTL revenue.

1 9.2.2 Real Time Pricing (RTP)/Load Shifting Rate
1 9.2.2 Real Time Pricing (RTP)/Load Shifting Rate 3 In recent years, NSPI has offered two RTP rates; One-Part and Two-Part RTP. 2P-RTP 4 was only available to customers also using ELIIR. The Board's September 281 hDecision 5 directs NSPI...

AI summary NSPI has offered One-Part and Two-Part RTP rates, with 2P-RTP only available to customers using ELIIR. The Board directed NSPI to revise 2P-RTP as an alternative to the former ELIIR rate. The 1P-RTP rate has been little-used since 2003 with no sales forecast for 2007.

11 9.2.3 Mersey System Rate
11 9.2.3 Mersey System Rate 12 13 14 15 17 18 19 20 This rate is based on the Mersey Agreement. The rate is forecast based on budgeted costs used for billing throughout the year, and is adjusted at year-end with a thirteenth bill or credit...

AI summary The Mersey System Rate is based on the Mersey Agreement and is forecast using budgeted costs, with adjustments made at year-end via a thirteenth bill or credit. A portion of energy sold includes 'Additional Energy,' with customers able to choose between the GRLF rate or the Large Industrial Interruptible Rider price.

9.3.1 Revenue to Cost Ratios and Proposed Changes to the Above-The-Line Rates
9.3.1 Revenue to Cost Ratios and Proposed Changes to the Above-The-Line Rates 20 21 22 23 24 25 Figure 9.1 compares projected costs to expected revenues priced at current rates, with the exception of exports and the GRLF class. This compar...

AI summary Figure 9.1 compares projected costs to expected revenues at current rates, showing a $82.5 million revenue shortfall in 2007 before any rate increases are applied to the Mersey Additional Energy rate or miscellaneous revenues.

This means that the average increase required for all remammg ATL classes is 7.3 percent. The resulting revenues and revenue-to-cost ratios for 2007 are as shown in Figure 9.2.
This means that the average increase required for all remammg ATL classes is 7.3 percent. The resulting revenues and revenue-to-cost ratios for 2007 are as shown in Figure 9.2. Figure 9.2 RIC Ratio %Revenue Increase Proposed Revenue ABOVE-...

AI summary The text discusses the required average increase for ATL classes at 7.3 percent and presents revenue and revenue-to-cost ratios for 2007. It also outlines the goal of rate-making to maintain revenue-to-cost ratios between 95 and 105 percent.

Section 253
1 2 3 4 5 6 7 8 9 Figure 9.2 shows that a simple across-the-board increase of 7.3 percent (with the exception of the Unmetered and ELIIR-2 classes) would put the General class outside of this range. 3 4 5 11 12 NSPI used a process of adjus...

AI summary NSPI adjusted a proposed 7.3% rate increase across classes to ensure all classes remained within the allowable revenue-to-cost ratio range. The General class rate increase was reduced from 8.7% to 3.5% to bring the revenue-to-cost ratio down to 105.0%, resulting in a $9.4 million revenue shortfall.

Figure 9.3
Figure 9.3 %Revenue Proposed RIC Ratio Increase Revenue ABOVE-THE-LINE CLASSES Residential 97.6% 7.3% $516.9 Commercial Small General 100.7% 7.3% $30.2 General Demand 105.0% 3.5% $252.9 Large General 97.7% 7.3% $35.3 Total Commercial 103.7...

AI summary The document presents a revenue requirement analysis showing a $9.4 million shortfall. To address this, revenues from four classes—Municipal, Large General, Large Industrial, and Residential—were increased to set their revenue to cost ratios equally at 99.1 percent, which is the lowest among all above-the-line rate classes except for ELIIR-2.

6
6 Figure 9.4 RIC Ratio % Revenue Increase Proposed Revenue ABOVE-THE-LINE CLASSES Residential 99.1% 9.0% $524.8 Commercial Small General 100.7% 7.3% $30.2 General Demand 105.0% 3.5% $252.8 Large General 99.1% 8.9% $35.8 Total Commercial 10...

AI summary The text presents a table showing proposed revenue increases and ratios for different classes of customers, including residential, commercial, industrial, and others. It also references a section on rate design, which is a key topic in regulatory proceedings.

Section 257
3 4 1 Electric rates generally comprise: 5 6 - Demand charges ($/kV A or kW); - 7 • Energy charges (cents/kWh); - Customer charges ($/month). 9 From a pure rate design perspective, demand charges are generally intended to recover the fixed...

AI summary The text explains how electric rates are structured, including demand, energy, and customer charges. It notes that NSPI is not proposing changes to customer charges or other rate components, but rather applying uniform increases to all rate components within each class to align revenue with the 95-105 percent band.

Section 258
t proposed to change), all customers within each rate class will see the same percentage increase in costs, provided there has been no change in their usage characteristics. 23 24 25 26 27 28 29 Aside from the recently approved 15 percent...

AI summary The text discusses a proposed rate increase that would apply uniformly to all customers within each rate class, assuming no change in their usage characteristics. It also mentions that the interruptible credit and transformer ownership credit remain unchanged, while other energy and demand components of the rates are proposed to increase, leading to differing overall effects among customers.

The replacement rate(s) for ELIIR are still under development and have not been included at this time.
The replacement rate(s) for ELIIR are still under development and have not been included at this time. Figure 9.5 PROPOSED INCREASES BY RATE COMPONENT RESIDENTIAL TARIFFS Domestic Service Rate units Current Rate Proposed Rate %change Custo...

AI summary The document outlines proposed increases in residential, commercial, and industrial tariffs, with the replacement rate(s) for ELIIR still under development and not included at this time. The proposed rate changes range from 0.0% to 10.2% across different rate components and customer categories.

Commercial Rate Classes Revenue Forecasts
Commercial Rate Classes Revenue Forecasts 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Commercial revenues are collected from three rate classes: Small General, General and Large General. The Small General...

AI summary The document outlines the structure of commercial rate classes (Small General, General, Large General) and the methods used to forecast revenue from each class. Each rate class has different components (customer charge, energy charge, demand charge) and calculation methods based on billing determinants, consumption, and demand projections.

3 11.1 Pending UARB Review
3 11.1 Pending UARB Review 4 5 6 NSPI has several regulatory proceedings scheduled for 2006. This Application does not incorporate any additional spending (revenue requirement) that may result from these decisions by the UARB. 7 8 9 10 11...

AI summary NSPI outlines regulatory proceedings scheduled for 2006 and notes that the 2007 Rate Application does not include additional spending from these decisions. Any changes to rates or funding for DSM, vegetation management, and relay testing programs will be reflected in the 2007 Compliance Filing.

15 11.3 2P-RTP Deferral
15 11.3 2P-RTP Deferral 16 17 18 19 20 21 22 23 The UARB Decision in the ELIIR-2 proceeding (P-883) offers the option of a new Two Part Real Time Pricing rate (2P-RTP) to customers in the ELIIR-2 customer class. A key issue in the proceedi...

AI summary The UARB Decision in the ELIIR-2 proceeding introduced a 2P-RTP rate with limitations to ensure cost neutrality. NSPI requests a true-up of unrecovered fuel expenses due to potential mismatches between credits/debits and actual fuel costs, ensuring NSPI can achieve its allowed return.

N-1-aAppendix D - Credit Rating Reports (Large File - 12 MB) 2 passages
Approximately C $1 Billion of Debt Securities Affected
nd some difficulties in NSP's relationship with its regulator Emera's rating considers the structural subordination of Emera's debt to approximately $1.6 billion of debt at its operating subsidiaries. Emera is a conservatively managed util...

AI summary The text discusses Emera's credit rating considerations, noting that approximately $1.6 billion of debt at its operating subsidiaries is structurally subordinated. It highlights that Nova Scotia Power Inc. (NSP) faces increasing debt proportions due to fuel cost escalations and capital expenditures for emission control. Furthermore, the Nova Scotia Utility and Review Board (UARB) has shown regulatory friction with NSP, specifically regarding fuel procurement strategies and the disallowance of $18 million from its fuel budget.

Issuer Review
Issuer Review issuel IV South Neview Fortis Inc. BBB+/Stable/ Laurie Conheady The ratings on Fortis and its subsidiaries were affirmed on Dec. 7, 2005, and the outlood was revised to stable from negative. Fortis' large but manageable capit...

AI summary The document provides a credit rating review for Fortis Inc. and Hamilton Utilities Corp. (HUC). Fortis Inc. received a rating affirmation with a stable outlook, attributed to its manageable capital expenditure program and ability to secure funding, despite weak credit metrics. It also notes regulatory approvals for rate increases and capital projects in its Western Canadian subsidiaries. Hamilton Utilities Corp. received a rating affirmation following a successful merger and the renewal of a revolving bank line, while awaiting a rate determination from the Ontario Energy Board.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 5 passages
1.1 Overview
1.1 Overview The overall objective of a cost of service analysis is to determine the costs associated with serving each class of customer, and to identify any inter-class inequities that may be present with regard to over or under contribu...

AI summary The text outlines the objectives and methodology of a Cost of Service Study (COSS). The primary goal is to determine the costs associated with each customer class and identify inter-class inequities based on revenue/cost ratios. It details the process of accumulating financial and operating data, allocating costs (including operating expenses, depreciation, and taxes) based on direct assignment or functional responsibility (production, transmission, distribution, and retail), and categorizing costs into demand, energy, customer, and revenue components.

1.2.2 Operating Expense
ass. The second step requires the allocation of energy related costs such as fuel, purchased power, and operating and maintenance. These were allocated on the basis of energy generated and purchased. Third, the customer related expenses ar...

AI summary The text outlines the methodology for allocating operating expenses to various customer classes to determine the net cost to each class. Energy-related costs are allocated based on generation and purchase volume. Customer-related expenses, such as billing, call center, and marketing services, are distributed using metrics like weighted customers, average customers, or defined responsibility commitments. Bad debt expenses are split based on write-off experience and secondary revenue. Finally, depreciation and taxes are allocated by function and rate base assignment to arrive at the inputs for rate design.

ALLOCATION OF AVERAGE POLE INVESTMENT
ALLOCATION OF AVERAGE POLE INVESTMENT (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) DOMESTIC $94,253 $36,707 $21 ,238 $15,056 $21 ,251 ( 2) SMALL GENERAL 5,727 2,422 1,155 994 1,15...

AI summary The document presents a table detailing the allocation of average pole investment across different customer classes. It breaks down total plant costs into primary and secondary demand and customer categories, specifically distinguishing between domestic, small general, general, general large, small industrial, medium industrial, industrial large, municipal, and unmetered categories. The table includes specific allocation factors (D-2, C-5, D-1, C-4) to determine how costs are distributed among these segments.

ALLOCATION OF OPERATING EXPENSES
ALLOCATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA Ll INTERR 2 (9) MUNICIPAL (10) UNMETERED (11) ALLOCAT...

AI summary The document presents a detailed financial table outlining the allocation of operating expenses and total demand for a utility company. It breaks down costs—including operations and maintenance, grants in lieu, depreciation, interest net of AFUDC, preferred dividends, and corporate taxes—across various customer classes such as Domestic, Small General, General, Industrial (Small, Medium, Large), Municipal, and Unmetered. The table provides specific allocation factors for both Transmission and Distribution components, totaling a demand of $271,494.

NOVA SCOTIA POWER INC. ALLOCATION OF OPERATING EXPENSES
NOVA SCOTIA POWER INC. ALLOCATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA Ll INTERR 2 (10) MUNICIPAL (11...

AI summary The document presents a detailed table of Nova Scotia Power Inc.'s operating expenses, categorized by energy classification and customer segment. It breaks down costs for fuel, purchased power (fixed and variable), operations and maintenance (including steam and hydro), depreciation, interest net of AFUDC, preferred dividends, and corporate taxes. The table also accounts for non-operating revenue from export sales and identifies specific allocation factors for various customer classes ranging from domestic to large industrial.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 41 passages
ENERGY CHARGE
ENERGY CHARGE 10.13 cents per kilowatt hour

AI summary The document specifies a unit rate for the energy charge, established at 10.13 cents per kilowatt hour.

March to November
March to November 07:00am to 11:00 pm 10.130 cents per kilowatt hour 11:00 pm to 07:00am 5.065 cents per kilowatt hour The above rates apply weekdays (Monday through Friday inclusive), excluding statutory holidays. For Saturdays, Sundays a...

AI summary The document specifies the electricity rates applicable from March to November. It outlines a time-of-use pricing structure where weekday consumption between 07:00 am and 11:00 pm is charged at 10.130 cents per kilowatt hour, while consumption between 11:00 pm and 07:00 am is charged at 5.065 cents per kilowatt hour. Additionally, a flat rate of 4.61 cents per kilowatt hour applies to all consumption on Saturdays, Sundays, and statutory holidays.

December, January and February
December, January and February 07:00am to 12:00 pm 16.010 cents per kilowatt hour 12:00 pm to 04:00pm 11 .160 cents per kilowatt hour 04:00pm to 11:00 pm 16.010 cents per kilowatt hour 11 :00 pm to 07:00am 5.580 cents per kilowatt hour The...

AI summary The document outlines the specific electricity pricing structure for the months of December, January, and February. It establishes a time-of-use rate schedule where peak periods (07:00 am to 12:00 pm, 12:00 pm to 04:00 pm, and 04:00 pm to 11:00 pm) are billed at 16.010 cents per kilowatt hour. Off-peak periods, including overnight hours and all weekend/statutory holiday consumption, are billed at a reduced rate of 5.580 cents per kilowatt hour.

MINIMUM MONTHLY CHARGE
MINIMUM MONTHLY CHARGE The minimum monthly charge shall be $18.82.

AI summary The document specifies the fixed minimum monthly charge for customers, establishing the amount as $18.82.

DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL)
DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06 Any outbuilding located on residential property adjacent to a domestic dwelling and supplied electrically through a separate meter shall have rates applied in accordance with actu...

AI summary The document outlines the rate application rules for outbuildings located on residential properties that are supplied via separate meters. It specifies that the applicable tariff depends on the primary use of the building: the Domestic tariff applies if the building is used for personal pursuits and hobbies, while General or Industrial tariffs apply if the building is used for commercial purposes.

DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06
DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06 Any outbuilding located on residential property adjacent to a domestic dwelling and supplied electrically through a separate meter shall have rates applied in accordance with actu...

AI summary The text outlines the application of the Domestic Service Time-of-Day Tariff (Rate Code 06) to outbuildings on residential properties. It specifies that outbuildings supplied via separate meters must be billed based on their primary use. If the outbuilding is used for personal pursuits and hobbies, the Domestic tariff applies; however, if the primary use is commercial, the appropriate General or Industrial tariff must be used.

ENERGY CHARGE
ENERGY CHARGE - 11.21 cents per kilowatt hour for the first 200 kilowatt hours per month - 9.86 cents per kilowatt hour for all additional kilowatt hours

AI summary The document specifies the energy charge structure for customers, detailing a two-tiered pricing model based on monthly kilowatt-hour (kWh) consumption. The first 200 kWh per month are billed at 11.21 cents per kWh, while any consumption exceeding this initial amount is billed at a reduced rate of 9.86 cents per kWh.

ENERGY CHARGE
ENERGY CHARGE 12.15 cents per kilowatt hour for the first 200 kilowatt hours per month 10.69 cents per kilowatt hour for all additional kilowatt hours

AI summary The document specifies the energy charge structure for consumers, outlining a two-tiered pricing model based on monthly kilowatt-hour consumption. Customers are charged 12.15 cents per kilowatt hour for the first 200 kilowatt hours used per month, with a reduced rate of 10.69 cents per kilowatt hour applied to all usage exceeding that initial 200 kilowatt-hour threshold.

MINIMUM MONTHLY CHARGE
MINIMUM MONTHLY CHARGE The minimum monthly charge shall be $12.65 .

AI summary The document specifies the minimum monthly charge for the utility's service, establishing a fixed amount of $12.65 that customers must pay each month.

ENERGY CHARGE
ENERGY CHARGE 8.60 cents per kilowatt hour for the first 200 kilowatt hours per month per kilowatt of maximum demand. 6.08 cents per kilowatt hour for all additional kilowatt hours.

AI summary The document specifies the components of the Energy Charge, which consists of two distinct rates based on monthly kilowatt hour (kWh) consumption. The first 200 kWh per month are charged at 8.60 cents per kWh for the first 200 kWh per month per kilowatt of maximum demand, while all subsequent kilowatt hours are charged at a reduced rate of 6.08 cents per kWh.

MAXIMUM PER KW.H CHARGE/MINIMUM BILL
MAXIMUM PER KW.H CHARGE/MINIMUM BILL The maximum charge per kW.h will be that for a billing load factor of 10% except that the minimum monthly bill shall not be less than $12.65.

AI summary The document specifies the calculation for the maximum charge per kW.h, which is based on a billing load factor of 10%. It further establishes a minimum monthly bill amount of $12.65, ensuring that customers are not charged below this threshold regardless of their actual usage.

MINIMUM MONTHLY CHARGE
MINIMUM MONTHLY CHARGE The minimum monthly charge shall be $12.65.

AI summary The document establishes the minimum monthly charge for customers, specifying that the amount shall be $12.65.

ENERGY CHARGE
ENERGY CHARGE The energy rate, in cents per kWh, will be calculated annually based on NSPI's budgets. The calculation will utilize the following formula and will be consistent with approved accounting and costing procedures. \left[ \left(...

AI summary The document outlines the methodology for calculating the energy rate in cents per kWh, which is based on Nova Scotia Power Inc.'s annual budgets. It provides a specific mathematical formula incorporating the Energy Portion of Base Load Fixed Costs, Annual Base Load Energy at an 85% Capacity Factor, Base Load Variable Costs, Base Load Energy Production, and adjustments for Loss and Export Benefits Credit. The rate is set at 5.390 cents per kW.h for the 2006 calendar year.

Load Factor Adjustment (LFA):
Load Factor Adjustment (LFA): The Energy Charge will be adjusted for varying Customer Load Factors in accordance with the following schedule: APPROVED: NOV A SCOTIA UTILITY AND REVIEW BOARD EFFECTIVE: JANUARY I, 2006

AI summary The document specifies that the Energy Charge will be adjusted based on varying Customer Load Factors. This adjustment follows a predefined schedule approved by the Nova Scotia Utility and Review Board, which became effective on January 1, 2006.

Energy Portion of Base Load Fixed Costs:
Energy Portion of Base Load Fixed Costs: The annual energy related portion of fixed costs as determined based on the total of the following: - 1. The annual energy portion of depreciation, return, interest, taxes, grants and fixed O&M on N...

AI summary The text outlines the methodology for determining the annual energy-related portion of fixed costs for Nova Scotia Power Inc. (NSPI). This includes depreciation, return, interest, taxes, grants, and fixed O&M for base load units (e.g., Tuft's Cove, Lingan) and the 138 kV and above transmission network. The energy component is derived using a forecast system load factor, which is locked in at the time of a new customer's subscription. Non-standard accounting treatments that do not benefit the rate are excluded.

Export Benefits Credit (EBC) ($/MWh):
Export Benefits Credit (EBC) ($/MWh): The Export Benefits Credit is the expected customer energy requirement under this rate divided by the adjusted Company energy requirement, multiplied by the total margin on export sales divided by the...

AI summary The text provides the formulaic definition for the Export Benefits Credit (EBC), which is a component of the rate design. The credit is calculated by taking the ratio of the expected customer energy requirement to the adjusted Company energy requirement, then multiplying that figure by the ratio of the total margin on export sales to the expected sales (MWh) to the customer under the specific rate.

12. Billing Order for Multiple-Rate Customers:
12. Billing Order for Multiple-Rate Customers: All energy taken by the customer at or above the upper limit of the Tariff Demand level shall be billed under the applicable Real Time Pricing rate. The customer will set an upper and lower th...

AI summary The document outlines the billing order for customers utilizing multiple-rate structures. It specifies that energy consumption at or above a customer-defined upper threshold (in kW) will be billed under the Real Time Pricing (RTP) rate. Conversely, energy consumption below a defined lower threshold may be billed under any Nova Scotia Power International (NSPI) rate for which the customer is eligible.

20. Annual Customer Review:
20. Annual Customer Review: Customers who elect to be on the rate will have an opportunity to independently verify the calculations and input data underlying the development of this rate, at a mutually agreeable time during normal business...

AI summary The document states that customers on the specific rate have the right to independently verify the calculations and input data used to develop the rate. This verification process can occur at a mutually agreed-upon time during regular business hours at the Company's offices in Halifax.

Annual Hourly Load Shape (AHLS)
Annual Hourly Load Shape (AHLS) The AHLS is a load shape defining one full year of energy consumption, using 8760 (8784) hours of the individual customer's usage in KWh per hour, based on customary use in absence of any identifiable load s...

AI summary The text defines the Annual Hourly Load Shape (AHLS), which represents a full year of energy consumption in kilowatt-hours per hour based on customary usage without load-shifting behaviors. For existing customers, the AHLS may be based on historical data, though they may propose alternative methods if they can prove the results are reasonably representative. For new customers, Nova Scotia Power International (NSPI) will construct an AHLS based on industry-type data unless the customer proposes a representative alternative.

Qualifying Alternative Rate (QAR)
Qualifying Alternative Rate (QAR) This is the customer's most economic alternative tariff (or tariffs) that would be applicable to the Annual Hourly Load Shape.

AI summary The document defines the Qualifying Alternative Rate (QAR) as the most economically viable alternative tariff option available to a customer based on their specific Annual Hourly Load Shape. This definition serves as a baseline for determining competitive and fair rate structures within the regulatory framework.

Decremental Shift Rebate
Decremental Shift Rebate The Decremental Shifted Load (DSL) each hour, is multiplied by the marginal price, adjusted for losses, in that hour, and summed to produce the Decremental Shift Rebate (DSR).

AI summary The document defines the calculation methodology for the Decremental Shift Rebate (DSR). The rebate is determined by multiplying the Decremental Shifted Load (DSL) for each hour by the marginal price (adjusted for losses) during that specific hour, and then calculating the sum of these values.

Incremental Export Benefit Credit
Incremental Export Benefit Credit Customers who take service under this rate will be given an Incremental Export Benefit Credit (IEBC) defined as follows: IEBC = (Lesser of Customer's Monthly DSL or NSPI' s Actual Exports calculated monthl...

AI summary The text defines the calculation for the Incremental Export Benefit Credit (IEBC) for customers under a specific rate. The credit is calculated by multiplying the lesser of the customer's monthly Distribution Service Load (DSL) or Nova Scotia Power International's (NSPI) actual exports by NSPI's average export margin for that month. A cap is established such that the total annual IEBC cannot exceed 15% of NSPI's total actual annual export margin.

Loss Adjustment
Loss Adjustment Loss adjustment factors will be applied to the ISLand the DSL. These loss adjustments will be equal to the adjustments in the 1P-RTP.

AI summary The text specifies that loss adjustment factors will be applied to the Intermediate Service Load (ISL) and the Distribution Service Load (DSL). It further clarifies that these loss adjustments are required to be equal to the adjustments applied to the 1P Real Time Pricing (1P-RTP) rate.

Pricing Period
Pricing Period Each hour of the day is a distinct pricing period, the day starting at the 00:00:01 , the first hour ending at 01:00:00. The applicable marginal price as posted on the RTP website will apply for each such period.

AI summary The text defines the structure of pricing periods for the Real Time Pricing (RTP) program. It specifies that each hour of the day constitutes a distinct pricing period, beginning at 00:00:01 and ending at 01:00:00. The applicable marginal price for each specific hour is determined by the price posted on the RTP website.

Modification of Existing CBL
Modification of Existing CBL If an existing 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (such...

AI summary The text outlines the conditions under which the Customer Billing Line (CBL) for 2P Real Time Pricing (2P-RTP) customers may be modified. Adjustments can be proposed by the Company or the customer due to significant physical plant modifications, capital expenditures, or material changes in product lines. Additionally, the CBL may be lowered or suspended in cases of significant load reductions. The annual energy consumption component of the CBL can be reset yearly by mutual agreement, with the UARB serving as the adjudicator for any disputes.

Order in which Rates are Applied
Order in which Rates are Applied With respect to the "stacking order" under which customers taking multiple rates are billed, no other rate may be taken above this rate. APPROVED: NOV A SCOTIA UTILITY AND REVIEW BOARD EFFECTIVE: JANUARY 1,...

AI summary The Nova Scotia Utility and Review Board established a 'stacking order' for customers who utilize multiple rates simultaneously. The order stipulates that no rate may be applied above a specific designated rate, ensuring a clear hierarchy in how multiple rate components are billed to customers.

Rate Mechanism
Rate Mechanism The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on his pre-de...

AI summary The text describes a rate mechanism designed to reward customers for shifting their electricity load in response to hourly pricing signals. Under this mechanism, customers are billed based on a pre-determined Annual Hourly Load Shape (AHLS) at a Qualifying Alternative Rate (QAR). Credits are issued for energy usage below the Customer Billing Line (CBL), while costs are applied for usage exceeding the CBL. Deviations from the CBL are billed or credited based on the 20-minute ahead Real Time Price.

Bill Calculation:
Bill Calculation: At the end of each month: Total Bill= AHLSbc \ + Incremental Charges - Decremental Rebate - Incremental Export Benefit Credit \ If this rate is being taken with ELIIR, CBLbc will be used instead of AHLSbc·

AI summary The text outlines the monthly bill calculation formula for customers under specific rate structures. The total bill is determined by multiplying the Annual Hourly Load Shape Base Cost (AHLSbc) by a rate factor, then adjusting for incremental charges, decremental rebates, and incremental export benefit credits. It further specifies that if the Energy Literacy and Inclusion Initiative (ELIIR) is applied, the Customer Billing Line base cost (CBLbc) replaces the AHLSbc in the calculation.

Relationship with ELIIR
Relationship with ELIIR Because of the unique nature of ELIIR, the calculation of the CBLbc is more complex when the customer's QAR is ELIIR. The calculation of the CBLbc in that case is as follows:

AI summary The document describes the specific methodology for calculating the Customer Billing Line base cost (CBLbc) for customers under the Energy Literacy and Inclusion Initiative (ELIIR). It notes that due to the unique nature of the ELIIR program, the calculation for these customers is more complex than standard rate structures and provides a specific formulaic approach for these cases.

Upper ELIIR and Lower ELIIR Thresholds (UET and LET)
Upper ELIIR and Lower ELIIR Thresholds (UET and LET) These are the upper and lower demand boundaries, expressed in kW, for load taken under the ELIIR rate, as defined in the ELIIR tariff. The difference between the UET and the LET is the T...

AI summary The text defines the Upper ELIIR Threshold (UET) and Lower ELIIR Threshold (LET) as demand boundaries in kW for loads under the ELIIR rate. The difference between these thresholds constitutes the Tariff Demand (TD). It specifies that when 2P-RTP is used with ELIIR, NSPI must approve the TD. If NSPI rejects a proposed TD, the utility bears the burden of proving that the rejection is necessary to prevent significant problems or inequities.

Customer's Alternative Cost (CAC)
Customer's Alternative Cost (CAC) This represents the customer's cost of energy for all load above the LET, and is calculated in the fall of each year preceding the active rate year using the Annual Hourly Load Shape and ELIIR only, or ELI...

AI summary The document defines the methodology for calculating the Customer's Alternative Cost (CAC), which represents energy costs for loads exceeding the Lower ELIIR Threshold (LET). Customers can choose between two modeling options: using the Energy Literacy and Inclusion Initiative (ELIIR) only, or a combination of ELIIR and 1P-RTP. The calculation involves determining the difference between the Upper ELIIR Threshold (UETcac) and the LET, applying average marginal costs for the 1P-RTP option, and summing these monthly costs to produce an annual figure.

Example:
Example: Assume the ELIIR + 1P-RTP is the option chosen by the customer Assume a one month period of 744 hours. Assume LET = 20 MW Assume Annual Hourly maximum demand = 60 MW Assume UETcAc = 55 MW Assume energy between LET and the UETcAc =...

AI summary The text provides a calculation example for a customer choosing the ELIIR + 1P-RTP option over a one-month period of 744 hours. It outlines specific assumptions for load factors, marginal costs, and energy consumption between various thresholds (LET and UETcAc). The final calculation demonstrates a total cost of $1,176,600. The document notes that the Two Part Real Time Pricing Tariff by Nova Scotia Power Incorporated was approved by the Nova Scotia Utility and Review Board in 2006 but has since been discontinued.

Forecast ELIIR Cost (FEC)
Forecast ELIIR Cost (FEC) This is the customer's anticipated ELIIR cost as determined in the Fall of each year preceding the active rate year. It is based on the cost that results from using the UET and the monthly ELIIR load factors that...

AI summary The document describes the methodology for calculating the Forecast ELIIR Cost (FEC), which represents the customer's anticipated cost for the Energy Literacy and Inclusion Initiative. The FEC is determined annually in the fall based on the Upper ELIIR Threshold (UET), monthly ELIIR load factors, and energy consumption between the Lower ELIIR Threshold (LET) and the UET under the Customer Billing Line (CBL). An example calculation is provided illustrating how the ELIIR rate and energy volume are multiplied to derive the FEC.

CBL Base Cost (CBLbc)
CBL Base Cost (CBLbc) The monthly cost of energy for all energy under the CBL but above the UET. This is determined in the fall of each year preceding the active rate year and it is equal to the difference between the CAC and the FEC. This...

AI summary The document defines the Customer Billing Line base cost (CBLbc), which represents the monthly cost of energy for usage exceeding the Upper ELIIR Threshold (UET). It is calculated as the difference between the Customer's Alternative Cost (CAC) and the Forecast ELIIR Cost (FEC). This calculation method is designed to maintain a consistent total customer bill prior to load shifting and to prevent the creation of artificial benefits resulting from the establishment of the UET.

Special Conditions
Special Conditions - 1. During periods of economic interruption, where the customer does not buy through, both the CBL and UET will be lowered by the amount of load interruption requested by NSPI. Any load reduction below this adjusted UET...

AI summary This document outlines special conditions for the Two Part Real Time Pricing (2P-RTP) tariff, specifically regarding the Energy Literacy and Inclusion Initiative (ELIIR). It establishes rules for adjusting the Customer Billing Line (CBL) and Upper ELIIR Threshold (UET) during economic interruptions or supply disruptions caused by system conditions. It also specifies how energy consumption above the CBL is priced during interruptions and defines which threshold governs the Customer's Alternative Cost (CAC) when calculating ELIIR rates.

ENERGY CHARGE
ENERGY CHARGE - 9.56 cents per kilowatt hour for the first 200 kilowatt hours per month per kilowatt of connected load. - 6.32 cents per kilowatt hour for all additional kilowatt hours.

AI summary The document specifies the energy charge structure for a utility service. It establishes a tiered pricing model where the first 200 kilowatt-hours per month per kilowatt of connected load are billed at 9.56 cents per kilowatt-hour, while all subsequent kilowatt-hours are billed at a reduced rate of 6.32 cents per kilowatt-hour.

ENERGY CHARGE
ENERGY CHARGE 10.28 cents per kilowatt hour for the first 200 kilowatt hours per month per kilowatt of connected load. 6. 79 cents per kilowatt hour for all additional kilowatt hours.

AI summary The document specifies the energy charge rates for electricity consumption. It establishes a two-tiered pricing structure: a lower rate of 10.28 cents per kilowatt-hour for the first 200 kilowatt-hours per month per kilowatt of connected load, and a higher rate of 6.79 cents per kilowatt-hour for all additional kilowatt-hours consumed beyond that threshold.

ENERGY CHARGE
ENERGY CHARGE - 9.56 cents per kilowatt hour for the first 200 kilowatt hours per month per kilowatt of connected load. - 6.32 cents per kilowatt hour for all additional kilowatt hours. The flat rate calculation (using a 30 day month) will...

AI summary The document specifies the energy charge structure for a service, detailing a tiered pricing model based on kilowatt-hour (kWh) consumption. The first 200 kWh per month per kilowatt of connected load are charged at 9.56 cents per kWh, while any additional consumption is billed at a reduced rate of 6.32 cents per kWh. The calculation assumes a 30-day month and the final charge is rounded to the nearest hundredth of a cent.

MAXIMUM PER KW.H CHARGE/MINIMUM BILL
MAXIMUM PER KW.H CHARGE/MINIMUM BILL The maximum charge per kW.h will be that for a billing load factor of 10% except that the minimum monthly bill shall be $12.65 per month if such unmetered service is billed separately from any metered a...

AI summary The document specifies the billing rules for unmetered service, establishing a maximum charge per kW.h based on a billing load factor of 10%. It further defines a minimum monthly bill of $12.65, which applies specifically when unmetered service is billed as a separate item from any metered account.

AVAILABILITY:
AVAILABILITY: A flat rate shall be calculated for any service requiring the supply of power and energy only, with a predeterminable usage, and where metering is considered to be impractical, such as: Telephone Booths, Cable Vision Power Su...

AI summary The text establishes a regulatory requirement for a flat rate to be calculated for services that provide power and energy with predeterminable usage in locations where metering is impractical. Examples of such services include telephone booths, cable vision power supplies, traffic control lights, police telephones, and railway signals. This provision was approved by the Nova Scotia Utility and Review Board effective March 10, 2006.

MAXIMUM PER KW.H CHARGE/MINIMUM BILL
MAXIMUM PER KW.H CHARGE/MINIMUM BILL The maximum charge per kW.h will be that for a billing load factor of 10% except that the minimum monthly bill shall be $12.65 per month if such unmetered service is billed separately from any metered a...

AI summary The document specifies the pricing structure for unmetered service, establishing a maximum charge per kilowatt-hour based on a billing load factor of 10%. Additionally, it mandates a minimum monthly bill of $12.65 for unmetered service when it is billed independently from a metered account.

N-1-aAppendix F - Load Forecast Report (Large File - 16 MB) 1 passage
1 One-Part Real Time Price (JP-RTP)
1 One-Part Real Time Price (JP-RTP) 2 3 This is an energy-only rate based on NSPI's 20 minute-ahead forecast hourly marginal energy 4 costs plus differing fixed cost adders for on-peak and off-peak usage. It is available to customers 5 ser...

AI summary The document describes the One-Part Real Time Price (JP-RTP), an energy-only rate structure offered by Nova Scotia Power Inc. (NSPI). The rate is based on 20-minute-ahead hourly marginal energy costs with fixed cost adders for on-peak and off-peak usage. It is designed to incentivize customers with loads of 2,000 kVA or more to shift energy consumption to off-peak periods. However, the text notes that the rate became less attractive to customers in 2003 due to rising off-peak marginal costs.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 3 passages
Response IR-1: (cont'd)
Response IR-1: (cont'd) - b. The question refers to line 22, not line 32. NSPI used the ELIIR rate applicable at the time of the Application to calculate ELIIR-2 revenue in figure 9 .1. Since the time of the Application, the new ELI 2P-RTP...

AI summary The response clarifies that line 22, not line 32, was used for calculating ELIIR-2 revenue. NSPI applied the ELIIR rate at the time of the Application, but a new ELI 2P-RTP rate was later approved and adopted by StoraEnso and Bowater starting December 1, 2006. The figure on line 22 will be updated with revisions from the response to UARB IR-48.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-2: Page 3 of the NSPI letter of October 23, 2006 with respect to the ELIIR true-up mechanism contains the statement "Unless the cost neutrality of the new rate is ensured, its...

AI summary The UARB asked NSPI if its rate application included an estimate of the impact of the ELIIR true-up mechanism on other rate classes. NSPI responded that its application did not include such an estimate, as the final tariff structures had not yet been set and SEB had not selected a preferred option. NSPI assumed revenue from the ELIIR-2 or ELI 2P-RTP rates would recover the costs of serving the load.

Response IR-2: (cont'd)
Response IR-2: (cont'd) Now that the Board has issued the final tariff structures, and both customers have selected the ELI 2P-RTP, NSPI is able to assess the possible effects. The results of the true-up mechanism will be transacted betwee...

AI summary NSPI discusses the implications of the true-up mechanism following the final tariff structures and customer selection of ELI 2P-RTP. NSPI asserts that rate increases for other customer classes will not be revised due to the true-up, as costs would be deferred and recovered from other customers, depending on discrepancies and customer behavior.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 4 passages
NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary The document serves as a formal heading for a regulatory proceeding before the Nova Scotia Utility and Review Board. It identifies the legal authority under the Public Utilities Act and notes that Nova Scotia Power Incorporated is seeking regulatory approval for revisions to its rates, charges, and regulations.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Response IR-48: ( cont' d) The two customers were given the choice of two rates- an Extra Large Industrial Two Part Real Time Pricing rate (ELI 2P-RTP), and ELIIR as revised by Dr. Stutz...

AI summary The UARB responded to an information request regarding the rate selection and fuel forecasting for two extra-large industrial customers. Both customers elected the ELI 2P-RTP rate, which requires a flat Customer Baseline Loadshape (CBL) agreed upon with NSPI. The UARB notes that while the current fuel forecast was based on historical off-peak loadshapes, the new rate structure requires NSPI to serve a flat CBL. Any load shifting benefits from this arrangement will be provided to the customers as 2P-RTP credits.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-50: Reference Pages 168-173. Please prepare a modified version of Figure 9.4 assuming that the RIC ratio for General Demand is held to 106.95 percent and all other ATL rates r...

AI summary The Utility and Rate Board (UARB) requested a modified version of Figure 9.4 from Nova Scotia Power Inc. (NSPI) to reflect a specific RIC ratio for General Demand (106.95 percent) with equal percentage increases for other Above the Line (ATL) rates. NSPI provided the modified figure but noted that the Unmetered class was not adjusted in the same manner as other ATL classes, citing specific reasons provided in the Revenue Section of their Application.

Proof of Revenue (Column 3, Table 6, Appendix A)
Proof of Revenue (Column 3, Table 6, Appendix A) Total Large Industrial 1,053.4 $ 55.4 1,053.4 $ 55.4 2.14 $ 11.8 $ 67.2 Total Industrial 1,810.3 $ 98.4 77.38 $ 4.3 1 887 7 $ 102.8 4.95 $ 33.8 $ 136.6 ., - 1,00111 ¥ .02.0 \ 100.0 Other Mun...

AI summary The document provides a detailed financial breakdown of revenue proof for various customer classes, including Large Industrial, Industrial, Municipal, and Unmetered categories. It specifically highlights 'Above-the-line' and 'Below-the-line' classes, with the latter including RTP, ELIIR, and GRLF and Mersey Contract components. The data tracks various cost components, rate impacts, and specific financial metrics across these different customer segments.

N-2-bRIRs 70 to 75 - NSUARB to NSPI - REDACTED (Large File - 33 MB) 43 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-71: Reference Appendix B, Page 43. It is stated that: "Labour decrease due to realignment of bonuses and incentives associated with the realignment of staff to Emera." - a. Pl...

AI summary The document is a response to an information request regarding the realignment of staff to Emera and the associated bonuses and incentives. It asks for the forecasted 2007 costs and a description of the work functions of the realigned staff in 2005, 2006, and 2007.

Question IR-72: Reference Appendix F
Question IR-72: Reference Appendix F - a. The title page of the Load Forecast report states Prepared September 2006. However, page 4, line 6 states it was prepared in the spring of 2006. In what month was the forecast prepared? - b. When i...

AI summary This section of the regulatory proceeding contains a series of questions directed at the Load Forecast report, focusing on discrepancies in dates, sources of data, and methodology for weather adjustments. The questions aim to clarify inconsistencies and obtain detailed explanations from the preparers of the report.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Response IR-72: (cont'd) The load adjustments due to weather are based on monthly heating degree-day (HDD) difference from normal multiplied by monthly factors which indicate the change i...

AI summary The UARB corrected an error in the weather adjustment calculation for load adjustments, changing the growth rate from 1.8% to 2.1% when adjusted for weather. This correction does not affect the 2007 Forecast. The calculation uses heating degree-day (HDD) differences and monthly factors derived from regression analysis.

Question IR-73: Appendix G
Question IR-73: Appendix G - a. Page 5, (last line but one): Provide an explanation of why wind assets are assigned 30% to 3CP demand and the remaining plant to energy. - b. Exhibit 7: Why isn't line 17 the same as Appendix A, Table 2, lin...

AI summary The document includes three questions related to energy sales, demand allocation, and load factor discrepancies. It asks for explanations on wind asset allocation, differences in line values between exhibits, and changes in peak demand forecasts while energy sales remain constant.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-74: Appendix H: Please file the two 2007 proposed ELIIR tariffs. Response IR-74: See Attachment 1. This attachment contains the present (2006) and proposed (2007) Extra Large...

AI summary The UARB responded to NSPI's request for the two 2007 proposed ELIIR tariffs by providing the 2006 and proposed 2007 ELI 2P-RTP tariff, noting that the ELIIR-2 tariff is not required as eligible customers have opted for the ELI 2P-RTP rate.

AVAILABILITY:
AVAILABILITY: - 1. This tariff is available to customer load formerly served under the Extra Large Industrial Interruptible Rate (ELIIR) and 2P-RTP tariffs, specifically that of StoraEnso Port Hawkesbury Ltd (StoraEnso ), and Bowater Merse...

AI summary This tariff applies to specific industrial customers previously under ELIIR and 2P-RTP tariffs, with conditions on voltage, priority interruption, and exclusivity. Customers must commit to the tariff for at least twelve months and cannot use it with the lP-RTP rate.

RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism aims to align customer load usage with hourly pricing signals. Customers are billed based on a predetermined CBL at the Standard Energy Charge, with credits for energy usage below the CBL and additional costs for energy above it, calculated using the 20-minute ahead marginal cost from NSPI's RTP website.

Order in which Rates are Applied
Order in which Rates are Applied Customers may elect to utilize other rates below the ELI 2P-RTP. In such case, the customer will make written request to the Company, specifying the MW level above which ELI 2P-RTP is to apply. Such changes...

AI summary Customers can choose to use the ELI 2P-RTP rate below other rates by making a written request to the Company, specifying the MW level above which ELI 2P-RTP applies. This change will take effect for the next full calendar year of billing. No other rate may be applied above the ELI 2P-RTP rate in the stacking order for billing.

Pricing Period
Pricing Period Each hour of the day is a distinct pricing period, the day starting at the 00:00:01 , the first hour ending at 01:00:00. The applicable 20 minute ahead marginal price as posted on the RTP website will apply for each such per...

AI summary The document defines the pricing period as each hour of the day, starting at 00:00:01 and ending at 01:00:00. The 20-minute ahead marginal price posted on the RTP website applies for each hour.

Customer Baseline Load (CBL)
Customer Baseline Load (CBL) This is a flat line load shape used for the operational purpose of calculating hourly Incremental Load (IL) and Decremental Load (DL). The CBL level (in MW) is to be calculated as the average hourly demand of t...

AI summary The Customer Baseline Load (CBL) is a flat line load shape used to calculate hourly Incremental Load (IL) and Decremental Load (DL). It is based on the average hourly demand from the customer's annual forecast total energy requirement, excluding system losses, and is calculated annually from January 1st to December 31st.

Forecast Total Energy Requirement
Forecast Total Energy Requirement Forecast total energy requirement from the Company is determined using the customer's total actual annual energy requirement (excluding system losses) from the Company for the previous 12 month period endi...

AI summary The forecast total energy requirement is based on the customer's previous 12-month energy consumption, with the customer submitting a proposed CBL by November 15th. NSPI has two weeks to accept or reject the proposal, and if there is a disagreement, the matter can be referred to the UARB for resolution.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The Marginal Cost (MC) is defined as the 20-minute ahead forecast of hourly marginal fuel and variable O&M costs, excluding electricity exports but including imports. NSPI calculates the MC forecast based on in-province load requirements, and projections are provided to customers daily and updated for major changes. The actual billing price is the MC adjusted according to the Decremental Rebate section of the tariff.

Decremental Load (DL)
Decremental Load (DL) This is the hourly energy calculated as the difference between the CBL and the actual demand when actual demand is less than the CBL. When other tariffs are used below ELI 2P-RTP, DL in any hour is limited to the amou...

AI summary Decremental Load (DL) refers to the hourly energy difference between the CBL and actual demand when actual demand is less than the CBL. DL is limited by the lower ELI 2P-RTP threshold when other tariffs are used below ELI 2P-RTP.

Decremental Rebate (DR)
Decremental Rebate (DR) The Decremental Load (DL) each hour, is multiplied by the MC, or a fraction of the MC as defined below, adjusted for losses, in that hour, and summed to produce the Decremental Rebate (DR). APPROVED: NOVA SCOTIA UTI...

AI summary The Decremental Rebate (DR) is calculated by multiplying the Decremental Load (DL) each hour by the Marginal Cost (MC) or a fraction thereof, adjusted for losses, and summing the results over time.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) DL will be credited according to the following schedule: - The credit for decrements, up to 30 MW for Bowater, and 75 MW for StoraEnso will be at MC as defined by this t...

AI summary The document outlines the credit schedule for decremental load under the ELI 2P-RTP tariff. Credits vary based on the amount of decrement, with different percentages of MC and the ELI 2P-RTP Standard Energy Charge applied. Eligibility is capped at 20% of the customer's annual CBL energy, after which no further shifting rebates apply.

Incremental Export Benefit Credit
Incremental Export Benefit Credit Customers who take service under this rate will be given an Incremental Export Benefit Credit (IEBC) defined as follows: IEBC = (Lesser of Customer's Monthly DL or NSPI's Actual Exports calculated monthly)...

AI summary The Incremental Export Benefit Credit (IEBC) is defined as the lesser of a customer's monthly demand or NSPI's actual exports multiplied by NSPI's average export margin, with an annual cap of 15% of NSPI's total actual annual export margin.

Modification of Existing CBL
Modification of Existing CBL If an existing ELI 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (...

AI summary The document outlines procedures for modifying an existing CBL (Customer Billing Load) when an ELI 2P-RTP customer makes significant physical plant modifications or experiences load reductions. If the customer and NSPI cannot agree, the matter will be referred to the UARB for adjudication.

Supply Interruption:
Supply Interruption: This tariff is interruptible for supply reasons. The customer will reduce its available interruptible system load by the amount requested by NSPI within ten (10) minutes of such request by the Company. Following interr...

AI summary This section outlines the rules for supply interruption under an interruptible tariff, requiring customers to reduce load within 10 minutes of a request by NSPI. Penalties apply for non-compliance, and interruptions are limited to specific hours per day and week. Customers must provide contact information for load reduction.

Conversion of Interruptible Load to Firm
Conversion of Interruptible Load to Firm Should a customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capacity av...

AI summary Customers under the interruptible load rate can convert to firm service with five years' notice, and may return to interruptible service after two years under the firm rate. The company may allow earlier conversions if needed.

Order of Supply Interruption:
Order of Supply Interruption: In the event of an interruption required in order to avoid shortfalls in electricity supply, rate classes will be called upon to provide capacity to NSPI in the following order: - 1. Generation Replacement and...

AI summary The document outlines the order in which rate classes will be called upon to provide capacity to NSPI during supply interruptions, prioritizing Generation Replacement and Load Following (GRLF) Rate, followed by Extra Large Industrial Interruptible Rate-2 and ELI 2P-RTP Rate, and finally the Interruptible Rider to the Large Industrial Rate.

Suspension of 2P-RTP Billing Mechanism
Suspension of 2P-RTP Billing Mechanism The Rate will be suspended during any period in which the customer's load is reduced due to a disruption in the supply of electricity to the customer because of an interruption call or NSPI system con...

AI summary The 2P-RTP billing mechanism will be suspended during electricity supply disruptions, with the customer estimating lost energy and being charged at the Standard Energy Charge. Disputes will be resolved by the UARB.

Sole Supplier
Sole Supplier NSPI reserves the right to be the sole supplier of all external power requirements (i.e. excluding self-generation) for customers taking service under this tariff. APPROVED: NOV A SCOTIA UTILITY AND

AI summary NSPI retains the right to be the sole supplier of external power for customers under this tariff, excluding self-generated power. This was approved by the Nova Scotia Utility and Regulatory Board.

Power Factor Correction
Power Factor Correction Under normal operating conditions, an average power factor over the entire billing period, calculated for kWh consumed and lagging kVAR-h, as recorded, of not less than 90% lagging for the total customer load (under...

AI summary The text outlines a regulation requiring customers to maintain an average power factor of at least 90% lagging over a billing period. If this requirement is not met, an adjustment factor will be applied to the Energy Charge.

Preamble
Metering will normally be at the low side of the transformer and, for billing purposes, meter readings will be increased by 1.75%. Should the customer's requirements make it necessary for the Company to provide primary metering, the custom...

AI summary The document outlines the standard metering practices, specifying that metering is typically at the low side of the transformer with a 1.75% increase in readings for billing. If primary metering is required, the customer must cover the additional cost as a capital contribution. Any special metering or communication systems required by the customer are also the customer's responsibility.

Standard Energy Charge
Standard Energy Charge The standard energy charge, before accounting for shifting credits or additional charges, is 5.993¢ per kWh. This charge will apply to all Customer Baseline Load (CBL) energy, regardless of actual consumption. The en...

AI summary The standard energy charge is set at 5.993¢ per kWh and applies to all Customer Baseline Load energy. The charge is calculated using NSPI's approved Cost of Service Study for the load forecast under the ELIIR-2 and ELI 2P-RTP tariffs.

RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism allows customers to benefit from adjusting load usage according to hourly pricing signals. Billing is based on a predetermined CBL at the Standard Energy Charge, with credits for energy use below the CBL and additional costs for energy use above the CBL, calculated using the 20-minute ahead marginal cost from NSPI's RTP website.

Order in which Rates are Applied
Order in which Rates are Applied Customers may elect to utilize other rates below the ELI 2P-RTP. In such case, the customer will make written request to the Company, specifying the MW level above which ELI 2P-RTP is to apply. Such changes...

AI summary The document outlines the process by which customers can elect to use the ELI 2P-RTP rate and specifies that written requests must be submitted to the Company, with changes taking effect in the next full calendar year. It also clarifies that no other rate may be applied above the ELI 2P-RTP rate when customers are taking multiple rates.

Pricing Period
Pricing Period Each hour of the day is a distinct pricing period, the day starting at the 00:00:01 , the first hour ending at 01:00:00. The applicable 20 minute ahead marginal price as posted on the RTP website will apply for each such per...

AI summary The document defines the pricing period as each hour of the day, starting at 00:00:01 and ending at 01:00:00. The applicable 20-minute ahead marginal price from the RTP website is used for each hour.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The document defines marginal cost (MC) as a 20-minute ahead forecast of hourly fuel and variable O&M costs, excluding electricity exports but including imports when they affect marginal costs. The MC forecast is calculated by NSPI based on in-province load requirements and is used for billing purposes, adjusted by the Decremental Rebate section of the tariff.

Decremental Load (DL)
Decremental Load (DL) This is the hourly energy calculated as the difference between the CBL and the actual demand when actual demand is less than the CBL. When other tariffs are used below ELI 2P-RTP, DL in any hour is limited to the amou...

AI summary Decremental Load (DL) is defined as the hourly energy difference between the Customer Billing Load (CBL) and actual demand when actual demand is less than the CBL. DL is limited below the ELI 2P-RTP threshold.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) DL will be credited according to the following schedule: - The credit for decrements, up to 30 MW for Bowater, and 75 MW for StoraEnso will be at MC as defined by this t...

AI summary The ELI 2P-RTP tariff outlines how decremental load (DL) is credited for Bowater and StoraEnso, with different rates depending on the amount of decrement. Credits are based on a percentage of the marginal cost (MC) or the standard energy charge, with a 20% limit on eligible decremental load relative to the customer's annual CBL energy.

Losses Adjustment:
Losses Adjustment: A 2% adjustment to metered energy will be applied to determine requirement including system losses. This Loss adjustment will be applied in determining the IL and the DL.

AI summary A 2% adjustment to metered energy is applied to account for system losses in determining the IL and DL. This adjustment is part of the process for calculating energy requirements.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) CBL Base Cost (CBLbc) The CBLbc is the monthly cost of energy under the CBL. It is calculated according to the following formula: Monthly CBLbc = (Standard Energy Charge...

AI summary The document outlines the calculation of the CBL Base Cost (CBLbc) under the ELI 2P-RTP tariff, which is determined by multiplying the Standard Energy Charge by the annual energy under CBL and dividing the result by 12.

Modification of Existing CBL
Modification of Existing CBL If an existing ELI 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (...

AI summary The document outlines procedures for modifying the Customer Billing Load (CBL) when ELI 2P-RTP customers make significant physical plant modifications or experience substantial load reductions. Adjustments may be proposed by the customer or NSPI, and if disagreements arise, the matter will be referred to the UARB for resolution.

Use of Self-Generation
Use of Self-Generation Unless existing customer-owned generation is to be retired, for purposes of determining forecast CBL energy, the continued use of such generation is to be appropriately accounted for in the customer's CBL energy requ...

AI summary The document discusses the continued use of self-generation by customers for determining forecast CBL energy requirements, emphasizing that existing customer-owned generation should be appropriately accounted for and used in a normal fashion.

Supply Interruption:
Supply Interruption: This tariff is interruptible for supply reasons. The customer will reduce its available interruptible system load by the amount requested by NSPI within ten (10) minutes of such request by the Company. Following interr...

AI summary This section outlines the procedures and penalties related to supply interruptions for customers under the ELIIR-2 and ELI2P-RTP tariffs. Customers must reduce load within 10 minutes of NSPI's request, and failure to comply results in penalty charges. Interruptions are limited to 16 hours per day and 5 days per week, with specific annual and monthly limits.

Conversion of Interruptible Load to Firm
Conversion of Interruptible Load to Firm Should a customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capacity av...

AI summary Customers under an interruptible load rate must provide five years' notice to convert to firm service, with the possibility of earlier conversion at the company's discretion. Customers may return to interruptible service after two years under the firm rate, also subject to earlier conversion at the company's discretion.

Suspension of 2P-RTP Billing Mechanism
Suspension of 2P-RTP Billing Mechanism The Rate will be suspended during any period in which the customer's load is reduced due to a disruption in the supply of electricity to the customer because of an interruption call or NSPI system con...

AI summary The 2P-RTP billing mechanism will be suspended during periods of electricity supply disruption. Customers must estimate lost energy during the disruption, which will be charged at the Standard Energy Charge. Disputes will be resolved by the UARB.

Power Factor Correction
Power Factor Correction Under normal operating conditions, an average power factor over the entire billing period, calculated for kWh consumed and lagging kV AR-h, as recorded, of not less than 90% lagging for the total customer load (unde...

AI summary The document outlines requirements for maintaining a power factor of at least 90% lagging for customer load under normal operating conditions. If this is not met, adjustment factors will be applied to the energy charge.

• Time-of-use rates
• Time-of-use rates The rates offered by some utilities vary depending on the season and/or time when energy is consumed. In the United States, for example, several utilities set a higher price in summer, when demand for air conditioning i...

AI summary Time-of-use rates vary by season and consumption timing, with examples from the U.S. and Quebec showing different demand patterns. An annual average price is used for utilities offering such rates, and Appendix 8 lists affected utilities.

General - Large Power
General - Large Power Power Consumption Voltage Load factor 5,000 kW 2,340,000 kWh 25 kV 65% 5,000 kW 3,060,000 kWh 25 kV 85% 10,000 kW 5,760,000 kWh 120 kV 80% 30,000 kW 17,520,000 kWh 120 kV 81% 50,000 kW 23,400,000 kWh 120 kV 65% 50,000...

AI summary The document presents a table comparing power consumption voltage, load factor, and associated costs across various Canadian and American cities, with data spanning different power consumption levels and voltage capacities.

Adjustment Clauses
Adjustment Clauses Below is a list of utilities whose rates include adjustment clauses that may cause fluctuations in the price of electricity even though base rates have not been adjusted. Boston Edison, MA Demand-Side Management Charge E...

AI summary The text lists various utilities and their adjustment clauses that can cause electricity price fluctuations. These include charges related to energy efficiency, renewable energy, decommissioning, and tax adjustments across multiple jurisdictions.

Commonwealth Edison (ComEdY
Commonwealth Edison (ComEdY Chicago, Illinois Since it sold its generating assets, Com Ed, a subsidiary of Exelon Corporation, purchases, transmits and distributes electricity on the wholesale and retail markets. On the retail market, it s...

AI summary The text provides an overview of Commonwealth Edison (ComEd) and Detroit Edison, highlighting their operations in Illinois and Michigan, respectively. It notes that both companies operate in restructured electricity markets, with specific details on customer service, market restructuring dates, and rate freezes for different customer segments.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 2 passages
e. Regulatory Amortization
e. Regulatory Amortization Accounting for the impact of rate regulation: In accordance with the regulations of the UARB, significant assets of NSPI, which are not currently being used and are not expected to provide service to customers in...

AI summary The text outlines the regulatory amortization policy for Nova Scotia Power Incorporated (NSPI) assets that are no longer in service or expected to provide future service. Specifically, it details the UARB's approval to amortize the Glace Bay generating station over five years, with provisions for annual write-off flexibility to maintain rate stability. The unamortized portion remains on the balance sheet as property, plant, and equipment, governed by specific UARB-approved accounting policies rather than standard cost-recovery timing.

Deferred Restructuring Costs
Deferred Restructuring Costs In order to provide rate stability, the UARB allows NSPI to defer the cost of large early retirement and severance programs, and amortize the resulting deferred charges on a straight-line basis over a three-yea...

AI summary The text explains the UARB's policy of allowing Nova Scotia Power Incorporated (NSPI) to defer costs associated with large early retirement and severance programs to ensure rate stability. These deferred charges are amortized on a straight-line basis over three years; without this allowance, 2005 net earnings would have been significantly higher. Additionally, the text notes a price rebate of approximately $48.4 million from a long-term natural gas purchase agreement, which is currently reflected in long-term receivables.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 5 passages
OVERVIEW
OVERVIEW Bangor Hydro is the second largest electric utility in Maine. BHE's core business is the transmission and distribution ("T&D") of electricity. Electricity generation is deregulated in Maine, and several suppliers compete to provid...

AI summary Bangor Hydro Electric (BHE) is a Maine-based electric utility primarily engaged in transmission and distribution. The company manages significant 'regulatory' assets (stranded costs) from the late 1990s industry restructuring, which account for 30% of its electric rate. BHE's operations are split between regulatory jurisdictions: distribution and stranded costs are regulated by the Maine Public Utilities Commission (MPUC) under an Alternate Rate Plan (ARP), while transmission is regulated by the Federal Energy Regulatory Commission (FERC).

EQUITY EARNINGS
EQUITY EARNINGS Equity earnings from the Maritimes & Northeast Pipeline were $1.7 million in Q4, 2005 compared to $1.2 million for the same period in 2004. The increase is primarily due to increases in tol ls collected for the US operation...

AI summary The document details the equity earnings of Maritimes & Northeast Pipeline (M&NP) for 2004 and 2005, noting an increase in 2005 primarily driven by higher tolls from US operations. It discusses the pending FERC rate decision for 2004, the interim collection of proposed rates, and the potential return of excess funds to customers. The text also highlights how earnings were impacted by pipeline expansion write-offs, currency fluctuations, and lower volumes in the US component.

Bangor Hydro
Bangor Hydro Bangor Hydro's business consists of four primary components wh ich are each governed by their own regulatory structure. The components include distribution, transm ission , standard costs, and supply (metering, billi ng, and s...

AI summary The document outlines the four primary components of Bangor Hydro's business: distribution, transmission, standard costs, and supply. BHE's distribution business operates under an Alternate Rate Plan (ARP) requiring annual rate decreases and performance penalties, with the potential for higher returns on equity. Transmission is regulated by FERC and linked to the Regional Transmission Organization for New England. BHE can recover stranded costs for regulatory assets and power purchases, while metering and billing costs are recoverable as prudently incurred.

1. SUJ\1MARY <H SIGNIFICANT ACCOUNTING POLICIES
capital structure. Rates were last set using 9.55% ROE with a common equity component of 37.5% of total capitalization. NSPI's accounting policies are subject to examination and approval by the UARB. Bangor Hydro's core business is the tra...

AI summary The text outlines the capital structure and accounting policies for Nova Scotia Power Inc. (NSPI) and Bangor Hydro (BHE). It details BHE's dual regulatory environment: transmission is regulated by FERC, while distribution and stranded costs are regulated by the Maine Public Utilities Commission (MPUC). BHE operates under an Alternate Rate Plan (ARP) for distribution, featuring an earnings band of 5% to 17% ROE. Additionally, the MPUC allows a 10% ROE on BHE's stranded assets, requiring periodic proceedings to adjust estimates.

Deferred Restructuring Costs
Deferred Restructuring Costs In order to provide rate stability, the UARB allows NSPI to defer the cost of large early retirement and severance programs, and amortize the resulting deferred charges on a stra ight-line basis over a three-ye...

AI summary The text discusses the regulatory treatment of deferred restructuring costs for Nova Scotia Power Inc. (NSPI) and Blue Energy (BHE). The Utility Analysis Review Board (UARB) permits NSPI to defer and straight-line amortize large early retirement and severance program costs over three years to ensure rate stability. Similarly, the Maritime Provincial Utilities Commission (MPUC) allowed BHE to defer and amortize specific employee transition and IT outsourcing costs over ten years. The document highlights that without these approvals, these costs would have significantly reduced reported earnings.

N-2-bRIRs 1 to 26 - AEC to NSPI - REDACTED (Large File - MB) 4 passages
Response IR-7: See the table below. Please note that average monthly bills 1 reflect one month of consumption and are before taxes.
Response IR-7: See the table below. Please note that average monthly bills 1 reflect one month of consumption and are before taxes. Average Monthly Bill at current rates Average Monthly Bill at proposed rates $ increase o;o Increase Non-Al...

AI summary Atlantic Energy Corporation (AEC) provides a breakdown of average monthly bill changes for customers under proposed rates compared to current rates. The data highlights a projected increase of $7.10 (8.8%) for non-all-electric customers and a $13.77 (9.4%) increase for all-electric customers. The response notes that these figures are based on one month of consumption and exclude taxes.

Question IR-12:
Question IR-12: What is the Company's policy with regards to disconnection of domestic customers during the winter months? - a. Would NSPI support a regulatory change to reflect that electrical power to domestic customers cannot be disconn...

AI summary The Information Request (IR-12) seeks clarification on Nova Scotia Power Inc.'s (NSPI) policy regarding the disconnection of domestic electricity customers during winter months. Specifically, it asks whether NSPI supports a regulatory moratorium on disconnections from November 30 to April 30, or if they would prefer regulatory changes to address the impact of higher electricity rates during the peak heating season.

Dalhousie Legal Aid Service A Community Service of Dalhousie University
d included a proposal for a. Universal Service Program. In support of those submissions, we filed a report by Roger D. Colton that can be found at htto://law.dal.ca/files/ Colton Direct Evidence. pdf. While the Board concluded that the rec...

AI summary Dalhousie Legal Aid Service, supported by evidence from Roger D. Colton, proposed a Universal Service Program to address the unsustainable energy burdens faced by low-income Nova Scotians. The submission highlights that low-income families often must choose between heating and food, leading to dangerous living conditions. While the Board ruled that a 'Rate Assistance Program' was beyond its jurisdiction, it offered to assist in future legislative or rate-making changes regarding low-income consumer assistance.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AEC Question IR-24: Provide the details of any low income energy assistance programs provided by Emera or its subsidiaries including but not limited to Bangor Power? Response IR-24: Bangor Hyd...

AI summary Atlantic Energy Corporation (AEC) responded to an information request regarding low-income energy assistance programs within Emera and its subsidiaries. The response identifies that Bangor Hydro operates the State Wide Low-Income Assistance Plan (LIAP), which offers discounted distribution rates for low-income residential customers based on Federal Poverty Guidelines. The discount ranges from 30 to 60 percent for customers consuming over 100 kWh per month. AEC clarified that transmission, energy, and base rates are not discounted and that no other Emera subsidiaries offer similar programs.

N-2-cRIRs 1 to 39 - CA to NSPI - REDACTED (Large File - 14 MB) 5 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-9: Identify the fuel forecast assumed in the calculation of the ELIIR-2 rate pursuant to the Board Order in P-883. To the extent if at all that it is different from the fuel for...

AI summary Canada Nova Scotia Electricity Corporation (CA) responded to an information request regarding the fuel forecast used in the ELIIR-2 rate calculation from Board Order P-883. CA clarified that the ELIIR-2 rate was based on a 2006C forecast of $434.1 million, whereas the 2007 Rate Application forecast is $498.7 million. Furthermore, CA noted that major customers Stora and Bowater have opted for the ELI 2P-RTP rate instead of ELIIR-2 for 2007.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-22: With respect to residential time of day rates, please explain the allocation of the revenue requirement to the three time periods, with particular attention to the peak peri...

AI summary Canada Nova Scotia Electricity Corporation (CA) clarifies the structure of residential time of day (TOD) rates in response to an information request. CA explains that TOD rates are linked to standard residential rates and are not modeled as a separate class in the Cost of Service Study. The response details the historical evolution of rate components from 1996 to 1998, noting adjustments made to increase customer acceptance, and describes the methodology for allocating the total residential revenue requirement across different time periods.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Response IR-22: (cont'd) across-the-board by the same percentage such that the revenue requirement from these two classes combined is achieved. The revenue contribution of the TOD class in...

AI summary Canada Nova Scotia Electricity Corporation (CA) responds to an information request regarding the revenue requirements and price differentials for Time of Day (TOD) rates. CA argues that increasing the differential between on-peak and off-peak rates may not necessarily result in greater load shifting, noting that high initial on-peak charges led to low customer acceptance. CA suggests that further increasing on-peak charges would reduce adoption, while decreasing off-peak charges would fail to recover service costs.

NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary This document segment introduces a regulatory proceeding before the Nova Scotia Utility and Review Board. Nova Scotia Power Incorporated is seeking formal approval for revisions to its rates, charges, and regulations under the authority of the Public Utilities Act.

6.7.3 Findings
ect? There's no other operating expenses per se. I'm not talking about capital expenditures, I'm talking about operating expenses. - A. (Biunden) Yes, I understood you to mean OM&G expenses, correct. - Q. Yes. So in view of that, then, how...

AI summary The discussion focuses on the reviewer's methodology for evaluating Other Management and General (OM&G) operating expenses. The reviewer notes a significant 15 percent increase (approximately $29 million) in OM&G costs for the current year and questions how the review process identified specific categories where potential savings or cost reductions could be achieved to mitigate requested rate increases.

N-2-dRIR 40 to 75 - CA to NSPI - REDACTED (Large File - 23 MB) 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-50: Referencing pp. 78-79, including Figure 4.6, please state whether it is fair to conclude from this Direct Evidence that NSPI does not foresee any efficiencies in 2007 in Cus...

AI summary The response to IR-50 indicates that NSPI is implementing cost control strategies in Customer Operations and has accounted for efficiencies in the 2007 Rate Filing. The response references Figure 4.5 and directs to UARB IR-38 for further information. Inflationary and emerging costs are also anticipated.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-53: Reference Appendix B (confidential), p.22-23, Thermal OM&G, please explain in more detail why the cost for Materials was considerably higher in the 2006C amount than in 2005...

AI summary The response explains that the higher material costs in 2006C compared to 2005 actual, 2006 forecast, and 2007 forecast were due to increased maintenance and plant outage costs for reliability, timing adjustments after Rate Case approval, and changes in contract costs at Tufts Cove and Trenton. Lower material costs in 2007 were attributed to fewer planned outages.

N-2-dRIRs 1 to 46 - CME to NSPI - REDACTED (Large File - 18 MB) 5 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-2: Reference Page 5, Lines 13-18 Explain in detail how the "true up" mechanism is anticipated to work and what is incorporated therein to avoid larger lump sum payments to rman...

AI summary CME requested clarification on the 'true up' mechanism for the new Extra Large Industrial Two Part Real Time Pricing rate to ensure it reflects actual load value without creating large lump-sum payments. NSPI responded that the true-up is intended to work in both directions, benefiting both the customer and the company. NSPI proposes providing monthly status updates to the Board and customers to ensure transparency regarding year-end costs, with the option for more frequent settlements than annually.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Response IR-10: (cont'd) recovery over three years and provided that the under-recovered sums earn interest. As a result of this plan, the increases will be about 5.4 percent for residenti...

AI summary CME provides a response to an information request regarding a recovery plan for under-recovered sums. The plan proposes a three-year recovery period where under-recovered amounts will earn interest. The projected rate increases resulting from this plan are approximately 5.4 percent for residential customers, 6.6 percent for commercial customers, and 8.3 percent for industrial customers.

Georgia Power
Georgia Power In February 2005, Georgia Power asked for and received a substantial rate increase tied to higher fuel costs (Docket No. 19142, FCR-17). In March 2006 Georgia Power applied for another rate increase tied to fuel costs. (Docke...

AI summary The document outlines the regulatory history of Georgia Power's fuel cost recovery requests between 2005 and 2006. It details a series of rate increase applications (FCR-17, FCR-18, and FCR-19) driven by fuel costs exceeding current recovery levels. Following a partial approval and an order to file more frequently, Georgia Power submitted a significantly higher rate request in November 2006. The text notes that while the company can recover actual costs, the primary driver for these requests is the desire to mitigate projected under-collections.

NOVA SCOTIA UTILITY AND REVIEW BOARD
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges and...

AI summary This document represents the introductory heading of a proceeding before the Nova Scotia Utility and Review Board. It identifies the regulatory framework as the Public Utilities Act and notes that Nova Scotia Power Incorporated is seeking approval for revisions to its rates, charges, and regulations.

Response IR-21: (cont'd)
Response IR-21: (cont'd) Senior Cost and Rates Specialist: Responsible for preparation and maintenance of the Cost of Service Study and administration of existing rates. Administrative Assistant: Provides administrative support for departm...

AI summary The document provides a breakdown of the specific job roles and responsibilities within a utility's regulatory department. It lists various personnel, including specialists for cost and rates, pricing, and technical advice, as well as administrative and project management roles. These positions are tasked with maintaining cost-of-service studies, performing revenue analysis for rate design, and managing regulatory projects such as general rate applications.

N-2-eRIRs 1 to 7 - HRM to NSPI - REDACTED 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: HRM Question IR-7: With respect to NSPI's updated cost of service analysis for street lighting, pages 11 and 12 and Schedule 9: - a. Please provide all calculations and workpapers in support o...

AI summary The document is a request for detailed information regarding NSPI's updated cost of service analysis for street lighting, specifically focusing on the calculation of the 'Misc. Small Loads Tariff Rate Components & 1kW lighting load' and its implications on the Power and Energy Rate component, as well as the breakdown of functional components of the tariff.

Response IR-7: (cont'd)
Response IR-7: (cont'd) (c) Increases to rate components within each customer class are proposed to be applied uniformly in all classes. - (d) Generation, transmission, distribution, customer and other costs are allocated to customer class...

AI summary The response outlines how rate components are uniformly applied across customer classes, how costs are allocated to classes rather than individual tariff components, and clarifies the assumptions and figures related to lighting costs. It also explains the application of load shapes and the use of the Misc. Small Loads Tariff.

N-2-fRIRs 1 to 18 - MEUNSC to NSPI - REDACTED 6 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: MEUNSC Question IR-2: Reference: Direct Evidence Page 63 "Incremental load increase is 111 GWh at a cost of $19.6 million." - a. Please explain the difference between the 17.65¢/kWh incrementa...

AI summary The Maritime Energy Users Notice Committee (MEUNSC) requested clarification from Nova Scotia Power Inc. (NSPI) regarding the incremental cost calculations for load increases. MEUNSC questioned the discrepancy between the reported 17.65¢/kWh incremental cost and the 10.32¢/kWh Load Following rate, suggesting the cost should be lower given the load size. NSPI responded that MEUNSC's calculations were incorrect, clarifying that the $19.6 million fuel cost increase applies to a 130.8 GWh net system requirement at a unit cost of 14.98¢/kWh.

Response IR-7: (cont'd)
Response IR-7: (cont'd) b.-e. The revised Generation Replacement Load Following loss factor results from a change in the way in which the Additional Energy portion ofBowater's load has been displayed. Until 2005, this energy had been taken...

AI summary The respondent explains a revision in the Generation Replacement Load Following loss factor, which stems from a change in how Bowater's 'Additional Energy' portion is categorized. Previously priced at the Load Following rate, this energy was moved to the Large Industrial rate with the Interruptible Rider following a 2004 UARB decision. While the load was moved from the GRLF class to Mersey Rate energy for reporting purposes, the respondent clarifies that the overall loss percentage for the combined Below The Line industrial load remains unchanged.

Question IR-8: Reference: Direct Evidence Page 172, Lines 2-5
Question IR-8: Reference: Direct Evidence Page 172, Lines 2-5 - a. The approach taken to recover the shortfall results in the Municipal class receiving the largest increase. Please indicate what the increases for the four affected classes...

AI summary The Information Request (IR-8) focuses on the methodology used to recover a shortfall in revenue. The intervenor questions the current approach, which results in the Municipal class receiving the largest and only double-digit increase among the A TL classes. The intervenor requests a comparative analysis of how the shortfall would be distributed if based on revenue to maintain the relativity of Rate Increase Components (RIC) across the four affected classes.

Response IR-8:
Response IR-8: - a. Please refer to Attachment 1. - b. The Municipal class received the largest percentage rate increase because its revenue-to-cost ratio was the lowest of the all rate classes, other than ELIIR-2, before accounting for th...

AI summary Nova Scotia Power Inc. (NSPI) explains the rationale for the rate increase in the Municipal class. The company asserts that the Municipal class experienced the largest percentage rate increase because it had the lowest revenue-to-cost ratio among all rate classes, with the exception of ELIIR-2, prior to accounting for a $9.4 million revenue shortfall.

DATE FILED: November 20, 2006 MEUNSC IR-8 Page 1 of 1
DATE FILED: November 20, 2006 MEUNSC IR-8 Page 1 of 1 Figure 9.4 Modified %Revenue Proposed RIC Ratio Increase Revenue ABOVE-THE-LINE CLASSES Residential 99.01% 8.9% $524.5 Commercial Small General 100.73% 7.3% $30.2 General Demand 105.00%...

AI summary The document presents a detailed breakdown of the proposed revenue requirement and Rate Increase Component (RIC) ratios for various customer classes. It categorizes electricity users into 'Above-the-line' classes (Residential, Commercial, Industrial, and Other) and 'Below-the-line' categories (Exports and Miscellaneous). The data highlights specific percentage revenue increases, ranging from -0.9% for Unmetered services to 11.1% for Large Industrial ELIIR-2, totaling a proposed revenue requirement of $1.197.6 million.

Question IR-17: Reference: Direct Evidence Page 1218, Regulatory Risk
Question IR-17: Reference: Direct Evidence Page 1218, Regulatory Risk - a. Please indicate the impact on the "regulatory lag" aspect of this risk component of the recent UARB decision to defer the 2005 Quarter 1 tax impacts; and, if approv...

AI summary The text addresses regulatory risks associated with Nova Scotia Power Inc.'s (NSPI) proposal to defer $18.3 million in fuel costs for recovery in 2008. It specifically questions how the UARB's decision to defer 2005 tax impacts affects 'regulatory lag' and whether this fuel cost deferral provides protection against credit rating downgrades. Additionally, it seeks clarification on how periodic rate increases under a Fuel Adjustment Mechanism (FAM) would be permitted given legislative restrictions on the frequency of rate increases.

N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-71: Please provide all supporting workpapers and calculations used in developing all weighting factors used in Exhibit SA of Appendix G. Response IR-71: The weighting factors u...

AI summary The response to Information Request IR-71 explains that weighting factors in Exhibit 8A were developed by Ernst and Ernst in 1977 and approved by the Board. The ELIIR-2 class factor was set equal to the Large Industrial Class, and the Unmetered Class factor was revised from five to two based on a customer service cost function review filed in 2006.

Response IR-91: (cont'd)
Response IR-91: (cont'd) Function Percentage Generation 36.0 Transmission 11.0 Distribution 26.0 Customer/Retail 27.0 Total 100.0 This functionalization was produced using the business judgement of the various corporate head office groups.

AI summary The functionalization of costs is divided into Generation (36.0%), Transmission (11.0%), Distribution (26.0%), and Customer/Retail (27.0%), determined through the business judgment of corporate head office groups.

N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB) 6 passages
2.0 THE C-3 WEIGHTED CUSTOMER ALLOCATOR
2.0 THE C-3 WEIGHTED CUSTOMER ALLOCATOR There has been discussion and debate about the use of the Cost of Service Study's C-3 Weighted Customer Allocator which is used to allocate certain customer-related expenses to ATL classes. There has...

AI summary Nova Scotia Power Inc. (NSPI) proposes a revision to the C-3 Weighted Customer Allocator used to allocate customer-related expenses to above-the-line (ATL) classes. NSPI argues that the Unmetered Class does not disproportionately cause costs in customer service head office and field areas, leading to a proposal to switch these costs to the C-1 Allocator. For Billing Services and Call Centre functions, NSPI conducted a review of effort and call volumes, proposing reduced weighting factors for the Unmetered Class based on specific analysis of LED conversions and call metrics.

1 4.0 STREET I CROSSWALK LIGHTING STUDY
1 4.0 STREET I CROSSWALK LIGHTING STUDY Street and Crosswalk lighting represent 90% of the total number of NSPI's unmetered service units and the total revenue collected from customers. As stated previously, NSPIowned streetlights include...

AI summary The text introduces a 2006 update to the 1977 Street and Crosswalk Lighting Study, noting that these services account for 90% of Nova Scotia Power Inc.'s unmetered service units and total revenue. It outlines the composition of charges for NSPI-owned and customer-owned lights, which include power and energy, maintenance, and capital recovery components. The update involves reviewing inventory levels, maintenance costs, installation labor, depreciation, weighted average cost of capital, material costs, lamp life, and revenue based on current inventory.

4.8 Schedule 9 -New Street and Crosswalk Lighting Rates by Cost Component
4.8 Schedule 9 -New Street and Crosswalk Lighting Rates by Cost Component 5 6 7 8 9 10 11 12 13 14 15 16 17 4 Once the analysis of all costs components was complete, they were summarized in Schedule 9 including the rate description, the ra...

AI summary This section details the methodology for establishing new street and crosswalk lighting rates based on cost components. It explains that incandescent rates were benchmarked against Mercury Vapour rates (250W and 400W). The power and energy component calculation is derived from annual photocell and continuous burning energy usage to determine average cents per kWh. Finally, the analysis notes that the new rates result in a projected revenue increase of $0.276M for 2006 compared to current approved rates.

5.0 CONCLUSION
5.0 CONCLUSION In order to ensure that the three components of unmetered rates remain aligned with costs, NSPI proposes to update this Street I Crosswalk Lighting Study each time the Company files a future general rate application. The Com...

AI summary Nova Scotia Power Inc. (NSPI) proposes a methodology update for unmetered rates to ensure the three cost components remain aligned with actual costs. Instead of applying an average across-the-board rate adjustment, NSPI intends to review and revise individual cost components for specific fixture types during each future general rate application. While the official tariffs will continue to display unmetered rates as single figures, the underlying pricing will reflect these individual components. Additionally, NSPI proposes updating terminology to reflect 'High Pressure Sodium' lighting.

Section 75
Customer Costs Assigned to Unmetered Class Using C-3 Allocator:

AI summary The document segment introduces the methodology for assigning customer costs to the unmetered class. It specifies the use of the C-3 allocator as the mechanism for this cost distribution.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Stutz Question IR-21: Reference DE, pages 173 and 176 Please explain why the demand and energy charges for the Large Industrial Rate shown in Figure 9.5 increases less than the average revenue...

AI summary The text provides a response to an information request regarding the Large Industrial Rate. Nova Scotia Power Inc. (NSPI) explains that while demand and energy charges increase at a lower rate than average revenue, this is because revenue is also influenced by supply-interruptible and transformer ownership credits. Since these credits remain unchanged in the current Rate Application, the specific charge increases are adjusted to ensure that the total anticipated revenue aligns with the total revenue requirement.

N-7-aRIRs 85 to 104 [105 to 107 (Filed 03/05/2007)] - NSUARB to NSPI - REDACTED 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-92: Reference Board StaffiR-1 Please provide an update of Figure 9.1 (page 168) using the ELI-2P- RTP rates approved by the Board in P-883, i.e 55.06 $/MWh for energy. Respons...

AI summary The UARB responds to NSPI's request for an updated figure using ELI-2P-RTP rates approved by the Board in P-883. The response notes that the figure is based on the Standard Energy Charge only and does not account for net credits or increased fuel costs. NSPI has requested a true-up mechanism to align net credits with actual costs.

Response IR-104: (cont'd)
Response IR-104: (cont'd) hedged positions that NSPI has put in place as part of its fuel portfolio strategy. In addition to updating commodity prices, NSPI revised the load shape based on the requirements associated with the new ELI 2P-RT...

AI summary NSPI has updated commodity prices and revised the load shape as part of its fuel portfolio strategy, specifically in response to the requirements of the new ELI 2P-RTP rate.

Key specific deliverables, due no later than July 31, 2006, include:
Key specific deliverables, due no later than July 31, 2006, include: - 1. Comprehensive review ofNSPI's Operations and Organizational Structure: - a) Overall assessment ofNSPI in the context of utility best practice - b) Identification of...

AI summary The key deliverables include a comprehensive review of NSPI's operations and organizational structure, focusing on efficiency improvements, benchmarking, and cost recovery arrangements. The consultant may also assist in regulatory hearings and provide expert testimony.

N-7-aRIRs 8 to 23 - HRM to NSPI - REDACTED 1 passage
Response IR-11: ( cont' d)
Response IR-11: ( cont' d) The two tariffs have been increased differently during each rate case proceeding since 1996. The current relationship of Unmetered costs to the rate components of the Miscellaneous Small Loads Tariff cannot be de...

AI summary The response addresses the structure of the Miscellaneous Small Loads Tariff, noting that its relationship to Unmetered costs cannot be determined due to differing tariff increases since 1996. It provides a hypothetical 2007 energy rate of 8.96 cents per KWh if the tariff used a flat energy rate instead of a declining block rate. Finally, it clarifies that the tariff's demand and energy components are not tied one-to-one to specific costs determined in the COSS, as rates are set by the Board to be cost-based at the class level.

N-7-aRIRs 27 to 39 - AEC to NSPI - REDACTED 11 passages
%Share
%Share 2006 Rate 2006 Rate Case Case Proposed Requested Year 1990 1995 2000 Present Rates Rates Available Test Year 1992 1996 2002 2007 2007 Residential 46.0% 43.7% 43.6% 43.6% 44.2% General Small General 1.6% 5.6% 1.1% 2.5% 2.5% General 2...

AI summary The document presents a comparative table of electricity rate shares for various customer classes (Residential, General, and Industrial) across multiple test years, including 1990, 1995, 2000, 2007, and a proposed rate case. It highlights the distribution of revenue across different categories such as Small General, Large General, and various Industrial segments, including specific components like ELIIR, RTP, and Mersey Basic Block.

What is the Time-of-Day (TOO) Rate?
What is the Time-of-Day (TOO) Rate? Nova Scotia Power offers a Time-of-Day (TOD) rate as an optional rate available to residential customers. Customers who qualify for the rate, can take advantage of low-cost electricity by focusing on the...

AI summary Nova Scotia Power offers an optional Time-of-Day (TOD) rate for qualifying residential customers. This rate structure is designed to provide lower-cost electricity by encouraging energy usage during off-peak periods. The pricing reflects the actual generation costs of electricity. The rate is particularly compatible with electric-based heating systems that utilize storage and timing controls to manage energy consumption patterns.

What do you mean by "off-peak" times?
What do you mean by "off-peak" times? There are different times throughout the day, and different seasons throughout the year when demand for electricity is higher. Nova Scotia Power must be able to produce and distribute enough electricit...

AI summary The text explains the concept of 'off-peak' times in the context of electricity demand, noting that while peak times require Nova Scotia Power to ensure sufficient generation and distribution capacity, off-peak times have excess capacity. To manage load and encourage customers to shift their electricity usage to these periods of lower demand, Nova Scotia Power offers a Time-of-Day (TOD) rate.

How can I use the majority of my power "off-peak"?
How can I use the majority of my power "off-peak"? There are various electric-based space heating systems that qualify for use with the TOD rate because they draw energy during low cost "off-peak" times and store the heat for release later...

AI summary The text explains how customers can utilize the Time-of-Day (TOD) rate to reduce costs by using electric-based space heating systems with thermal storage. These systems are designed to draw energy during low-cost 'off-peak' periods and store that heat for later use. This contrasts with traditional electric heating, which consumes power on demand, regardless of the time of day, thereby missing the cost-saving benefits of the TOD rate structure.

Cost is measured in ¢/kWh ALL YEAR - Weekends & Holidays (115 days)
Cost is measured in ¢/kWh ALL YEAR - Weekends & Holidays (115 days) Time of Day Rate Base Charge: $18.62/mth Standard Residential Rata: Base Charge: $10.83/mth Energy Charge: 10.13¢/kWh (24hoursl365 days) All costs based on rates of March...

AI summary The document outlines the rate structure for residential electricity, specifically detailing the Time of Day Rate and Standard Residential Rate. It specifies a monthly base charge of $18.62 for the Time of Day Rate and $10.83 for the Standard Residential Rate. The energy charge is set at 10.13¢/kWh, applicable 24 hours a day, 365 days a year, including weekends and holidays. All costs are based on rates established on March 10, 2006.

How do you know what to bill me?
How do you know what to bill me? Qualifying customers will have their regular meter replaced with a Time-of-Day (TOO) meter. A TOO meter records the amount of power used, the time of day the usage occurred, and the season that we are in. T...

AI summary The text explains how Time-of-Day (TOD) meters enable differentiated billing for qualifying customers. These meters record electricity consumption based on the specific time of day and season, including holiday tracking. This allows the utility to bill customers at variable costs, where 'on-peak' usage incurs premium pricing and 'off-peak' usage is billed at a reduced rate (half of the standard residential rate), as illustrated by a laundry example.

How can I qualify for the TOD rate?
How can I qualify for the TOD rate? In order to qualify for the TOD rate you must have an electric-based space heating system that has the capacity to store heat with appropriate timing and controls in place approved by Nova Scotia Power....

AI summary The text outlines the eligibility requirements for the Time-of-Day (TOD) rate, which is available to customers with electric-based space heating systems capable of storing heat. These systems must have approved timing and controls from Nova Scotia Power. It highlights that Electric Thermal Storage (ETS) can be implemented as central heating or individual units, offering a clean and safe alternative to oil-fired systems with potential cost savings.

How Do I Find Out More?
How Do I Find Out More? For information on Nova Scot ia Power's Time-Of-Day rate and lease-to-own financing, call 1-800-428- NSPI (6774) or visit www.nspower.ca. To learn more about Electric Thermal Storage heating systems contact an ETS c...

AI summary The document provides contact information for Nova Scotia Power Inc. (NSPI) regarding their Time-Of-Day rate and lease-to-own financing options. It also directs consumers to find local contractors for Electric Thermal Storage (ETS) heating systems via the NSPI website.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AEC Question IR-29: Please provide the proportion of residential consumers who depend on the charitable rate, seasonal rate and time of day rate as outlined in the Response to IR 5. a. Please...

AI summary Access Energy Corporation (AEC) submitted a response to a request for information (IR-29) from Nova Scotia Power Inc. (NSPI). The request seeks to identify the proportion of residential consumers utilizing specific rate structures, namely the charitable rate, seasonal rate, and time-of-day (TOD) rate. AEC is tasked with explaining the definition of the 'charitable rate' and providing the specific regulatory references governing it.

The percentage breakdown of customers using rates included m the Residential class as of September 30, 2006 is as follows:
The percentage breakdown of customers using rates included m the Residential class as of September 30, 2006 is as follows: Residential Sector Count Percentage Domestic Households 392,500 92.1 Seasonal Customers 27,700 6.5 Time-of-Use Custo...

AI summary The text provides a customer breakdown for the Residential class as of September 30, 2006, showing that domestic households make up the vast majority (92.1%) of the class. It also identifies the specific types of customers included in the Charitable rate, noting that these are commercial customers qualifying under Section 73 of the Public Utilities Act, such as senior citizen's clubs, volunteer fire departments, and community halls.

Domestic rate or charge in certain cases
Domestic rate or charge in certain cases (3) Subject to subsection (4), the rate or charge for electric energy supplied by an electric public utility to a customer that is a senior citizens club, service club, volunteer fire department, a...

AI summary The text outlines a specific regulatory provision regarding the pricing of electric energy for various community and non-profit organizations. It mandates that electric public utilities must provide electricity to entities such as senior citizens clubs, volunteer fire departments, community halls, charitable organizations, and religious institutions at a rate or charge that does not exceed the standard domestic rate.

N-7-aRIRs 47 to 67 - CME to NSPI - REDACTED 1 passage
NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary This document fragment introduces a formal proceeding before the Nova Scotia Utility and Review Board. It identifies the legal basis for the proceeding under the Public Utilities Act and notes that Nova Scotia Power Incorporated is seeking regulatory approval for revisions to its rates, charges, and regulations.

N-7-bRIRs 19 to 22 - MEUNSC to NSPI - REDACTED 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: MEUNSC Question IR-19: NSPI's demand billed rates make no provision for anomalous situations which may create demand spikes (examples: cold load pick up, capacitor failure). Can the words "sub...

AI summary Nova Scotia Power Inc. (NSPI) opposes adding the phrase "subject to any correction for anomalies" to its demand-based tariffs. NSPI argues that its current ratcheted demand charge is already designed to recover costs associated with winter peak demands and send price signals to large customers. The company contends that phenomena like cold load pick-up are understood industry effects rather than "anomalies" and notes that the Board previously declined to order rate changes regarding this specific issue in a 2005 proceeding.

N-7-bRIRs 92 to 141 - SEB to NSPI - REDACTED (Large File - 11 MB) 1 passage
NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary The Nova Scotia Utility and Review Board (NSUB) issued a response to an information request from Nova Scotia Power Incorporated (NSPI). The request asked for an update to Figure 2.10, titled 'Uncommitted Volumes,' in NSPI's application for rate revisions. NSPI responded that the requested information is confidential and therefore withheld from disclosure.

N-7-bRIRs 11 to 17 - NSDOE to NSPI - REDACTED 1 passage
Response IR-15:
Response IR-15: - a. Combustion Turbines (CT) usage is expected to be higher in 2007 due to load growth. Unlike the former Extra Large Industrial Interruptible Rate (ELIIR) tariff, the new ELI 2P-RTP rate is not explicitly designed to redu...

AI summary The response clarifies the impact of the new ELI 2P-RTP rate on combustion turbine (CT) usage compared to the former ELIIR tariff. Unlike ELIIR, the new rate provides hourly price signals to customers without explicitly targeting combustion turbine reduction. Additionally, the response confirms that combustion turbine fuel costs for in-province load are now included in the Above the Line (ATL) rates, noting that revenue from export sales offsets these costs.

N-10Comments filed by Allan F. Smith 1 passage
Working With Customers and Other Stakeholders
Working With Customers and Other Stakeholders On page 4 of the introduction, line 13, the company suggests it must actively manage its costs. But stops short on what that means. They talk about rate of return, a fair rate of return, and a...

AI summary The text criticizes NSPI for not fully addressing cost management and for taking a restrictive approach in its application process. It highlights a lack of stakeholder collaboration and calls for the Board to introduce conservation requirements and eliminate the base rate. The author argues that the base rate is seen as unfair and urges a more cooperative effort to reduce peak demand and high winter consumption.

N-12Evidence filed by John Stutz on behalf of NSUARB 3 passages
VIEWS AND APPROACH?
VIEWS AND APPROACH? A. Yes, it is. In its recent decision in the ELIIR Replacement Proceeding the Board explained its views and procedures as follows: "As long as the RIC ratio falls within the target range of95% to 105%, the Board is sati...

AI summary The Board has stated that as long as the RIC ratio remains between 95% and 105%, it considers all customer classes to be treated fairly. It has also approved rates outside this range when necessary for rate stability, as explained in its recent decision in the ELIIR Replacement Proceeding.

3 REQUEST?
3 REQUEST? 1 4 A. 5 6 7 8 9 10 11 12 13 14 15 16 17 Yes, I do. The actual fuel costs incurred by a utility rarely match the costs reflected in the utility's rates. For example, in a mild winter the fuel cost for serving the residential cla...

AI summary The text discusses concerns about the proposed true-up mechanism for ELI 2P-RTP, arguing that it would create inequities and risks for customers by requiring adjustments based on sunk costs. The speaker opposes the true-up, emphasizing that it would be inconsistent with existing rate structures and could make ELI 2P-RTP unworkable.

Section 32
- 1. The related, "practical" attributes of simplicity, understandability, public acceptability, and feasibility of application. - 2. Freedom from controversies as to proper interpretation. - 3. Effectiveness in yielding total revenue requ...

AI summary The text outlines eight principles for setting public utility rates, emphasizing simplicity, revenue stability, fairness, and efficiency. These principles aim to ensure effective and equitable rate structures that discourage wasteful use while promoting justified service consumption.

N-13Evidence of Robert D. Greneman on behalf of HRM 3 passages
US. and Other:
ity and Review Board on behalf of HRM in NSUARB-P-881. I am also a licensed professional engineer in the states of New York and New Jersey. - Q3. What evidence are you presenting in this proceeding? - A3. I am presenting evidence on behalf...

AI summary The witness presents evidence on behalf of HRM regarding concerns with NSPI's cost of service study, particularly the methodology used in the updated street lighting analysis and the allocation of field labour costs to the unmetered service class.

Schedule 5- Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Labour Only
Schedule 5- Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Labour Only Rate Class Total Percent of Meter Reading Processing Billing Inquires Large accounts requiring manual effort Unmetered accounts with...

AI summary The table details the distribution of labor resources across different rate classes, focusing on the processing of meter readings, billing, and inquiries. It highlights the number of accounts, FTEs, and operating budgets allocated per rate class, including a weighting factor for unmetered accounts.

Schedule 6 - Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Non-Labour
Schedule 6 - Table 2 (Modified Unmetered Accts with more than 10 lights & LED TCL conversions) Non-Labour Rate Class Total Accounts Percent of Accounts Meter Reading Processing Billing Inquires Large accounts requiring manual effort Unmete...

AI summary Schedule 6 - Table 2 provides a breakdown of accounts related to modified unmetered accounts with more than 10 lights and LED TCL conversions, detailing FTEs, operating budgets, and percentages across various rate classes.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 10 passages
DO YOU HAVE ANY GENERAL COMMENTS ON THE COMPANY'S DEVELOPMENT OF ITS ANTICIPATED TEST YEAR FUEL-RELATED COSTS?
of gas and heavy fuel oil. We hope that additional information, to be provided by NSPI 4 by January 8, will allow us to adjust NSPI's filed costs to produce reasonable figures for 5 the test year. 6 7 There are a variety of ways that curre...

AI summary The document discusses concerns regarding Nova Scotia Power Inc.'s (NSPI) submitted fuel-related costs and the need for additional information to ensure accuracy. The Board is considering various adjustment methods, including normalization, but expresses concern over NSPI's lack of cooperation in providing necessary data, which could lead to the rejection of the filing.

8 Q. HOW DO THESE PRICE INCREASES AFFECT THE COMPANY'S FUEL COSTS?
8 Q. HOW DO THESE PRICE INCREASES AFFECT THE COMPANY'S FUEL COSTS? - 10 A. Increases in the prices of fuel oils affect the Company's estimated fuel costs in two ways: - Directly, through an increase in the cost of a given amount of fuel -...

AI summary The company explains that rising fuel oil prices increase fuel costs directly and indirectly by altering the optimal fuel mix used for electricity generation. The proposed rates reflect a shift in fuel usage, with solid fuels decreasing and natural gas consumption becoming more balanced with HFO, influenced by factors like weather and customer operations.

Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS?
Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS? 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A. Q. A. Q. A. Q. A. Yes. WHAT HAS HAPPENED IN RESPONSE TO YOUR RECOMMENDATION FOR ANOTHER COMPETITIVE SOLICITATION? NSPl retained a co...

AI summary The Board adopted recommendations, including conducting competitive solicitations for excess gas. NSPI retained a consultant to administer two competitions, both won by the affiliate. However, the Board found these competitions insufficient in terms of arm's-length dealing. Discussions with NSPI focused on evaluating term-sale offerings and market penetration strategies for natural gas.

Q. WHAT IS YOUR OPINION OF NSPI'S PROCESS FOR ACQUIRING HFO?
with that refinery to take the product in 60,000- and 1 0,000-bbllots at a price that was very nearly the same as the contract for larger volumes. The smaller lots were better suited to the Company's 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17...

AI summary The discussion centers on Nova Scotia Power Inc.'s (NSPI) process for acquiring Heavy Fuel Oil (HFO) and its procurement practices, including tender reviews and concerns regarding post-sale obligations following the sale of a former affiliate. The Company forecasts a significant increase in LFO consumption and costs, citing changes in rate structures and load growth as factors.

18 Q. HOW WELL DO THESE CHANGES RESPOND TO YOUR PRIOR RECOMMENDATIONS AND TO THE WEAKNESSES UNDERLYING THEM?
18 Q. HOW WELL DO THESE CHANGES RESPOND TO YOUR PRIOR RECOMMENDATIONS AND TO THE WEAKNESSES UNDERLYING THEM? Liberty believes that NSPI's efforts to find an outside candidate have been diligent, and that efforts to develop internal resourc...

AI summary Liberty acknowledges NSPI's efforts in developing internal resources but recommends an aggressive development program for the selected employee, including training and mentorship, while continuing to use an outside consultant. They also suggest considering a senior, retired individual for a mentoring role to address prior recommendations and underlying weaknesses.

Natural Gas Marketing Strategy
Natural Gas Marketing Strategy Assisted a production-area storage developer in identifying prospective users of a proposed gas storage facility, and in marketing interests in the project. For National Fuel Gas Supply Corporation, analyzed...

AI summary The text outlines various consulting activities related to natural gas marketing, including market analysis, rate design studies, and strategy development for gas producers, marketers, and utilities. These efforts span North America and involve multiple stakeholders in the energy sector.

U.S. and Canadian Gas Industry Regulation
y, and between The Southern Connecticut Gas Company and BP Energy. Similarly assisted the DPUC in considering implementation of those Agreements, and in considering two extensions of those Agreements. Served as an extension of the Staff of...

AI summary The text outlines various roles and responsibilities in gas industry regulation, including serving as an extension of the Connecticut Department of Public Utility Control staff for multiple proceedings, presenting expert testimony on rate-design policy, and evaluating gas-service and capacity-release projects. These activities involve affiliate relationships, incentive rate plans, and regulatory considerations.

Strategic Analysis and Business Planning
Strategic Analysis and Business Planning Consultant on a merger-benefits study performed for an electric distribution cooperative and a local farmers' cooperative. Lead consultant on a business-enhancement project for a Rocky-Mountain-area...

AI summary The text outlines various strategic analysis and business planning projects conducted by a consultant for energy and utility companies, including merger-benefits studies, diversification planning, unbundling strategies, and evaluations of acquisitions and regulatory changes in the gas and electricity sectors.

Electricity
on in its charge to oversee the divestiture of the Seabrook nuclear plant as part of a major restructuring settlement. The sale produced record high compensation for nuclear facilities in the country. Project Manager and witness for Libert...

AI summary The text discusses the oversight of the Seabrook nuclear plant divestiture and the involvement of Liberty in various regulatory and corporate matters, including fuel procurement, affiliate transactions, and telecommunications policy. It highlights Liberty's role in multiple proceedings and assessments.

Commission-Sponsored Studies
Commission-Sponsored Studies Served as a Lead Consultant in an audit of the fuel and purchased-power procurement practices and costs of Arizona Public Service Company for the Arizona Corporation Commission. Responsible for examining all as...

AI summary The text outlines various consulting roles undertaken by Liberty in audits related to fuel and energy procurement practices for multiple utility companies across different states and regions, including Arizona, Nova Scotia, Ohio, and Kentucky.

N-18Direct Testimony - Nancy Brockway on behalf of the Consumer Advocate REDACTED (Large File - 37 MB) 12 passages
15 A. The Company went through an iterative process to reconcile its proposed revenue requirement to classes, and settled on the following proposed revenue/cost ratios for the various classes:
15 A. The Company went through an iterative process to reconcile its proposed revenue requirement to classes, and settled on the following proposed revenue/cost ratios for the various classes: 18 Residential 99.1% 17 docket. Dr. Rosenberg...

AI summary The Company adjusted its revenue/cost ratios for different classes during an iterative process. Dr. Rosenberg estimated ELIIR customers would receive credits for load shifting, potentially reducing their revenue requirement. The current higher fuel forecast suggests these credits may be even larger, which may affect the percentage increases in rates shown in the Company's figures.

Section 19
eflexive concerns of investors as to the likelihood of imprudence disallowances in the future. 1 Q. 2 Turning to the issue of the lack of a fuel clause, what is Dr. Morin's argument? 3 - 4 A. 5 6 7 8 9 Dr. Morin asserts that the lack of a...

AI summary Dr. Morin argues that the absence of a fuel cost adjustment clause increases NSPI's business risk compared to other utilities. However, the response refutes this by pointing out that Dr. Morin double-counts the risk and overlooks Nova Scotia's regulatory practices, such as the future test year and frequent rate increases.

Section 24
- 10 A. 11 12 13 14 15 16 17 18 19 20 21 For a test year adjustment to be made, the changes must be known in the sense that they are fairly certain to take place. They also must be measurable, in the sense that the Board can determine an a...

AI summary The discussion emphasizes that cost recovery for expenditures made in response to regulatory requirements is not automatic. The Board must ensure that costs are both certain and measurable before including them in rates, even when using a forecast test year. This highlights the importance of vigilance in cost estimation to avoid misstating revenue requirements.

NANCY BROCKWAY: TESTIMONIES
NANCY BROCKWAY: TESTIMONIES West Penn Power Co. " " PA PUC, No. R-00973981 1997 Duquesne Light Co. " " PA PUC, No. R-00974101 1997 PECO, Inc., " PA PUC, No. R-00973953 1997 PP&L " " PA PUC, No. R-00973954 1997 Met Ed. " " PA PUC, No. R-009...

AI summary The document lists various utility regulatory proceedings from different states and provinces, focusing on topics such as low-income rates, demand-side management, universal service, and cost recovery. These proceedings involve multiple organizations and legal entities, highlighting concerns related to affordability, service quality, and regulatory compliance.

33 A. An Overview and Summary.
33 A. An Overview and Summary. 34 36 35 Building a rate affordability program consists of six basic steps: 37 1. Eligibility: Defming the eligibility for the universal service program should allow 38 the program to be open to enrollment by...

AI summary Building a rate affordability program involves six steps, starting with defining eligibility for low-income consumers based on income thresholds. The program should be open to all low-income consumers, with outreach targeting those in payment trouble. Assistance should be based on energy burdens rather than income alone, ensuring that even moderately low-income households receive support if their energy bills exceed affordable limits.

Preamble
, an - 6 across-the-board discount does not. Using an across-the-board discount, the universal service - 7 program would pay some customers more than is necessary to bring bills into an affordable - 8 range while paying other customers les...

AI summary The text discusses the use of a fixed credit approach for rate affordability assistance in the Universal Service Program. It argues that an across-the-board discount is not appropriate as it may over or under compensate customers. Instead, a percentage of income targeting mechanism is recommended, with eligibility based on income and energy burden. The fixed credit model involves calculating a burden-based payment, annual bill, and the necessary credit to reduce the bill to the burden-based payment.

13 C. A "SmaU Utility Alternative'~
13 C. A "SmaU Utility Alternative'~ 15 Not all electric and/or natural gas utilities have the fmancial wherewithal to adopt the fixed credit 16 rate affordability described above. For these small utilities the definition of "small" is a ma...

AI summary The text discusses a 'small utility' alternative to affordability programs for utilities that cannot adopt fixed credit rate programs. It describes a tiered discount program as a less precise but more administratively feasible alternative. The approach is contrasted with the fixed credit method, which directly reduces bills to an affordable level based on income and energy use.

Section 86
7 This difference is the benefit that a tiered discount is designed to deliver. So long as a customer 8 has annual expenditures that are equal to the company's residential average, application of a 9 tiered discount will reduce that custom...

AI summary The text explains that a tiered discount is intended to reduce a customer's annual electric bill to an affordable level, assuming their expenditures match the company's residential average.

9 Summary
9 Summary 10 11 Outside of these two major issues, the tiered discount should operate in much the same fashion 12 as the fixed credit. No inherent differences exist. The tiered discount and the fixed credit are 13 simply alternative ways o...

AI summary The tiered discount operates similarly to the fixed credit as a tariffed rate, with no inherent differences. It does not require new procedures for small utilities, as the same credit and collection processes apply. Low-income customers remain out of the collection cycle if they pay under the tiered discount, unlike if they do not participate.

30 PART 2: THE ARREARAGE MANAGEMENT COMPONENT.
veloping a billing capacity for the customer copayment is not merited by the amount of revenue produced by the copayment process. These utilities provide credits toward 100% of the preprogram arrears. 1 The requirement of a customer copaym...

AI summary The text discusses a proposal to set customer copayments for preprogram arrears as a percentage of income rather than a fixed amount, ensuring alignment with affordability goals. A 1% income-based copayment is suggested, with examples showing how credits are calculated based on income and arrears amounts.

2 PART 3: THE CRISIS INTERVENTION COMPONENT.
tion component should be on a limited-46 time basis. The crisis intervention is intended to help meet financial exigencies rather than to 47 provide monthly rate affordability assistance to customers. 1 As a general rule, universal service...

AI summary The text discusses the structure of a crisis intervention component within a Universal Service Program, recommending it be set at 5% of the total rate affordability assistance and distributed through an existing provincial program called Share the Warmth. It emphasizes that the component should not be income-eligible and should be temporary.

24 PART 4: THE CONSERVATION AND DEMAND MANAGEMENT COMPONENT.
cent study of payments plans] and undertake a marketing effort that 22 targets high use, low-income customers." The company, according to the stafftestimony, was 23 not effective in its marketing. 24 25 The state Office of Public Advocate...

AI summary The text discusses the need for effective marketing of energy management programs to low-income customers, particularly those on special payment arrangements, to reduce write-offs and collection costs. The Maine PUC criticized CMP for its lack of action and directed the company to take remedial action, emphasizing the benefits of such programs beyond energy savings.

N-20Direct Testimony and Exhibit - Alan Rosenberg on behalf of SEB - REDACTED (Large File - 20 MB) 7 passages
11 Q WHY SHOULD FUEL COSTS THAT FORM THE BASIS FOR THESE NEW RATES 12 BE BASED ON 2007 AND 2008 FUEL COSTS?
11 Q WHY SHOULD FUEL COSTS THAT FORM THE BASIS FOR THESE NEW RATES 12 BE BASED ON 2007 AND 2008 FUEL COSTS? 13 A In Decision NSPI-P-875, in dealing with the subject of fuel costs based on a 2002 test 14 year, the Board (on page 29, emphasi...

AI summary The document discusses the rationale for using 2007 and 2008 fuel costs as the basis for new rates, referencing a prior Board decision that emphasized the need for prospective ratemaking. The Board adjusted coal costs by 10% to better reflect expected future costs, and the argument is made that NSPI should update its cost of service methodology to account for increased peak usage.

7 Q IN THE 2002 RATE CASE DECISION, IT STATES IN PARAGRAPH NUMBER 85,
7 Q IN THE 2002 RATE CASE DECISION, IT STATES IN PARAGRAPH NUMBER 85, 8 If the rate-making process were based on the most up-to-date 9 numbers, as opposed to forward-looking data derived from 10 experience over the longer term, each month...

AI summary The text discusses the Board's position on using updated information in the rate-making process, emphasizing that relying on the most up-to-date data rather than forward-looking data can lead to frequent changes in revenue requirements. It also addresses concerns about NSPI's use of stale data and the fairness of allowing unilateral discretion in choosing fuel forecast timing.

Section 36
6 It should also be noted that NSPI acknowledges that it has not had any trouble 7 to date in securing capital and it has not had to post any letters of credit in order to 8 purchase fuel. 9 Furthermore, while I do agree that, all other th...

AI summary NSPI acknowledges it has not faced challenges in securing capital or posting letters of credit for fuel purchases. The Board emphasizes that NSPI's financial health should not override ratepayer interests, citing a past decision where $15.7 million in fuel costs were disallowed. The Board questions whether NSPI can address concerns about potential deviations between actual fuel costs and those used in rate calculations.

Section 48
4 Second, like NSPI's proposal to defer the difference between the current base 5 rate of fuel and the new base rate of fuel in the first quarter of 2007, it constitutes 6 single-issue ratemaking. 7 Third, the request is premature as there...

AI summary The text argues against NSPI's proposal to defer the difference between current and new base fuel rates, citing concerns about single-issue ratemaking, premature requests, discrimination, and lack of clarity on how to calculate and apportion a 'true-up' for customers.

8 Q PLEASE EXPLAIN THE THIRD MODIFICATION THAT YOU HAVE MADE TO THE 9 COMPANY'S FILED STUDY.
8 Q PLEASE EXPLAIN THE THIRD MODIFICATION THAT YOU HAVE MADE TO THE 9 COMPANY'S FILED STUDY. 10 A In addition to the Mersey energy, which is priced according to a long-standing 11 contract, and thus is a below-the-line rate, Bowater Mersey...

AI summary The third modification involves the classification of Additional Energy under the Large Industrial Rate with Interruptible Rider (LIRIR) as an Above-the-Line rate, but NSPI incorrectly treats it as Below the Line, leading to complications in cost analysis and requiring an iterative process to estimate prices and costs.

6 Q WHAT IS YOUR PROPOSED SOLUTION TO THIS PROBLEM?
6 Q WHAT IS YOUR PROPOSED SOLUTION TO THIS PROBLEM? 7 A The solution is straight-forward in my view. The guesswork and the circular 8 reasoning can be eliminated by simply moving the Additional Energy (and demand) 9 into the same class or...

AI summary The proposed solution involves reclassifying Additional Energy and demand into the same category as Large Industrial interruptible rate energy and demand, ensuring accurate and transparent cost analysis without guesswork or assumptions.

Preamble
management in committing to certain expenditures, the used and useful test examines whether the expenditure in question is (1) physically used and {2) useful to the ratepayers from an economic standpoint, after consideration of any non-pri...

AI summary The used and useful test assesses whether expenditures are both physically used and economically beneficial to ratepayers. An example from Vermont highlights the imprudence of locking into a power purchase agreement with Hydro Quebec, leading to disallowance of related costs due to imprudence and lack of use-and-usefulness.

N-22Direct Testimony and Exhibit - Michael Gorman (on behalf of Stora Enso/ Bowater) 1 passage
Preamble
~ 6 In August of 1989, I accepted a position with Merrill-Lynch as a financial 7 consultant. After receiving all required securities licenses, I worked with individual 8 investors and small businesses in evaluating and selecting investment...

AI summary The individual has extensive experience in financial consulting, utility analysis, and energy supply evaluation. They have worked with various firms, including Merrill-Lynch and Brubaker & Associates, Inc., and have conducted analyses on cost of capital, utility mergers, and energy supply agreements.

N-30RIRs 1 to 15 - Nancy Brockway (on behalf of Consumer Advocate) to NS Attorney General (includes attachment to RIR 11) (Large File - 44 MB) 3 passages
1. EAP as a Price Offer
1. EAP as a Price Offer Different customer classes have always paid different prices for the same amounts of energy. Historically, utilities and regulatory authorities, while guided by the fundamental principle of equity in pricing, have a...

AI summary The Energy Affordability Program (EAP) is discussed as a brokered pricing mechanism for vulnerable residential customers, similar to a negotiated rate with conditions. The text suggests that the Commission, Bureau of Consumer Services, and Office of Consumer Advocate may act as a collective broker in this process, akin to how competitive market pricing works for larger customers.

3. The Measures: "Net Back Ratio" and "Dollars Returned"
3. The Measures: "Net Back Ratio" and "Dollars Returned" The "Net Back Ratio" is a comprehensive measure of program performance referenced to the variable cost of gas. It provides an explicit quantitative result which shows whether the var...

AI summary The text introduces two performance measures, 'Net Back Ratio' and 'Dollars Returned,' used to evaluate program performance. 'Net Back Ratio' assesses whether variable gas costs are covered by payments and is suited for the competitive era with optional rate products. 'Dollars Returned' calculates the absolute difference in dollars collected and remains relevant for traditional utility regulation and the emerging competitive era.

b) Dollars Returned Results
b) Dollars Returned Results The "Dollars Returned" measure is referenced to the payment behavior evidenced by the 1989 Reference Group. In this model, based on the 50% payment rate in the group studied in 1989-1990, a customer who would ha...

AI summary The 'Dollars Returned' measure evaluates payment behavior based on a 1989 reference group, showing shortfalls when customers fail to pay full bills under the standard residential rate. EAP (Energy Affordability Program) is designed to assist low-income customers who struggle with traditional collection methods, ensuring they pay 100% of their billed amount under a more affordable rate structure.

N-31RIRs 1 to 5 - Consumer Advocate Response to IRs from NSPI 1 passage
IR-4 Reference pages 18 to 23
ase proceeding but was not known at the time of filing, is that investment considered to be hypothetical or speculative? If approved by the Board, for what reason would these costs not be recoverable? There is no reason why costs approved...

AI summary The text discusses whether costs approved by the Board should be recoverable in rates, emphasizing fairness, notice, prudence, and measurability. It also addresses NSPI's proposed surcharge due to additional fuel costs in 2007 and whether the Consumer Advocate will cross-examine Roger Colton.

N-32RIRs 1 to 16 - Nancy Brockway (on behalf of Consumer Advocate) to Stora Enso/ Bowater (SEB) 2 passages
RESPONSES TO INFORMATION REQUESTS
ed in turn on "NSPI forecast price of oil for CTs." I believe that the forecast price of oil for CTs was drawn from the same fuel cost budget that produced an estimated $434 million overall fuel cost. - IR-2. On page 7, Ms. Brockway states...

AI summary The text discusses the potential impact of different fuel cost forecasts on the ELIIR-2 rate, with a response suggesting that if the best fuel forecast available at the time of the ELIIR-2 hearing was different from that used in the most recent base rate case, the ELIIR-2 rate should be based on that forecast to avoid a gap in cost recovery. It also references the Board's decision in proceeding P-883.

IR-9. On page 27, Ms. Brockway discusses tolerable burdens for residential households:
IR-13. Please specifically identify all low-income energy programs that Ms. Brockway is recommending in this proceeding, and quantify how the funding of -those programs will impact other ratepayers. RESPONSE: See the answer to question 9a....

AI summary The document includes questions and responses related to low-income energy programs, Mr. Colton's report, and the impact of recommendations on revenue requirements. It also references a past Board decision regarding fuel cost allocation and asks for further evidence on hourly versus monthly allocation methods.

N-34RIR 1 to 6 - NSPI to John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr, Liberty Consulting Group 1 passage
IR-2 Question:
ate" such risk depends on its structure. Different methods have different levels of influence on that risk, but it is generally true that the predominant goal of such methods is to mitigate that risk. Second, in our experience, acceptance...

AI summary Nova Scotia Power Inc. responds to a question regarding its methodology for developing test year prices for HFO and natural gas, confirming that the methods were generally similar to those used in previous rate applications. Liberty Consulting Group raised concerns about the selection of high fuel prices in the 2006 application.

N-37RIR 1 to 11 - NSPI to John Stutz [Board Counsel Consultant] 1 passage
IR-8 Reference page 13, lines 7-13
MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION BY NSPI FOR APPROVAL OF CERTAIN REVISIONS TO ITS RATES, CHARGES AND REGULATIONS INFORMATION REQUESTS To: John Stutz From: Nova Scotia Power Incorporated Responses Due...

AI summary The document discusses a rate revision application by Nova Scotia Power Incorporated (NSPI) and includes a response to Dr. Stutz's comments regarding a $12.5 million increase to the ELI 2PRTP rate. Dr. Stutz notes that the increase does not account for potential cost reductions from load shifting but does not make specific rate design recommendations.

N-40RIRs 1 to 13 - Dr. Alan Rosenberg [SEB] to NSPI 3 passages
Response to Question No. IR-8 (continued):
Response to Question No. IR-8 (continued): The term pro-forma adjustment is consonant with the expression "normalization" as Dr. Rosenberg uses that term of art on pages 12-13 of his testimony. Thus, the very concept of a future test year...

AI summary The document discusses the use of 'pro-forma adjustment' and 'normalization' in rate-making, referencing a 2002 Nova Scotia Power rate case. It emphasizes that rate-making should be prospective, not retroactive, and that fuel costs in the test year must be adjusted to reflect more accurate, normalized estimates. A 10% reduction in coal costs was deemed reasonable to align with historical averages.

Response to Question No. IR-8 (continued):
Response to Question No. IR-8 (continued): Furthermore, he is generally aware from his experience that reductions, as well as increases, to test year expenses that are known and measurable have been reflected in the establishment of rates....

AI summary The response acknowledges that rate adjustments reflect known and measurable changes in test year expenses, citing examples from Alberta and British Columbia. It also refers to a prior response for further details.

Response:
Response: a. Dr. Rosenberg recalls that before deregulation New York state for many years used fuel clauses with a sharing and/or a deadband. Dr. Rosenberg has not conducted research on all such utilities, as he is only addressing the situ...

AI summary Dr. Rosenberg discusses historical fuel cost adjustment mechanisms in New York and references a report on incentive-based fuel adjustment mechanisms (BFAM). He notes that a deadband and sharing feature was recommended for approval of a FAM in a prior proceeding, but the regulator declined to approve it.

N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB) 19 passages
APPLICABILITY
APPLICABILITY Applicable as an integral part of each base rate schedule of the Company in which reference is made to this Rate ECR.

AI summary The document specifies the scope of applicability for the Rate ECR, stating that it serves as an integral component of every base rate schedule of the Company that makes reference to the ECR.

RULES AND REGULATION GOVERNING APPLICATION OF ENERGY COST RECOVERY RATE
RULES AND REGULATION GOVERNING APPLICATION OF ENERGY COST RECOVERY RATE These rules and regulations are applicable to and are an integral part of Rate ECR. These rules and regulations established the procedures to be used in the determinat...

AI summary This text outlines the regulatory procedures for determining and adjusting the Energy Cost Recovery factor (ECRF). It establishes a timeline for the Company to submit estimates of energy costs and sales to the Commission. It specifies requirements for public hearings, the Company's burden of proof to justify rate increases based on cost fluctuations, and the notice periods required for proposing new factors to be incorporated into the Company's base rate schedules.

A SOUTHERN COMPANY
A SOUTHERN COMPANY PAGE EFFECTIVE DATE REVISION 6of6 November, 2001 Billings Second - 7. The Commission shall not prohibit or limit the operation of this Rate ECR to the extent it permits rate increases or decreases to adjust for increased...

AI summary The text outlines a provision regarding the Rate Energy Cost Recovery (Rate ECR) mechanism. It specifies that the Commission will not restrict the operation of this rate to allow for adjustments in purchase power costs, provided those costs are governed by federal regulatory procedures or approved federal contracts. Additionally, it mandates that any subsequent refunds received by the Company related to such purchase power costs must be returned to customers as directed by the Commission.

EXPERIENCE MODIFICATION FACTOR
EXPERIENCE MODIFICATION FACTOR An Experience Modification Factor (EMF) decrement of0.0069 ¢I kWh and EMF interest decrement ofO.OOIO ¢I kWh is effective for service on and after July I, 2006 and will continue until June 30, 2007

AI summary The document specifies the application of Experience Modification Factor (EMF) decrements to the electricity cost recovery structure. Specifically, an EMF decrement of 0.0069 ¢/kWh and an EMF interest decrement of 0.0010 ¢/kWh are scheduled to take effect on July 1, 2006, and remain in force until June 30, 2007.

STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...

AI summary The document outlines the methodology for Standard Contract Rider No. 60, which establishes the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that charges for electric service to retail customers will be adjusted—increased or decreased to the nearest 0.001 mill per KWH—based on a formula designed to recover or credit the costs associated with fuel. The formula is defined as the Fuel Cost Adjustment Factor, calculated by dividing total projected system fuel costs by estimated total energy sales, minus a fixed correction factor.

where:
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...

AI summary The text defines the methodology for calculating the fuel cost adjustment factor for native load customers. It specifies the components of estimated fuel expenses (F), including fossil and nuclear fuel costs for company-owned units and purchased energy, as well as estimated kilowatt-hour sales (S). The formula includes modifications for utility receipts taxes, a mechanism to reconcile differences between estimated and actual incremental fuel costs, and a specific fixed adjustment rate of $0.004520 per kilowatt-hour effective from 2007.

The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service:
The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Energy Loss Factor Fixed Fuel Factor ($/KWH) PES Projected energy sales (kWh) subject to this Rider ECR for the projected energy cost period. (CT...

AI summary This document excerpt outlines the methodology for calculating the Fixed Fuel Factor for The Empire District Electric Company. It specifies that the factor accounts for energy loss adjustments across different voltage levels. The text provides detailed notes on the formula, including definitions for the Energy Cost Period, the inclusion of specific account portions, the initial Energy Loss Factor (EAF) value, the True-up Adjustment (TUA) calculations, and the determination of the Carrying Charge Rate based on the authorized rate of return.

38.2 ENERGY COST RATE
38.2 ENERGY COST RATE The Energy Cost Rate to be initially effective under this Rider ECR shall be determined in the manner prescribed by the Arkansas Public Service Commission ("Commission") in its final order in Docket No. 96-360-U and s...

AI summary The document outlines the rules for determining and applying the Energy Cost Rate under Rider ECR. The initial rate is established based on the Arkansas Public Service Commission's final order in Docket No. 96-360-U. Subsequently, the rate is subject to annual redetermination through specific filing procedures. The rate is applied to monthly billing energy in kilowatt-hours (kWh), with an exception for special rate contracts that do not contain specific provisions for energy cost recovery.

38.3 ANNUAL REDETERMINATION
38.3 ANNUAL REDETERMINATION On or before March 15 of each year beginning in 1999, the Company shall file a redetermined Energy Cost Rate with the Commission. The redetermined Energy Cost Rate shall be determined by application of the Energ...

AI summary The text outlines the annual redetermination process for the Energy Cost Rate (ECR) for Entergy Arkansas, Inc. The Company is required to file a redetermined rate by March 15 annually, calculated using a specific formula and accompanied by supporting workpapers. The rate must reflect projected energy costs for the upcoming 12-month period, including a true-up adjustment for over- or under-recoveries from the previous calendar year. These rates are effective for a twelve-month 'Rider Cycle' starting in April.

38.5 TERM
38.5 TERM This Rider ECR shall remain in effect until modified or terminated in accordance with the provisions of this Rider ECR or applicable regulations or laws. If this Rider ECR is terminated by a future order of the Commission, the En...

AI summary This section outlines the term and termination provisions for Rider ECR. It states that the rider remains in effect until modified or terminated by the Commission or law. In the event of termination, existing Energy Cost Rates will persist until an alternative recovery mechanism is approved. Furthermore, it mandates that any cumulative over-recovery or under-recovery resulting from the terminated rates must be adjusted in customer billings over a twelve-month period following the termination.

ENERGY COST RATE FORMULA
ENERGY COST RATE FORMULA ECR ENERGY COST RATE ECR (TUA + PEC) / PES (RT) WHERE, TUA TRUE-UP ADJUSTMENT FOR THE ENERGY COST PERIOD INCLUDING CARRYING CHARGES (1) = \sum_{j=1}^{12} (EC_j - (RR_j - PTU_j)) \ (1 + CCR \ ((21 - j) / 12)) (RT) W...

AI summary The text provides the mathematical formula for the Energy Cost Rate (ECR), which is calculated by dividing the sum of the True-Up Adjustment (TUA) and Projected Energy Cost (PEC) by the Projected Energy Sales (PES). The formula specifically defines the True-Up Adjustment, which accounts for energy costs including carrying charges, and details the components of energy costs such as fuel expenses charged to specific accounts, excluding certain retained share fuel charges for the Grand Gulf project.

ENERGY COST RATE FORMULA (CONT'D)
ENERGY COST RATE FORMULA (CONT'D) = = CCR = REVENUE UNDER RIDER ECR FOR MONTH j OF THE ENERGY COST (RT) PERIOD PLUS AN IMPUTED LEVEL OF REVENUES FOR SALES (AT) UNDER SPECIAL RATE CONTRACTS WHERE THE ENERGY COST (AT) RATE IS NOT SEPARATELY...

AI summary The document provides a technical breakdown of the Energy Cost Rate formula, specifically detailing the calculation of the Carrying Charge Rate (CCR). It outlines the components of the Projected Energy Cost (PEC) for a given period, including the integration of revenues from special rate contracts, prior period true-up adjustments, and specific adjustments such as the Nuclear Refueling Outage Adjustment (NRFA). The formulas are intended to determine the rate structure for the Energy Cost (RT) period.

All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to:
All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to: Secondary Distribution customers 3.0248¢ per kWh Primary Distribution customers 2.9767¢ per kWh Transmission customers 2.9...

AI summary The document specifies the rate increases for various customer classes subject to the Fuel Cost Recovery Schedule. It defines the specific cents-per-kWh amounts for Secondary Distribution customers (3.0248¢), Primary Distribution customers (2.9767¢), and Transmission customers (2.9389¢). The text also introduces the definition of Fuel Costs, which the subsequent section of the document would detail.

SENIOR CITIZEN- LOW INCOME ASSISTANCE:
SENIOR CITIZEN- LOW INCOME ASSISTANCE: Qualifying customers, after certification by the Company, will be eligible for a fuel cost recovery credit of $6.00 monthly at their primary residence. To qualify, the customer must be certified as el...

AI summary The document outlines the 'SENIOR CITIZEN- LOW INCOME ASSISTANCE' program, which provides a monthly fuel cost recovery credit of $6.00 to qualifying customers at their primary residence. Eligibility is determined by the Company following a certification process based on the R-15 tariff or its successor. The provision specifies that there shall be no net credits and no carry-over of credits between billing periods.

TERMS AND CONDITIONS OF SERVICE
TERMS AND CONDITIONS OF SERVICE (Cont=d from Sheet No. 3.18) - B. The adjustment factor as computed above shall be further modified to allow the recovery of gross receipts taxes and other similar revenue based tax charges occasioned by the...

AI summary The text outlines the terms and conditions for fuel cost adjustments, including mechanisms to recover gross receipts taxes and adjustments based on incremental fuel costs from the previous three months. It further specifies that certain subsections are suspended due to a 2005 Settlement Agreement (Cause No. 42045-S1). During this suspension, I&M is required to file semi-annual applications for fixed fuel adjustment charges, ensuring that fuel costs are not offset by other expense decreases and that the charges do not result in an unauthorized return.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of a...

AI summary The document outlines the applicability of a fuel cost adjustment for the Utility's retail electric rate schedules in South Carolina. It specifies that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one-thousandth of a cent using a provided formula, provided the Commission deems the costs reasonable and proper.

PURCHASED POWER COST RECOVERY FACTOR (PCRF)
PURCHASED POWER COST RECOVERY FACTOR (PCRF) A PCRF will be added to the energy charges for each rate schedule on a per kWh basis. The factor will be determined as follows: PCRFcloss = [(P x AF)- CAc,,..J!ESc,,.. Where: - P = Estimated purc...

AI summary The document outlines the methodology for calculating the Purchased Power Cost Recovery Factor (PCRF), a new component to be added to energy charges on a per-kWh basis. The PCRF is designed to recover estimated purchased power costs (excluding fuel) that exceed the amounts recovered in base rates. The calculation incorporates a demand allocation factor (AF) based on the most recent cost-of-service study, an estimated annual kWh sales figure (ES), and a correction amount (CA) to account for variances between actual allocated costs and revenues from the preceding twelve months.

The following are the allocation factors to be used in the calculation of the PCRF:
The following are the allocation factors to be used in the calculation of the PCRF: Rate Class Demand Allocation Factor (AF) Residential Lighting 0.130000 Residential All Electric 0.013154 Residential Space Heating 0.004100 Residential Wat...

AI summary The document specifies the demand allocation factors (AF) used to calculate the Purchased Power Cost Recovery Factor (PCRF). It provides a detailed breakdown of factors for various rate classes, including residential lighting, space heating, heat pumps, irrigation, and various industrial and public authority categories, as well as specific distribution and transmission classes.

BEFORE THE NORTH CAROLINA UTILITIES COMMISSION
BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Application by Carolina Power & Light Company, ) ORDER APPROVING d/b/a Progress Energy Carolinas, Inc. for Authority to ) FUEL CHARGE Adjust Its Electric Rates Pursuant to G.S...

AI summary This document represents the formal heading of a regulatory proceeding before the North Carolina Utilities Commission. It identifies the application filed by Carolina Power & Light Company (operating as Progress Energy Carolinas, Inc.) seeking authority to adjust its electric rates. The proceeding is governed by G.S. 62-133.2 and NCUC Rule RS-55, specifically concerning the approval of a fuel charge adjustment.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 28 passages
MINIMUM BILL
MINIMUM BILL No monthly bill will be rendered for less than the Base Charge, plus the capacity charge, plus applicable adjustments for transformation, plus applicable provisions of Rate ECR (Energy Cost Recovery) and Rate T (Tax Adjustment...

AI summary The document specifies the rules for determining the minimum monthly bill for customers. It establishes that no monthly bill will be rendered for an amount lower than the combined sum of the Base Charge, the capacity charge, transformation adjustments, and the applicable provisions of Rate ECR (Energy Cost Recovery) and Rate T (Tax Adjustment).

The kWh charges shown reflect adjustment pursuant to Rates RSE and CNP for application to monthly bills effective for April 2006 billings.
The kWh charges shown reflect adjustment pursuant to Rates RSE and CNP for application to monthly bills effective for April 2006 billings. PAGE EFFECTIVE DATE REVISION 3 of 3 January, 2006 Billings Fourteenth TERM OF CONTRACT

AI summary The document specifies that the kilowatt-hour (kWh) charges are subject to adjustments based on the Rates RSE and CNP. These adjustments are scheduled to be applied to monthly customer bills starting with the April 2006 billing cycle. The table provided indicates that the current information is based on the fourteenth revision effective for January 2006 billings.

NAME OF OFFICER TITLE ADDRESS
NAME OF OFFICER TITLE ADDRESS i MOIN FLECTRIC COMPANY kVar = kilovar billing units kVarh = metered kilovarhours kWh = metered kilowatthours kW = metered kilowatts 1 0.4843 = kilovar requirement at 90% lagging power factor. 1 1 Where in the...

AI summary This document excerpt outlines specific tariff rules for reactive power supply and optional Time-of-Day (TOD) service for Large Primary Service customers. It specifies the formula for kilovar requirements at a 90% lagging power factor, allows for alternative agreements for self-generation customers, and establishes 12-month minimum commitment periods for the TOD option with specific cancellation penalties. The rates were issued pursuant to a 1993 Order from the Public Service Commission of Missouri.

Rider B DISCOUNTS APPLICABLE FOR SERVICE TO SUBSTATIONS OWNED BY CUSTOMER IN LIEU OF COMPANY OWNERSHIP
Rider B DISCOUNTS APPLICABLE FOR SERVICE TO SUBSTATIONS OWNED BY CUSTOMER IN LIEU OF COMPANY OWNERSHIP \ A. Where a substation provided or leased by Customer transforms all or a part of the service from a delivery voltage of 34,500 volts o...

AI summary The text introduces Rider B, which outlines specific discounts applicable for service to substations owned by customers rather than the Company. It specifies that when a customer-provided or leased substation transforms service from 34,500 volts or higher to a lower voltage, the Company will adjust meter readings and apply discounts from its applicable rate schedule.

\ Indicates Change.
\ Indicates Change. P.S.C. Mo.DATE OF ISSUE May 30, 2001 D ATE EFFECTIVE June 30 , 2001 ISSUED BY Charles W. Mueller President & CEO St. Louis, Missouri NAME OF OFFI( CER TITLE ADD RESS SCHEDULE L.P.S.-T.O.D. (Large Power Service Time-of-D...

AI summary This document excerpt provides administrative information regarding a Public Service Commission of Missouri (PSC Mo.) order issued on May 30, 2001, and effective June 30, 2001. The order was issued by Charles W. Mueller, President & CEO. The text specifically identifies 'SCHEDULE L.P.S.-T.O.D. (Large Power Service Time-of-Day)', which pertains to time-of-day rate structures for large power services.

Issued: February 24, 2006 Effective: March 1, 2006
Issued: February 24, 2006 Effective: March 1, 2006 STATE OF MISSOURI, PUBLIC SERVICE COMMISSION P.S.C. MO. No. 1 Canceling P.S.C. MO. No. 1 Aquila, Inc., dba AQUILA NETWORKS KANSAS CITY, MO 64138 Revised Sheet No;3:;_4; Original Sheet No;3...

AI summary This document is a formal order from the Public Service Commission of Missouri (P.S.C. MO.) issued on February 24, 2006. It cancels a previous order and establishes a revised rate sheet for Aquila Networks (dba Aquila Networks Kansas City). The specific section provided defines a Primary Discount Rider for customers served under certain rate schedules who provide their own transformation and distribution equipment. It specifies a primary kW discount of $0.59 per kW.

APPLICABLE:
APPLICABLE: To general service supplied for all power requirements when all such service taken on the premises is supplied through one meter installation for a demand of not less than 2,500 kVA but not greater than 25,000 kV A. The average...

AI summary The text outlines the specific rate schedule and service requirements for large power service. It defines eligibility based on a customer's average demand (between 2,500 kVA and 25,000 kVA) over a twelve-month period. The monthly rate structure includes tiered energy charges based on consumption volume, a demand charge for the first 3,000 kVA with additional charges for excess, and a primary voltage discount for high-voltage service. Customers are also required to maintain their own transformers and enter into a minimum five-year contract.

APPLICABLE:
APPLICABLE: To Customers in the State of Idaho where the Company has electric service available. This Power Cost Adjustment shall be applicable to all retail customers for charges for electric energy sold and to the flat rate charges for C...

AI summary The text defines the scope and purpose of a Power Cost Adjustment for retail customers in the State of Idaho where the Company provides electric service. The adjustment applies to electric energy charges as well as flat rate charges for street and area lighting. Its primary function is to recover or rebate the variance between actual and allowed net power supply costs.

The energy charges of the individual rate schedules are to be increased by the following amounts:
The energy charges of the individual rate schedules are to be increased by the following amounts: Schedule 1 0.163¢ per kwh Schedules 11 & 12 0.190¢ per kwh Schedules 21 & 22 0.145¢ per kwh Schedules 25 0.103¢ per kwh Schedule 25P 0.093¢ p...

AI summary The document specifies the proposed rate increases for various energy schedules and flat rate charges. It outlines specific cents-per-kWh increases for Schedules 1, 11, 12, 21, 22, 25, 25P, 31, and 32, as well as a percentage increase for Street Lighting and Area Lighting Service charges.

MONTHLY RATE:
MONTHLY RATE: The energy charges of the individual rate schedules are to be increased by the following amounts: Schedule 1 - .081¢ per kWh Schedule 11 & 12 - .095¢ per kWh Schedule 21 & 22 - .073¢ per kWh Schedule 25 - .052¢ per kWh Schedu...

AI summary The document specifies the approved increases for the monthly energy charges across various individual rate schedules. Specific per-kWh increases are provided for Schedules 1, 11, 12, 21, 22, 25, 25P, 31, and 32. Additionally, it mandates a 1.25% increase for flat rate charges associated with Company-owned or Customer-owned Street Lighting and Area Lighting Services.

STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...

AI summary The document defines Standard Contract Rider No. 60, which establishes the mechanism for the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that electric service charges for the Company's retail customers will be adjusted (increased or decreased) to the nearest 0.001 mill per KWH. The adjustment is designed to recover or credit fuel costs based on a specific formula involving the ratio of fuel costs to sales (F/S) minus a constant of $0.014484.

where:
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...

AI summary The text defines the methodology for calculating the fuel cost adjustment factor, specifically identifying the components of fuel expense (F) and estimated kilowatt-hour sales (S). It outlines the inclusion of fossil and nuclear fuel costs for native load customers, net energy costs for economic dispatch, and adjustments for utility receipts taxes. Additionally, it specifies a fixed fuel cost adjustment rate of $0.007713 per kilowatt-hour effective October 2006 and provisions for recovering costs for power purchases exceeding monthly benchmarks.

STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail customers, to the extent so served, shall include a...

AI summary The document outlines the methodology for the Qualified Pollution Control Property Revenue Adjustment for retail electric service customers. It specifies that these charges reflect the rate base treatment for qualified pollution control property as per established regulations. The revenue adjustment is calculated by multiplying a specific adjustment factor (rounded to the nearest 0.001 mill) by the customer's monthly billed or estimated kilowatt-hours, depending on whether the service is metered or unmetered.

where:
where: - 1. "a" is the jurisdictional cost of the Company's cumulative qualified pollution control property including costs of completed capital projects or parts of capital projects that comply with provisions of Commission Rule 170 lAC 4...

AI summary The text defines the components and methodology for calculating the Qualified Pollution Control Property Revenue Adjustment Factor by Rate Group. It specifies that the calculation includes the jurisdictional cost of qualified pollution control property (complying with Commission Rule 170 lAC 4-6), the Company's weighted average cost of capital, a revenue conversion factor after interest expense synchronization, and specific production demand allocators and adjusted billing cycle kilowatt-hour sales for individual retail rate groups.

STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT FACTOR APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT FACTOR APPLICABLE TO RETAIL RATE GROUPS Qualified Pollution Control Property Qualified Pollution Control Property Revenue Adjustment Line Revenue Adjust...

AI summary The document outlines Standard Contract Rider No. 62, which establishes the Qualified Pollution Control Property Revenue Adjustment Factor for various retail rate groups. It provides specific financial factors per kilowatt-hour (KWH) and non-coincident kilowatts (KW) for different service categories, including Residential Service (RS), Commercial Service (CS), and various industrial and transmission service rates. The rider serves to adjust revenues based on qualified pollution control property investments.

ASSIGNMENT OF DEMAND SIDE MANAGEMENT (DSM) ON-GOING COST RECOVERY BY RETAIL RATE GROUP BASED ON THE PROVISIONS OF THE COMMISSION'S ORDERS IN CAUSE NOS. 41875,42325 AND 42612
ASSIGNMENT OF DEMAND SIDE MANAGEMENT (DSM) ON-GOING COST RECOVERY BY RETAIL RATE GROUP BASED ON THE PROVISIONS OF THE COMMISSION'S ORDERS IN CAUSE NOS. 41875,42325 AND 42612 Line No. Retail Rate Group (Note) Calendar Year2006 On-Going Expe...

AI summary The document outlines the assignment of Demand-Side Management (DSM) on-going cost recovery across various retail rate groups. It specifies that the total retail on-going expense for the 2006 calendar year is $5,650,000, with the majority ($5,125,000) assigned to the Residential Service (RS) rate. Notably, the text includes a provision excluding commercial and industrial customers with an annual peak demand exceeding 500 kW from these on-going expenses.

Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker)
Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker) On April 17, 2004, the Commission approved the recovery of certain jurisdictional purchas...

AI summary The document outlines Standard Contract Rider No. 67, which establishes a mechanism for the recovery of preapproved purchased power costs. These costs are specifically associated with meeting the peak load requirements of retail customers within the IURC jurisdiction. The rider ensures that these charges are recovered separately from the fuel adjustment charge. It specifies that retail electric service rates will be increased based on a formula involving a Purchased Power Factor to account for the estimated costs of purchased power.

STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS - 7. $2,726,000 is the three (3) month average pro forma level of Midwest ISO transm...

AI summary This document outlines the methodology for the Midwest Independent System Operator (MIDWEST ISO) Management Cost Adjustment and Revenue Factor. It defines the variables used to calculate adjustments for retail rate groups, including transmission revenues, allocated shares of retail peak demand, prior year kilowatt-hour sales, and a revenue conversion factor. The rider also establishes a mechanism to reconcile differences between actual and projected base monthly fees charged to retail electric customers starting from the sixth succeeding billing cycle month.

STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS ALLOCATED SHARE OF RETAIL PEAK DEMAND FOR THE COMPANY'S RETAIL CUSTOMERS BY RATE GRO...

AI summary The text introduces Standard Contract Rider No. 68, which establishes a management cost and revenue adjustment for the Midwest Independent System Operator (MIDWEST ISO) applicable to retail rate groups. It specifies that the allocated share of retail peak demand for the Company's retail customers is determined as a percentage of the total retail peak demand developed for cost of service purposes in Cause No. 42359, based on data from the twelve-month period ending September 30, 2002.

STANDARD CONTRACT RIDER NO. 70 SUMMER RELIABILITY ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 70 SUMMER RELIABILITY ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES Estimated Summer Reliability Factor Per kWh Line to be Applied to Customer Line No. Rate Groups Bills No. (A) RateRS $0.000385 2 Rates CS...

AI summary The document outlines Standard Contract Rider No. 70, which establishes a Summer Reliability Adjustment applicable to all retail rate schedules. It provides specific estimated summer reliability factors per kWh for various rate groups, including residential, commercial, and industrial customers, as well as specific industrial entities like NUCOR and Air Liquide. The adjustment became effective during the first billing cycle of November 2006.

STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail customers, shall be increased or decreased to the nearest 0.00...

AI summary Standard Contract Rider No. 71 establishes a mechanism for adjusting retail electric service charges to recover clean coal operating costs, specifically depreciation and operation and maintenance expenses. The adjustment is to be updated and reconciled by the Company at least every six months. The rider specifies that charges shall be adjusted to the nearest 0.001 mill per kWh, with the specific revenue adjustment factor determined by a formula based on various cost and rate group components.

Where:
Where: - 1. "a" is the forecasted depreciation expense applicable to investments in clean coal energy projects that comply with provisions of Ind. Code 8-1-8.8. For purposes of determining the value of depreciation expense, the clean coal...

AI summary The text defines the components of a clean coal operating cost revenue adjustment factor. It specifies how to calculate forecasted depreciation expenses over an eighteen-year period, identifies incremental operation and maintenance expenses (O&M) as recorded under FERCUSOFA standards, and establishes the use of a revenue conversion factor and jurisdictional production demand allocators. The factor is designed to adjust for the difference between estimated and actual incremental operating costs experienced by retail rate groups.

STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS .
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS . Clean Coal Clean Coal Operating Cost Operating Cost Revenue Adjustment Line Revenue Adjustment Factor Per Line No. Retail Rate G...

AI summary The document outlines Standard Contract Rider No. 71, which establishes the Clean Coal Operating Cost Revenue Adjustment for various retail rate groups. It provides specific revenue adjustment factors per kilowatt-hour (KWH) and non-coincident kilowatts (KW) for different customer categories, including Residential Service (RS), Commercial Service (CS), and various industrial and transmission service rates. The rider became effective on November 1, 2006.

Section 189
The Energy Charge for customers receiving service in establishments classified as "Manufacturing Industries" by the Standard Industrial Classification Manual published by the United States Government, and where more than 50% of the electri...

AI summary The text defines the classification criteria for the 'Industrial Service' rate category. Customers classified as 'Manufacturing Industries' under the Standard Industrial Classification Manual, where manufacturing processes account for more than 50% of their electric energy consumption, are assigned to the 'Industrial Service' rate. All other customers are categorized under the 'General Service' rate schedule.

USE OF RIDER
USE OF RIDER Since adjustments are already included in the Rates of the Company's current rate schedules which are effective for service on and after July 1, 2006, this Rider should not be used in addition to such rate schedules for bill c...

AI summary The document specifies that the Rider should not be applied to bill calculations for services rendered on or after July 1, 2006. This is because the necessary adjustments are already incorporated into the Company's current rate schedules. The text references a specific North Carolina Fifteenth Revised Leaf and an Order from the North Carolina Utilities Commission (NCUC) regarding these rate structures.

DEFINITION OF "MONTH"
DEFINITION OF "MONTH" The term "month" as used in this Schedule means the period intervening between meter readings for the purposes of monthly billing. Readings are taken each month at intervals of approximately thirty (30) days. Summer m...

AI summary This section defines the term 'month' for the purpose of monthly billing, specifying that it refers to the period between meter readings, which occur approximately every 30 days. It also establishes the specific calendar periods for 'summer months' rates (June 1 to September 30) and 'winter months' rates (October 1 to May 31). Additionally, it provides specific billing month designations for customers in cycles 1-14 and 21-34.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...

AI summary The text defines the applicability of a fuel cost adjustment within the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one ten-thousandth of a cent using a specific formula (F=E/S + G/S1), provided the Commission deems the costs reasonable and proper.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...

AI summary The text outlines the applicability of a fuel cost adjustment formula to the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in base rates, rounded to the nearest one ten-thousandth of a cent, based on a formula that calculates fuel costs as the sum of energy and generation costs divided by system capacity (F = E/S + G/S).

N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB) 28 passages
Billing Demand
Billing Demand The billing demand for any month shall be the maximum demand measured during on-peak hours as hereinafter defined plus 15% of the excess of the maximum off-peak demand over such on-peak demand but in no case shall be less th...

AI summary The text defines the methodology for calculating monthly billing demand for electricity service. It establishes that billing demand is based on the maximum demand measured during on-peak hours (Monday through Saturday, 7:00 A.M. to 10:00 P.M.), plus 15% of the excess of maximum off-peak demand over on-peak demand. It also sets minimum billing demand thresholds based on the service point's establishment date, the capacity specified in the Electric Service Agreement, or 70% of the previous 12 months' highest billing demand.

MONTHLY RATE
MONTHLY RATE I. Basic Customer Charge: $500.00

AI summary The document identifies the 'Basic Customer Charge' as a component of the monthly rate, specifying a value of $500.00. This represents a fixed cost associated with customer service or infrastructure access rather than a variable charge based on energy consumption.

III. kWh Energy Charge:
III. kWh Energy Charge: 4.157¢ per on-peak kWh 3.657¢ per off-peak kWh

AI summary The document specifies the electricity net energy charge rates for the utility, establishing a price of 4.157¢ per on-peak kWh and 3.657¢ per off-peak kWh.

I. On-Peak Hours:
I. On-Peak Hours: A. Service used beginning at 12:00 midnight March 31 and ending at 12:00 midnight September 30: The on-peak hours are defined as the hours between 10:00 a.m. and 10:00 p.m., Monday through Friday, excluding holidays consi...

AI summary The text defines the specific timeframes for 'on-peak' electricity service during two different periods of the year. From March 31 to September 30, on-peak hours are 10:00 a.m. to 10:00 p.m., Monday through Friday. From September 30 to March 31, on-peak hours are divided into two blocks: 6:00 a.m. to 1:00 p.m. and 4:00 p.m. to 9:00 p.m., Monday through Friday, with holidays excluded.

II. Off-Peak Hours:
II. Off-Peak Hours: The off-peak hours in any month are defined as all hours not specified above as on-peak hours. All hours for the following holidays will be considered off-peak: New Year's Day, Good Friday, Memorial Day, Independence Da...

AI summary The document defines the criteria for off-peak hours, stating they encompass all hours not designated as on-peak within a given month. It specifically lists various holidays that are automatically classified as off-peak, including New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. It also provides rules for adjusting off-peak classifications when these holidays fall on a Saturday or Sunday, designating the preceding Friday or following Monday as off-peak respectively.

MONTHLY RATE
MONTHLY RATE The Monthly Rate shall be an amount computed under the Large General Service or Large General Service (Time-of-Use) Schedule for the Billing Demand and the kilowatt-hours used during the current month, less a discount of$4.20...

AI summary The text defines the calculation method for the Monthly Rate under the Large General Service and Large General Service (Time-of-Use) Schedules. It specifies that the rate is based on Billing Demand and kilowatt-hours consumed during the current month. Additionally, it establishes a specific discount of $4.20 per kW for Billing Demand that exceeds Firm Demand, noting that for Time-of-Use Schedules, the on-peak Billing Demand must be used for this calculation.

2. DURING A LEVEL 1 CAPACITY CURTAILMENT PERJOD
2. DURING A LEVEL 1 CAPACITY CURTAILMENT PERJOD For use of Curtailable Demand during a Level 1 Capacity Curtailment Period, the Customer shall pay to Company, $2.10 per kWh for all kilowatt-hours attributable to all Curtailable Demands dur...

AI summary The text defines the pricing structure for Curtailable Demand during a Level 1 Capacity Curtailment Period. Customers are required to pay a specific rate of $2.10 per kWh for all kilowatt-hours associated with Curtailable Demands during such periods, in addition to any applicable kilowatt-hour charges specified in the rate schedule where the Rider is utilized.

MONTHLY RATE
MONTHLY RATE I. Basic Facilities Charge:

AI summary The provided text is a section heading and an introductory line for the 'Monthly Rate' structure within a regulatory proceeding. It specifically introduces the 'Basic Facilities Charge' component of the rate design. No substantive arguments, data, or discussions are contained in this specific excerpt beyond the identification of the rate component.

II. Off-Peak Hours:
II. Off-Peak Hours: The off-peak hours in any month are defmed as all hours not specified above as on-peak hours. All hours for the following holidays will be considered off-peak: New Year's Day, Good Friday, Memorial Day, Independence Day...

AI summary The text defines the parameters for off-peak hours within a time-of-use (TOU) tariff structure. It specifies that off-peak hours comprise all hours not designated as on-peak. Additionally, it lists specific holidays—including New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day—as off-peak. It also includes rules for holiday adjustments when they fall on weekends, designating the preceding Friday or following Monday as off-peak.

MON'JBL Y RATE
MON'JBL Y RATE The Monthly Rate shall be an amount computed under the Large General Service or Large General Service (Time-of-Use) Schedules for the Billing Demand and the kilowatt-hours used during the current month, less a discount of $5...

AI summary The text defines the calculation methodology for the Monthly Rate under the Large General Service and Large General Service (Time-of-Use) Schedules. It specifies that the rate is based on Billing Demand and kilowatt-hours used during a month, with a specific discount of $5.00 per kW for Billing Demand exceeding Firm Demand. For Time-of-Use Schedules, the discount is specifically tied to the on-peak Billing Demand.

Monthly Charge
Monthly Charge Firm Power and Energy: Energy Charge: 16.31 mills per kilowatt hour Customer Charge: $283 per Billing Period Demand Charge: $8.81 per kW

AI summary The document specifies the monthly charges for Firm Power and Energy under a tariff structure. It outlines the Energy Charge at 16.31 mills per kilowatt-hour, a Customer Charge of $283 per billing period, and a Demand Charge of $8.81 per kilowatt. These figures represent the core components of the rate structure for the specified power service.

ELECTRIC SERVICE SCHEDULE NO. 9A- Continu.ed
ELECTRIC SERVICE SCHEDULE NO. 9A- Continu.ed MONTHLY BILL: (continued) Energy Charge: 5.9596¢ per kWh for all On-Peak kWh 2.5604¢ per kWh for all Off-Peak kWh Minimum: The monthly Customer Charge plus appropriate Facilities and Energy Char...

AI summary The document excerpt specifies the monthly energy charges for Electric Service Schedule No. 9A. It establishes distinct rates for On-Peak and Off-Peak energy consumption, set at 5.9596¢ per kWh and 2.5604¢ per kWh, respectively. Additionally, it defines the monthly minimum bill as the sum of the Customer Charge plus applicable Facilities and Energy Charges, and notes that all monthly bills are subject to adjustments as per Schedule 193.

Interim Credit
Interim Credit AVAILABILITY: At any point on the Company's interco:imected system. APPLICATION: This Schedule shall be applicable to all retail tariff CU$omers taking service under the terms contained in this Tariff. This Schedule will exp...

AI summary The document outlines the terms for an 'Interim Credit' available to all retail tariff customers on the Company's interconnected system. The credit is applied as a percentage decrease to the Monthly Charges of a customer's applicable schedule. The provision specifies that this Schedule is valid until its expiration on May 31, 2007.

ELECTRIC SERVICE SCHEDULE NO. 193 - Continued
ELECTRIC SERVICE SCHEDULE NO. 193 - Continued MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable schedule, all monthly bills shall have the following percentage increases applied to the Power Charge, En...

AI summary This section of Electric Service Schedule No. 193 specifies that certain percentage increases will be applied to various components of a customer's monthly bill. These adjustments affect the Power Charge, Energy Charge, Facilities Charge, and Voltage Discount, in addition to any standard Monthly Charges defined in the customer's specific schedule.

Basic Charge
Basic Charge $3,780.00 per month

AI summary The document specifies the monthly Basic Charge, which is set at $3,780.00. This represents a fixed monthly cost component of the utility's rate structure.

Applicable
Applicable All retail tariff rate schedules shall be subject to two normally scheduled rate elements, a Base Net Power Costs (NPC) charge and Deferred NPC Adjustment that together recover total net power costs including fuel, purchased pow...

AI summary The document specifies that all retail tariff rate schedules are subject to two primary rate elements: the Base Net Power Costs (NPC) charge and the Deferred NPC Adjustment. Together, these elements are designed to recover total net power costs, which encompass fuel, purchased power (including financial hedges), wheeling, and sales for resale for both natural gas and electricity. It explicitly excludes other NPC costs that are not specifically modeled in the Company's production cost model.

Definitions and Basic Concepts:
Definitions and Basic Concepts: NPC Rate Effective Period shall be the 12 month period beginning April 1, 2007 and extending through March 31, 2008 in the first PCAM application filed on or before February 1, 2007. In each succeeding PCAM...

AI summary This document section defines the temporal and structural parameters for the Net Power Costs (NPC) Price Comparison and Amortization Mechanism (PCAM). It establishes the 'NPC Rate Effective Period' as a 12-month window and the 'NPC Comparison Period' as the preceding 12-month historic period. Additionally, it defines the 'Base NPC' as the sum of monthly total Company NPC approved by the Commission, noting that it must reflect an Embedded Cost Differential (ECD) adjustment and be recovered through unbundled rate elements.

Preamble
Sharing Proportion is also illustrated in Table 1 above and is the symmetrical proportion of Deferred NPC Adjustment eligible for recovery from, or repayment to customers. The Sharing Proportion shall be layered to reflect a Customer Propo...

AI summary The text outlines the mechanics for the Deferred NPC Adjustment, specifically defining the 'Sharing Proportion' which divides adjustments between customers and the company. It specifies that no interest is deferred for the company's portion. Additionally, it describes the Revenue Variation Adjustment based on actual versus forecast kilowatt-hours sold in Wyoming and establishes a 'Symmetrical Interest' rule where interest is paid to the company on under-collections and to customers on over-collections of the deferred balance.

Definitions and Basic Concepts (continued):
Definitions and Basic Concepts (continued): Symmetrical Interest (continued) Adjustments in the NPC Rate Effective Period. If the Commission implements a proposed Deferred NPC Adjustment on an interim basis, any excess charges or under cha...

AI summary This section defines key concepts related to the NPC (Net Power Costs) Rate Effective Period and interjurisdictional cost allocations. It specifies that interim adjustments to Deferred NPC must include interest, with rates determined by the Commission or the Company's authorized weighted average cost of capital for periods exceeding 12 months. Additionally, it defines the methodology for calculating Wyoming's allocated share of net power costs, including the factors for allocation and the recalculation process for the Wyoming Actual Adjusted ECD.

Deferred NPC Adjustment:
Deferred NPC Adjustment: Deferred NPC for the Comparison Period shall be calculated monthly and recorded on the Company's books, based on the following formula: Deferred NPC adjustment= ((((Adjusted Actual NPC- (Base NPC x Revenue Variatio...

AI summary The text outlines the calculation methodology for the Deferred Net Power Costs (NPC) Adjustment. It provides a specific formula involving Adjusted Actual NPC, Base NPC, Revenue Variation adjustments, and Dead bands, weighted by Sharing Proportions and Wyoming Allocated Shares, plus Symmetrical Interest. It also details the inclusion of an Embedded Cost Differential (ECD) Adjustment. Furthermore, it establishes the initial annual Base NPC at $660 million, with specific conditions and revisions for the 2006 comparison period based on the filing of a general rate case.

.... e •snzt'¥tM e'ffl& Deferred NPC Adjustment: (continued)
.... e •snzt'¥tM e'ffl& Deferred NPC Adjustment: (continued) schedules and, where applicable, to the demand and energy rate components within each schedule based on the applicable allocation factors and cost of service study relationships...

AI summary The text describes the methodology for allocating and calculating the Deferred NPC (Net Power Costs) Adjustment. The Company proposes to distribute allocated and classified costs across demand and energy rate components based on allocation factors and cost of service study relationships established in the previous General Rate Case (GRC). These costs are then divided by billing determinants to determine specific rates, ensuring the Deferred NPC adjustment is spread across customer classes and rate elements in the same proportion as the Base NPC.

MONTHLY RATE
MONTHLY RATE The rate per month shall be that stated on the Industrial Power Service Rate 23 or Large General Service Time-Of-Use Rate 24 schedules for the billing demand and the kilowatt-hours during the current billing month. The interru...

AI summary The text specifies how the monthly rate is calculated for industrial and large general service customers. It establishes that the rate is based on the schedules provided in Industrial Power Service Rate 23 or Large General Service Time-Of-Use Rate 24, covering both billing demand and kilowatt-hours. Additionally, it notes that interruptible demand is subject to a reduction based on a Demand Credit per kilowatt, depending on the customer's selected option.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of a...

AI summary The text specifies the applicability of a fuel cost adjustment for the Utility's South Carolina retail electric rate schedules. It states that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one-thousandth of a cent using a specific formula (F = E_S + G_S1), provided the Commission deems the costs reasonable and proper.

DEFINITION OF TERMS
DEFINITION OF TERMS Total kW : Total kW is defined as the sum of the Firm kW and the Curtailable kW designated by the customer when contracting for service under this Rider and will be used to determine the applicable rate schedule. Firm k...

AI summary This document section provides formal definitions for terms used under the Experimental Curtailable Service Rider (Rate Schedule No. 36) for Southwestern Electric Power Company. It defines 'Total kW' as the sum of Firm and Curtailable kW, and distinguishes between 'Firm kW' (not subject to curtailment) and 'Curtailable kW' (subject to curtailment). It specifies that customers must designate these amounts when contracting and may adjust them annually via written request.

MONTHLY CHARGES AND CREDITS
MONTHLY CHARGES AND CREDITS Customer's net monthly bill for service provided under this Rider will be calculated in accordance with Company's applicable rate schedule, with the exception that a Curtailable Power Credit will be applied. The...

AI summary This section outlines the calculation method for a customer's net monthly bill under a specific Rider. It specifies that the bill follows the Company's standard rate schedule but incorporates a Curtailable Power Credit. This credit is calculated by applying a Demand Credit to the average kilowatt load during the month's peak 15-minute period that exceeds the Firm kW, subject to a maximum cap based on the Curtailable kW.

En e cf IVe: J my I 2006 th roug1 hJ nne 2007 revenue mon th
En e cf IVe: J my I 2006 th roug1 hJ nne 2007 revenue mon th Descri12tion Rate Code Year Six Over/Under Adjusted Year 7 Factor %for year 6 Net Merger Savine:s Credit Residential Basic 015,038 2.0323% -0.4288% 1.6035% Residential Heating 02...

AI summary The document provides a detailed breakdown of rate adjustments and merger savings credits for various customer classes for the 2006 through 2007 revenue months. It lists specific rate codes, Year Six factors, over/under percentages, and adjusted Year 7 figures. Key categories include residential heating, general services, lighting and power (primary and secondary), municipal services, and industrial applications like pulp and paper mills. It also specifies that Net Merger Savings Credits are excluded for certain standby and emergency power services.

The Net Monthly Rates set forth in SWEPCO's Rate Schedules identified below will be increased by the following Rate Adjustment amounts.
The Net Monthly Rates set forth in SWEPCO's Rate Schedules identified below will be increased by the following Rate Adjustment amounts. Rate Class Rate Adjustment Residential $0.0002480 per kWh Commercial/Small Industrial $0.0001949 per kW...

AI summary The document outlines specific Rate Adjustment increases for various customer classes under SWEPCO's Rate Schedules. The adjustments are provided as fixed amounts per kilowatt-hour (kWh) for five distinct categories: Residential, Commercial/Small Industrial, Large Industrial, Municipal, and Lighting.

Large Industrial Class
Large Industrial Class Large Lighting & Power - Primary Large Lighting & Power - Transmission Pulp & Paper Mill- Transmission

AI summary The document segment identifies specific categories within the Large Industrial Class for the proceeding. These include Large Lighting & Power (Primary and Transmission) and Pulp & Paper Mill - Transmission. These classifications are used to organize the rate structures and service types for large-scale industrial customers.

N-40RIRs Attachment SEB-NSPI - 2h 6 passages
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUMF PTIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90...

AI summary The document provides a detailed cost calculation for a firm 50 MW load with a 90% load factor under Rate Schedule 25 - Extra Large General Service. It breaks down the monthly costs into demand charges (based on kVA) and energy charges (based on kWh), including a primary voltage discount. It also accounts for specific adjustments such as the Temporary Power Cost Adjustment and the Energy Efficiency Rider Adjustment, resulting in a total monthly cost of $1,291,703.

Max Int. / Min Firm
Max Int. / Min Firm Line Description Rates Units Cost 1 Customer Charge - Firm $170.00 1 $ 170 2 Customer Charge - Interr $28.40 1 28 Demand Charge: 3 Summer (JJAS) $11.45 16,667 190,833 4 Winter 7.70 33,333 256,667 5 Total 50,000 $447,500...

AI summary The document provides a detailed cost breakdown for a 'Max Int. / Min Firm' rate structure. It outlines specific charges including Customer Charges for Firm and Interruptible services, Demand Charges for Summer and Winter periods (including Interruptible Credits), and Energy Charges based on hourly usage. The calculation concludes with a total cost of $1,730,815, incorporating an Electricity Cost Recovery (ECR) mechanism and reflecting a final rate of 52.69 mills per kWh.

ENTERGY ARKANSAS, INC.
ENTERGY ARKANSAS, INC. (formerly Arkansas Power & Light Company htto:l/www.entergy-arkansas.com Contact: Jim Berkau 581-377-5584 Voltage: Transmission Power Factor: 90% Assumes Substation Ownership Rate: PST (LPS-TOU), effective 3/9/01 Opt...

AI summary The document identifies Entergy Arkansas, Inc. (formerly Arkansas Power & Light Company) as a relevant entity. It provides technical and rate specifications for their service, including a transmission power factor of 90% and substation ownership assumptions. It also notes specific rate structures, such as the PST (LPS-TOU) effective since March 9, 2001, and the Optional Interruptible Service Rider (OIS) effective on the same date.

Section 41
www.appalachianpower.comiCustomerService/RatesAndTariffsi leqaiTaritfFilinosfTennessee.aspx Contact: Judi Willis [email protected] Greg Shamblin, 1-888-710-4237 Ext 4510 Tariff I.P. Industrial Power December 1997 Voltage: Transmission Power...

AI summary The document provides contact information and technical specifications for the Appalachian Power Industrial Power (I.P.) Tariff, dated December 1997. It lists contact persons Judi Willis and Greg Shamblin and specifies technical requirements for the service, including a transmission voltage and a 90% Power Factor. It also notes that the service assumes substation ownership.

East System
East System Rate 53 Large Industrial (eff 3/1/99) Rider No. 4 Interruptible Power Service (eff 5/27/97)

AI summary The document identifies specific rate structures and riders applicable to the East System. It highlights the 'Rate 53 Large Industrial' and the 'Rider No. 4 Interruptible Power Service' as relevant components of the tariff design for large industrial customers in that region.

Voltage: Transmission Power Factor: 90%
Voltage: Transmission Power Factor: 90% ASSUME TIONS Firm Monthly kW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Max...

AI summary The document presents a detailed cost calculation for a Large Industrial Firm Rate based on a transmission power factor of 90%. It outlines specific demand charges for summer and winter periods, energy charges for peak and off-peak usage, and includes cost recovery mechanisms for AEP (Appalachian Power) and Energy Efficiency. The total firm cost is calculated at $1,301,468, which is subsequently reduced by a Rider No. 4 Interruptible Power credit to a total cost of $1,141,468, resulting in a final rate of 34.75 mills per kWh.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 17 passages
MONTHLY RATE
MONTHLY RATE Demand Charge $21.25 per kilowatt for all kilowatts of Demand {I)(T) (D) Energy Charge $0.00645 per kilowatt-hour for all kilowatt-hours (I)

AI summary The document specifies the monthly rate structure for electricity, detailing two primary components: a Demand Charge of $21.25 per kilowatt for all kilowatts of demand, and an Energy Charge of $0.00645 per kilowatt-hour for all kilowatt-hours consumed.

RATING PERIOD SELECTION OPTION
RATING PERIOD SELECTION OPTION Upon written request by the Customer and approval by the Company, a customer may shift his 10-hour peak period for billing purposes by two (2) hours around the normally defined on-peak period. The Customer ma...

AI summary The document outlines a 'Rating Period Selection Option' allowing customers to request a shift in their 10-hour peak period for billing purposes. With written request and Company approval, customers can move the peak period by up to two hours in either direction from the normally defined on-peak period. This option is limited to two exercises per twelve-month billing period.

OTHER TERMS AND CONDITIONS
OTHER TERMS AND CONDITIONS During the term of the Customers' Contract for Power Service, Customer may not engage in self-generation other than periodic operation of any existing self-generation facilities, not to exceed a total capacity of...

AI summary The document outlines specific terms and conditions for a Power Service Contract. It restricts customers from engaging in new self-generation, permitting only the periodic operation of existing facilities with a capacity limit of 10,000 KW. Additionally, it specifies that interruptible sales under the current rate schedule are classified as non-firm sales, meaning they are excluded from cost-of-service allocations in any Eastern Power Corporation (EPEC) rate cases.

INTERIM ORDER DOCKET NO. 12700 Page 1 of 3
INTERIM ORDER DOCKET NO. 12700 Page 1 of 3 Line · Demand Charge No. Calculation Value Source 1 Total Transmission Plant $162,114,000 Page 2 of 18 Commission Jurisdictional COS Study 2 Accum. Depr. Transmission 45,125,000 Page 3 of 18 Commi...

AI summary This document presents a calculation for the annual and monthly demand charges for El Paso Electric Company's interruptible rate transmission voltage customers for the test year ending June 30, 1993. The calculation derives a total demand-related cost of $19,125,941 based on net transmission plant values, depreciation, O&M expenses, and property taxes. This total is divided by the loss-adjusted non-coincident peak demands to arrive at an annual demand charge of $18.29 per kW and a monthly charge of $1.521 per kW.

Section 56
Schedule GP Customer .................................... Schedule PT Customer ..... 21.5% of (CT) (CR) (CT) (CR) Credit on Demand Reduction, per kW 18.2. MONTHLY RATE: 18.3. BILLING DEMAND: The minimum monthly billing demand for all Custo...

AI summary The text outlines the rate structures and credit mechanisms for two types of customers (Schedule GP and Schedule PT) under a demand reduction rider. It specifies a minimum monthly billing demand of 1000 kW. Customers receive monthly credits based on their actual demand reduction during interruption periods, provided they meet contracted targets. Specifically, GP customers receive a credit of 33% of the Demand Charge price, while PT customers receive 21.5%. Failure to meet the contracted reduction results in the repayment of all credits issued during that contract year.

- 18.6.9. Credits shall be applied to bills the month after such credits are earned.
- 18.6.9. Credits shall be applied to bills the month after such credits are earned. AKKANSA 45 PUBL IC SE KVICI - 00 DIVINISSION 16.4. (1) (2) (3) (4) NOTES TO FORMULA: The initial effective value of the EAF shall be 0.0311. The Energy Co...

AI summary The document outlines the formulaic components and notes for a specific electric service rate schedule (Schedule 16) for The Empire District Electric Company. It specifies the application of credits, the initial effective value of the Energy Cost Factor (EAF), and the methodology for calculating True-up Adjustments (TUA). It also defines the Carrying Charge Rate based on the authorized rate of return on the rate base and establishes the projected Energy Cost Period starting April 1 of the filing year.

9.4. NET MONTHLY RATE
9.4. NET MONTHLY RATE (AT, MT) This rate shall remain in effect until modified or terminated in accordance with its terms or applicable regulations or laws. 1st Revised Sheet No.: 9.2 Docket No.: 99-249-U Replacing: Original Sheet No.: 9.2...

AI summary This document section specifies the 'Net Monthly Rate' for Large Power Service under the Time-Of-Use PST schedule. It establishes that the rate remains in effect until modified or terminated by regulations or laws. The rate applies to Commercial/Industrial electric services for Entergy Arkansas, Inc. and references specific docket and order numbers from a previous revision.

9.4.2. On-Peak Hours
9.4.2. On-Peak Hours Summer Period: Other Period 1:00 p.m. -8:00p.m. Monday- Friday 7:00 a.m. -6:00p.m. Monday- Friday

AI summary The document defines the specific timeframes for 'On-Peak Hours' during the Summer Period. It identifies the On-Peak window as 1:00 p.m. to 8:00 p.m. from Monday to Friday, while the 'Other Period' is defined as 7:00 a.m. to 6:00 p.m. from Monday to Friday.

9.4.3. Off-Peak Hours
9.4.3. Off-Peak Hours All hours not designated as on-peak hours. 2"d Revised Sheet No.: 9.3 Replacing: 1 51Revised Sheet No.: 9.3 Entergy Arkansas, Inc. Name of Company Kind of Service: Electric Class of Service: Commercial/Industrial Dock...

AI summary This document section defines 'Off-Peak Hours' as all hours not designated as on-peak hours. It is part of a revised rate sheet (Revised Sheet No. 9.3) for Entergy Arkansas, Inc., specifically concerning Large Power Service under a Time-Of-Use PST. The filing pertains to the Commercial/Industrial class of service for Docket No. 04-052-TF.

9.4.4. Minimum
9.4.4. Minimum Function: Billing Item Customer Charge: Generation Transmission Distribu lion $344.45 Customer Service $24.43 Total $368.88 Demand Charge per kW: Highest kW established in the twelve months ending with the current month: $1....

AI summary The document specifies the minimum charges for customers under a specific rate schedule. It provides a breakdown of the total monthly charge of $368.88, which includes components for Generation, Transmission, Distribution, and Customer Service. Additionally, it defines the Demand Charge per kW as $2.21, broken down into its respective components across the same categories. The text also notes that energy cost recovery factors are applied based on energy consumed, subject to potential reductions under Rate Schedule No. 18.

Preamble
- 41.5.3. Except as provided in Section 41.5.6. for Small General Service, Large General Service and Large Power Service Customers, the monthly billing demand will be the maximum demand as registered for the current month, but no more than...

AI summary The text outlines the billing demand rules for customers under the Optional Interruptible Service (OIS) Rider. It specifies that monthly billing demand is generally based on the maximum demand registered for the month, capped at the Firm Contract Demand. It also establishes a 51.6% rate for Non-Firm demand under specific schedules. Furthermore, it details penalty multipliers for customers who fail to reduce demand during Restricted Hours, with the multiplier increasing for subsequent failures up to a maximum of 5.0.

37.2. CONDITIONS
37.2. CONDITIONS - 37.2.1. This rider is necessary in order to collect the decommissioning costs associated with EAI's Arkansas Nuclear One nuclear generating station (ANO). - 37.2.2. The Net Monthly Rates in EAI's currently effective rate...

AI summary The document outlines the conditions for a rate rider designed to recover decommissioning costs for the Arkansas Nuclear One (ANO) nuclear generating station owned by Entergy Arkansas, Inc. (EAI). It specifies that Net Monthly Rates in current rate schedules will be increased by specific Rate Adjustment amounts, which are scheduled for annual revision according to established procedures.

37.2.4. Annual Revision
37.2.4. Annual Revision - A. EAI shall determine revised Rate Adjustment amounts annually in accordance with the provisions of Paragraph 37.2.5. below and file a revised Attachment A containing such revised Rate Adjustment amounts with the...

AI summary This section outlines the annual revision process for Rate Adjustment amounts. Entergy Arkansas, Inc. (EAI) is required to determine and file revised amounts with the Commission by November 1st annually. The Commission Staff is tasked with reviewing these filings for compliance by December 15th, allowing EAI time to submit corrections. The finalized Rate Adjustments become effective on January 1st and remain in effect for the following calendar year.

37.2.5. Revenue Requirement and Rate Determination
37.2.5. Revenue Requirement and Rate Determination A. TheANO decommissioning revenue requirement for the Arkansas retail jurisdiction that is to be utilized to develop the Rate Adjustment amounts in Attachment A for each calendar year shal...

AI summary This section outlines the methodology for determining the Arkansas Nuclear One (ANO) decommissioning revenue requirement and the resulting Rate Adjustments for the Arkansas retail jurisdiction. It specifies that adjustments must be based on current estimates of various inputs, including trust management fees, income tax rates, bad debt rates, trust earnings, and decommissioning expenditures. The revenue requirement is allocated across rate classes based on the proportions established in Entergy Arkansas, Inc.'s most recent final general rate filing, and the final Rate Adjustments are calculated by dividing the class revenue requirements by projected annual billing units.

The Net Monthly Rates for Grand Gulf demand related costs for the billing period from January 2006 through December 2006 will be as follows: (CT)
The Net Monthly Rates for Grand Gulf demand related costs for the billing period from January 2006 through December 2006 will be as follows: (CT) Rate Class Rate Schedules Net Monthly Rate Residential Small General Service RS,RT SGS, GFS,...

AI summary The document specifies the net monthly rates for Grand Gulf demand-related costs applicable for the billing period of January 2006 through December 2006. It provides a detailed breakdown of rates for different customer classes, including Residential Small General Service and Large General Service Lighting, categorized by specific rate schedules. The text also introduces the section regarding the procedures for the recovery of these costs.

MONTHLY RATE:
MONTHLY RATE: Residential Energy Charge Including Demand Charge: Base Charge$17.00 All consumption (kWh) not greater than 200 hours times the billing demand: First 3,000 kWh All consumption (kWh) in excess of 200 nours and not greater than...

AI summary The text outlines the residential energy charge structure, which includes a base charge of $17.00 and a tiered consumption rate based on the number of hours the billing demand is active. It establishes a minimum monthly bill calculation incorporating the base charge, billing demand, excess kVAR charges, and Fuel Cost Recovery. Additionally, it specifies a separate rate for metered outdoor lighting, capped at the lesser of the standard residential calculation or a flat rate of $38.60 plus Fuel Cost Recovery.

APPLICABILITY:
APPLICABILITY: The MTC will be applied to all customers in the Georgia Power territory as it existed on June 30, 2006 and will be designed to distribute all amounts collected by the MTA to customers in the Georgia Power territory as it exi...

AI summary The text defines the applicability of the Main Terms Charge (MTC) within the Georgia Power territory as of June 30, 2006. It specifies that the MTC is designed to distribute amounts collected by the Main Terms Agreement (MTA) to customers on a per kilowatt-hour basis. However, a specific exclusion is noted: the MTC does not apply to Real-Time Pricing (RTP) customers for usage exceeding their Contract Billing Level (CBL), as these customers are not subject to the higher fuel charges the MTC is intended to compensate.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB) 14 passages
PAYMENT FOR SERVICE
PAYMENT FOR SERVICE Customers who pay within 20 days of the date of the bill will pay the net bill computed on the Net Monthly Rate. The gross bill will be payable after 20 days of the date of the bill. The gross bill will be the total net...

AI summary The document outlines the billing and payment terms for customers, establishing a tiered structure based on payment timeliness. Customers who settle their bills within 20 days of the billing date are charged the net bill calculated on the Net Monthly Rate. Conversely, payments made after the 20-day window are subject to a gross bill, which includes the total net bill plus an additional 3 percent surcharge.

BASE RATE REVENUE PERCENTAGES
BASE RATE REVENUE PERCENTAGES Major Rate Classes % of Base Rate Revenue Residential 2.2139% Commercial & Sm. Industrial 1.0562% Large Industrial 1.7827% Municipal 1.1159% Lighting 0.7003% ANNUAL REDETERMINATION

AI summary The document provides a breakdown of the distribution of base rate revenue across five major rate classes in Nova Scotia. It shows that the Residential rate class accounts for the largest share at 2.2139%, followed by Large Industrial (1.7827%), Municipal (1.1159%), Commercial & Sm. Industrial (1.0562%), and Lighting (0.7003%). The section also introduces the concept of annual redetermination of these percentages.

APPLICATION
APPLICATION This Rate Reduction Rider provides for a monthly credit calculated as a percentage of the customer's base rate revenue beginning with the first billing cycle of the July 2006 billing period and expiring after completion of the...

AI summary The application describes a Rate Reduction Rider designed to provide a monthly credit to customers as a percentage of their base rate revenue. The credit is scheduled to begin in July 2006 and expire after June 2007, or upon the implementation of competition in the Texas region for the Southwest Power Pool (SPP), whichever occurs first. This rider is specifically established as a result of the merger between the American Electric Power Company, Inc. and Central and South West Corporation.

- AAF = Adjusted Allocation Factor is ((((DP TU) \ D) / BPS) \ S) for each listed major rate class / divided by the sum of this calculation for all listed major rate classes.
- AAF = Adjusted Allocation Factor is ((((DP TU) \ D) / BPS) \ S) for each listed major rate class / divided by the sum of this calculation for all listed major rate classes. PUSLIC UTILI N CUMINIS APPROVE SIGHT OF TEXAS OCT 14 '05 DOCKET...

AI summary The document snippet provides the mathematical formula for the Adjusted Allocation Factor (AAF), which is used to determine the distribution of costs across major rate classes. The calculation incorporates variables including Estimated costs of DSM resource contracts (DP), True-Up amounts (TU), a specific factor (D), Base Power Sales (BPS), and a secondary factor (S). The text also references a 2005 docket from the Public Utility Commission of Texas regarding electric service tariffs.

BPS = Base Period Adjusted Kilowatt-hour Sales are the sales utilized to calculate the Kilowatt-hour rate for the first year of the PPCF. These kWh sales figures are as follows:
BPS = Base Period Adjusted Kilowatt-hour Sales are the sales utilized to calculate the Kilowatt-hour rate for the first year of the PPCF. These kWh sales figures are as follows: Major Rate Class Base Period kWh Sales Residential 2,192,184,...

AI summary The document defines Base Period Adjusted Kilowatt-hour Sales (BPS) as the sales figures used to calculate the Kilowatt-hour rate for the first year of the Power Purchase Cost Factor (PPCF). It provides a breakdown of these kWh sales across four major rate classes: Residential, Commercial, Industrial, and Lighting. Additionally, it introduces the Demand Allocation Factor (D), which is derived from the company's most recent cost allocation study.

Preamble
PUBLIC UTILITY COMMISSION OF TEXAS APPROVED OCT 14'05 DOCKET 31236 CONTROL# TARIFF FOR ELECTRIC SERVICE Section No .: Revision 4.21 47.03 PPCF Rate: Cycle 1 November, 2005 Sheet: Effective Date: Applicable: Entire System Code:

AI summary This document snippet represents a preamble and a specific section (4.21) of a tariff for electric service approved by the Public Utility Commission of Texas on October 14, 2005. It identifies the Power Purchase Cost Factor (PPCF) as a relevant rate component for the entire system, effective for Cycle 1 starting in November 2005.

Residential Rate Class:
Residential Rate Class: Basic Service Basic Service with Water Heating Basic Service with Space Heating Basic Service with Water & Space Heating

AI summary The provided text serves as a heading and a list of sub-categories within the Residential Rate Class. It outlines the different service tiers available to residential customers, specifically distinguishing between 'Basic Service' and variations that include 'Water Heating', 'Space Heating', or both 'Water & Space Heating'.

The following are the allocation factors to be used in the calculation of the PCRF:
The following are the allocation factors to be used in the calculation of the PCRF: Rate Class Demand Allocation Factor (AF) Residential Lighting 0.130000 Residential All Electric 0.013154 Residential Space Heating 0.004100 Residential Wat...

AI summary The document provides a table of Demand Allocation Factors (AF) used to calculate the Purchased Power Cost Recovery Factor (PCRF) for the Southwestern Public Service Company. It lists specific numerical factors for various rate classes, including residential categories (Lighting, All Electric, Space Heating, Water Heating, Heat Pump), industrial/agricultural services (Irrigation, Cotton Gin, Grain Elev. & Feed Mill, Oil Well Pumping), and public authority services (Schools, Street Lights, Guard Lights).

Pricing
Pricing Rate schedule firm demand and energy charges are applicable for FPJ demand and energy: including the ratcheted billing demand provisions of the rate schedule . A monthly credit of $3.40 per kW of FPI demand is given. The credit for...

AI summary The text outlines the pricing structure and contractual terms for Flat Price Interruptible (FPI) demand and energy. Key components include a monthly credit of $3.40 per kW of FPI demand, which is subject to annual review and specific notice requirements for adjustments. It details 'Credit Reduction Charges' for non-compliance with suspension obligations, administrative fees, and the exclusion of Growth Credits. Additionally, it specifies technical requirements, such as five-minute interval metering and telephone access for the Transmission Valley Authority (TVA) to verify compliance.

VIII. DETERMINATION OF ELECTRICITY SUPPLY ADJUSTMENT DEMAND
VIII. DETERMINATION OF ELECTRICITY SUPPLY ADJUSTMENT DEMAND This credit is required in order to achieve customer bill neutrality, arising from changes to the Distribution Demand Charge while maintaining the overall capped rates. The kW of...

AI summary The text explains the necessity of an electricity supply adjustment credit to maintain customer bill neutrality. This adjustment is required because of changes made to the Distribution Demand Charge while keeping overall rates capped. It specifies that the kW of demand billed will be based on the Distribution Demand determined under Paragraph IV.

Energy Charge:
Energy Charge: A For new Customers and Customers supplied with Electricity under Schedule 1821 for less than 12 Billing Periods as of the date this Schedule becomes eff~ctive : 2.852 ¢ per kW.h for all kW.h per Billing Period a This rate w...

AI summary The document outlines the energy charge structure for customers under a specific electric tariff. It establishes a tiered pricing model based on the duration of service. New customers (less than 12 billing periods) are charged a flat rate of 2.852 ¢ per kW.h. Customers with 12 or more billing periods are subject to a tiered rate: 2.569 ¢ per kW.h for the first 90% of their Customer Billing Limit (CBL) and 5.400 ¢ per kW.h for any usage exceeding that 90% threshold.

Billing demand 5.4
Billing demand 5.4 The billing demand at Rate Lis equal to the maximum power demand during the consumption period concerned, but cannot be less than the contract power, which becomes the minimum billing demand. For each overrun during an i...

AI summary The text outlines the billing demand rules for Rate Lis, stating that it is based on maximum power demand during a consumption period but is capped at a minimum of the contract power. It also specifies penalty structures for overruns during interruption periods, limiting total penalties to the amount of fixed credits paid. Furthermore, it establishes a threshold for the Distributor to terminate a commitment if penalties are incurred four times during the winter period.

Declining Discount Firm Rate:
Declining Discount Firm Rate: The declining discount is available for five years to Customers who meet all of the following criteria: - (i) the Customer is served directly from the NB Power transmission system; - (ii) the additional firm l...

AI summary The text outlines the eligibility criteria for the 'Declining Discount Firm Rate' offered by NB Power. To qualify for this five-year discount, customers must be served directly from the NB Power transmission system, have an additional firm load of at least 5,000 kW, and enter into a five-year agreement with NB Power as the electricity supplier for the total load at the site.

Electric rate disclaimer
Electric rate disclaimer The rates herein defined are net and do not include any taxes or surcharges, which may lawfully be imposed by or at the request of any municipal, provincial or federal authority. Call TOLL-FREE in Canada or contine...

AI summary The document provides a disclaimer stating that the electric rates defined in the proceeding are net rates. They exclude any taxes or surcharges that may be imposed by municipal, provincial, or federal authorities. It also provides contact information for power trouble and outage reporting in Saskatchewan.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 26 passages
Adjustments to Rate.
Adjustments to Rate. Bills computed under the rates set forth herein will be adjusted as follows:

AI summary The document introduces a section regarding adjustments to the rates established in the proceeding. It specifies that electricity bills computed under the set rates will be subject to specific adjustments, though the specific mechanisms and details of these adjustments are not elaborated upon in this particular excerpt.

Preamble
This tariff is subject to a minimum monthly charge equal to the sum of the monthly service charge, the product of the demand charge and the monthly billing demand, the fuel cost adjustment, and the AEP/CSW Net Merger Savings Reduction Ride...

AI summary The text defines the minimum monthly charge for a specific tariff. It establishes that this minimum amount is calculated by summing four components: the monthly service charge, the product of the demand charge and the monthly billing demand, the fuel cost adjustment, and the AEP/CSW Net Merger Savings Reduction Rider.

AEP/CSW NET MERGER SAVINGS REDUCTION RIDER
AEP/CSW NET MERGER SAVINGS REDUCTION RIDER The net merger savings reduction rider factors identified below will reduce bills to customers pursuant to the Indiana Utility Regulatory Commission's April 26, 1999, Order in Cause No. 41210, rel...

AI summary The document describes the application of the net merger savings reduction rider, which reduces customer bills following the merger of American Electric Power, Inc. and Central and South West Corporation. Pursuant to an Indiana Utility Regulatory Commission Order, these savings are allocated to rate classes based on total revenues (excluding fuel cost adjustments) and applied via a per-kilowatt-hour factor. The factors are updated annually and reconciled for actual versus projected usage, remaining in effect until the base rates of Indiana Michigan Power Company are modified.

RATE CLASS ENERGY CREDIT (¢/KWH)
RATE CLASS ENERGY CREDIT (¢/KWH) RS 0.0883 SGS 0.1143 MGS/IS 0.0840 LGS 0.0704 QP/CS-IRP 0.0728 IP/IRP/CS-IRP 0.0506 MS 0.0874 WSS 0.0575 EHS 0.0888 EHG 0.0900 OL 0.1580\ SL 0.0873\ \ The Energy Credits for the OL and SL Rate Classes are r...

AI summary The document provides a schedule of Energy Credits (¢/KWH) for various rate classes, including RS, SGS, MGS/IS, LGS, QP/CS-IRP, IP/IRP/CS-IRP, MS, WSS, EHS, EHG, OL, and SL. It notes that for the OL and SL Rate Classes, these credits are applied as reductions in monthly lamp rates, with specific exceptions for metered lamps under Tariff S.L.C.M. and lamps served under Tariff-F.W.-S.L.

22. Employees Discount.
22. Employees Discount. Regular employees who have been in the Company employ for six months or more and are the head of the family or mainly responsible for maintenance of the premises they occupy may, at the discretion of the Company, se...

AI summary The document outlines the eligibility criteria and specific rate structures for employee discounts on residential electric bills. Regular employees with at least six months of service who are primarily responsible for their residence may receive bill reductions. It specifies various rate tiers, including standard service charges, discounted rates for approved energy-storage or load-management water-heating systems, and time-of-day (TOD) rates with distinct on-peak and off-peak pricing.

ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57 1/97 \ \ \ \ ,\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Missouri Public LARGE POWE P SERVICE Misso...

AI summary The document is a schedule (Schedule 100) issued by the Indiana Utility Regulatory Commission under Cause No. 38702-FAC57. It specifies the monthly customer charges for large power service at primary voltage. The rates provided are $537.24 for both the Summer and Winter seasons. The document appears to be a formal rate filing or order pertaining to large power service categories.

Agers, Donna
Agers, Donna From: jrw : [email protected] Sent: F Friday, December 08, 2006 8:32 AM To: Agers, Donna Subject: Re: Kentucky Power Adjustments Hi Donna, The fuel adjustment, environmental and net merger credit factors are the same for all cu...

AI summary Donna Agers received a correspondence from Atlantic Power (AEP) regarding Kentucky Power adjustments. The communication clarifies that fuel adjustment, environmental, and net merger credit factors apply uniformly across residential, commercial, and industrial customer classes. It further specifies that residential customers are subject to additional surcharges, including a Home Energy Assistance fee of ten cents per month, a capacity charge, and a demand-side management factor, excluding school taxes or franchise fees.

RATING PERIODS
RATING PERIODS The rating periods applicable to the Maximum Load charges shall be as follows: On-Peak Period during Summer Billing Months of June through September is defined as weekdays from 10:00 a.m. to 9:00p.m., Eastern Standard Time,...

AI summary The text defines the specific rating periods used to calculate Maximum Load charges across the Company's service area. It distinguishes between 'On-Peak' and 'Off-Peak' periods for different seasons. Summer On-Peak periods occur on weekdays from 10:00 a.m. to 9:00 p.m. during June through September, while Winter On-Peak periods occur on weekdays from 8:00 a.m. to 10:00 p.m. during October through May. Off-Peak periods encompass all other hours, including weekends.

FAC Fuel Adjustment Clause
FAC Fuel Adjustment Clause - (4) Sales (S) shall be all KWH's sold, excluding inter-system sales. Where, for any reason, billed system sales cannot be coordinated with fuel costs for the billing period, sales may be equated to the sum of (...

AI summary This document outlines the technical specifications and methodology for the Fuel Adjustment Clause (FAC). It defines 'Sales' as all KWH sold excluding inter-system sales, with specific protocols for when billed sales cannot be coordinated with fuel costs. It specifies that the cost of fossil fuel includes only the invoice price minus discounts, including transportation to the unloading point. The document also establishes the base period (ending September 2004), the base fuel factor (1.810 cents per KWH), and the current period calculation, effective July 2005.

RATE
RATE Customer will receive a credit against the applicable power schedule for curtailable 10JV, as determined in the preceding paragraph, times the applicable credit. Customers will be charged for the portion of each requested curtailment...

AI summary The document specifies the mechanism for providing customer credits for curtailable 10JV. Customers are eligible for a credit against their power schedule based on the amount of curtailable 10JV determined in the preceding section, multiplied by the applicable credit rate. Conversely, if a requested curtailment is not fully met, the customer will be charged for the remaining portion at the applicable charge.

AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE This schedule is available for three-phase power and lighting service to industrial customers whose monthly demand is equal to or greater than 2,000 kilowatts, the customer to furnish and maintain all necessary tran...

AI summary This section outlines the eligibility criteria for the industrial three-phase power and lighting service schedule. It specifies that industrial customers must have a monthly demand of at least 2,000 kilowatts and are responsible for providing and maintaining their own transformation and voltage regulatory equipment. The Company maintains the right to refuse new loads exceeding 50,000 kilowatts. Furthermore, it defines 'industrial' activity as manufacturing or other activities where lighting accounts for no more than 10% of total usage.

MINIMUM CHARGE
MINIMUM CHARGE The bill shall in no event be less than the Customer Charge plus the Demand Charge computed upon the billing demand for the month.

AI summary The document specifies the minimum billing requirements for customers, stating that a bill cannot fall below the sum of the Customer Charge and the Demand Charge calculated based on the billing demand for the month.

RATE
RATE The monthly billing amount under each of the schedules to which this mechanism is applicable, including the fuel clause, shall be increased or decreased by a percentage factor calculated in accordance with the following formula. CESF...

AI summary The text outlines the calculation methodology for the Monthly Environmental Surcharge Factor (MESF). It establishes that the monthly billing amount for applicable schedules will be adjusted by a percentage factor. The formula determines the MESF by subtracting the Base Environmental Surcharge Factor (BESF) from the Current Environmental Surcharge Factor (CESF), where the CESF is calculated as the ratio of the jurisdictional total of approved environmental compliance plan revenue requirements to the total revenue for the current expense month.

DEFINITIONS
DEFINITIONS - 1) For all Plans, E(m) = [(RB/12) (ROR + (ROR DR) (TR / (1 TR))] + OE - a) Where RB is the Total Environmental Compliance Rate Base. - b) Where ROR is the Rate of Return on Environmental Compliance Rate Base, designated as th...

AI summary This document provides formal definitions for calculating the Environmental Compliance Rate Base [E(m)] and related revenue components for an electric utility. It outlines the mathematical formulas for determining the revenue requirement based on the Rate of Return (ROR), Debt Rate (DR), Composite Income Tax Rate (TR), and Operating Expenses (OE). It also defines the methodology for jurisdictional allocation of environmental costs and the calculation of average monthly revenue [R(m)] for the purpose of environmental surcharge billing.

APPLICABILITY OF SERVICE
APPLICABILITY OF SERVICE To all electric rate schedules excluding those customers receiving their one-time payment of the surcredit amount under the settlement agreement in PSC Case No. 2002-00430.

AI summary The document specifies the scope of applicability for the service described, stating it applies to all electric rate schedules. It explicitly excludes customers who are receiving a one-time surcredit payment as part of a specific settlement agreement under PSC Case No. 2002-00430.

SURCREDIT
SURCREDIT The monthly billing amount computed under each of the rate schedules to which this surcredit is applicable shall be adjusted by the Merger Surcredit Factor, which shall be calculated in accordance with the following formula: Merg...

AI summary The document defines the calculation method for the 'Merger Surcredit Factor,' which is used to adjust monthly billing amounts for specific rate schedules. The factor is determined by the sum of two components: MS and BA. This surcredit appears to be a mechanism to provide billing adjustments related to a merger event.

TERMS OF DISTRIBUTION
TERMS OF DISTRIBUTION - 1. The total distribution to Company's customers will, in no case, be less than the sum of the amounts shown above. - 2. On or before the 21st of the first month of each distribution year following Year 1, the Compa...

AI summary This section outlines the terms of distribution for a Merger Surcredit. It mandates that the total distribution to customers cannot fall below specified amounts. The Company is required to file a status report with the Commission by the 21st of the first month of each distribution year following Year 1, including a Balancing Adjustment calculation. The Surcredit is applied to electric service bills before taxes. Additionally, the Company must submit a plan by the midpoint of Year 10 regarding the Surcredit's future disposition.

RATE
RATE The monthly billing amount computed under each d the rate schedules to which this surcredit is applicable shall be adjusted by the Value Delivery Surcredit Factor, which shall be calculated in accordance with the following formula : V...

AI summary The text defines the calculation method for the Value Delivery Surcredit Factor, which is used to adjust monthly billing amounts for specific rate schedules. The factor is determined by a formula involving the Value Delivery Surcredit (VDS) and the Base Adjustment (BA).

(VDS) is the Value Delivery Surcredit which is based on the total Company net savings that are to be distributed to the Company's customers in each 12-month period.
(VDS) is the Value Delivery Surcredit which is based on the total Company net savings that are to be distributed to the Company's customers in each 12-month period. Net Savings To be Distributed Value Delivery Surcredit (VDS) Year 1, Dec 1...

AI summary The text defines the Value Delivery Surcredit (VDS), a mechanism where the Company's net savings are distributed to customers over 12-month periods. It provides a schedule of net savings and VDS percentages for the years 2001 through 2006. Additionally, it describes the Balancing Adjustment (BA), which reconciles over- or under-distributions of net savings from previous periods based on expected retail electric revenues, with a final adjustment applied in the second month following the VDS termination.

TERMS OF DISTRIBUTION
TERMS OF DISTRIBUTION (1) The total distribution to Company's customers will, in no case, be less than the sum of the amounts shown above for Year 1 through Year 5, plus one-twelfth of the amount shown for Succeeding Annual Periods for eac...

AI summary The document outlines the terms of distribution for a utility company, specifically defining the minimum total distribution to customers for a five-year period starting in 2006. It establishes a formula for calculating distribution amounts during the period the Value Delivery Surcredit is effective, ensuring that the monthly amount is not less than the sum of the Year 1 through Year 5 amounts plus one-twelfth of the Succeeding Annual Periods amount. The document was issued by John R. McCall on March 31, 2006.

Value Delivery Surcredit Rider
Value Delivery Surcredit Rider - (2) On or before the 21st of the first month of each distribution year following Year 1, the Company will file with the Commission a status report of the Surcredit. Such report shall include a statement sho...

AI summary The text outlines the administrative and billing procedures for the Value Delivery Surcredit (VDS). It requires the Company to file annual status reports comparing expected versus actual distributions and to implement a Balancing Adjustment (BA) to reconcile discrepancies. The Surcredit is applied to customer bills after electric service charges but before taxes and fees. The rider specifies that the Surcredit will terminate once the Company files for or receives an order regarding an adjustment of electric base rates.

LOUISVILLE GAS AND ELECTRIC COMPANY
LOUISVILLE GAS AND ELECTRIC COMPANY MONTHLY ELECTRIC ADJUSTMENTS MONTHLY GAS ADJUSTMENTS Fuel Adjustment Clause !Cents/Kwh) STOD Cost Recovery Applicable to Rate LC !Cents/Kwh) DSM RATES Rate RS Rate GS Rate & VFD & STOD {Cents Per Kwh) LC...

AI summary The document provides a historical monthly data table for Louisville Gas and Electric Company, detailing various electric and gas adjustments from late 2005 through mid-2006. Key metrics include the Fuel Adjustment Clause, STOD Cost Recovery, DSM Rates for various service categories, Environmental Cost Recovery Surcharges, Merger Surcredits, and Value Delivery Surcredits. The data tracks fluctuations in costs and surcharges for both electricity and gas supply across different retail and generation service rates.

DEMAND CHARGE CREDIT:
DEMAND CHARGE CREDIT: For agreeing to interrupt electrical requirements, the customer shall receive for billing purposes the following credit against the Billing Demand Charge or a prior mutually accepted demand when the customer is billed...

AI summary The text specifies the credit amount granted to customers on Rate 22 for agreeing to interrupt electrical requirements. Customers receive a credit of $3.20 per kilowatt for all agreed-upon interruptible load, which must be refined to the nearest 100 kW based on actual metering or mutual agreement. The agreement requires a minimum of 1,000 kW of interruptible load, with any additional quantities required in 100 kW increments.

Large General Service, LNP/LNO , continued
Large General Service, LNP/LNO , continued DEMAND: The kW as shown by or computed from the readings of the Company's demand meter for the 15-minute period of the customer's greatest use during the month, determined to the nearest kW, but n...

AI summary The text outlines the rate structure and billing provisions for Large General Service, LNP/LNO customers. It specifies how demand (kW) and reactive demand (kVAR) are measured and billed, including a power factor threshold of 89.44% for reactive demand charges. It defines seasonal periods, establishes a minimum bill calculation including various charges and credits (such as a transformer ownership credit), and details payment terms, including a 1.5 percent monthly late payment charge.

Section 238
LCL, and ABS RECONCILIATION: A reconciliation will be filed annually. The energy efficiency costs recovered from customers during the prior period will be compared to those which were C C 1st Revised Sheet No. C-4.20 Canceling Sub Original...

AI summary The document outlines the transition and calculation methodology for the Cooper Nuclear Station (CNS) Capital Additions Tracker. It specifies that the tracker was eliminated for most electric rates effective September 30, 2004, while remaining active for residential and street lighting rates. For these specific classifications, factors were established to ensure revenue-neutral adjustments. The text provides specific kilowatt-hour (kWh) rates for various residential and street lighting categories effective November 30, 2006.

Section 239
$0.00045/ kWh RBN, RWN, RTN North $0.00045/ kWh RSN, REN, RAN,RHN North $0.00032 I kWh SLN South $(0.00040)/ kWh RBS, RWS, RTS South $(0.00033)/ kWh RSS,RES, RAS, RHS South $(0.00036) I kWh SLS R R R The CNS capital additions charge for re...

AI summary The document outlines specific rate adjustments for CNS capital additions charges affecting residential and street lighting rates, effective November 30, 2006. For the East and North Systems, rates were increased to offset a reduction in the AEP Cost Recovery Clause rate. Conversely, for the South System, rates were decreased by proportionally distributing the dollar amount of the East and North System's reduction based on South System kWh sales.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 1 passage
DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) (2) Pole & Wire Inv Demand % Responsibility (1) TOTAL COMPANY 147,218 100,00% (2) DOMESTIC 87,119 59,18% (3) SMALL GENERAL 5,749 3,91% (4...

AI summary The text presents a detailed breakdown of allocation factors for various infrastructure and customer categories for the year ending December 31, 2007, with percentages of responsibility attributed to different customer segments and infrastructure components.

N-44RIRs 76 to 136 - CA to NSPI - REDACTED (Large File - 19 MB) 3 passages
— Selected Relevant Experience:
— Selected Relevant Experience: - Business transformation of a gas and electric utility. Redesigned business model and operating strategy, for the following functions: energy delivery, generation, customer care, shared services, finance an...

AI summary The text outlines various business transformation and strategic development initiatives undertaken by a utility company, including redesigning business models, corporate strategy development, and portfolio restructuring, with a focus on achieving projected financial benefits and improving operational efficiency.

☐ Date for final UARB report moved up to Jan 8; workplan adjusted to reflect this accelerated schedule; final design of future operating capability will occur after UARB report has been finalized
☐ Date for final UARB report moved up to Jan 8; workplan adjusted to reflect this accelerated schedule; final design of future operating capability will occur after UARB report has been finalized Key Milestones Target Date Status Conduct c...

AI summary The final UARB report date has been moved up to January 8, and the workplan has been adjusted to accommodate the accelerated schedule. The final design of future operating capability will occur after the UARB report is finalized. Key milestones and achievements for the performance assessment are outlined, including data collection, interviews, and report development.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-125: Referring to page 50, what factors were included as part of the sliding scale? Were any of these factors, weighted? If so, fully explain. Response IR-125: The descriptive c...

AI summary The response explains that factors listed under 'Basic' and 'Advanced' capabilities are representative and not exhaustive. Each factor was generally weighted equally, with professional judgment used to determine the final assessment for each capability and overall.

N-44RIRs 144 to 191 - SEB to NSPI - REDACTED (Large File - 10 MB) 2 passages
NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary This document fragment introduces a regulatory proceeding before the Nova Scotia Utility and Review Board. It pertains to an application submitted by Nova Scotia Power Incorporated seeking approval for revisions to its rates, charges, and regulations under the authority of the Public Utilities Act.

NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary This document snippet serves as the formal heading for a regulatory proceeding before the Nova Scotia Utility and Review Board. It identifies the legal authority under the Public Utilities Act and introduces a formal application by Nova Scotia Power Incorporated seeking approval for revisions to its rates, charges, and regulations.

N-46Rebuttal Evidence of NSPI - REDACTED (Large File - 31 MB) 10 passages
23 Avon Closing Submission PagelO
would turn out to be the peak. In fact, 29 new peaks had been established in each of the three months prior to July 2006 30 as well. Further, the establishment of previous peaks in October 2004, March 2005, and August/September 2005 were f...

AI summary NSPI chose July 2006 as the peak for rate purposes despite no knowledge of oil price peaks or the Lebanese cease-fire. Higher oil prices and other factors made the rate application unavoidable, suggesting NSPI deferred filing to avoid a rate case.

WORLD STEAM COAL PRICES
WORLD STEAM COAL PRICES Mr. Gubbins objects to the contract for different reasons. He states that this contract is in violation of NSPI's policies and procedures. Mr. Gubbins alleges that "(a) tonnes of coal is committed at the time of the...

AI summary Mr. Gubbins objects to a coal contract, claiming it violates NSPI's policies and proposes adjusting the fuel budget. He argues the 2008 pricing is too high, while Dr. Raschke uses a different methodology. The Board previously approved similar contracts, and Liberty found NSPI's procurement process sound. Neither party asserts imprudence, but both seek adjustments based on forecasted market prices.

Lack of Independent Analysis
Lack of Independent Analysis 6 7 8 9 10 11 12 13 14 15 5 The required return on common equity is usually estimated with several methodologies: (1) the Capital Asset Pricing Model, or CAPM, (2) the Risk Premium, (3) the Discounted Cash Flow...

AI summary The document highlights that Mr. Gorman's recommendation for the required return on common equity (ROE) was based solely on the Board's previous authorization and changes in interest rates, without conducting any formal independent analysis using standard methodologies like CAPM or DCF.

Automatic ROE Adjustment Formulas
Automatic ROE Adjustment Formulas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Automatic ROE adjustment formulas of the kind implied in Mr. Gorman's approach whereby ROEs are a direct function of i...

AI summary The text critiques the use of automatic ROE adjustment formulas based on interest rates, arguing that they fail to account for risk, reduce efficiency incentives, and are not transferable across utilities. It highlights that NSPI has a higher investment risk compared to other utilities and thus requires a higher allowed ROE or stronger balance sheet.

4.2 Ql Fuel Deferral
4.2 Ql Fuel Deferral invalid. Intervenors and Board Consultants have recommended the Board reject the Company's request for deferred recovery of increased fuel costs during the first quarter of 2007. These criticisms fail to recognize the...

AI summary Intervenors and Board Consultants recommend rejecting NSPI's request for deferred recovery of increased fuel costs in Q1 2007, but NSPI argues that legal and regulatory uncertainties, including new legislation, justify the deferral. The company claims that the legislation restricts the Board's ability to approve timely rate increases, preventing recovery of legitimate costs.

Use ofthe ELI 2P-RTP CBL in determining fuel costs
Use ofthe ELI 2P-RTP CBL in determining fuel costs 23 24 25 NSPI's October 10, 2006 Application was predicated on fuel costs of $498.7 million. This was calculated using the load forecast presented as Appendix F of the Application and util...

AI summary NSPI's 2006 application used a $498.7 million fuel cost estimate based on load forecasts and historical load shapes. However, the Board's 2006 Order introduced the ELI 2P-RTP rate with a flat CBL for Extra Large Industrial customers, differing from NSPI's assumptions. NSPI must now use this CBL to calculate fuel costs, with any savings from load reductions allocated as rebates to customers.

Decrementa1 Rebates
Decrementa1 Rebates 2 3 4 5 6 1 There was considerable discussion during the BLUR-replacement proceeding (P-883) regarding the difference between the value of credits that would be paid to SEB for a load decrement priced at marginal cost (...

AI summary During the BLUR-replacement proceeding (P-883), there was discussion about adjusting the value of credits paid to SEB for load decrements. SEB's consultant suggested a 94 percent adjustment factor based on historical data, while Dr. Stutz proposed a lower factor of approximately 77 percent. SEB proposed a three-tiered adjustment mechanism to address NSPI's concerns about marginal cost credits exceeding fuel cost savings.

Incremental Charges
Incremental Charges 9 10 11 12 13 14 8 When questioned by NSDOE (during P-883) for clarification of how an adjustment factor would be applied to the marginal costs when SEB's load is above the CBL77 (i.e. incremental load), Dr. Stutz appea...

AI summary The text discusses the Board's decision not to adjust marginal costs for incremental load, despite significant differences between marginal cost and avoided cost for decremental load. NSPI argues that an adjustment factor should be applied to incremental load pricing to ensure costs are properly reflected. This decision is linked to the tariff credit and debit mechanism, which NSPI believes may overcredit SEB.

4.5 HRM's Concerns Regarding Unmetered Rates
4.5 HRM's Concerns Regarding Unmetered Rates 17 18 19 20 21 22 23 HRM is concerned that the Unmetered class is being allocated Billing Services costs that are inappropriate. It suggests that bill printing, preparation and postage costs all...

AI summary HRM is concerned about the allocation of Billing Services costs to the Unmetered class, specifically the high costs associated with bill printing, preparation, and postage. HRM argues that these costs are inappropriate and that a 0.5 FTE position is unnecessary for LED traffic light conversions. NSPI acknowledges these concerns and proposes revising the allocation method based on the number of accounts, which would reduce costs and the C-3 weighting factor.

Normalization of Fuel Costs
Normalization of Fuel Costs 15 16 17 18 19 20 21 22 Dr. Stutz's approach to setting fuel prices is based on his view that actual fuel costs for 2007 are likely to be significantly less than NSPI's estimate. This is not supported by the fac...

AI summary The text critiques Dr. Stutz's approach to fuel cost normalization, arguing that his statistical projection is flawed and inconsistent with NSPI's approved procurement methodology. It highlights that NSPI has already implemented a hedged fuel strategy for 2007, and Dr. Stutz's analysis fails to account for this, potentially leading to arbitrary disallowance of costs.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 1 passage
Tariff and Rates Issues
Tariff and Rates Issues - For the City of Charlottesville Gas Department, Mr. Crook performed a study of the interruptible service tariff in order to develop a revised tariff design and to implement a transportation-only service. - Mr. Cro...

AI summary The text outlines the professional experience of Mr. Crook regarding tariff design and rate analysis. Key highlights include developing a transportation-only service tariff for the City of Charlottesville Gas Department, preparing testimony for FERC and the District of Columbia Public Utility Commission, and researching socioeconomic impact costs for the Alaska Natural Gas Transportation System. Additionally, the text details his work with USAID and the Czech Republic's Ceske Plynarenske Podniky to develop long-run marginal cost pricing principles for gas distribution rates.

N-48Minutes of Settlement - Public Utilities Act and Application by NSPI for Approval of Revisions to Rates, Charges and Regulations 1 passage
Section 2
lish a process that commences as soon as possible to establish a F AM. The parties will work constructively on the content or elements of a F AM. A F AM hearing will begin no later than July 15, 2007. - 5. NSPI shall file with the UARB and...

AI summary The document outlines a process for establishing a Fuel Adjustment Mechanism (FAM) with a hearing no later than July 15, 2007. NSPI is required to file an updated forecast by October 31, 2007. There are discussions around rate adjustments, deferrals, and the adoption of the Revenue to Cost ratio methodology.

N-51NSPI Counsel Statement 1 passage
Section 2
utilities throughout the Province; and - UARB staff and their consultants, Dr. Stutz and Liberty Consulting; And now, Stora Enso and Bowater (SEB) have joined this group and support the Settlement. The parties supporting the settlement are...

AI summary The Settlement Agreement proposes a resolution to the proceeding, excluding constitutional issues related to low-income customers. It involves multiple stakeholders and requires NSPI to forgo 2007 earnings to establish a fuel adjustment mechanism by 2008. The Agreement is seen as a balanced approach to competing interests and is supported by various parties including Stora Enso and Bowater.

N-52N-52.pdf 3 passages
Nova Scotia Utility and Review Board
rie Curtis, Manager, Regulatory Projects, NSPI By email By email By email By email >> 11/05/06 9:46 PM >>> Good Day I would like to take this time to make a comment or two. - It seems that the rate structure has evolved into a very complic...

AI summary William Mulock expresses concerns about the complexity of the rate structure, the burden of rate increases on consumers, and the need for NSPI to incorporate renewable energy and modern coal technology. He suggests a simplified rate structure based on actual power usage and calls for long-term renewable energy planning.

Preamble
ize ratepayers for increased fuel costs, some of which may be the result of future N. S. Power incompetence to negotiate a cost efficient fuel supply agreement. If ratepayers are required to automatically cover any fuel shortfall, then whe...

AI summary The commenter argues that ratepayers should not automatically bear the cost of fuel shortfalls, as this would reduce accountability for NSPI's fuel procurement. They suggest that fuel shortfalls should be addressed through the company's rate of return and that NSPI should develop a long-term fuel strategy. They also raise concerns about using Cape Breton coal and recommend investigating its costs and environmental impact.

Nova Scotia Utility and Review Board
lternatives from which to choose. Furthermore, according to DBRS Credit Rating Services 2005 Credit Rating Report on Nova Scotia Power, Nova Scotia's electricity rates are among the highest in Canada. Business ratepayers expect NSPI's oper...

AI summary The document highlights concerns about Nova Scotia Power's high electricity rates, the need for improved energy efficiency for businesses, and the importance of adopting less polluting technologies. It also calls for a more responsive rate change mechanism to address volatile energy markets.

N-54Direct Testimony - Consumer Advocate Witnesses - Michael J. McGarry and Rudolph C. Krizan 5 passages
Regulatory and Rate Case Management
Regulatory and Rate Case Management He has worked with clients to manage all aspects of the regulatory and rate case process. He has developed efficient processes to prepare supporting analyses and testimony for submission to the regulator...

AI summary The text discusses the expertise of a professional in managing regulatory and rate case processes, including preparing analyses, testimony, and models for revenue requirements and cost of service. The individual has experience working with clients in multiple states and has supported rate requests with complex models.

Restructuring, Unbundling, and Cost Allocation
Restructuring, Unbundling, and Cost Allocation Mr. McGarry has developed the supporting analyses and regulatory filing requirements needed to support unbundling rates for utilities. This has included detailed studies where the company's pl...

AI summary Mr. McGarry has conducted analyses and prepared regulatory filings to support unbundling rates for utilities. His work includes allocating the company's plant-in-service and depreciation reserve to each unbundled function and assessing utility management actions to prepare for competition and new market entry.

Before the Illinois Commerce Commission
Before the Illinois Commerce Commission Consultant to Illinois Power Company. Conducted mandated compliance filing to un-bundle utility's rate tariffs. Prepared filing requirements and all support schedules analysis to justify allocation o...

AI summary A consultant for Illinois Power Company conducted a mandated compliance filing to un-bundle the utility's rate tariffs. They prepared filing requirements and support schedules to justify the allocation of generation, transmission, and distribution, and prepared testimony on behalf of the Company's Controller.

Before the New York Public Service Commission
Before the New York Public Service Commission 20 2 Case: 87003 Operational Audit of the Homer City Coal Cleaning Plant Commission Staff. Comprehensive operational audit to determine effectiveness of ratepayer funds spent on the constructio...

AI summary This document outlines a comprehensive operational audit of the Homer City Coal Cleaning Plant, jointly owned by NYSEG and Penelec, conducted by Commission Staff to assess the effectiveness of ratepayer funds spent on its construction and evaluate costs, alternatives, and contracting practices.

Auditing
Auditing Involved in over twenty-five comprehensive management and operational audits. Experience includes auditing of utility construction, operations and management, rates, quality assurance, and safety. Testified in numerous rate procee...

AI summary The text discusses experience in over twenty-five comprehensive management and operational audits, including utility construction, operations, rates, and safety. It also covers testimony in rate proceedings on topics such as rate design, revenues, depreciation, and operation and maintenance expenses, along with training in pipeline operations.

57960Board Decision 3 passages
MINUTES OF SETTLEMENT
MINUTES OF SETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. ("NSPI"), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative of No...

AI summary The document outlines a settlement agreement regarding NSPI's 2007 revenue requirement, fuel expenses, and the adoption of a Fuel Adjustment Mechanism (FAM). It also addresses deferrals, rate adjustments, and the continuation of certain regulatory studies.

3.7 Findings
3.7 Findings [22] The Board has carefully reviewed the terms of the Agreement and the comprehensive evidentiary record consisting of pre-filed testimony and responses to information requests. It has also considered the comments expressed t...

AI summary The Board has reviewed the Settlement Agreement and the evidence, considering intervenor comments, particularly from the Consumer Advocate. While supportive of settlement agreements, the Board emphasizes the need to ensure that approved costs are fair, justifiable, and prudently incurred, and that customer rates are reasonable and in the public interest.

4.0 FUEL ADJUSTMENT MECHANISM
4.0 FUEL ADJUSTMENT MECHANISM - [39] The Minutes of Settlement state: - 4. All parties agree in principle that the UARB should adopt a Fuel Adjustment Mechanism ("FAM"). The parties request the UARB to establish a process that commences as...

AI summary The document discusses the Fuel Adjustment Mechanism (FAM) and the UARB's considerations regarding its adoption. While parties agree in principle on the FAM, the Board has previously expressed concerns about approving it due to NSPI's imprudent fuel procurement practices and the risk of transferring fuel price volatility to ratepayers.

57962Board Decision - Supplementary 5 passages
Preamble
[1] This is a decision on the issue of the Compliance Filing process followed by the Nova Scotia Utility and Review Board (the "Board") and arises from the Board's Decision dated February 5, 2007, and an Order of the Board dated March 8, 2...

AI summary This decision addresses the Compliance Filing process used by the Nova Scotia Utility and Review Board (the Board) following rate applications. The process was challenged by Avon Valley eta/ in an appeal, leading to the inclusion of the issue in a 2007 rate application hearing. The Board denied access to Compliance Filings and issued orders approving revised rates without allowing intervenor review.

Avon
Avon - [6] In its submission, Avon stated that Compliance Filings, with appropriate supporting documentation and opportunity for comment, should be available to Intervenors prior to the Board approving NSPI's tariff. Avon stated that: - 4....

AI summary Avon argues that the Nova Scotia Utility and Review Board should provide intervenors with access to Compliance Filings, including revenue allocation scenarios and communications, prior to approving NSPI's tariff. This, Avon claims, is necessary for transparency, administrative fairness, and due process.

CA
CA [9] The CA, while endorsing Avon's position, has requested additional information on the Compliance Filing, including the cost of service study, provision for further information requests and disclosure of various calculations and assum...

AI summary The CA supports Avon's request for more transparency in NSPI's Compliance Filing, including disclosure of cost allocation scenarios, R/C ratios, and the steps taken from the initial revenue allocation to the final exhibit. This is necessary for intervenors to understand and challenge the revenue allocation process and ensure accuracy in the settlement adjustments.

NSPI
NSPI [1 0] NSPI indicated that it has no specific objection to the proposals for changes to the Compliance Filing process, but expressed concern regarding possible delays in the implementation of the Board's decision which could result fro...

AI summary NSPI has no objection to changes in the Compliance Filing process but is concerned about potential delays in implementing the Board's decisions and maintaining confidentiality. It emphasizes the importance of timely rate implementation and preserving confidentiality through standard procedures.

3.0 FINDINGS
3.0 FINDINGS [11] The Board has carefully considered the submissions of Intervenors and NSPI in this matter. Generally, Intervenors filing submissions on the Compliance Filing process agree with the position put forward by Avon. Two Interv...

AI summary The Board has considered submissions regarding the Compliance Filing process and agrees with Avon's position on making RIC ratios and revenue allocations available for comment. It also agrees to provide written requests and responses to all parties, ensuring transparency while maintaining timely decision-making. The Board does not see a general need for additional disclosure beyond what is already provided.

57968Amended Board Order (and attached Schedules A to C) 49 passages
DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06
DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06 Any outbuilding located on residential property adjacent to a domestic dwelling and supplied electrically through a separate meter shall have rates applied in accordance with actu...

AI summary This section outlines the application of the Domestic Service Time-of-Day Tariff (Rate Code 06) to outbuildings on residential property. The tariff depends on whether the building is used for personal purposes or commercial purposes.

DEMAND CHARGE
DEMAND CHARGE $8.26 per month per kilowatt of maximum demand. 32 cents per kilowatt reduction in demand charge where the transformer was owned by the customer prior to February 1, 1974, or under Special Condition (2) as set out below.

AI summary The document outlines a demand charge structure, including a fixed monthly fee per kilowatt of maximum demand and a rebate for demand charge reduction under specific conditions related to transformer ownership and special conditions.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary Special conditions for metering and service provisions are outlined. Primary metering requires a capital contribution from the customer, and non-standard service provisions may require the customer to own transformers. Adjustments to meter readings are specified for high voltage metering.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...

AI summary The special conditions outline the requirements for metering, specifying that primary metering may require a capital contribution from the customer. Adjustments to meter readings are based on the voltage level of the substation, with specific percentages applied for readings on high or low voltage sides.

LARGE GENERAL TARIFF
LARGE GENERAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 12 - (2) The Company will withdraw the availability of this tariff to any specific customer, if, on a consistent basis, the customer is not maintaining a billing demand of2...

AI summary The Large General Tariff (Rate Code 12) applies to customers with a demand of 2,000 kV.A or 1,800 kW and over. The company may withdraw the tariff from a customer if they consistently fail to maintain the required demand level. The company also reserves the right to establish separate service and operating agreements when necessary for the benefit of the company and its customers.

DEMAND CHARGE
DEMAND CHARGE $5.89 per month per kilovolt ampere of maximum demand. 32 cents per kilovolt ampere reduction in demand charge where the transformer was owned by the customer prior to February 1, 1974, or under Special Condition (2) as set o...

AI summary The document outlines a demand charge structure, including a fixed monthly rate per kilovolt ampere of maximum demand and a rebate for demand charge reduction under specific conditions related to transformer ownership and special conditions.

DEMAND CHARGE
DEMAND CHARGE $9.48 per month per kilovolt ampere of maximum demand. 32 cents per kilovolt ampere reduction in demand charge where the transformer is owned by the customer.

AI summary The document outlines a demand charge structure, specifying a monthly fee of $9.48 per kilovolt ampere of maximum demand and a credit of 32 cents per kilovolt ampere reduction in demand charge for customers owning the transformer.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The special conditions outline requirements for metering and billing demand. Primary metering requires a capital contribution from the customer, and billing demand below 250 kV.A may result in the withdrawal of the tariff. Adjustments to metered usage are specified for high voltage metering.

LARGE INDUSTRIAL TARIFF
LARGE INDUSTRIAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 23

AI summary The document outlines the Large Industrial Tariff, specifically Rate Code 23, applicable to industrial users with a demand of 2,000 kV.A or 1,800 kW and over.

DEMAND CHARGE
DEMAND CHARGE $9.11 per month per kilovolt ampere of maximum demand of the current month or the maximum actual demand of the previous December, January or February occurring in the previous eleven (11) months. 32 cents per kilovolt ampere...

AI summary The demand charge is set at $9.11 per month per kilovolt ampere of maximum demand, based on the current month or the highest demand from the previous eleven months. A reduction of 32 cents per kilovolt ampere is applied if the customer owns the transformer.

AVAILABILITY:
AVAILABILITY: This rider will be available to a minimum regular billing demand of2 000 kV.A at 90% Power Factor, under the following terms and conditions: - (1) The customer has provided written notice ofhis desire to take service under th...

AI summary This rate rider outlines the availability of service to customers with a minimum demand of 2000 kV.A at 90% power factor, detailing conditions for interruptible service, load reduction requirements, penalties for non-compliance, and procedures for converting between interruptible and firm service.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its custome...

AI summary The document outlines special conditions for service agreements, load management, and metering adjustments. The company may require separate agreements for specific issues, and customers must ensure their load does not harm the power supply system. Meter readings are adjusted based on voltage levels and transformer losses.

DEMAND CHARGE
DEMAND CHARGE $9.38 per month per kilovolt ampere of maximum demand of the current month or the maximum actual demand of the previous December, January or February occurring in the previous eleven (11) months. 32 cents per kilovolt ampere...

AI summary The demand charge is set at $9.38 per month per kilovolt ampere, based on the current month's maximum demand or the highest demand from the previous eleven months in December, January, or February. A reduction of 32 cents per kilovolt ampere is provided if the customer owns the transformer.

AVAILABILITY:
AVAILABILITY: This tariff is applicable to three phase electric power and energy, supplied at the low voltage side of the bulk power transformer, to municipal electric utilities. Meter readings shall be increased by 1. 7 5% for each transf...

AI summary This tariff applies to three phase electric power and energy supplied at the low voltage side of the bulk power transformer to municipal electric utilities. Meter readings are adjusted by 1.75% for each transformation between the meter and the low voltage side to account for transformation losses, and are reduced when metering is at transmission voltage.

RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism aims to align customer load usage with hourly pricing signals. Customers are billed based on a predetermined CBL, with credits for energy use below and charges for energy use above this baseline, calculated using 20-minute ahead marginal costs from NSPI's RTP website.

Order in which Rates are Applied
Order in which Rates are Applied Customers may elect to utilize other rates below the ELI 2P-RTP. In such case, the customer will make written request to the Company, specifying the MW level above which ELI 2P-RTP is to apply. Such changes...

AI summary Customers can choose to use the ELI 2P-RTP rate, but must submit a written request specifying the MW level above which the rate applies. Changes will take effect in the next full calendar year. No other rate may be applied above this rate when multiple rates are used.

Pricing Period
Pricing Period Each hour of the day is a distinct pricing period, the day starting at the 00:00:01, the first hour ending at 01:00:00. The applicable 20 minute ahead marginal price as posted on the RTP website will apply for each such peri...

AI summary The document defines the pricing period as each hour of the day, starting at 00:00:01 and ending at 01:00:00. The applicable 20-minute ahead marginal price from the RTP website applies for each period.

Customer Baseline Load (CBL)
Customer Baseline Load (CBL) This is a flat line load shape used for the operational purpose of calculating hourly Incremental Load (IL) and Decremental Load (DL). The CBL level (in MW) is to be calculated as the average hourly demand of t...

AI summary The Customer Baseline Load (CBL) is a flat line load shape used to calculate hourly Incremental Load (IL) and Decremental Load (DL). It is based on the average hourly demand of a customer's annual forecast total energy requirement, excluding system losses, and is in effect from January 1st to December 31st of each year.

Forecast Total Energy Requirement
Forecast Total Energy Requirement Forecast total energy requirement from the Company is determined using the customer's total actual annual energy requirement (excluding system losses) from the Company for the previous 12 month period endi...

AI summary The forecast total energy requirement from the Company is based on the customer's previous 12-month energy consumption, adjusted for anomalies. The customer must submit a proposed CBL by November 15th, and NSPI has two weeks to respond. Disagreements can be referred to the UARB for resolution.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) During periods of major scheduled maintenance, the CBL will be reduced accordingly to match the operating conditions of the plant. Such events will be treated as cutouts...

AI summary During major scheduled maintenance periods, the Customer Baseline Load (CBL) will be adjusted to reflect the plant's operating conditions, and these events will be treated as cutouts without impacting the CBL for the following year.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The Marginal Cost (MC) is defined as the 20-minute ahead forecast of hourly marginal fuel and variable O&M costs, excluding electricity exports but including imports. MC forecasts are calculated by NSPI based on in-province load requirements and used for billing after adjustments per the Decremental Rebate section.

Decremental Load (DL)
Decremental Load (DL) This is the hourly energy calculated as the difference between the CBL and the actual demand when actual demand is less than the CBL. When other tariffs are used below ELI 2P-RTP, DL in any hour is limited to the amou...

AI summary Decremental Load (DL) is defined as the hourly energy difference between the Customer Baseline Load (CBL) and actual demand when actual demand is less than the CBL. DL is also limited by the lower ELI 2P-RTP threshold when other tariffs are used below ELI 2P-RTP.

Losses Adjustment:
Losses Adjustment: A 2% adjustment to metered energy will be applied to determine requirement including system losses. This Loss adjustment will be applied in determining the IL and the DL.

AI summary A 2% adjustment to metered energy is applied to account for system losses when determining the Incremental Load (IL) and Decremental Load (DL). This adjustment is part of the process for calculating energy requirements.

Incremental Export Benefit Credit
Incremental Export Benefit Credit Customers who take service under this rate will be given an Incremental Export Benefit Credit (IEBC) defined as follows: IEBC = (Lesser of Customer's Monthly DL or NSPI's Actual Exports calculated monthly)...

AI summary The Incremental Export Benefit Credit (IEBC) is a credit given to customers based on the lesser of their monthly decremental load or Nova Scotia Power Incorporated's actual exports, multiplied by the average export margin. The annual IEBC is capped at 15% of NSPI's total actual annual export margin.

CBL Base Cost (CBLbc)
CBL Base Cost (CBLbc) The monthly CBLbc is calculated by multiplying the ELI 2P-RTP energy under the CBL level in each hour of the billing period by the applicable Standard Energy Charge.

AI summary The monthly CBL Base Cost (CBLbc) is determined by multiplying the ELI 2P-RTP energy at the CBL level during each hour of the billing period by the applicable Standard Energy Charge.

Bill Calculation:
Bill Calculation: At the end of each month: Total Bill = CBLbc + Incremental Charges- Decremental Rebates - Incremental Export Benefit Credit Applicable Energy Charges, rebates, penalties, and adjustments will be calculated by the Company...

AI summary The document outlines the formula for calculating a customer's total monthly bill, which includes components such as the customer's baseline load cost, incremental charges, decremental rebates, and incremental export benefit credits. These calculations are determined by the Company and reflected on the customer's bill.

Modification of Existing CBL
Modification of Existing CBL If an existing ELI 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (...

AI summary The document outlines procedures for modifying the Customer Baseline Load (CBL) for ELI 2P-RTP customers under specific conditions, such as significant capital expenditures or load reductions. Disagreements between the customer and NSPI will be referred to the UARB for adjudication.

Use of Self-Generation
Use of Self-Generation Unless existing customer-owned generation is to be retired, for purposes of determining forecast CBL energy, the continued use of such generation is to be appropriately accounted for in the customer's CBL energy requ...

AI summary The document states that existing customer-owned generation should continue to be used normally when determining forecast CBL energy requirements, unless it is to be retired. Customers are expected to use their own generation as they see fit.

Supply Interruption:
Supply Interruption: This tariff is interruptible for supply reasons. The customer will reduce its available interruptible system load by the amount requested by NSPI within ten (1 0) minutes of such request by the Company. Following inter...

AI summary This section outlines the terms for supply interruption under the tariff, requiring customers to reduce load within ten minutes of a request by NSPI. Penalties apply for non-compliance, and interruptions are limited to specific hours per day and week.

Conversion of Interruptible Load to Firm
Conversion of Interruptible Load to Firm Should a customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capacity av...

AI summary The document outlines the process for converting interruptible load service to firm service, requiring five years' advance notice and allowing for early conversion at the company's discretion. Customers may revert to interruptible service after two years under the firm rate, with potential for earlier conversion.

Order of Supply Interruption:
Order of Supply Interruption: In the event of an interruption required in order to avoid shortfalls in electricity supply, rate classes will be called upon to provide capacity to NSPI in the following order: - 1. Generation Replacement and...

AI summary This order outlines the priority sequence for rate classes to provide capacity to Nova Scotia Power Inc. (NSPI) during electricity supply interruptions, starting with Generation Replacement and Load Following (GRLF) Rate, followed by specific industrial interruptible rates, and concluding with the Interruptible Rider to the Large Industrial Rate. The order was approved by the Nova Scotia Utility and Review Board and became effective on April 1, 2007.

Suspension of 2P-RTP Billing Mechanism
Suspension of 2P-RTP Billing Mechanism The Rate will be suspended during any period in which the customer's load is reduced due to a disruption in the supply of electricity to the customer because of an interruption call or NSPI system con...

AI summary The 2P-RTP billing mechanism will be suspended during electricity supply disruptions, with the customer estimating lost energy and being charged at the Standard Energy Charge. Disputes will be resolved by the UARB.

Preamble
Metering will normally be at the low side of the transformer and, for billing purposes, meter readings will be increased by 1.75%. Should the customer's requirements make it necessary for the Company to provide primary metering, the custom...

AI summary The document outlines the standard metering practices, specifying that metering is typically at the low side of the transformer with a 1.75% increase in readings for billing. If primary metering is required, the customer must cover the additional cost as a capital contribution. Any special metering or communication systems required by the customer must also be paid for by the customer as a capital contribution.

DEMAND CHARGE
DEMAND CHARGE $8.43 per month per kilowatt of connected load.

AI summary The demand charge is set at $8.43 per month per kilowatt of connected load.

1.1 INTERPRETATION AND DEFINITIONS
1.1 INTERPRETATION AND DEFINITIONS "Residential Customer" "residential customer" means any individual non- commercial customer receiving service under the Domestic Service Rate at his/her permanent or temporary place of residence; "Seconda...

AI summary This section defines key terms related to residential customers, secondary metering, service line allowances, temporary electric service, and unmetered electricity supply under the regulatory framework.

Elapsed Time Percent Customer Contribution
Elapsed Time Percent Customer Contribution Up to 1 year 0 Year 1-2 20% Year 2-3 40% Year 3-4 60% Year 4-5 80% After 5 Years 100% Where the new requirement represents or indicates an expansion or upgrade of the prior facilities, the reduced...

AI summary The table outlines the elapsed time and corresponding percentage of customer contribution for a service. After five years, customers contribute 100% of the cost. The text specifies that reduced contribution applies only to equivalent service provision costs when there is an expansion or upgrade of prior facilities.

3.1 FARMING OR FISHING LOAD THAT MAY QUALIFY FOR THE DOMESTIC SERVICE RATE
3.1 FARMING OR FISHING LOAD THAT MAY QUALIFY FOR THE DOMESTIC SERVICE RATE Farming or fishing units may receive electric service at the domestic rate providing the following conditions are met: - (a) each unit may have connected up to 200...

AI summary Farming or fishing units may qualify for the domestic service rate if they meet specific conditions, such as having a maximum service capacity of 200 amps and being served by no more than three separately metered services. Excess capacity or additional services are billed at the Non Domestic rate.

3.2 PREMISES JOINTLY USED FOR RESIDENTIAL AND COMMERCIAL- PURPOSES
3.2 PREMISES JOINTLY USED FOR RESIDENTIAL AND COMMERCIAL- PURPOSES When a customer uses part of his premises as a residence and part for a small store or office, or other commercial use, the Domestic rate shall be applied to the entire pre...

AI summary This section outlines the application of Domestic and Non Domestic rates for premises used jointly for residential and commercial purposes. If the commercial load (excluding heating and cooling) is under 3kW, the Domestic rate applies to the entire premises. Otherwise, the Non Domestic rate applies, or the services can be separated with individual meters.

3.5 STREET AND AREA LIGHTING
3.5 STREET AND AREA LIGHTING The Company may on request supply and maintain standard street and area lighting units including fixtures, automatic switch, all electric energy and any brackets and hardware required for regular mounting of th...

AI summary The document outlines the terms and conditions for street and area lighting services, including customer responsibilities, cost structures, and the Company's rights regarding replacement and repairs. Customers are responsible for additional costs and easements, and the Company may delay replacements if the existing lighting is fully depreciated but still has useful life.

3.6.4 Billing
3.6.4 Billing a) Customer-generators will be billed under the otherwise-applicable metered tariff schedules. APPROVED: NOV A SCOTIA UTILITY AND - b) If in a given billing period the electricity supplied to NSPI' s grid by the customergener...

AI summary The billing rules for customer-generators under net metering service are outlined, including how excess self-generation is banked as energy credits, applied to future bills, and reset annually. Energy credits cannot be converted to cash, and customers must set a permanent anniversary date for credit reset. NSPI is the sole beneficiary of emission credits from renewable energy used in net metering installations.

3.6.6 Special Conditions
3.6.6 Special Conditions - a) Special conditions in this regulation do not supersede, modify or nullify special conditions accompanying the otherwise-applicable metered tariff schedules. - b) Qualifying generating equipment must meet the f...

AI summary This section outlines special conditions for net metering, including requirements for generating equipment, ownership, and compliance with safety standards. It also details the application process and termination policies. NSPI has the authority to approve or verify compliance and may impose additional costs.

4.1 INSTALLATION AND ACCESS TO METERS
4.1 INSTALLATION AND ACCESS TO METERS Representatives of the Company shall have the right of access to connect, remove, read or test meters or other appurtenances at all reasonable hours. When suitable arrangements cannot be made for the C...

AI summary The document outlines the responsibilities of customers regarding meter installation and access. Customers must allow utility representatives access to meters at reasonable times and may be required to install outdoor meters if necessary. Costs associated with meter relocation or protection are the customer's responsibility. Non-compliance may result in service discontinuation.

4.3 MULTIPLE METERING POINTS
4.3 MULTIPLE METERING POINTS Where, because of the customer's requirements, it is necessary to use more than one metering point, then the power and energy recorded on each meter shall be billed separately and at the rate applicable to the...

AI summary This section outlines that when a customer requires multiple metering points, each meter's recorded power and energy will be billed separately at the rate applicable to the load served at each meter.

4.5 CONVERSION OF SINGLE FAMILY RESIDENCE
4.5 CONVERSION OF SINGLE FAMILY RESIDENCE If a Domestic Service customer permits additional living quarters for other parties in the same premises or a separate establishment to be connected through his meter, the Company has the option of...

AI summary The document outlines the policy for handling the conversion of a single-family residence into a multi-unit dwelling by a Domestic Service customer. If additional living quarters are connected through the existing meter, the company may adjust the base charge and kilowatt hour rates or disconnect the service until a separate meter is installed.

METER READING IN RURAL AREAS
METER READING IN RURAL AREAS Where electric service is supplied to a Customer in a rural area, the Company may adopt a post card meter reading system of monthly or bi-monthly meter reading. Under such system, the Company shall supply the C...

AI summary The document outlines a postcard meter reading system for rural areas, allowing customers to record and return meter readings via prepaid postage cards. This system is approved by Nova Scotia Utility and Regulation.

6.7 DISPUTE TEST
6.7 DISPUTE TEST Upon notice from Industry Canada, the Company will remove the meter and ship it to Industry Canada (seal intact) for testing. If the meter, when tested, is found to be accurate, the customer is responsible for any outstand...

AI summary The dispute test procedure outlines that if a meter is found accurate after testing by Industry Canada, the customer is responsible for outstanding charges and a fee as outlined in Schedule of Charges 7.1, Section 1.

7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES
7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES The following schedule of charges shall apply to customers requesting Load Research information. (Note: Customers must provide access to a shared phone line for dat...

AI summary This section outlines the schedule of charges for Load Research monitoring, reporting, and analytical services. It specifies that all costs will be based on actual expenses incurred by the company, with a 25% markup applied to setup, analysis, reporting, and specialized customer analysis.

7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES
7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES 4.0 Analysis and Reporting See Charge per Billing Period Base Package Load profile for peak day billing period plus times and magnitude of six highest peaks 33.00 O...

AI summary This section outlines the schedule of load research monitoring, reporting, and analytical charges, detailing various analysis and reporting options with associated costs. It includes base package items, specialized analysis, and hourly rates for services related to load profiling and data analysis.

Section 273
- 7. NSPI's request for a deferra] of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary The document outlines various withdrawn and deferred requests by NSPI, including fuel cost deferral and true-up for the 2P-RTP rate. It also confirms the adoption of the Revenue to Cost ratio methodology with modifications. The agreement does not prevent future regulatory positions.

57960Board Decision 4 passages
3.5 Intervenors Objecting to Settlement Agreement
3.5 Intervenors Objecting to Settlement Agreement [19] Two of the inteNenors appearing at the hearing did not support the Agreement. Claire McNeil, on behalf of the AEC and Brendan Haley, representing the EAC, were not part of the Settleme...

AI summary Two intervenors, AEC and EAC, opposed the Settlement Agreement, arguing that any rate increase would violate constitutional and human rights, and they sought a remedy for low-income residential consumers. They requested that these issues be addressed before the fuel adjustment mechanism hearing. Written submissions were due by January 26, 2007, and the hearing was scheduled to conclude on January 24, 2007.

3.7 Findings
3.7 Findings [22] The Board has carefully reviewed the terms of the Agreement and the comprehensive evidentiary record consisting of pre-filed testimony and responses to information requests. It has also considered the comments expressed t...

AI summary The Board has reviewed the Settlement Agreement and supporting evidence, considering intervenor comments and the Consumer Advocate's position. While supportive of settlement agreements, the Board emphasizes the need to ensure that approved costs are fair, justifiable, and in the public interest.

4.0 FUEL ADJUSTMENT MECHANISM
4.0 FUEL ADJUSTMENT MECHANISM - [39] The Minutes of Settlement state: - 4. All parties agree in principle that the UARB should adopt a Fuel Adjustment Mechanism ("FAM"). The parties request the UARB to establish a process that commences as...

AI summary The document discusses the Fuel Adjustment Mechanism (FAM) and the Board's stance on its adoption. While parties agree in principle on establishing a FAM, the Board has previously rejected proposals due to concerns over NSPI's fuel procurement practices and the risk of transferring fuel price volatility to ratepayers.

7.1 Written and Oral Submissions from the Public
7.1 Written and Oral Submissions from the Public [61] In the advertised Notice of Public Hearing concerning NSPI's rate application and the rate increases proposed, the public were advised that they could file submissions with the Board ou...

AI summary The public submitted concerns about rate increases, environmental issues, and human rights practices related to coal suppliers. The Board acknowledges these concerns, addresses some through the Integrated Resource Plan (IRP) process and service improvements, and concludes that the rate increases are reasonable and justified.

57962Board Decision - Supplementary 4 passages
Preamble
[1] This is a decision on the issue of the Compliance Filing process followed by the Nova Scotia Utility and Review Board (the "Board") and arises from the Board's Decision dated February 5, 2007, and an Order of the Board dated March 8, 2...

AI summary This document discusses the Compliance Filing process followed by the Nova Scotia Utility and Review Board (the 'Board') in relation to rate applications. The process was challenged by Avon Valley eta/., leading to a decision by the Board to address the issue during a 2007 rate application hearing.

Avon
Avon - [6] In its submission, Avon stated that Compliance Filings, with appropriate supporting documentation and opportunity for comment, should be available to Intervenors prior to the Board approving NSPI's tariff. Avon stated that: - 4....

AI summary Avon emphasizes the importance of transparency and fairness in the regulatory process by advocating for the disclosure of revenue allocation scenarios and related documentation to intervenors prior to the Board's final decision on NSPI's tariff. This ensures administrative fairness and due process.

CA
CA [9] The CA, while endorsing Avon's position, has requested additional information on the Compliance Filing, including the cost of service study, provision for further information requests and disclosure of various calculations and assum...

AI summary The CA supports Avon's request for more transparency in NSPI's Compliance Filing, including detailed information on cost allocation, revenue requirements, and the steps taken to derive final figures. The CA emphasizes the need for intervenors to have access to intermediate data and alternative scenarios to ensure informed decision-making.

NSPI
NSPI [1 0] NSPI indicated that it has no specific objection to the proposals for changes to the Compliance Filing process, but expressed concern regarding possible delays in the implementation of the Board's decision which could result fro...

AI summary NSPI has no objection to changes in the Compliance Filing process but is concerned about potential delays in implementing the Board's decision and maintaining confidentiality. It emphasizes the importance of timely rate implementation and preserving confidentiality provisions in the compliance process.

57965Board Order 1 passage
IT IS ORDERED that:
IT IS ORDERED that: 1. NSPI's proposed revenue requirement as identified in the Board's February 5, 2007 Decision, which according to NSPI's Compliance Filing, totals $1,159.5 million, is approved; Document: 127123 - 2. The above-the-line...

AI summary The Board approves NSPI's revenue requirement and rate increases, sets the common equity ratio and rate of return on common equity, and outlines procedures for future compliance filings and stakeholder engagement. It also addresses the need for NSPI to comply with past directives and establishes a separate hearing for constitutional and human rights challenges.

57968Amended Board Order (and attached Schedules A to C) 36 passages
AVAILABILITY:
AVAILABILITY: This tariff is applicable to electric energy used by any customer in a private residence for the customer's own domestic or household use, including lighting, cooking, heating, or refrigeration purposes. Upon application to t...

AI summary This section outlines the applicability of the domestic tariff for residential electric energy use, including conditions for outbuildings and their classification based on primary usage. The tariff is governed by Section 73 of the Public Utilities Act.

DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06
DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06 Any outbuilding located on residential property adjacent to a domestic dwelling and supplied electrically through a separate meter shall have rates applied in accordance with actu...

AI summary This section outlines the application of the Domestic Service Time-of-Day Tariff (Rate Code 06) for outbuildings on residential property. It specifies that the Domestic tariff applies if the building is used for personal pursuits, while General or Industrial tariffs apply for commercial use.

DEMAND CHARGE
DEMAND CHARGE $8.26 per month per kilowatt of maximum demand. 32 cents per kilowatt reduction in demand charge where the transformer was owned by the customer prior to February 1, 1974, or under Special Condition (2) as set out below.

AI summary The demand charge is set at $8.26 per month per kilowatt of maximum demand. A reduction in demand charge is available at 32 cents per kilowatt for customers who own a transformer prior to February 1, 1974, or under Special Condition (2).

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The document outlines special conditions for metering and service provisions. Primary metering requires a capital contribution from the customer, and non-standard service provisions may require the customer to own transformers. Adjustments to meter readings are specified when metering is on the high voltage side.

MEDIUM INDUSTRIAL TARIFF
MEDIUM INDUSTRIAL TARIFF (250 kV.A or 225 kW- 1 999 kV.A or 1 799 kW) Rate Code 22

AI summary The text outlines a section of a regulatory proceeding document related to the Medium Industrial Tariff, specifying the rate code and the applicable power ranges for this tariff category.

DEMAND CHARGE
DEMAND CHARGE $9.48 per month per kilovolt ampere of maximum demand. 32 cents per kilovolt ampere reduction in demand charge where the transformer is owned by the customer.

AI summary The document outlines a demand charge structure, including a monthly fee of $9.48 per kilovolt ampere of maximum demand and a reduction of 32 cents per kilovolt ampere where the transformer is owned by the customer.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary Special conditions for metering and tariff availability are outlined. Primary metering requires a capital contribution from the customer, and adjustments to metered usage apply when metering is on the high voltage side. The company may withdraw the tariff if a customer's billing demand falls below 250 kV.A.

LARGE INDUSTRIAL TARIFF
LARGE INDUSTRIAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 23

AI summary This section outlines the Large Industrial Tariff, specifically for customers with a demand of 2,000 kV.A or 1,800 kW and over, under Rate Code 23.

DEMAND CHARGE
DEMAND CHARGE $9.11 per month per kilovolt ampere of maximum demand of the current month or the maximum actual demand of the previous December, January or February occurring in the previous eleven (11) months. 32 cents per kilovolt ampere...

AI summary The demand charge is set at $9.11 per month per kilovolt ampere of maximum demand, based on the current month or the previous eleven months. A reduction of 32 cents per kilovolt ampere is applied if the transformer is owned by the customer.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transform...

AI summary The document outlines special conditions for a tariff, including adjustments for transformer losses, capital contributions for primary metering, and criteria for withdrawing tariff availability based on demand and cost reduction.

DEMAND CHARGE
DEMAND CHARGE $9.38 per month per kilovolt ampere of maximum demand of the current month or the maximum actual demand of the previous December, January or February occurring in the previous eleven (11) months. 32 cents per kilovolt ampere...

AI summary The demand charge is set at $9.38 per month per kilovolt ampere, based on the current month's maximum demand or the previous eleven months' maximum demand in December, January, or February. A reduction of 32 cents per kilovolt ampere is applied if the customer owns the transformer.

RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism aims to align customer benefits with load adjustments based on hourly pricing signals. Customers are billed based on a pre-determined CBL at the Standard Energy Charge, with credits and costs applied based on energy deviations from the CBL, calculated using the 20-minute ahead marginal cost from NSPI's RTP website.

Order in which Rates are Applied
Order in which Rates are Applied Customers may elect to utilize other rates below the ELI 2P-RTP. In such case, the customer will make written request to the Company, specifying the MW level above which ELI 2P-RTP is to apply. Such changes...

AI summary The document outlines the process for customers to elect alternative rates below the ELI 2P-RTP, requiring a written request specifying the MW level for application in the next full calendar year. It also states that no other rate may be applied above this rate when stacking multiple rates.

Customer Baseline Load (CBL)
Customer Baseline Load (CBL) This is a flat line load shape used for the operational purpose of calculating hourly Incremental Load (IL) and Decremental Load (DL). The CBL level (in MW) is to be calculated as the average hourly demand of t...

AI summary The Customer Baseline Load (CBL) is a flat line load shape used to calculate hourly Incremental Load (IL) and Decremental Load (DL). It is based on the average hourly demand of a customer's annual forecast total energy requirement, excluding system losses, and is effective from January 1st to December 31st of each year.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) During periods of major scheduled maintenance, the CBL will be reduced accordingly to match the operating conditions of the plant. Such events will be treated as cutouts...

AI summary During major scheduled maintenance periods, the Capacity Bidding Limit (CBL) will be adjusted to reflect the plant's operating conditions, and these events will be treated as cutouts without impacting the CBL for the following year.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The Marginal Cost (MC) is defined as the 20-minute ahead forecast of hourly marginal fuel and variable O&M costs, excluding electricity exports but including imports. NSPI calculates the MC forecast based on in-province load requirements, and the ELI 2P-RTP tariff uses the CBL value for load levels. Hourly price forecasts are provided daily, and billing uses the adjusted MC as outlined in the Decremental Rebate section.

Decremental Load (DL)
Decremental Load (DL) This is the hourly energy calculated as the difference between the CBL and the actual demand when actual demand is less than the CBL. When other tariffs are used below ELI 2P-RTP, DL in any hour is limited to the amou...

AI summary Decremental Load (DL) is defined as the hourly energy difference between the Capacity Bidding Limit (CBL) and actual demand when actual demand is lower than the CBL. DL is limited to the amount available between the lower ELI 2P-RTP threshold and the CBL when other tariffs are used below ELI 2P-RTP.

Losses Adjustment:
Losses Adjustment: A 2% adjustment to metered energy will be applied to determine requirement including system losses. This Loss adjustment will be applied in determining the IL and the DL.

AI summary A 2% adjustment to metered energy is applied to account for system losses in determining the IL and the DL. This adjustment helps in accurately calculating energy requirements.

Modification of Existing CBL
Modification of Existing CBL If an existing ELI 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (...

AI summary The document outlines procedures for modifying the Capacity Bidding Limit (CBL) for ELI 2P-RTP customers, including adjustments for significant capital expenditures, load reductions, and dispute resolution through the Utility and Ratepayers Board (UARB).

Supply Interruption:
Supply Interruption: This tariff is interruptible for supply reasons. The customer will reduce its available interruptible system load by the amount requested by NSPI within ten (1 0) minutes of such request by the Company. Following inter...

AI summary This section outlines the requirements for supply interruption under the tariff, including customer obligations to reduce load promptly, procedures for contacting customers, penalties for non-compliance, and limitations on the frequency and duration of interruptions.

Conversion of Interruptible Load to Firm
Conversion of Interruptible Load to Firm Should a customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capacity av...

AI summary This section outlines the procedure for customers wishing to convert from interruptible load service to firm service, requiring a five-year advance notice and allowing for potential early conversion. Customers may also revert to interruptible service after two years under the firm rate schedule, with the possibility of earlier conversion.

Order of Supply Interruption:
Order of Supply Interruption: In the event of an interruption required in order to avoid shortfalls in electricity supply, rate classes will be called upon to provide capacity to NSPI in the following order: - 1. Generation Replacement and...

AI summary This document outlines the order in which rate classes will be called upon to provide capacity to NSPI during an electricity supply interruption, starting with Generation Replacement and Load Following (GRLF) Rate, followed by specific industrial rates, and ending with an interruptible rider to the Large Industrial Rate. The order was approved by the Nova Scotia Utility and Review Board on April 1, 2007.

Suspension of 2P-RTP Billing Mechanism
Suspension of 2P-RTP Billing Mechanism The Rate will be suspended during any period in which the customer's load is reduced due to a disruption in the supply of electricity to the customer because of an interruption call or NSPI system con...

AI summary The 2P-RTP billing mechanism will be suspended during electricity supply disruptions, with the customer estimating lost energy and being charged at the Standard Energy Charge. Disputes will be resolved by the UARB.

CAPITAL CHARGE: (if applicable)
CAPITAL CHARGE: (if applicable) Depreciation based on a 25 year life, and interest at the Company's long term rate shall be used to determine the monthly capital charge.

AI summary The monthly capital charge is determined using depreciation based on a 25-year life and interest at the Company's long-term rate.

DEMAND CHARGE
DEMAND CHARGE $8.43 per month per kilowatt of connected load.

AI summary The document specifies a demand charge of $8.43 per month per kilowatt of connected load.

1.1 INTERPRETATION AND DEFINITIONS
1.1 INTERPRETATION AND DEFINITIONS "Residential Customer" "residential customer" means any individual non- commercial customer receiving service under the Domestic Service Rate at his/her permanent or temporary place of residence; "Seconda...

AI summary This section provides definitions for key terms used in the regulatory proceeding, including 'Residential Customer,' 'Secondary metering,' 'Service line allowance,' 'Temporary electric service,' and 'Unmetered.' These definitions clarify the scope and application of specific terms within the regulatory framework.

3.1 FARMING OR FISHING LOAD THAT MAY QUALIFY FOR THE DOMESTIC SERVICE RATE
3.1 FARMING OR FISHING LOAD THAT MAY QUALIFY FOR THE DOMESTIC SERVICE RATE Farming or fishing units may receive electric service at the domestic rate providing the following conditions are met: - (a) each unit may have connected up to 200...

AI summary Farming or fishing units may qualify for the domestic service rate if they meet specific conditions, including a maximum service capacity of 200 amps and no more than three separately metered services. Exceeding these limits results in billing at the Non Domestic rate.

3.2 PREMISES JOINTLY USED FOR RESIDENTIAL AND COMMERCIAL- PURPOSES
3.2 PREMISES JOINTLY USED FOR RESIDENTIAL AND COMMERCIAL- PURPOSES When a customer uses part of his premises as a residence and part for a small store or office, or other commercial use, the Domestic rate shall be applied to the entire pre...

AI summary The document outlines the rate application for premises used jointly for residential and commercial purposes. If the commercial load (excluding heating and cooling) is 3kW or less, the Domestic rate applies to the entire premises. Otherwise, the Non Domestic rate applies, or the services can be separated with individual meters.

3.6.1 Defmition
3.6.1 Defmition Net metering service is a metering and billing practice that efficiently enables electricity consumers with small, privately-owned generators to offset part or all of their own electrical requirements by utilizing their own...

AI summary Net metering service allows electricity consumers with small, privately-owned generators to offset their electrical usage by utilizing their own generation. Excess energy is credited against purchased energy for billing purposes over a limited period, and customers using this service are referred to as 'customergenerators'.

3.6.4 Billing
3.6.4 Billing a) Customer-generators will be billed under the otherwise-applicable metered tariff schedules. APPROVED: NOV A SCOTIA UTILITY AND - b) If in a given billing period the electricity supplied to NSPI' s grid by the customergener...

AI summary This section outlines the billing procedures for customer-generators under net metering arrangements, including the banking of excess self-generation, application of energy credits, anniversary dates, and the handling of multiple facilities on the same land. NSPI is designated as the sole beneficiary of emission credits from renewable energy used in these installations.

4.2 METERED ELECTRIC SERVICE- UNMETERED ELECTRIC SERVICE
4.2 METERED ELECTRIC SERVICE- UNMETERED ELECTRIC SERVICE The consumption of electric service supplied by the Company shall be recorded by the use of the appropriate meters, provided however that the Company may provide unmetered electric s...

AI summary The document outlines the conditions under which unmetered electric service may be provided by the Company, specifying that it is permissible when consumption is low, constant, and easily determined. Metered service is otherwise required for recording consumption.

4.5 CONVERSION OF SINGLE FAMILY RESIDENCE
4.5 CONVERSION OF SINGLE FAMILY RESIDENCE If a Domestic Service customer permits additional living quarters for other parties in the same premises or a separate establishment to be connected through his meter, the Company has the option of...

AI summary The section outlines the policy for handling the conversion of a single-family residence into multiple dwelling units. If additional living quarters are connected through the existing meter, the utility company may adjust the billing rate or disconnect service until a new meter is installed for the additional units.

4.7 POWER FACTOR CORRECTION
4.7 POWER FACTOR CORRECTION When charges are based on maximum demand measured in kilowatts, the customer shall maintain a power factor of not less than 90%. Where the Company determines that a customer's power factor is less than acceptabl...

AI summary The section outlines requirements for power factor correction, specifying that customers must maintain a power factor of at least 90% when charges are based on kilowatts. If a customer fails to meet this requirement, the company may bill based on kV.A demand and adjust the kW billing demand to reflect a 90% power factor.

ESTIMATED METER READINGS IN RURAL AREAS
ESTIMATED METER READINGS IN RURAL AREAS In those rural areas where the post card meter reading has been adopted, should the Customer fail to return the prepaid postage card, then the amount of power and energy used by the Customer shall be...

AI summary In rural areas using post card meter readings, if customers do not return the prepaid postage card, the company must estimate usage based on available data. Actual readings are required at least once every twelve months for bi-monthly meters and every six months for monthly meters.

7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES
7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES The following schedule of charges shall apply to customers requesting Load Research information. (Note: Customers must provide access to a shared phone line for dat...

AI summary This section outlines the charges for Load Research monitoring, reporting, and analytical services. It specifies that all costs are based on actual expenses incurred by the company, with a 25% markup applied to setup, analysis, reporting, and specialized customer analysis.

7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES
7.3 SCHEDULE OF LOAD RESEARCH MONITORING, REPORTING AND ANALYTICAL CHARGES 4.0 Analysis and Reporting See Charge per Billing Period Base Package Load profile for peak day billing period plus times and magnitude of six highest peaks 33.00 O...

AI summary This section outlines the schedule of load research monitoring, reporting, and analytical charges, including various analysis and reporting options with associated fees. It details base package items, specialized analysis, and hourly rates for services provided.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 35 passages
Preamble
I's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and income taxes. The financial effect of the SA is summarized on Table 1 of Appendix 2. 9. NSPI's request for a true-up for the...

AI summary The document outlines NSPI's application regarding rate base, return on equity, and OM&G, and mentions a deferred true-up for the 2P-RTP rate. It also discusses the adoption of the Revenue to Cost ratio methodology with modifications and the allocation of revenue responsibilities across different classes.

3.0 RATE DESIGN
3.0 RATE DESIGN As shown in Table 1 of Appendix 2, the total revenue approved by the Board as a result of its February 5, 2007 decision is $1 ,159.5 million. Of this, $10.6 million will result from the provision of miscellaneous services s...

AI summary The document outlines the total revenue approved by the Board in 2007, including revenue from miscellaneous services, export sales, and electricity sales. It also references the Settlement Agreement and the methodology used for revenue allocation, as well as the distinction between Below-the-Line and Above-the-Line rates.

29 3.2 Above-the-Line Revenues and Rate Design
29 3.2 Above-the-Line Revenues and Rate Design Given the total revenues of$ 1,159.5 million and the expected revenues from miscellaneous sources, export sales and BTL sales, the residual revenue from ATL sales can be calculated. As shown i...

AI summary The text discusses the calculation of residual revenue from above-the-line (ATL) sales, given total revenues and expected revenues from miscellaneous sources, export sales, and BTL sales. The residual revenue is calculated as $1,121.2 million, representing a 3.8% average increase across all ATL classes.

7 3.3 Proposed Rates
7 3.3 Proposed Rates 8 9 10 II 12 NSPI developed new rates by applying the class revenue percent increases to both energy and demand charges within each rate class. No customer charges were changed. There are no changes to the interruptibl...

AI summary NSPI has proposed new rates by applying class revenue percent increases to energy and demand charges, without altering customer charges or credits. The Compliance Tariffs are detailed in Appendix 7, with updates to the Unmetered Services section. A revision to the 'CBL Base Cost' section of the ELI 2P-RTP tariff was requested in 2007 and is now operational.

FOR THE YEAR ENDING DECEMBER 31, 2007
FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL...

AI summary The document presents a table with various metrics related to demand, responsibility percentages, and energy generation and purchase figures for different categories, including small, general, and large industrial sectors, as well as municipal and unmetered entities, for the year ending December 31, 2007.

AVAILABILITY:
AVAILABILITY: This tariff is applicable to electric energy used by any customer in a private residence for the customer's own domestic or household use, including lighting, cooking, heating, or refrigeration purposes. Upon application to t...

AI summary The Domestic tariff applies to electric energy used in private residences for household purposes. It may also apply to outbuildings on residential property if used primarily for personal pursuits. Commercial use of such buildings requires application of General or Industrial tariffs.

NOV A SCOTIA POWER IN CORPORA TED
NOV A SCOTIA POWER IN CORPORA TED DOMESTIC SERVICE TIME-OF-DAY TARIFF (OPTIONAL) Rate Code 06 Any outbuilding located on residential property adjacent to a domestic dwelling and supplied electrically through a separate meter shall have rat...

AI summary Nova Scotia Power has approved a Domestic Service Time-of-Day Tariff (Rate Code 06) that specifies how rates are applied to outbuildings on residential property. The tariff depends on the primary use of the building, with the Domestic tariff applying if used for personal pursuits and General or Industrial tariffs if used for commercial purposes.

DEMAND CHARGE
DEMAND CHARGE $10.06 per month per kilovolt ampere of maximum demand ofthe current month or the maximum actual demand of the previous December, January, or February occurring in the previous eleven (11) months. 32 cents per kilovolt ampere...

AI summary The demand charge is set at $10.06 per month per kilovolt ampere, based on either the current month's maximum demand or the highest demand from the previous eleven months in December, January, or February. A reduction of 32 cents per kilovolt ampere is provided if the customer owns the transformer.

LARGE GENERAL TARIFF
LARGE GENERAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 12 - (2) The Company will withdraw the availability ofthis tariff to any specific customer, if, on a consistent basis, the customer is not maintaining a billing demand of2 0...

AI summary The Large General Tariff applies to customers with a demand of 2,000 kV.A or 1,800 kW and above. The Company may withdraw the tariff from a customer if they consistently fail to maintain the required demand level. The Company also reserves the right to establish separate service and operating agreements when necessary for the benefit of both the Company and its customers.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The document outlines special conditions for metering and service provisions. It specifies that primary metering may require a capital contribution from the customer and that meter readings on the high voltage side will be adjusted by 1.75%. Additionally, non-standard service provisions may require the customer to own transformers typically provided by the company.

DEMAND CHARGE
DEMAND CHARGE $9.48 per month per kilovolt ampere of maximum demand. 32 cents per kilovolt ampere reduction in demand charge where the transformer is owned by the customer.

AI summary The demand charge is set at $9.48 per month per kilovolt ampere of maximum demand. A reduction in demand charge is offered at 32 cents per kilovolt ampere where the transformer is owned by the customer.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The special conditions outline requirements for metering and billing demand under a tariff. Customers requiring primary metering must contribute to the additional capital cost, and adjustments to metered usage are made when metering is on the high voltage side. The company may also withdraw the tariff from customers not maintaining a minimum billing demand.

LARGE INDUSTRIAL TARIFF
LARGE INDUSTRIAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 23

AI summary This section outlines the Large Industrial Tariff, specifically for customers with a demand of 2,000 kV.A or 1,800 kW and over, under Rate Code 23.

INTERRUPTIBLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25)
INTERRUPTIBLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25) Customers who qualify for interruptible service will receive a $3.43 per month per kilovolt ampere reduction in demand charge for billed interruptible demand. The billed int...

AI summary The interruptible rider to the Large Industrial Tariff (Rate Code 25) provides a $3.43 monthly credit per kilovolt ampere reduction in demand charge for qualifying customers. The credit is based on the difference between contracted firm demand and billing demand, with specific rules for when the credit applies.

AVAILABILITY:
AVAILABILITY: This rider will be available to a minimum regular billing demand of 2 000 k V .A at 90% Power Factor, under the following terms and conditions: - (1) The customer has provided written notice of his desire to take service unde...

AI summary This rider outlines the terms and conditions for interruptible service, including customer obligations to reduce load upon request, penalties for non-compliance, and procedures for converting between interruptible and firm service rates.

LARGE INDUSTRIAL TARIFF
LARGE INDUSTRIAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 23 ( 6) Interruption is limited to 16 hours per day and 5 days per week to a maximum of 3 0% of the hours per month and 15% of the hours in a year.

AI summary The Large Industrial Tariff (Rate Code 23) applies to customers with a demand of 2,000 kV.A or 1,800 kW and over. Interruption of service is limited to 16 hours per day and 5 days per week, with a maximum of 30% of the hours per month and 15% of the hours in a year.

Standard Energy Charge
Standard Energy Charge The standard energy charge, before accounting for shifting credits or additional charges, is 5.655 cents per kWh. This charge will apply to all Customer Baseline Load (CBL) energy, regardless of actual consumption. T...

AI summary The standard energy charge is set at 5.655 cents per kWh and applies to all Customer Baseline Load energy. This charge is based on NSPI's approved Cost of Service Study for the load forecast under the ELIIR-2 and ELI 2P-RTP tariffs combined.

Changes to Rate Components
Changes to Rate Components The customer charge and standard energy charge of this tariff shall be subject to change as approved by the UARB following general rate applications by the Company. For operational purposes, the annual CBL for ea...

AI summary The customer charge and standard energy charge in the tariff may be adjusted based on approvals from the UARB following general rate applications by the company. The annual CBL for each customer is reset annually for operational purposes.

RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism aims to align customer benefits with load adjustments based on hourly pricing signals. Customers are billed based on a predetermined CBL, with credits for energy use below and costs for energy use above this baseline, calculated using 20-minute ahead marginal costs from NSPI's RTP website.

Order in which Rates are Applied
Order in which Rates are Applied Customers may elect to utilize other rates below the ELI 2P-RTP. In such case, the customer will make written request to the Company, specifying the MW level above which ELI 2P-RTP is to apply. Such changes...

AI summary Customers can opt for rates below ELI 2P-RTP by submitting a written request specifying the MW level above which ELI 2P-RTP applies. Changes take effect for the next full calendar year. No other rate may be applied above ELI 2P-RTP when stacking multiple rates.

Pricing Period
Pricing Period Each hour of the day is a distinct pricing period, the day starting at the 00:00:01 , the first hour ending at 01:00:00. The applicable 20 minute ahead marginal price as posted on the RTP website will apply for each such per...

AI summary The document defines the pricing period as each hour of the day, starting at 00:00:01 and ending at 01:00:00. The applicable 20-minute ahead marginal price from the RTP website is used for each period. The text is approved by Nova Scotia Utility and.

Forecast Total Energy Requirement
Forecast Total Energy Requirement Forecast total energy requirement from the Company is determined using the customer's total actual annual energy requirement (excluding system losses) from the Company for the previous 12 month period endi...

AI summary The forecast total energy requirement from the Company is based on the customer's previous 12-month energy consumption, excluding system losses. Customers must submit a proposed CBL by November 15, with justification, and NSPI has two weeks to respond. Disagreements may be referred to the UARB for expedited resolution.

Major Scheduled Maintenance Periods
Major Scheduled Maintenance Periods Prior to the start of each calendar year, the customer will provide the Company with information on the timing and duration and magnitude of its anticipated periods of major scheduled maintenance. If the...

AI summary The document outlines procedures for customers to notify the Company of major scheduled maintenance periods, including providing timing, duration, and magnitude details, and requiring three weeks' notice before commencing maintenance. Disagreements will be referred to the U ARB.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) During periods of major scheduled maintenance, the CBL will be reduced accordingly to match the operating conditions of the plant. Such events will be treated as cutouts...

AI summary During major scheduled maintenance periods, the Customer Baseline (CBL) will be adjusted to reflect the plant's operating conditions, and these events will be treated as cutouts without affecting the CBL for the following year.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The Marginal Cost (MC) is defined as the 20-minute ahead forecast of hourly marginal fuel and variable O&M costs, excluding exports but including imports. NSPI calculates the MC forecast based on in-province load requirements, and the CBL value is used for customers on the ELI 2P-RTP tariff. Hourly price forecasts are provided to customers daily, with major changes communicated promptly. The actual billing price is the MC adjusted according to the Decremental Rebate section.

Decremental Load (DL)
Decremental Load (DL) This is the hourly energy calculated as the difference between the CBL and the actual demand when actual demand is less than the CBL. When other tariffs are used below ELI 2P-RTP, DL in any hour is limited to the amou...

AI summary Decremental Load (DL) refers to the hourly energy difference between the Customer Baseline (CBL) and actual demand when actual demand is lower than the CBL. Under certain tariffs below ELI 2P-RTP, DL is capped between the lower ELI 2P-RTP threshold and the CBL.

EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP)
EXTRA LARGE INDUSTRIAL TWO PART REAL TIME PRICING TARIFF (ELI 2P-RTP) DL will be credited according to the following schedule: - The credit for decrements, up to 30 MW for Bowater, and 75 MW for StoraEnso will be at MC as defined by this t...

AI summary The document outlines the credit schedule for decremental load under the ELI 2P-RTP tariff. Credits are based on the marginal cost (MC) and the ELI 2P-RTP Standard Energy Charge, with different percentages applied depending on the amount of decremental load. The total eligible decremental load is capped at 20% of the customer's annual CBL energy.

CBL Base Cost (CBLbc)
CBL Base Cost (CBLbc) The monthly CBLbc is calculated by multiplying the actual ELI 2P-RTP energy under the CBL level in each hour of the billing period by the applicable Standard Energy Charge.

AI summary The monthly CBL Base Cost is determined by multiplying the actual ELI 2P-RTP energy at the CBL level during each hour of the billing period by the applicable Standard Energy Charge.

Modification of Existing CBL
Modification of Existing CBL If an existing ELI 2P-RTP customer undertakes significant physical plant modification, (as signified by a specific capital expenditure above and beyond normal annual capital spending) or other material change (...

AI summary The document outlines procedures for modifying the Customer Baseline (CBL) for ELI 2P-RTP customers under specific conditions, such as significant capital expenditures or load reductions. If the customer and Nova Scotia Power Inc. (NSPI) cannot reach an agreement, the matter will be referred to the Utility Arbitration Board (UARB) for resolution.

Supply Interruption:
Supply Interruption: This tariff is interruptible for supply reasons. The customer will reduce its available interruptible system load by the amount requested by NSPI within ten (1 0) minutes of such request by the Company. Following inter...

AI summary This section outlines the terms and conditions for supply interruption under an interruptible tariff. Customers must reduce load within ten minutes of a request by NSPI, with penalties for non-compliance. Supply interruptions are limited to specific hours per day and week, and customers must provide contact information for load reduction.

Conversion of Interruptible Load to Firm
Conversion of Interruptible Load to Firm Should a customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capacity av...

AI summary This section outlines the process for customers to convert from interruptible load service to firm service, requiring five years' advance notice and allowing for potential early conversion. Customers can also return to interruptible service after two years under the firm rate schedule, with possible early conversion permitted by the company.

Suspension of 2P-RTP Billing Mechanism
Suspension of 2P-RTP Billing Mechanism The Rate will be suspended during any period in which the customer's load is reduced due to a disruption in the supply of electricity to the customer because of an interruption call or NSPI system con...

AI summary The 2P-RTP billing mechanism will be suspended during power disruptions, with energy loss estimated by the customer and charged at the Standard Energy Charge. Disputes over the estimated energy loss will be resolved by the UARB.

Power Factor Correction
Power Factor Correction Under normal operating conditions, an average power factor over the entire billing period, calculated for kWh consumed and lagging kV AR-h, as recorded, of not less than 90% lagging for the total customer load (unde...

AI summary The text outlines requirements for maintaining a minimum power factor of 90% lagging for customer load under normal operating conditions, with adjustment factors applied to the energy charge if this requirement is not met.

DEMAND CHARGE
DEMAND CHARGE $8.43 per month per kilowatt of connected load.

AI summary The document specifies a demand charge of $8.43 per month per kilowatt of connected load, indicating a fee structure based on the customer's peak demand capacity.

DEMAND CHARGE
DEMAND CHARGE $8.43 per month per kilowatt of connected load.

AI summary The document specifies a demand charge of $8.43 per month per kilowatt of connected load, indicating a fee structure based on the customer's peak demand capacity.

57984Submission - Barrington Wind Energy Ltd. - Re: Late Filed Evidence 1 passage
Section 1
" NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE.l\1ATTER OF: The· Public Utilities Act, R.S.N.S. 1989, C·. 380, as amended -and- IN THE .MATTER OF: An Application by Nova Scotia Power Incorporated, and a Hearing for Approval of Certain Revis...

AI summary BWEL supports Mr. George Cooper's letter opposing the admission of evidence by NSPI, citing concerns about due process and the potential introduction of a Fuel Adjustment Mechanism. They argue that the evidence raises issues outside the ELIIR2 proceedings and challenges intervenors' ability to participate effectively.

57985NSPI Correspondence - Re: 2007 Rate Application proceedings [and attachments] 1 passage
SCOPE
SCOPE The consultant will address the missing elements in the NSPI hedging program outlined by the UARB in its decision. The missing elements listed are: - A clear, concise definition of hedging objectives - Statement of specific goals in...

AI summary The consultant is tasked with addressing missing elements in NSPI's hedging program as outlined by the UARB. Key missing elements include definitions of hedging objectives, permissible techniques, reporting requirements, and control mechanisms.

57987Letter - SEB - Re: Late Filed Evidence 3 passages
1. O'SHEASY EVIDENCE
1. O'SHEASY EVIDENCE SEB is strongly of the view that this evidence should not be admitted as part of the record in this proceeding. To the extent that any part of this evidence is allowed to form part of the record, SEB requests that the...

AI summary SEB opposes the admission of O'Sheasy evidence, arguing it was not filed in accordance with the Board's schedule and should not be included in the proceeding. The evidence addresses three topics related to the 2P-RTP: the flat customer base line, incremental export benefit credit, and marginal pricing mechanism.

1. The flat customer base line ("CBL") used in the 2P-RTP requires a change to fuel forecasting
1. The flat customer base line ("CBL") used in the 2P-RTP requires a change to fuel forecasting This item was not identified as an issue in the final Issues List, and therefore has not been filed in accordance with the mandated process. In...

AI summary The document discusses the flat customer base line (CBL) in the 2P-RTP rate and NSPI's use of preliminary estimates for the ELIIR-2 rate. NSPI acknowledges that changes to the ELIIR-2 rate will not affect its 2007 revenue requirement, but SEB argues that new evidence should not be filed at this late stage and that revisions should be properly addressed through the regulatory process.

3. The marginal pricing mechanism utilized in the 2P-RTP would benefit from a true-up
3. The marginal pricing mechanism utilized in the 2P-RTP would benefit from a true-up In its correspondence dated October 27, 2006 the Board specifically stated as follows: "In the Compliance Filing issued today, the Board declined to incl...

AI summary The Nova Scotia Utility and Review Board (NSUARB) declined to include a true-up mechanism in the 2P-RTP rate, citing that NSPI did not participate in discussions on risk protection mechanisms during the ELIIR hearing. The Board emphasized that a true-up mechanism was not intended to be added based on current evidence and submissions.

58003Participant responses to Preliminary Issues List for P-886 5 passages
Nancy McNeil - CME Submission re Preliminary Issues List P-886
costs are affected by usage patterns and we feel the cost, pricing and timing of the deployment of types of generation especially away from times of high fuel cost usage should be a matter of review. - 4. The exploitation of renewable ener...

AI summary The submission highlights the interrelation between rate design, fuel costs, and renewable energy deployment, emphasizing the need for a comprehensive review of NSPI's costs, pricing, and resource planning. It also references past recommendations and the need for a hearing on cost of service and future planning.

RECEIVED
RECEIVED OCT 3 1 2005 BERWICK, NOVA SCOTIA Nova Scotia Utility and Review Board October 30, 2006 By e-mail; original follows Ms Nancy McNeil, Regulatory Affairs Officer The Nova Scotia Utility and Review Board P.O. Box 1692, Unit "M", Hali...

AI summary The letter discusses the integration of multiple processes, including the Integrated Resource Plan (IRP) and the Energy Efficiency and Load Integration Report (ELIR-2) rate hearing, and emphasizes the need for a coordinated approach. It supports delaying the IRP timeline to ensure thorough consideration and calls for provincial leadership in energy and emissions policy.

General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule and suggests narrowing the issues list to avoid duplication of recent reviews. It highlights that many operational aspects have already been or will be reviewed, such as fuel-related directives, affiliate audits, and demand-side management plans.

General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule and suggests narrowing the issues list to avoid duplication of recent reviews. The Company highlights ongoing and completed reviews by the Board and third-party consultants, such as Liberty and Accenture, and notes that many aspects of its operations have already been addressed.

Section 44
- 6. the extra volatility experienced in fuel prices from the international market in recent years; - 7. the introduction of substantial quantities of wind power, and the prospect of further large increases in wind power as the Province ro...

AI summary The text discusses factors contributing to increased volatility in fuel prices, the impact of wind power integration, and the move toward a partially competitive market. It also highlights concerns about the current COS Study's methodology, which disproportionately affects high load factor customers, as demonstrated by Dr. Rosenberg's testimony.

58136Reply Submission - Avon Valley et al. (AVON) 1 passage
REPLY SUBMISSION ON BEHALF OF:
REPLY SUBMISSION ON BEHALF OF: Avon Valley Greenhouses Ltd. Canadian Salt Company Limited Crown Fibre Tube Inc. Halifax Grain Elevator Limited High Liner Foods Incorporated Imperial Oil Limited J.D. Irving Ltd., Saw Mills Division Lafarge...

AI summary The intervenors represented in this submission support the proposed settlement but request greater transparency in the Board's Compliance Filing process, including access to revenue allocation scenarios and related communications prior to the Board's final order to ensure administrative fairness and due process.

58137Submission - Consumer Advocate (CA) - Re: Compliance filing process 1 passage
Section 3
e 9.1, nor of any intermediate stages in the process of getting from the Figure 9.1 starting point to the end result. The starting point and the intermediate stages are largely unknown to the parties. While A von did not specify it, the Co...

AI summary The Consumer Advocate requests that intervenors be provided with revised COSS results to support the initial cost allocation to classes, ensuring transparency and confidence in the starting point for class revenue determination. The Company provided a COSS run in its rate increase filing, but additional information is needed for transparency.

58140Final Submission - Ecology Action Centre 5 passages
Overview
Overview - 1. The rate application before the Utility and Review Board (the Board) is based on an assumption that the use of fossil fuels, and the costs associated with those fuels, is sufficient evidence upon which the Board can rely in m...

AI summary The rate application by Nova Scotia Power Inc (NSPI) is based on fossil fuel costs, but the Ecology Action Centre (EAC) argues that a rate increase is not justified as more cost-effective and less volatile alternatives exist. EAC urges the Board to prioritize energy efficiency and renewable energy and to reconsider its role in addressing social and environmental costs.

Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Demand Side Management?
for energy efficiency in Nova Scotia - 17. Thus a lack of publicly available evidence currently exists in Nova Scotia regarding the maximum achievable potential for cost-effective energy efficiency. - 18. The EAC understands that in this h...

AI summary The EAC emphasizes the need for a proper framework to procure energy efficiency in Nova Scotia, noting the lack of publicly available evidence on cost-effective energy efficiency potential and the importance of integrating energy efficiency with fuel cost considerations for rational electricity system governance.

expediently in cooperation with NSPI, The Government of Nova Scotia and Stakeholders.
expediently in cooperation with NSPI, The Government of Nova Scotia and Stakeholders. - 28. In addition to uncertainty regarding Nova Scotia's ability to maximize renewable energy generation in the province, it remains uncertain if renewab...

AI summary The EAC highlights concerns about Nova Scotia's renewable energy procurement process, citing past project setbacks and volatility risks. It suggests adopting a feed-in law mechanism to ensure renewable energy development and calls for a re-evaluation of procurement policies in consultation with stakeholders. The EAC also argues that considering fuel costs without addressing related capital expenditures is not a rational approach to governing the electricity system.

Should Social and Environmental Costs and Benefits Be a Consideration?
Should Social and Environmental Costs and Benefits Be a Consideration? - 33. In this submission the EAC has not chosen to question the reasonableness and prudence ofNSPI's expenses from a social cost and benefits perspective. However, cons...

AI summary The EAC highlights the social and environmental impacts of NSPI's energy practices, including energy poverty, human rights abuses, and climate change. They request the Board to consider these costs and benefits in future processes and seek clarification from the Government of Nova Scotia under the Public Utilities Act.

Should a Fuel Adjustment Mechanism Process be initiated?
Should a Fuel Adjustment Mechanism Process be initiated? - 42. Before the hearing of NSPI's Application a settlement agreement was reached among the parties that signed the confidentiality agreement and the Company. Given that the EAC has...

AI summary The Ecology Action Centre (EAC) opposes the initiation of a Fuel Adjustment Mechanism (FAM) process, arguing that it may prioritize the interests of a select group of interveners over the public and other stakeholders. The EAC calls for the Board to first address issues such as the impact of rate increases on low-income customers, energy efficiency investments, and renewable energy integration before considering a FAM.

58141Closing Submission - NDP - Re: Proposed Settlement Agreement 1 passage
Overview
approval process. We suggest that decision-making instruments, including technical conferences and settlement conferences, should be open to all intervenors and not just confidential intervenors. .. Increases in the residential, commercial...

AI summary The NDP Caucus criticizes the opacity of the rate approval process and the use of settlement conferences that exclude public participation. They express concern over the proposed Fuel Adjustment Mechanism (FAM) being agreed upon without proper public scrutiny and call for greater transparency and accountability in regulatory decisions.

58241Comments Preliminary Issues List - Canadian Manufacturers & Exporters (CME) 2 passages
Section 2
year plan for NSPI. This also ties into resource planning, DSM, etc. Fuel is a major component of NSPI's costs and this application. Matters relating to this specific issue should be a consideration. - 5. As the Board is all too aware, rat...

AI summary The text discusses the interrelation between rate design, revenue requirements, and planning for NSPI, emphasizing the need to address multiple interrelated issues in a single hearing to avoid delays and inefficiencies. It references past proceedings and highlights concerns about the handling of long-range forecasting and planning topics.

Section 3
ent by intervenors for consideration by the Board as to their relative importance, timing, priority to be dealt with, etc. in future hearing(s) to avoid both adhocracy and to minimize hearing fatigue. In c.onclusion, the CME respectfully r...

AI summary The CME recommends that the Board consider the importance, timing, and priority of matters for future hearings to avoid adhocracy and hearing fatigue. It emphasizes that issues affecting NSPI's economics and rates should be included, as well as the long-term interests of Nova Scotians and the impact of prolonged proceedings on participants.

58244Comments on Preliminary Issues List - NSPI 1 passage
General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule, emphasizing the need to focus on material issues affecting the 2007 test year and avoid duplication of previous reviews. NSPI highlights that many aspects of its operations have already been or will be reviewed, and suggests narrowing the issues list accordingly.

58245Comments on Preliminary Issues List - Stora Enso/ Bowater (SEB) 1 passage
Re: Submissions Regarding Cost of Service Methodology Hearing
international coal in the years following the Devco closure; - 5. the introduction of the LM6000s; - 6. the extra volatility experienced in fuel prices from the international market in recent years; - 7. the introduction of substantial qua...

AI summary The text discusses factors affecting the cost of service methodology, including changes in fuel sources, market volatility, and the integration of renewable energy. It highlights that the current methodology disproportionately impacts high load factor customers compared to other jurisdictions, as evidenced by Dr. Rosenberg's testimony.

86471Letter - Re: Future Filing Requirements - Strawman Proposal 2 passages
Important Considerations
Important Considerations There are four issues that have not been addressed in the Strawman Proposal, which in the view of NSPI are integral considerations in this process. NSPI seeks the Board's direction on these items. The first conside...

AI summary NSPI highlights four unresolved issues in the Strawman Proposal, including the impact of a Fuel Adjustment Mechanism on FFRs, the Board's role in electronic information storage, the number of Information Requests rounds, and the importance of an Issues List in GRAs. NSPI requests the Board's guidance on these matters.

Further Items for Clarification
Further Items for Clarification In addition to the foregoing, attached is a list of items, set out in the Strawman Proposal, to which NSPI provides further clarification. As this process evolves NSPI looks forward to working with Board sta...

AI summary NSPI provides further clarification on items listed in the Strawman Proposal and expresses its commitment to working with Board staff to develop standard templates for General Rate Applications. The process is expected to improve filing requirements over time through collaboration with stakeholders.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 3 passages
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

A. Statement
l(s) used for the rate design proposed in its direct testimony. If any party's case changes in subsequent testimony based on updated models, the updated model(s) shall be provided with that testimony. 6. The Commission also took oral comme...

AI summary The Commission requires parties proposing rate designs to provide detailed impact analyses in both hard copy and electronic formats, using specified average customer usage levels. Parties suggesting changes to another's rate design are not required to submit cost of service studies or rate impact information. A request for a public hearing in Pueblo is noted for further consideration.

A. The Commission Orders That:
A. The Commission Orders That: - 1. The procedural schedule proposed by the parties to this matter at the pre-hearing conference as articulated above is adopted. - 2. Aquila, Inc., doing business as Aquila Networks-WPC shall provide work p...

AI summary The Commission adopts a procedural schedule for the proceeding, sets deadlines for submitting work papers and discovery responses, and requires parties proposing rate designs to provide cost of service study models and customer impact analyses. The 120-day decision period is extended to 210 days but waived by agreement, with a final decision due by September 3, 2004.

86475Board Letter - Re: NSPI Future Filing Requirements - Strawman Proposal - April 10, 2007 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizat...

AI summary This document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, covering financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and emissions compliance.

86476Letter - Re: Standard Filing Requirements 1 passage
1. Implications of a FAM Proceeding
1. Implications of a FAM Proceeding Dr. Stutz's suggestion to standardize filing requirements was made prior to any discussion and agreement in principle that the Board should approve a FAM. The FAM process is ongoing and during 2007 the B...

AI summary The text discusses the implications of a FAM (Fuel Adjustment Mechanism) proceeding, including the standardization of filing requirements, the impact on general rate applications, and the resolution of past concerns about fuel cost explanations. The FAM aims to increase transparency and regularity in fuel cost reporting, potentially eliminating the need for fuel matters to be addressed in general rate applications.

86477Submission - Re: Rate Hearing Future Filing Requirements 2 passages
Re: Rate Hearing Future Filing Requirements: Board File P-886.2
Re: Rate Hearing Future Filing Requirements: Board File P-886.2 Please find attached the Submission of Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited ("SEB") with respect to the above noted matter. Although the...

AI summary Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited (SEB) submit comments on future rate case filing requirements, emphasizing the need for transparency, electronic formatting of documents, and the provision of complete work papers and calculations. They reference the Board's 2007 Rate Case Order and highlight concerns with NSPI's reluctance to provide electronic versions of the Cost of Service model.

SUMMARY OF SEB RECOMMENDATIONS
es. All supporting workpapers and calculations should also be provided. This information is required in order to - properly assess NSPI's calculations with respect to the overall revenue requirement. - 27. SEB submits: that NSPI be require...

AI summary SEB recommends that NSPI provide detailed financial and operational information during its application, including financial ratios, load forecast details, and breakdowns of OM&G costs, to ensure proper assessment of the revenue requirement and NSPI's financial condition.

86478Letter - Re: Rate Hearing - Future Filing Requirements 1 passage
Section 2
n a preliminary hearing on December 7, 2006 and an updated filing on January 8, 2007 (reference P-886 - letter from UARB dated December 8, 2006 regarding pre-hearing conference held December 7, 2006). The Nova Scotia Department of Energy s...

AI summary The Nova Scotia Department of Energy argues that updated fuel forecast and contractual commitment information from NSPI is necessary for setting accurate test year costs. This information should be provided shortly before a rate hearing.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →