HomeRate DesignM12829Evidence
Topic/Matter Intersection

Topic:"Rate Design" in M12829

Matter: NSPI DRO Appeal - Meter and Billing Issues - Jaspal SinghLinked to query Q05333
2 passages 1 document

Rate Design across all matters →

S-6NSPI (NSEB) RIR-1 to RIR-3 (redacted) 2 passages
REDACTED
REDACTED 1 for a 10-year certification period. Based on NS Power's meter certification 2 schedule, meter #2567965 is not due for recertification testing until April 2, 2035. 3 4 (g) NS Power can generally arrange for a meter to be removed...

AI summary The text discusses the recertification schedule for a specific meter, noting that it is not due for testing until 2035. It also outlines the timeframes for meter removal, submission for testing, and reporting of results. Additionally, it references a regulatory proceeding involving NSPI and the NSEB.

Section 7
3 (b) Although AMI meter communications and billing system functionality have been restored 4 as of March 31, 2026, interval usage data for the period from December 10 to December 5 31, 2025 is not available. Accordingly, NS Power is unabl...

AI summary NS Power is unable to provide Mr. Singh's actual electricity consumption for a specific billing period due to missing interval usage data. A confidential attachment has been removed, and the matter is part of an appeal before the Nova Scotia Energy Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →