REDACTED 1 for a 10-year certification period. Based on NS Power's meter certification 2 schedule, meter #2567965 is not due for recertification testing until April 2, 2035. 3 4 (g) NS Power can generally arrange for a meter to be removed...
AI summary The text discusses the recertification schedule for a specific meter, noting that it is not due for testing until 2035. It also outlines the timeframes for meter removal, submission for testing, and reporting of results. Additionally, it references a regulatory proceeding involving NSPI and the NSEB.