HomeRate DesignM12898Evidence
Topic/Matter Intersection

Topic:"Rate Design" in M12898

Matter: Nova Scotia Power Inc. - Distribution Routines CI Various- D055 – Planned Replacement of Deteriorated Equipment (ATO) - $11,359,8222025 ACE Plan – Routine Capital - Authorization to Overspend (ATO):Distribution Routines – Non-Confidential • D055 – Planned Replacement of Deteriorated Equipment: ATO amount $11,359,822
4 passages 2 documents

Rate Design across all matters →

N-2NSPI (CA) RIR 1 to 12 - Redacted 3 passages
REDACTED Distribution Routines ATO CA IR-5 Attachment 1 Page 8 of 67 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 16
REDACTED Distribution Routines ATO CA IR-5 Attachment 1 Page 8 of 67 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - 4.2 Notwithstanding anything contained herein, this Agreement in no way creates an exclusive arrangement between NSPI and th...

AI summary This section of the agreement outlines the non-exclusive nature of the arrangement between NSPI and the Service Provider, the conditions under which NSPI may procure services from other suppliers, and the governance structure for managing the agreement and services, including the designation of representatives for both parties.

9 SUBCONTRACTORS p. p. 16
9 SUBCONTRACTORS - 9.1 Where NSPI provides written consent to the Service Provider to subcontract any of the Services, such consent shall not to be unreasonably withheld, the Service Provider shall preserve and protect the rights of the Pa...

AI summary This section outlines the conditions under which NSPI may allow subcontracting of services. It requires the Service Provider to ensure that subcontractors adhere to the same terms and conditions as in the main agreement, including safety and environmental provisions, and maintain appropriate insurance coverage.

Section 205 p. p. 82
- 7. The Agreement is further amended, as of the Effective Date of this Third Amending Agreement by deleting line 2 of Table 6 found in Schedule "A": Storm Work and replacing it with an increase in the Distribution Storm Work (Hourly Rates...

AI summary The agreement is amended to adjust the hourly rate for a 2-person distribution storm crew, effective August 1, 2024, with a provision to match the prevailing rate in the Maritime Provinces if it exceeds the current CAUS storm contract rate.

N-3NSPI (NSEB) RIR 1 to 10 1 passage
as Attachment 1. p. p. 19
as Attachment 1. 1 Request IR-29: 2 3 Please describe whether and how each of the following is weighted in the criticality score: 4 5 (a) the number of customers; 6 7 (b) the load of customers; 8 9 (c) the performance standard. 10 11 Respo...

AI summary The response details how the criticality score for feeders is calculated, considering factors like the number of customers, load of customers, and performance standards. Each factor is weighted based on quintiles, with the highest scoring factor determining the overall criticality score for a feeder.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →