1 INTRODUCTION p. p. 4
1 INTRODUCTION IESO Nova Scotia was established under the More Access to Energy Act as the province's independent system operator, responsible for resource planning, including resource adequacy assessments, transmission planning, and procu...

AI summary IESO Nova Scotia, established under the More Access to Energy Act, is responsible for resource planning and transmission planning. This document outlines the inaugural 10-Year System Outlook, with filing requirements for the Load Forecast and 10YSO reports, previously managed by NS Power and now under IESO Nova Scotia.

3.2.3 NS Community Solar p. p. 13
3.2.3 NS Community Solar The Community Solar Program, administered by the Government of Nova Scotia, enables up to 100 MW of solar gardens developed by municipalities, First Nations, towns/townships and villages, business, co-operatives, c...

AI summary The Community Solar Program, managed by the Government of Nova Scotia, allows various entities to develop up to 100 MW of solar gardens. The first three approved projects are expected to begin commercial operations in Q3 2027.

3.2.6 Demand Response p. p. 14
3.2.6 Demand Response IESO Nova Scotia has included forecast increases in available demand response capacity, and its corresponding firm capacity contribution, in the 10-Year System Outlook Resource Plan in each year, as reflected in Table...

AI summary The 10-Year System Outlook Resource Plan includes forecast increases in demand response capacity from EfficiencyOne and NS Power's DSM programs. Contributions from E1's 2027-2031 DSM Plan and post-2031 capacity from E1's 2019 Potential Study are included, along with forecast contributions from NS Power's Critical Peak Pricing program.

Winter 2026/ 2027 2027/ 2028 2028/ 2029 2029/ 2030 2030/ 2031 2031/ 2032 2032/ 2033 2033/ 2034 2034/ 2035 2035/ 2036 p. pp. 18-19
Winter 2026/ 2027 2027/ 2028 2028/ 2029 2029/ 2030 2030/ 2031 2031/ 2032 2032/ 2033 2033/ 2034 2034/ 2035 2035/ 2036 1 Load Forecast 2 System Peak (with DSM) 2,497 2,526 2,549 2,563 2,593 2,620 2,652 2,689 2,730 2,765 3 Interruptible Load...

AI summary The table presents a 10-Year System Outlook (10YSO) with load forecasts, system peak, required capacity, existing and new firm resources, retirements, and reserve margin percentages for various years from 2026/2027 to 2035/2036. It outlines the capacity additions and retirements, including wind, storage, and coal-to-gas conversions, along with the resulting reserve margins.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →