HomeRate DesignM12947Evidence
Topic/Matter Intersection

Topic:"Rate Design" in M12947

Matter: NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell
2 passages 2 documents

Rate Design across all matters →

W-3DRO Decision d. June 26, 2026 (redacted) 1 passage
meter test by Measurement Canada if the Customer wishes to have an independent meter test performed
meter test by Measurement Canada if the Customer wishes to have an independent meter test performed I Instructed N.S.Power to test your serving meter for accuracy measuring both that generated and delivered to the network and that consumed...

AI summary The document discusses the results of a meter test conducted by N.S. Power on meter #2291261, confirming it operates within prescribed accuracy limits. It outlines the net metering service and the responsibilities of N.S. Power versus the customer. The final decision by the Dispute Resolution Office (DRO) is provided, along with appeal options to the Nova Scotia Energy Board.

W-6NSPI Response to Appeal (redacted) 1 passage
Section 1 p. p. 0
PO Box 910 Halifax, Nova Scotia Canada B3J July 17, 2026 REDACTED Lisa Wallace Chief Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: M12947– DRO Appeal – Bernard Wentzell Dear Ms. Wall...

AI summary This letter from Lisa Wallace, Chief Clerk of the Board, directs Nova Scotia Power Inc. to respond to an appeal by Bernard Wentzell regarding a Dispute Resolution Officer (DRO) decision from June 26, 2026. The appeal concerns the accuracy of solar array generation and charges/credits under the net metering program.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →