N-1CI C0086325 – Maritime Launch Services - Application - Redacted
1 passage
4.5 Power Factor Should the customer utilize a Rate with a demand charge based on kW of Maximum Demand, the power factor of their load facility must be at least 90% per Regulation 4.7. NSPI's Rates and Regulations can be found on the [www....
AI summary The section discusses power factor requirements for customers on different rate structures. Customers using a demand charge based on kW must maintain a power factor of at least 90%, while those on kVA-based rates are not required to improve power factor. Installing power factor correction capacitors can also help improve voltage at the MLS Spaceport site.
103795Letter NSPI re: Capital Items Filed Outside the Quarter Package & Request for Confidentiality
1 passage
Commercial Information Items 2, 3 and 4: Partial confidentiality was applied to costs associated with materials, contracts, freight postage delivery, application software, consulting, and sustaining operating cost details provided in the c...
AI summary NS Power argues that keeping certain cost details confidential protects customer interests by preventing competitors from gaining advantages and ensuring competitive pricing. This is particularly important as customer rates are based on costs, and transparency could lead to higher prices and reduced competition.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →