100570Board Decision & Order
6 passages
The Board approves the application and orders the following: 1. A 2023 General Rate Application Deferred Revenue Rider for the Domestic Service (including Domestic Time of Day and Net Metering); Small General Service, and General Service r...
AI summary The Board has approved a 2023 General Rate Application Deferred Revenue Rider for specific rate classes, effective from January 1, 2026, to December 31, 2027, including adjustments for Domestic Service, Small General Service, General Service, and Town Street Lighting.
Rate Class 2026 2027 Domestic 0.5289 cents/kWh 0.5289 cents/kWh Small General 0.4866 cents/kWh 0.4866 cents/kWh General 0.3572 cents/kWh 0.3572 cents/kWh LED 50-watt $0.92/month $0.92/month LED 53-watt $0.98/month $0.98/month LED 83-watt $...
AI summary The document provides the approved schedule of electricity rates for 2026 and 2027, including specific rates for different rate classes and LED wattage tiers. These rates are approved by the regulatory body for implementation starting January 1, 2026.
Town Street Lighting Lamp type and Rating $/Month LED, 50 watt $19.84 LED, 53 watt $20.28 LED, 83 watt $23.64 Availability: The above rates are applicable to street lighting supplied to the Town of Mahone Bay. They include supply and insta...
AI summary The document provides monthly costs for different LED lamp types used in town street lighting in Mahone Bay, including installation, power, and maintenance for approximately 4,000 hours of annual operation.
2023 General Rate 5.526 cents per kilowatt hour for service from January 1, 2026, Application Deferred 2026,to December 31, 2027. Converted to a flat monthly amount, 2026 Revenue Rider: this equates to $0.92/month for LED 50 watt, $0.98/mo...
AI summary The 2023 General Rate application for a 5.526 cents per kilowatt hour rate from January 1, 2026, to December 31, 2027, has been deferred. The rate is converted to a flat monthly amount, with specific figures provided for different LED wattages.
NET METERING RATE Eligible customers will be billed under the otherwise-applicable metered rates. The service is applicable at the option of the customer to any metered electric service accounts which are electrically connected to the Util...
AI summary Eligible customers can opt into net metering rates, which apply to their metered electric service accounts connected to the Utility's distribution system and owned by the same customer.
2023 General Rate Application Deferred 0.5289 cents per kilowatt hour for service from January 1, 2026 Revenue Rider: to December 31, 2027
AI summary The application for a rate increase is deferred, with a proposed rate of 0.5289 cents per kilowatt hour for service from January 1, 2026, to December 31, 2027.
100570Board Decision & Order
5 passages
The Board approves the application and orders the following: 1. A 2023 General Rate Application Deferred Revenue Rider for the Domestic Service (including Domestic Time of Day and Net Metering); Small General Service, and General Service r...
AI summary The Board has approved a 2023 General Rate Application Deferred Revenue Rider for specific rate classes, effective from January 1, 2026, to December 31, 2027, including adjustments for Domestic Service, Small General Service, General Service, and Town Street Lighting.
Rate Class 2026 2027 Domestic 0.5289 cents/kWh 0.5289 cents/kWh Small General 0.4866 cents/kWh 0.4866 cents/kWh General 0.3572 cents/kWh 0.3572 cents/kWh LED 50-watt $0.92/month $0.92/month LED 53-watt $0.98/month $0.98/month LED 83-watt $...
AI summary The document presents the approved Schedule of Rates for Electric Supply and Services, effective from January 1, 2026, with no changes in rates between 2026 and 2027 across various rate classes.
Town Street Lighting Lamp type and Rating $/Month LED, 50 watt $19.84 LED, 53 watt $20.28 LED, 83 watt $23.64 Availability: The above rates are applicable to street lighting supplied to the Town of Mahone Bay. They include supply and insta...
AI summary The document provides a table of monthly costs for different LED lamp types used in town street lighting in Mahone Bay. The rates include supply, installation, power, energy for 4,000 hours of annual operation, and ordinary repair and maintenance costs.
2023 General Rate 5.526 cents per kilowatt hour for service from January 1, 2026, Application Deferred 2026,to December 31, 2027. Converted to a flat monthly amount, 2026 Revenue Rider: this equates to $0.92/month for LED 50 watt, $0.98/mo...
AI summary The 2023 General Rate application for 5.526 cents per kilowatt hour, effective from January 1, 2026, to December 31, 2027, has been deferred. The rate is converted to a flat monthly amount, with specific figures provided for different LED wattages as part of the 2026 Revenue Rider.
2023 General Rate Application Deferred 0.5289 cents per kilowatt hour for service from January 1, 2026 Revenue Rider: to December 31, 2027
AI summary The application for a rate increase has been deferred, with a proposed rate of 0.5289 cents per kilowatt hour for service from January 1, 2026, to December 31, 2027. A revenue rider is associated with this deferred application.