Table 1: Fixed Price Breakdown TASK COST Project Management & Coordination Engineering Drawings TOTAL REDACTED C0059483 NSEB IR-3 Attachment 1 Page 5 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED)
AI summary The text presents a redacted table titled 'Fixed Price Breakdown' with categories such as Project Management & Coordination, Engineering, and Drawings, but no specific details are provided due to redaction. The document is part of a regulatory proceeding and includes a page number and confidentiality notice.
PROJECT : L5017 and L5046 Modifications Prepared by y M. LeBlanc Client Ref.: Client: NSPI CIMA File: 00012232 Checked by Checked by D. Lamont Date: 2025-05-06 Rev.: Rev. 0 0111211110 1 00012202 LOT NUMBER DESCRIPTION Hours $ LOT 600 Coord...
AI summary The document outlines the costs associated with project modifications L5017 and L5046, detailing various tasks such as coordination, engineering, and drawings, with a total of 420 hours and expenses. It includes information about the client, NSPI, and CIMA, and is part of a confidential attachment.