N-1CI 49595 – HYD Tusket Unit 1 Overhaul - Application - Redacted
13 passages
FIRM PROPOSAL QUOTE: Q2891 R1 DATE: October 28, 2025 PREPARED FOR: Nova Scotia Power Inc. [CUSTOMER] ATTENTION TO: Ainslee Walker (902) 717-3202 [RECIPIENT] Procurement Specialist [email protected]
AI summary This document is a firm proposal prepared for Nova Scotia Power Inc., addressed to Ainslee Walker, the Procurement Specialist. It includes a quote reference and contact details for the recipient.
The following commercial documents, amendments, and addenda issued to date by the CONTRACTOR have been included as supplemental for consideration with this proposal. FILENAME FILETYPE REVISION Norcan Hydraulic Turbine Inc - Goods and Servi...
AI summary The document lists commercial documents, amendments, and addenda issued by the CONTRACTOR for consideration with a proposal, including files related to hydraulic turbine agreements and rate documents for 2025 and 2026.
Field Service Notes: - 1. Pricing shown is ESTIMATED. Actual invoices will be prepared on a T&M basis supported by the signed Daily Timesheets. - 2. No proposed schedule dates shall be considered Firm until a PO or credit card authorizatio...
AI summary The field service notes outline that pricing is estimated and actual invoices will be based on time and materials with signed daily timesheets. Proposed schedule dates are not considered firm until a purchase order or credit card authorization is received.
6.1 Prices/Rates. - Unless the Contract says otherwise, the prices, Software license fees and rates: - a) are fixed for Goods, Documentation and Software licenses delivered and for Services performed within the period(s) stated in the Cont...
AI summary The section outlines pricing and rate terms for goods, software licenses, and services, specifying that prices are fixed for the duration of the contract and that taxes, duties, and other charges are excluded unless an exemption is provided by the customer.
6.2 Payment Terms. - a) Unless the Contract says otherwise, Customer will pay Emerson: - (i) in full without set-off, counterclaim or withholding (except deductions required by Law); - (ii) in the currency of Emerson's quotation; and - (ii...
AI summary The payment terms outline the obligations of the Customer and Emerson regarding invoicing, payment methods, dispute resolution, and consequences for non-payment. Key points include full payment without set-off, invoicing on delivery or completion, and Emerson's right to suspend performance for non-payment.
Terms of Quotation and Sale - Goods & Services 9.3 Termination after 90 Days' Force Majeure . Either party may end the Contract without liability by written notice to the other if performance of the Contract is delayed or prevented by a ca...
AI summary This clause outlines the termination rights of either party in the event of a 90-day force majeure delay, allowing termination without liability. The customer remains responsible for payment for delivered goods, documentation, software licenses, and services rendered before termination.
16. Limitation of Liability - 16.1 EMERSON AND ITS AFFILIATES WILL NOT BE LIABLE FOR DAMAGES CAUSED BY DELAY IN PERFORMANCE. THE REMEDIES OF CUSTOMER STATED IN THIS CONTRACT ARE EXCLUSIVE. REGARDLESS OF THE TYPE OF THE CLAIM (WHETHER BASED...
AI summary This section limits Emerson and its affiliates' liability for damages caused by delays in performance, data loss, cyber attacks, and consequential damages. It also sets a two-year statute of limitations for any claims arising from the contract.
Date: 17-Apr-26 PROJECT TITLE QUOTE # EXPIRATION DATE Tusket GS Engineering Design Scope of Work 26025 17-May-26 LINE # DESCRIPTION QTY UNIT PRICE (CAD) LINE TOTAL (CAD) 1 Engineering Design Scope of Work per Tusket 1 Overhaul Total Estima...
AI summary The document is a quotation for engineering design work related to the Tusket GS Engineering Design Scope of Work, with details on payment terms, attachments, and a budgetary estimate. The quotation is prepared by Bruno Cestra and is valid until 17-May-26.
REDACTED CI 49595 Attachment 7 Page 2 of 8 Item Drawings Dwg & QA Review As found QA As built QA Technical support Column1 SR Eng Jr Eng total Third party comments Stuffing Box 16 4 4 4 4 24 28 Turbine Bearing LV Staves 8 2 2 2 2 12 14 Hea...
AI summary The document contains a table outlining project details for a 2026 project, including itemized breakdowns of drawings, quality assurance reviews, and technical support requirements, along with hourly rates for technical and trades staff. It provides an overview of labor and resource allocation for a specific project.
FARO Rates 2026 DESCRIPTION HOURLY RATES Time Overtime MEASUREMENTS Laser tracker and one operator Laser tracker, one operator and a helper Report writing/CAD Threaded/epoxy or weld-on stainless steel monuments OTHER CHARGES Employee trave...
AI summary The document outlines hourly and overtime rates for various services and charges related to the FARO Rates 2026, including measurement tasks, report writing, and travel expenses. It includes details on employee travel time, night shift premiums, and transportation and equipment shipping costs.
- 1. "Time" (straight time) shall be the rate charged for "Regular Working Hours" defined as the first 8 hours of work on all regular working days (excluding Saturdays, Sundays and Statutory Holidays). - 2. Overtime" shall apply to all wor...
AI summary The text outlines definitions and rates for time-based billing, including regular working hours, overtime, standby time, and minimum charges. It also notes that taxes are additional to quoted fees.
Environmental conditions may affect the accuracy and operation of the FARO laser tracker. Please consult with Hydro Tech personnel regarding application. Approved By: Date: Romer Arm Rates 2026 DESCRIPTION HOURLY RATES Time Overtime MEASUR...
AI summary The document discusses environmental conditions affecting the FARO laser tracker's accuracy and operation, advising consultation with Hydro Tech personnel. It includes a table of hourly rates for Romer arm services in 2026, covering measurements, report writing, and additional charges such as travel and equipment shipping.
- 1. "Time" (straight time) shall be the rate charged for "Regular Working Hours" defined as the first 8 hours of work on all regular working days (excluding Saturdays, Sundays and Statutory Holidays). - 2. "Overtime" shall apply to all wo...
AI summary The text defines time-based rates for work, distinguishing between regular working hours, overtime, and standby time. It also mentions that taxes are additional and notes environmental conditions may affect equipment performance. The document is approved by an unspecified party.