Topic/Matter Intersection

Topic:"Regulatory Approval Processes" in M03669

Matter: E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year.  (Also see Matter Nos. M04538 and M04539)
71 passages 29 documents

Regulatory Approval Processes across all matters →

E-1Evidence - 2012 DSM Plan 2/28/2011 7 passages
1.1 ENSC Startup and Transition of DSM Administrator Responsibilities in 2010 p. p. 3
1.1 ENSC Startup and Transition of DSM Administrator Responsibilities in 2010 On January 22, 2010, the Governor in Council proclaimed the Efficiency Nova Scotia Corporation Act 1 (ENSC Act) that established ENSC as the province's new elect...

AI summary In 2010, Efficiency Nova Scotia Corporation (ENSC) was established as the new DSM program administrator under the ENSC Act. ENSC transitioned responsibilities from NSPI, with a Transition Committee and plan approved by UARB. The transition, completed by December 31, 2010, ensured continuity in DSM program management and delivery.

1.3 Development of the 2012 DSM Plan p. pp. 4-6
1.3 Development of the 2012 DSM Plan To aid in the preparation of the 2012 DSM Plan, ENSC developed guiding principles, which are presented in Section 6. ENSC received the advice and assistance of Navigant Consulting Inc. (Navigant) and Du...

AI summary ENSC developed the 2012 DSM Plan with stakeholder input, consulting Navigant and Dunsky. Meetings with DSM experts and stakeholders were held in 2010-2011. A Board order (NSUARB 153) acknowledged the PDWG's role during the ENS transition. The plan's development emphasized stakeholder engagement and regulatory alignment.

3. 2011 DSM PLAN p. pp. 11-12
3. 2011 DSM PLAN The UARB approved the 2011 DSM Plan on July 27, 2010. 10 The 2011 DSM programs are underway, and will grow and evolve during the year, providing momentum and insights that will guide detailed program development for 2012....

AI summary The UARB approved the 2011 DSM Plan on July 27, 2010, which includes three pilot programs: Fuel Substitution, Green Schools, and Eco Home. ENSC is implementing these programs, with ongoing development expected to inform 2012 initiatives.

5.4 Allocation of DSM Program Costs Among Rate Classes p. p. 20
5.4 Allocation of DSM Program Costs Among Rate Classes Appendix B contains a preliminary estimate of the proposed 2012 DSM program costs to 1 be allocated among rate classes. The preliminary allocation uses the methodology approved by the...

AI summary The document discusses the allocation of 2012 DSM program costs among rate classes, referencing the methodology approved by the UARB in its 2010 DSM Plan Decision.

10. PERFORMANCE-BASED APPROACH p. pp. 29-31
10. PERFORMANCE-BASED APPROACH The creation of ENSC flows from the recommendations of a stakeholder consultation process facilitated by Dr. David Wheeler. 17 The final report resulting from this process envisioned a performance-driven over...

AI summary The document discusses the creation of ENSC based on a stakeholder consultation process led by Dr. David Wheeler, proposing a performance-based oversight mechanism for energy and demand savings. This model would shift regulatory focus from annual filings to multi-year frameworks, similar to those used in Vermont, with the UARB's role evolving to evaluate and verify performance.

IMPLICATIONS FOR THE 2012 PLANNING PROCESS p. p. 116
IMPLICATIONS FOR THE 2012 PLANNING PROCESS As DSM efforts are fully transferred from NSPI to ENSC, ENSC will also take on responsibility for preparing and filing its 2012 DSM Plan with the UARB. The plan must be filed by February 28th, 201...

AI summary As DSM efforts transition from NSPI to ENSC, ENSC will prepare and file its 2012 DSM Plan with the UARB by February 28th, 2010. The proposal suggests a 'business as usual' approach with minor changes to the planning framework and clarification of DSM savings targets, budgets, and attribution. A new performance framework for 2013 and beyond is also recommended.

POST-2012 FRAMEWORK CHANGES p. p. 116
POST-2012 FRAMEWORK CHANGES Within or in parallel with the 2012 DSM Plan filing, we suggest that ENSC petition the UARB to hold a broader discussion on a new framework for DSM planning post-2012. This would be an opportunity for ENSC, the...

AI summary The text suggests that ENSC should petition the UARB to initiate a broader discussion on a new framework for DSM planning post-2012. This would involve developing a multi-year, performance-based oversight process, streamlining oversight, and creating a long-term savings attribution and reporting framework. These discussions should be completed ahead of the 2013 regulatory proceeding.

E-6ENSC (EAC) IR-1 to IR-43 (Revised April 6, 2011) 3/29/2011 1 passage
Introduction p. p. 253
, 61st General Assembly, NS 2009 (assented to 5 November 2009, c. 3), NSPI and the Administrator are required to enter into a transition plan which pursuant to section 42 must be approved by the UARB. It is appropriate that the collaborati...

AI summary The document discusses the transition plan required by the 61st General Assembly of Nova Scotia in 2009, involving NSPI and the Administrator, which must be approved by the UARB. Stakeholder NPB provided suggestions for the Action Plan, including adding 'and interested parties' in various sections and sharing transmission planning information through annual filings and technical conferences.

E-7ENSC (Multeese) IR-1 to IR-31 3/29/2011 8 passages
Formal Investigation p. p. 47
Formal Investigation - The investigator(s) will interview the complainant, the respondent, and any witnesses, and will review relevant documentation. - The investigator(s) must complete their investigation and file a report of their findin...

AI summary The formal investigation process involves interviewing the complainant, respondent, and witnesses, and reviewing documentation. The investigator(s) must complete the investigation and submit a report to the CEO and Advisor within 30 working days, with possible extensions approved by the Board.

► Decision p. p. 47
► Decision • Within 15 working days of receiving the investigator's report, the CEO determines on the basis of the investigator's report what action, if any, including appropriate disciplinary action, is to be taken. - The CEO may seek the...

AI summary The decision outlines the process for the CEO to take action based on an investigator's report, including disciplinary actions and workplace restoration measures. The CEO is required to consult with the Advisor and Head of Human Resources, and report findings to the Board.

▶ Employee p. p. 47
▶ Employee A person who has an employment contract or letter of employment with Efficiency Nova Scotia Corporation. Upon Board decision, an individual who does not have an employment contract or letter of employment may be considered an em...

AI summary An employee of Efficiency Nova Scotia Corporation is defined as someone with an employment contract or letter of employment. Under a Board decision, individuals without such contracts may also be considered employees for the purposes of this policy.

7.6 Voting p. p. 47
7.6 Voting 7.6.1 Unless otherwise provided herein, matters arising at any meeting of the Board shall be decided by a majority of votes. Only Board members present in person or by teleconference may vote and no Board member may vote or be r...

AI summary This section outlines the voting procedures for the Board, specifying that decisions are made by a majority vote, the use of ballots upon demand, and the Chair's role in breaking ties. It also states that the Chair's declaration of a resolution's passage is considered prima facie evidence.

13. NOTICE p. p. 47
13. NOTICE 13.1.1 Whenever written notice is required to be given to any person, it may be given to such person, either personally or by sending a copy thereof through the mail, by fax, or by email, charges prepaid, to his or her address a...

AI summary This section outlines the procedures for providing written notice to individuals, specifying that it can be delivered personally or via mail, fax, or email, with charges prepaid, to the address on file with the Corporation or provided by the individual.

14. AMENDMENTS p. p. 47
14. AMENDMENTS 14.1.1 These bylaws may be altered, amended or repealed by Special Resolution of the Board.

AI summary This section outlines that the bylaws can be altered, amended, or repealed through a Special Resolution of the Board.

Telephone conversation with Colleen, OPA, November 8, 2010. p. p. 205
Telephone conversation with Colleen, OPA, November 8, 2010. 1 Request IR-14: 2 3 With respect to page 29, lines 20 – 21, 4 a) Please clarify what ENSC means by the phrase "further assess the options for 5 implementing such a model". Is the...

AI summary The text includes a request and response regarding the implementation of a model and engagement with the UARB. ENSC recommends assessing both the model and its implementation strategy, proposing a stakeholder forum or workshop in 2011 to consider performance-based approaches and multi-year frameworks.

1 Request IR-21: p. p. 229
1 Request IR-21: 2 3 With respect to Appendix A, page 17, lines 5 – 7, 4 5 a) Please provide examples of "new program titles" that are currently being 6 considered. 7 8 b) If transition to the new titles begins in 2011, why are they not be...

AI summary The document discusses responses to requests regarding program titles in the DSM Plan and the limitations of the current regulatory model. It explains that new program titles are being developed and will be adopted in the 2013 plan, and highlights how the current regulatory framework may hinder flexibility in program delivery.

E-8ENSC (NPB) IR-1 to IR-11 3/29/2011 1 passage
1
1 Peak Annual Present Program Air Receiver / Tank for Screw Compressor 10 2,823 11,883 $96 $12,951 $1,515 6.9 $0.13 $0.018 Air-Entraining Air Nozzle 15 175 736 $14 $1,044 $94 9.5 $0.13 $0.014 Air Compressor Cycling Air Dryer 10 850 2,682 $...

AI summary The document contains a table outlining various equipment costs and a request for clarification on performance-based mechanisms for a non-profit entity. It also includes a response confirming the consideration of subsidy-free financing options. The discussion relates to regulatory processes and energy efficiency programs.

E-10Evidence of George Foote on behalf of CA 4/8/2011 2 passages
2012 DSM PLAN TARGETS AND SPENDING
2012 DSM PLAN TARGETS AND SPENDING - Q. Please summarize your conclusions and recommendations with regard to the proposed - budget, energy savings targets and programs for DSM for the year 2012. - A. While somewhat ambitious, the proposed...

AI summary The 2012 DSM Plan's $43.7M budget is deemed ambitious but aligned with historical ratepayer benefits. Concerns include rising cost-per-MW savings ($352 vs. $264 in 2011) and the need for ENSC to justify increased targets due to capacity/emission constraints. The 2009 Integrated Resource Plan's targets are suggested as a guide, while challenges in integrating multi-fuel DSM programs are highlighted.

Q. Does the reporting of savings from outside 2012 DSM Programs raise any concerns?
Q. Does the reporting of savings from outside 2012 DSM Programs raise any concerns? - Previous DSM plans relied exclusively on customer-funded, incentive-based DSM programs to - meet IRP targets. In 2012, ENSC is recording incremental ener...

AI summary The reporting of savings from outside 2012 DSM programs is discussed, referencing the 2009 IRP Update Report which allows inclusion of non-program savings. Concerns include lack of criteria for verifying such savings, potential erosion from industrial efficiency projects, and ensuring ENSC's spending is justified. Savings from non-program sources may reduce new generation needs and aid environmental targets.

E-12Evidence of Mel Whalen, Multeese Consulting, Board Consultant 4/8/2011 1 passage
5 WHAT ARE YOU CONCLUSIONS?
5 WHAT ARE YOU CONCLUSIONS? - 7 My conclusions are as follows: - 8 a) With the exception of one new program and the addition of new enabling 9 strategies, the DSM programs proposed for 2012 are expanded continuations of 10 programs previou...

AI summary The 2012 DSM programs are largely continuations of prior approved programs but require adjustments due to lower projected savings. Key approvals include program structure changes, stakeholder engagement, and alignment with IRP. Evaluations of past programs have been implemented to improve effectiveness.

E-13Evidence of Tim Woolf, Synapse Energy Economics Inc., Board Consultant 4/8/2011 1 passage
TESTIMONY
Mississippi Public Service Commission (Docket No. 96-UA-389). Oral testimony on generation pricing and performance-based ratemaking. On behalf of the Mississippi Attorney General. February 16, 2000. Delaware Public Service Commission (Dock...

AI summary The text contains multiple testimonies from various public service commissions and regulatory bodies across the United States, discussing topics such as generation pricing, system reliability, standard offer services, codes of conduct, energy efficiency plans, and merger requests. These testimonies were provided on behalf of different organizations and legal representatives.

E-17NPB Opening Statement 4/18/2011 2 passages
Section 1
OPENING STATEMENT OF NEWPAGE PORT HAWKESBURY CORP. AND BOWATER MERSEY PAPER COMPANY LTD. Mr. Chair, Board Members, as you are aware, NewPage Port Hawkesbury Corp. and Bowater Mersey Paper Company Limited (NPB) are NSPI's two largest custom...

AI summary NewPage Port Hawkesbury Corp. and Bowater Mersey Paper Company Ltd., NSPI's largest customers, support ENSC's 2012 DSM Plan, which exceeded 2009 IRP savings targets while minimizing rate increases. They commend the collaborative stakeholder process and Board's timetable for the proceeding.

Section 2
so understands that this proposed level of DSM investment is broadly supported by other ratepayer representatives including the Consumer Advocate, the Avon Group, and the Municipal Electric Utilities. As a result, following our review of t...

AI summary NPB initially planned to avoid participating in the hearing but changed course after intervenor evidence suggested increasing ENSC's 2012 DSM spending. NPB supports cost-effective DSM but notes the plan already exceeds 2009 IRP targets. Both Bowater and NewPage have conducted internal energy initiatives beyond ratepayer-funded programs.

E-19Proof of Advertising 4/18/2011 7 passages
AND IT IS FURTHER ORDERED that notice of this hearing be given, in a form to be approved by the Board, by publishing it in accordance with the following schedule: p. p. 2
AND IT IS FURTHER ORDERED that notice of this hearing be given, in a form to be approved by the Board, by publishing it in accordance with the following schedule: Halifax Chronicle-Herald November 10, 2010 November 2010 17, November 20,201...

AI summary The document outlines an order requiring the publication of notice for a hearing in Halifax and Cape Breton, Nova Scotia, on specific dates in November 2010, as approved by the Board.

Fence p. p. 2
Fence Diver meident who in River resident who invented the ElectroBraid and sold the rights to Bryson before setting up a competing company. That dispute concluded before the courts recently with E.B.F Manufacturing receiving permis-sion t...

AI summary ElectroBraid faces financial challenges, including a $452,000 debt dispute with White, layoffs due to surplus inventory, and a proposal to creditors for payment deferrals. The company seeks restructuring, including offshore manufacturing, and claims creditor support for its plan. Legal and financial proceedings involve the Nova Scotia Supreme Court.

BRIEFLY p. p. 3
er quality and improve water flow throughout the distribution system. The flushing program is conducted twice a year and also includes inspection and testing of hydrants. Water Utility thanks you for your patience NOVA SCOTIA'S ELECTRICITY...

AI summary The Nova Scotia Utility and Review Board is conducting a hearing for Efficiency Nova Scotia Corporation's 2012 Electricity Demand Side Management Plan. The proceeding includes dates, location, and mentions a separate water utility flushing program.

Nexen wants partners for developing shale lands p. p. 4
rocess of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process of process o...

AI summary The document outlines procedural details for a regulatory proceeding, including deadlines for written comments (April 7, 2011) and an invitation for offers to purchase Schaffner Enterprises Limited's assets. It mentions evening sessions for presentations and stakeholder engagement processes.

NOVA SCOTIA UTILITY AND REVIEW BOARD p. p. 5
NOVA SCOTIA UTILITY AND REVIEW BOARD NOVA SCOTIA POWER INC. REGULATION 3.6 – NET METERING Notice Is hereby given that Nova Scotia Power Incorporated Notice is hereby given that Nova Scotia Power Incorporated ("PISPT) has more an Applicatio...

AI summary Nova Scotia Power Inc. has applied to amend Regulation 3.6 – Net Metering to enhance the service, comply with recent legislative changes, and provide for expanded customer capacity, aggregated metering, and payment for annual success generation. The Board will issue directions on the application and pre-filed evidence is available for review.

Fed chairman also issues warning to China p. p. 6
hat "wherever it's possible ... the support or growth is still the support to growth is still something which is absolutely necessary." NOVA SCOTIA UTILITY AND REVIEW BOARD NOTICE OF PUBLIC HEARING

AI summary The Nova Scotia Utility and Review Board issues a notice of public hearing, indicating that support for growth remains absolutely necessary despite challenges.

NOTICE OF PUBLIC HEARING NOVA SCOTIA'S ELECTRICITY DEMAND SIDE MANAGEMENT PLAN FOR 2012 p. p. 7
NOTICE OF PUBLIC HEARING NOVA SCOTIA'S ELECTRICITY DEMAND SIDE MANAGEMENT PLAN FOR 2012 otice is hereby given that the Nova Scotta Utility and Review Board ("the is increasy givent that one nova occura uturity and newtew bit owition of a h...

AI summary This document is a notice of a public hearing for Nova Scotia's Electricity Demand Side Management Plan for 2012. The hearing will take place on April 15 and 18, 2011, with details provided on how individuals can participate, including filing notices, submitting evidence, and making written comments.

E-24SNPI Responses to UARB Undertakings (U-1 and U-2) from NSPI DSM Plan for 2011 Hearing 4/18/2011 2 passages
NSP! Application to Approve Nova Scotia's Electricity Demand Side Management Plan for 2011 (NSUARB P-884(3» NSPI Responses to UARB Undertakings
NSP! Application to Approve Nova Scotia's Electricity Demand Side Management Plan for 2011 (NSUARB P-884(3» NSPI Responses to UARB Undertakings

AI summary Nova Scotia Power (NSP) seeks approval for its 2011 Electricity Demand Side Management Plan, with NSPI responding to undertakings by the Utility and Review Board (UARB). The proceeding involves regulatory review of demand-side management initiatives and compliance with undertakings.

NSPI Application to Approve Nova Scotia's Electricity Demand Side Management Plan for 2011 (NSUARB P-884(3» NSPI Responses to UARB Undertakings
NSPI Application to Approve Nova Scotia's Electricity Demand Side Management Plan for 2011 (NSUARB P-884(3» NSPI Responses to UARB Undertakings

AI summary NSPI seeks regulatory approval for Nova Scotia's 2011 Electricity Demand Side Management Plan, responding to UARB undertakings. The proceeding involves the Utility and Review Board's oversight of energy efficiency initiatives.

05676Hearing Order 11/4/2010 2 passages
ORDER
ORDER IT IS ORDERED that a hearing respecting an application by Efficiency Nova Scotia Corporation ("ENSC") for approval of its Electricity Demand Side Management Plan for 2012 be conducted by the Nova Scotia Utility and Review Board ("Boa...

AI summary The Nova Scotia Utility and Review Board has ordered a hearing for Efficiency Nova Scotia Corporation's 2012 Electricity Demand Side Management Plan. The hearing is scheduled to begin on April 18, 2011, with a detailed timetable provided for filing documents and stakeholder sessions.

AND IT IS FURTHER ORDERED that notice of this hearing be given, in a form to be approved by the Board, by publishing it in accordance with the following schedule:
AND IT IS FURTHER ORDERED that notice of this hearing be given, in a form to be approved by the Board, by publishing it in accordance with the following schedule: Halifax Chronicle-Herald November 10,2010 November 2010 17, November 20, 201...

AI summary The document outlines the scheduling of notice for a hearing, to be published in specified newspapers according to a defined timeline. The notice must be approved by the Board and published in accordance with the schedule provided.

07313Board Order 6/30/2011 1 passage
IN THE MATTER OF THE EFFICIENCY NOVA SCOTIA CORPORATION ACT
IN THE MATTER OF THE EFFICIENCY NOVA SCOTIA CORPORATION ACT - and- IN THE MATTER OF AN APPLICATION by EFFICIENCY NOVA SCOTIA CORPORATION for Approval of its Electricity Demand Side Management Plan for 2012 BEFORE: Peter W. Gurnham, a.c., C...

AI summary The document outlines an application by Efficiency Nova Scotia Corporation for approval of its 2012 Electricity Demand Side Management Plan, heard before a three-member board including Peter W. Gurnham, Kulvinder S. Dhillon, and Roberta J. Clarke.

07314Board Decision 6/30/2011 6 passages
IN THE MATTER OF THE EFFICIENCY NOVA SCOTIA CORPORATION ACT p. p. 0
IN THE MATTER OF THE EFFICIENCY NOVA SCOTIA CORPORATION ACT - and- IN THE MATTER OF AN APPLICATION by EFFICIENCY NOVA SCOTIA CORPORATION for Approval of its Electricity Demand Side Management Plan for 2012 BEFORE: Peter W. Gurnham, a.c., C...

AI summary The document outlines a regulatory proceeding involving Efficiency Nova Scotia Corporation's application for approval of its 2012 Electricity Demand Side Management Plan. The proceeding includes counsel from the corporation, consumer advocates, the Ecology Action Centre, Nova Scotia Power Inc., and municipal representatives. The case is before a regulatory board chaired by Peter W. Gurnham.

NOVA SCOTIA DEPARTMENT OF ENERGY, NOVA SCOTIA ENVIRONMENT AND CONSERVE NOVA p. p. 0
NOVA SCOTIA DEPARTMENT OF ENERGY, NOVA SCOTIA ENVIRONMENT AND CONSERVE NOVA SCOTIA Mark V. Rieksts, LL.B. Richard Penny Nancy Rondeaux NEWPAGE PORT HAWKESBURY CORP. and BOWATER MERSEY PAPER COMPANY LIMITED David MacDougall, LL.B. James Mac...

AI summary The Nova Scotia regulatory proceeding involved an application approved by the Board on June 30, 2011, following hearings on April 18-19, 2011, and final submissions on May 20, 2011. Board counsel and consultants provided input, with directions issued for future filings.

[11 ] The relevant provisions of the ENSC Act are: p. p. 0
, by letter dated September 22, 2010, which provided: The Board has carefully reviewed the DSM Transition Plan and grants approval to proceed with implementation, subject to the following directives: - a) The DSM Transition Committee is to...

AI summary The Board approved the DSM Transition Plan with specific directives, noting ENSC's compliance and the evaluation of the 2010 DSM Report and SVS. The 2012 DSM Plan is under consideration, with stakeholders generally supportive of the transition and existing DSM efforts.

5.5.1 Findings p. p. 0
5.5.1 Findings [125] The Board understands that ENSC's mandate is being expanded to manage non-electricity efficiency programs. Some transition is already underway and formal negotiations are to be concluded in the near future. ENSC, at th...

AI summary The Board acknowledges ENSC's expansion into managing non-electricity efficiency programs and notes the lack of a formal policy to track time and costs. Intervenors are concerned about delays and potential cross-subsidization, prompting the Board to order ENSC to develop and file a policy by September 30, 2011.

5.6 Multi Year Performance Based Model ("PBM") p. p. 0
5.6 Multi Year Performance Based Model ("PBM") [127] ENSC seeks Board approval to engage stakeholders to assess the use of a Performance Based Model ("PBM") for future submissions to the Board. ENSC stated that: Under such a multi-year, pe...

AI summary ENSC seeks Board approval to engage stakeholders in assessing a multi-year, performance-based model (PBM) for future submissions. The model would shift regulatory oversight from preapproving annual DSM plans to approving overall investments and savings targets, followed by performance review and validation.

[128] The Dunsky report noted that: p. p. 0
[128] The Dunsky report noted that: The move to a performance-based model would provide ENSC with increased flexibility to adjust and adapt its plans as needed, as situations arise and as feedback comes in. Furthermore, an oversight model...

AI summary The Dunsky report supports moving to a performance-based model (PBM) for DSM programs, citing increased flexibility and reduced regulatory burden. ENSC seeks Board approval to consult stakeholders on this approach. The Province and EAC also support the PBM discussion, emphasizing benefits for low-income rate-payers and program outreach. Board Counsel questioned the need for Board approval before consultation.

IR-1 to IR-13 issued by Tim Woolf, Synapse Energy Economics, Inc. (Board Counsel Consultant)06609 3/17/2011 1 passage
NOVA SCOTIA UTILITY AND REVIEW BOARD p. p. 7
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF: AN APPLICATION by Efficiency Nova Scotia Corporation ("ENSe") for approval of 2012 Electricity Demand Side Management ("DSM") Plan for...

AI summary Efficiency Nova Scotia Corporation (ENSe) seeks approval for its 2012 Electricity Demand Side Management (DSM) Plan under the Public Utilities Act. The application focuses on energy efficiency initiatives to manage electricity demand.

IR-1 to IR-31 issued by Mel Whalen, Multeese Consulting Inc. (Board Counsel Consultant)06607 3/17/2011 1 passage
Request IR-5 With respect to Figure 5.1, a) If the annual avoided energy and avoided capacity costs used in the development of the TRC's and PAC's are different from those used to assess the 2011 DSM Plan, Please provide them. Please provide the date of the most recent update. Please confirm that the avoided costs currently being used were derived using the same methodology as was used to develop the avoided costs for the 2011 DSM programs. If not, please provide the new derivation. b) Please confirm that avoided costs are being applied in the same manner as in 2011. c) Please provide the derivation of the TRC and PAC results for two of the measures in the Efficient Products program that have different life expectancies. Request IR-6 With respect to Figure 5.1, Note e, please provide the derivation of the "historic savings" of 10 Gwh associated with the adoption of Codes and Standards. Request IR-7 With respect to page 15, line 17, please provide the basis for concluding that the industrial projects "were not included in the 2009 IRP Update" and reconcile it to the statement in Note 13 that "All DSM is assumed to be included in the projection used in the 2009 IRP". Request IR-8 With respect to page 15, lines 19 - 23, a) Please provide the "preliminary investigation" provided to ENSC by a third-party specialist. b) Please provide the qualifications of the third-party specialist to complete this work. Request IR-9 With respect to page 16, line 25, please provide the basis on which ENSC concludes that
means by the phrase "further assess the options for implementing such a model". Is the focus on implementation strategies, or is it of the assessment, please provide the model that ENSC has in mind. 5 intended that the model itself will be...

AI summary The text requests clarification on whether the model for implementing a certain approach is part of the assessment and whether the focus is on implementation strategies or the assessment itself. It also asks ENSC to provide the model they have in mind.

IR-1 to IR-43 issued by Ecology Action Centre06613 3/17/2011 1 passage
Section 9
pilot project relates to provincial government policy initiatives such as the Natural Resources Strategy and other planned utilization of biomass in the province (i.e. Renewable Electricity Plan). ENSC is discussing a mandate for DSM progr...

AI summary The document discusses ENSC's mandate expansion to manage DSM programs for other fuel types, including the need for harmonization with electricity programs. It references ongoing negotiations with the provincial government and the potential impact on the DSM 2012 plan. A multi-year performance framework is proposed, inspired by practices in Vermont.

05676Hearing Order 11/4/2010 1 passage
ORDER
ORDER IT IS ORDERED that a hearing respecting an application by Efficiency Nova Scotia Corporation ("ENSC") for approval of its Electricity Demand Side Management Plan for 2012 be conducted by the Nova Scotia Utility and Review Board ("Boa...

AI summary The Nova Scotia Utility and Review Board has ordered a hearing for Efficiency Nova Scotia Corporation's 2012 Electricity Demand Side Management Plan. The hearing will take place in Halifax on April 18, 2011, with a detailed timetable provided for various procedural steps.

05677Notice of Hearing 11/4/2010 1 passage
NOVA SCOTIA'S ELECTRICITY DEMAND SIDE MANAGEMENT PLAN FOR 2012
NOVA SCOTIA'S ELECTRICITY DEMAND SIDE MANAGEMENT PLAN FOR 2012 Notice is hereby given that the Nova Scotia Utility and Review Board ("the Board") will conduct a hearing respecting an application by Efficiency Nova Scotia Corporation for ap...

AI summary The Nova Scotia Utility and Review Board will hold a hearing to approve Efficiency Nova Scotia Corporation's 2012 Electricity Demand Side Management Plan. The process includes a consultative phase, evidence filing deadlines, and opportunities for public participation through written comments or presentations. The hearing will occur on April 18, 2011, with specific procedures for formal standing and witness cross-examination.

05841Participants' List 1 passage
EFFICIENCY NOVA SCOTIA CORPORATION APPLICATION FOR APPROVAL OF ITS
EFFICIENCY NOVA SCOTIA CORPORATION APPLICATION FOR APPROVAL OF ITS

AI summary The document outlines an application by Efficiency Nova Scotia Corporation seeking regulatory approval for an unspecified proposal. The proceeding involves a regulatory process where the corporation must demonstrate compliance with relevant legislation and justify the approval of its plan or initiative.

06934EAC Final Submission 5/13/2011 1 passage
An Application by Efficiency Nova Scotia Corporation for Approval of its Electricity Demand Side Management Plan for 2012 p. p. 1
An Application by Efficiency Nova Scotia Corporation for Approval of its Electricity Demand Side Management Plan for 2012 Submitted By: Brennan Vogel (BES, MA) Energy & Climate Change Coordinator Ecology Action Centre Halifax, NS May 13, 2...

AI summary Efficiency Nova Scotia Corporation seeks regulatory approval for its 2012 Electricity Demand Side Management Plan. The application, submitted by Brennan Vogel of the Ecology Action Centre, is addressed to the Nova Scotia Utility and Review Board.

06935NPB Final Submission 5/13/2011 2 passages
1. ENSC's PROPOSED 2012 DSM BUDGET SHOULD NOT BE INCREASED
nd target of 101 MW. 6 Ex. E-7, response to Multeese IR-6, Page 1. 7 Ex. E-7, response to Multeese IR-8, Attachment 1, Page 82. 8 Transcript, page 129, lines 11-14. 9 Ex. E-7, response to Multeese IR-8, Attachment 1, Page 79 and Transcript...

AI summary The document discusses the debate over whether ENSC's 2012 DSM budget should be increased. While ENSC's plan meets or exceeds IRP targets, some argue for additional savings beyond IRP levels, while others, including the Consumer Advocate, oppose increasing the budget beyond current targets. Consultants and the Board's verification expert support including verifiable efficiency savings in DSM plans.

Conclusion
Conclusion For the reasons set out in this Submission, NPB respectfully submits that the Board should reject any recommendations that would require ENSC to further increase the proposed DSM spending levels as part of its 2012 DSM Plan. NPB...

AI summary NPB submits that the Board should reject recommendations to increase ENSC's 2012 DSM Plan spending, citing the plan's collaborative development and support for its budgeted expenditures. The submission emphasizes alignment with ENSC's approach and concludes with the filing date of May 13, 2011.

06951ENSC Closing Submission 5/13/2011 4 passages
1 Hearing Transcript, April 19, 2011, Page 401, Line 9.
1 Hearing Transcript, April 19, 2011, Page 401, Line 9. 1 Evaluation and verification of the success of the 2010 DSM Plan has been positively 2 received and is not being challenged by any stakeholder. As part of the recognized cycle 3 of c...

AI summary The 2010 DSM Plan evaluation and verification have been positively received and are not being challenged. ENSC is committed to implementing recommendations for improvement and requests Board approval of the 2012 DSM Plan and acceptance of the evaluation reports.

1 ENSC sees continued value and support in having the PDWG continue throughout 2011,
19 See, for example, Exhibit [E-12], Supra Note 8, Page 3, Lines 5-6. 20 Exhibit [E-1], Supra Note 7, Page 29. 21 Exhibit [E-12], Supra Note 8, Page 2, Lines 26-28. 1 ENSC sees continued value and support in having the PDWG continue throug...

AI summary ENSC supports continuing the PDWG throughout 2011 and proposes a multi-year performance-driven regulatory model. ENSC seeks approval from the UARB and the Board to assess options for implementing this model. Board Counsel Mel Whalen shows tacit agreement, subject to legislative confirmation. The Board Chair raises questions about the Public Utilities Act's compatibility with performance-based regulation.

1 Rather, the intent and focus of ENSC to consider options for change to the existing
1 Rather, the intent and focus of ENSC to consider options for change to the existing 2 regulatory framework, which is focused on annual pre-approval of one-year DSM plans, 3 are the possible advantages and efficiencies available to all st...

AI summary ENSC is proposing a shift from the current annual pre-approval model for DSM plans to a multi-year, performance-driven regulatory framework. This change is supported by the ENSC Act, which allows the UARB to approve multi-year frameworks. ENSC argues that this approach would improve economic efficiencies and reduce administrative burdens.

9 8. CONCLUSION
9 8. CONCLUSION 10 The 2012 DSM Plan continues to build on Nova Scotia's achievements in energy 11 efficiency while setting a path for long-term success, and should be approved. 12 The 2012 DSM Plan addresses the directives and recommendat...

AI summary The 2012 DSM Plan is recommended for approval as it aligns with UARB directives, incorporates stakeholder feedback, and balances cost-effective energy savings. The Board is advised against increasing ENSC's budget for the plan at this time, emphasizing stakeholder support and financial responsibility.

06952Avon Group Closing Submission 5/13/2011 1 passage
CONCLUSION p. p. 0
CONCLUSION On behalf of the Avon Group, we recommend: - (a) the budget as filed, be approved, subject to either a deduction for budgeted DSM expenditures assigned to the large industrial class (or a reallocation). It is recommended that 20...

AI summary The Avon Group recommends approving the budget with adjustments to DSM expenditures for large industrial customers, confirming non-program savings inclusion, directing ENSC to engage directly with industrial clients, confirming multi-sector cost allocation, scrutinizing shared services, and requiring rate impact information in future DSM filings.

06953NSDOE/NSE Closing Submission 5/13/2011 2 passages
Via Email p. p. 0
Via Email Nancy MacNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3rd Floor - 1601 Lower Water Street Summit Place Halifax, NS B3J 3P6 Dear Ms. MacNeil: Re: Efficiency Nova Scotia Corporation - Application for A...

AI summary Final submissions are made on behalf of the Nova Scotia Department of Energy (NSDOE) and Nova Scotia Environment (NSE) for the approval of the 2012 Electricity Demand Side Management Plan. Submissions reference testimony from a hearing held on April 19, 2011, and pre-filed evidence.

Proposed 2012 Programs and Expenditures p. p. 0
Proposed 2012 Programs and Expenditures The 2012 DSM plan is the first plan filed by the new administrator of electricity DSM programs for Nova Scotia, Efficiency Nova Scotia Corporation (ENSC). NSDOE echoes the comments of Dr. Peach given...

AI summary The 2012 DSM plan by Efficiency Nova Scotia Corporation (ENSC) expands prior programs approved from 2008–2011, with four key changes: integrating low-income programs, adding a Home Energy Report, reclassifying education/outreach as 'enabling strategies,' and minor name adjustments. NSDOE endorses the plan, citing ENSC's experience and alignment with previous program successes.

07014ENSC Reply Submission 5/20/2011 1 passage
6 EAC Costs
6 EAC Costs 7 8 ENSC has discussed the issue of costs with EAC. As with the previous hearing, ENSC 9 has requested that EAC provide it with a proposed Bill of Costs following closure of the 10 hearing and submissions. In the event that ENS...

AI summary ENSC and EAC discussed cost allocation procedures. ENSC requested a proposed Bill of Costs post-hearing, with UARB having jurisdiction to rule on costs if agreement isn't reached.

07314Board Decision 6/30/2011 7 passages
[11 ] The relevant provisions of the ENSC Act are: p. p. 0
, by letter dated September 22, 2010, which provided: The Board has carefully reviewed the DSM Transition Plan and grants approval to proceed with implementation, subject to the following directives: - a) The DSM Transition Committee is to...

AI summary The Board approved the DSM Transition Plan with directives including oversight by the DSM Transition Committee, quarterly financial reporting by ENSC, addressing deferred DSM initiatives, filing Transition Agreements, and submitting a 2012 DSM Plan workplan. ENSC complied with directives, and the Board reviewed the 2010 DSM Evaluation Report and 2010 SVS.

[65] In its Closing Submission of May 13, 2011, ENSC stated: p. p. 0
rvenor consultants that further increases to ENSC's budget are required at this time. [NPB Closing Submission, pp. 1,2,6] [70] In its Reply Submission, EAC supported increased levels of DSM savings: In the past, Nova Scotian stakeholders h...

AI summary ENSC requests increased budget funding, while EAC supports higher DSM savings, citing DSM's cost-effectiveness and system benefits. EAC recommends approving the increased DSM budget based on consultant proposals, emphasizing energy efficiency's role in reducing electricity system costs.

5.5.1 Findings p. p. 0
5.5.1 Findings [125] The Board understands that ENSC's mandate is being expanded to manage non-electricity efficiency programs. Some transition is already underway and formal negotiations are to be concluded in the near future. ENSC, at th...

AI summary The Board acknowledges ENSC's expansion of its mandate to manage non-electricity efficiency programs and notes the lack of a formal policy to track time and costs. Intervenors expressed concerns about delays and potential cross-subsidization, leading the Board to order ENSC to submit a policy by September 30, 2011.

5.6 Multi Year Performance Based Model ("PBM") p. p. 0
5.6 Multi Year Performance Based Model ("PBM") [127] ENSC seeks Board approval to engage stakeholders to assess the use of a Performance Based Model ("PBM") for future submissions to the Board. ENSC stated that: Under such a multi-year, pe...

AI summary ENSC requests the Board's approval to engage stakeholders to evaluate the implementation of a multi-year, performance-based model for future submissions. This model would shift the UARB's oversight from preapproving individual DSM measures to approving overall investments and savings targets, followed by performance validation.

[128] The Dunsky report noted that: p. p. 0
[128] The Dunsky report noted that: The move to a performance-based model would provide ENSC with increased flexibility to adjust and adapt its plans as needed, as situations arise and as feedback comes in. Furthermore, an oversight model...

AI summary The Dunsky report supports transitioning to a performance-based model for DSM programs, which would increase flexibility and reduce regulatory burdens. ENSC seeks Board approval for stakeholder consultation on this model, with support from the Province and EAC. The discussion highlights the need for regulatory alignment and stakeholder engagement.

5.6.1 Findings p. p. 0
5.6.1 Findings [134] ENSC suggests exploration of a PBM with stakeholders for future approval by the Board. The Board noted its concerns during the hearing and ENSC elaborated on the issue in its closing submission. [135] Based on this, th...

AI summary ENSC proposes exploring a Performance-Based Model (PBM) with stakeholders for future Board approval. The Board expressed concerns during the hearing, but has no objection to ENSC discussing the PBM with stakeholders.

8.0 ECOLOGY ACTION CENTRE REQUEST FOR COSTS p. p. 0
8.0 ECOLOGY ACTION CENTRE REQUEST FOR COSTS [149] In its Final Submission, EAC stated: - 1. It is submitted that the EAC acted responsibly and prudently as an intervener in these hearings. The interventions have been novel and brought a di...

AI summary The Ecology Action Centre (EAC) requests reimbursement for costs incurred during its participation in the hearings related to the 2012 DSM plan. EAC argues it acted responsibly and prudently as an intervener, contributing to a better understanding of customer-related issues. ENSC has requested a proposed Bill of Costs, and the Board reserves jurisdiction to rule on costs if EAC and ENSC cannot agree.

08028NSPI proposed ENS DSM Cost Recovery Rider and DSM Cost Recovery Rider Balance Adjustment Charges by rate class effective from January 1 through December 31, 2012 9/30/2011 2 passages
Section 5 p. p. 0
ogy. As such, it is appropriate that on a go forward basis, ENS, as administrator with the responsibility for the amount of the rider charges, make the rider filing as an extension of its DSM process. Nova Scotia Power has discussed this p...

AI summary Nova Scotia Power Inc. (NSPI) agrees with Efficiency Nova Scotia (ENS) on adjusting the rider responsibilities, ensuring continued collaboration and information sharing as outlined in the DSM Transition Plan. NSPI will take the lead in revising the cost allocation methodology for approval by the UARB, aligning with the 2013 DSM Plan filing.

Section 6 p. p. 0
nsibility for reviewing and revIsing the methodology as appropriate, for approval by the UARB. It is anticipated that revisions for 2013 would be filed coincident with the filing of the 2013 DSM Plan. The above paragraph contemplates that...

AI summary Nova Scotia Power Inc. (NSPI) requests the UARB to confirm the 2012 ENS DSM Rider allocations and the 2010 DSM DCR BA, and asks for confirmation that ENS is best suited to lead any necessary stakeholder dialogue regarding the cost allocation methodology prior to the 2013 DSM filing.

08030Efficiency Nova Scotia Corporation - Cost Allocation Methodology Report - Prepared by Elenchus Research Associates Inc. - September 2011 9/30/2011 3 passages
4 CONCLUSION p. pp. 8-9
4 CONCLUSION The methodology used to allocate ENSC's total "costs for electric and other fuel mandates" is consistent with the standard approach to the fully allocated costing models that are used for rate setting purposes by regulated ele...

AI summary The document outlines ENSC's cost-allocation methodology for electric and other fuel mandates, aligning with Canadian utility standards. Direct and joint program costs are allocated case-by-case, with administrative costs tied to staff resources. Costs are recovered via NSUARB-approved rate riders for electricity programs and government payments for other fuel programs.

3. Approval of invoice p. p. 9
3. Approval of invoice a. Once the Accounts Payable Clerk has coded the invoice received, it is then forwarded to the appropriate ENSC Program Manager and Senior Program Manager for approval of coding and payment.

AI summary The invoice approval process involves the Accounts Payable Clerk coding invoices, which are then forwarded to ENSC Program Managers and Senior Program Managers for approval of coding and payment.

CONCLUSION p. p. 9
CONCLUSION The cost allocation and procedural direction outlined above creates an accounting methodology and procedure designed to satisfy the regulatory requirement to ensure that costs are properly and fairly allocated between programs p...

AI summary The conclusion outlines a cost allocation methodology to ensure fair distribution of costs between ratepayer-funded and taxpayer-funded programs, utilizing objective measures and the CAM for reporting to the NSUARB.

08067Letter to Parties asking for comments on NSPI's proposed DSM Recovery Rider 10/6/2011 1 passage
Section 1 p. p. 0
Nova Scotia Utility and Review Board Mailing address PO Box 1692, Unit "M" Halifax, Nova Scotia B3J 353 [email protected] Web www.nsuarb.ca Office 3rd floor 1601 lowerWater Street Halifax, Nova Scotia B3J 3P6 902 424-4448 t 902424-3919...

AI summary Nova Scotia Power Inc. (NSPI) seeks approval for a proposed Efficiency Nova Scotia Demand Side Management (DSM) Cost Recovery Rider (DCRR) and Balance Adjustment (DCRR BA) for 2012. The Nova Scotia Utility and Review Board requests comments from stakeholders by October 20, 2011, on the proposed charges by rate class.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →