Topic/Matter Intersection

Topic:"Regulatory Approval Processes" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
33 passages 20 documents

Regulatory Approval Processes across all matters →

N-1-(i)Generation Utilization and Optimization Final Report Appendices 5.1, 5.2 and 5.3 - Synapse 1 passage
Notation Scenario Name Load Capital CapCredit NB Trans RetirePath
Shearwater, NS location. http://pvwatts.nrel.gov/ 8. Pan Canadian Wind Integration Study, Revision 3 (October 2016). http://canwea.ca/wp- content/uploads/2016/07/pcwis-fullreport.pdf Synapse Energy Economics, Inc. M08059 Generation Utiliza...

AI summary Synapse Energy Economics responds to stakeholder feedback on its modeling plan for a generation utilization study, agreeing to simplify the plan by reducing scenarios from 30 to 12. The report timeline includes initial results by January 2018, a draft in February, and a final report after a technical conference.

69694Board letter re Board's view further work is needed on generation utilization and optimatization issues 1 passage
Section 2
llions of dollars of projected sustaining capital on those facilities still remains outstanding. In addition, analysis of storage options and wind capacity contributions deserve greater consideration. In order to move forward with these ma...

AI summary The Board engages Synapse Energy Economics Inc. to analyze generation resource utilization and cost-effective options for Nova Scotia ratepayers. A reclassification of thermal units is deferred until after the 2017-2019 rate stabilization period. Stakeholders will review Terms of Reference, and NSPI will provide technical data for analysis.

69694Board letter re Board's view further work is needed on generation utilization and optimatization issues 1 passage
Section 2
llions of dollars of projected sustaining capital on those facilities still remains outstanding. In addition, analysis of storage options and wind capacity contributions deserve greater consideration. In order to move forward with these ma...

AI summary The Board will engage Synapse to analyze generation resource utilization and cost-effective options, requiring data from NSPI. Reclassifying thermal units for capacity purposes is deferred due to the 2017-2019 rate stabilization period. Stakeholders will review Terms of Reference, and the Board acknowledges stakeholder input.

69705NSPI - Comments 3 passages
Section 1
PO Box 910 ● Halifax, Nova Sco a ● Canada ● B3J 2W5 April 27, 2017 Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit “M” Halifax, NS B3J 3S3 Re: M07540...

AI summary This letter from Nova Scotia Power Inc. (NS Power) to the Nova Scotia Utility and Review Board (UARB) outlines the company's response to a February 2017 directive to host a Technical Conference addressing thermal fleet analysis and engagement process improvements, following the UARB's December 2016 decision on the 2014-2015 FAM Audit.

Section 2
echnical Conference, NS Power discussed its intention to improve its engagement process. 1 NSUARB Letter, 10‐Year System Outlook Report, February 9, 2017, M07540. April 27, 2017 D. Friis Stakeholders brought to the Company’s attention more...

AI summary NS Power aims to improve stakeholder engagement following feedback on its thermal unit utilization and investment strategy. Key discussion topics include reserve margin requirements, federal coal legislation impacts, gas consumption outlook, and regional transmission interconnections. Stakeholders emphasized the need for transparency on resource adequacy planning and potential alternatives to NS Power's existing investment strategy for fossil fuel units.

Section 3
consensus building approach. We have experienced this in the 2013 Cost of Service Proceeding, the 2015‐2016 Renewable to Retail Proceeding and in recent Annual Capital Expenditure Plan proceedings. The Company proposes to begin this same t...

AI summary NS Power proposes a collaborative engagement process with stakeholders to enhance resource adequacy planning, referencing past proceedings like the 2013 Cost of Service and 2015-2016 Renewable to Retail. The approach aims to improve knowledge-sharing, clarify assumptions, and establish a long-term stakeholder framework for resource planning in Nova Scotia.

69706SBA - Comments 1 passage
Section 1
D a ™ Blackburn Law April 27, 2017 VIA EMAIL Ms. Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 383 Dear Ms. Friis: Re: M07540 — Nova Scotia Power Inc. 2...

AI summary Blackburn Law comments on Nova Scotia Power's 2016 System Outlook Report, arguing that retaining coal plants as peaking units during winter high-demand periods, despite reduced coal burning, still poses environmental risks from coal pile management, dust control, and ash handling. NS Power defends this approach as economically viable, though it plans to retire Lingan 2 post-Maritime Link. The SBA highlights environmental and reliability concerns.

70410Board letter enclosing proposed terms of reference 1 passage
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, Unit “M" 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3i 3P6 B3J 3S3 1 855 442 4448 (toll-free) [email protected] 902 424-4448 t ht...

AI summary The Nova Scotia Utility and Review Board invited participants to comment on Synapse Energy Economics Inc.'s Terms of Reference for 'Generation Utilization and Optimization' (M08059). Synapse requested data from NSPI to develop a Plexos model, including operational constraints and cost details, as part of the regulatory process.

70411Proposed Terms of Reference 1 passage
Section 8
with greater coordination of unit commitment, dispatch, and reserve planning than is currently the case). f. Include additional constraints in NS as needed to reflect stability, voltage, inertia, minimum unit commitment, operation reserve...

AI summary The document outlines steps for enhancing grid modeling through Plexos, including stakeholder input, technical conferences, and regulatory hearings. It emphasizes coordination in unit commitment, dispatch, and reserve planning, with NSPI providing technical data. The process involves iterative modeling, quality assurance, and final reporting.

70544Comments - PHP 1 passage
Section 1
MCINNES David S. MacDougall Direct +1 (902) 444 8561 [email protected] COOPER 1969 Upper Water Street Suite 1300 Purdy's Wharf Tower II Halifax NS Canada B3J 2V1 Tel +1 (902) 425 6500 I Fax +1 (902) 425 6350 Our File: 1003...

AI summary Port Hawkesbury Paper Limited Partnership (PHP) submits comments on the Terms of Reference (TOR) for Synapse Energy Economic's analysis of retaining NSPI thermal resources through 2030. PHP acknowledges the TOR's thoroughness but notes specific comments for Synapse and the Board's consideration, referencing Matter M08059.

70545Comments - NSPI 4 passages
Section 3
to be taken from them. The objectives and purpose have typically been stated upfront as part of the IRP TORs. In the most recent 2014 IRP for instance, the Purpose was stated in the TOR as follows: The IRP is a comprehensive and public uti...

AI summary The text discusses the Integrated Resource Plan (IRP) process, emphasizing its non-prescriptive nature and flexibility. It highlights NS Power's recommendation for clear objectives in the Terms of Reference (TOR) for the Synapse Generation Utilization and Optimization study, a new UARB process. The 2014 IRP's purpose is outlined as a strategic roadmap for resource planning without committing the utility to specific actions.

Section 4
e issues to be resolved by this work. 1 2014 NSPI 2014 IRP Update; M05522, P-884.14, Terms of Reference, Exhibit N-3. Page 2 of 10 July 17, 2017 D. Friis 2. Process and Timeline The Synapse TOR provides a timeline for commencement through...

AI summary NS Power requests greater stakeholder input in the Synapse-led IRP update process, criticizing the limited consultation opportunities and late-stage feedback mechanisms. The current timeline allows minimal engagement, with only a post-draft technical conference for input, which NS Power argues undermines transparency and thoroughness.

Section 5
o be permitted to review the modelling plan and draft input assumptions and to provide comments and have their comments considered before assumptions are finalized and before modelling work is done. NS Power also requests confirmation in t...

AI summary NS Power requests enhanced stakeholder consultation during a modelling process, including interim technical conferences and advance sharing of draft reports. They express concerns about the proposed timeline, citing 177,147 model runs and a lack of input opportunities until the final stage. The Board is urged to prioritize consensus-building in regulatory processes.

Section 6
table on page 2 of the Terms of Reference were to be fully modelled, it appears that Synapse would have to perform 177,147 individual runs (as further explained in the attached technical Appendix). The TOR does not state what happens follo...

AI summary NS Power requests clarification on post-Final Report procedures, including filing with the Board and review processes. They emphasize the need for collaboration with Synapse to establish a feasible timeline, citing resource constraints and concurrent projects that may impact data availability and response times.

70737Board letter enclosing Response to Stakeholder Comments on Proposed Terms of Reference - Track Changes Version Aug 1 vs July 28 1 passage
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3J 3P6 B3J3S3 1 855 442-4448 (toll-free) [email protected] 902 424-4448 t http://nsuar...

AI summary The Nova Scotia Utility and Review Board requests further stakeholder comments on Synapse Energy Economics Inc.'s amended Terms of Reference (TOR) for M08059 - Generation Utilization and Optimization by August 10, 2017. The Board panel includes Peter W. Gurnham, Roland A. Deveau, and Steven M. Murphy.

70759Response to Stakeholder Comments on Proposed Terms of Reference - Track 2 passages
Section 9
e minimum number of generation units online, system stability or voltage, operating reserves, or related parameters. h. Execute model runs, iterate as necessary, post-processing of results. Scope The scope of work will encompass refining a...

AI summary The scope involves refining a modeling plan for system stability, voltage, and operating reserves, with stakeholder input, Plexos model execution, and potential 2018 hearings. The process includes iterative modeling, reporting, and finalizing outcomes subject to regulatory review.

Section 11
uns. e. Specify balancing area constructs to model. Research and develop alternatives to model balancing area constructs over the longer-term (e.g., NS alone, with import paths from NB and NL; or 3 combined Maritime provincial balancing re...

AI summary The text outlines steps for modeling balancing area constructs, incorporating technical constraints, and conducting stakeholder reviews using Plexos software. It emphasizes collaboration with NSPI, iterative modeling, and stakeholder feedback through conferences and hearings.

70827NSPI Comments on Proposed Terms of Reference 1 passage
Section 1
PO Box 910 ● Halifax, Nova Sco a ● Canada ● B3J 2W5 August 10, 2017 Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit “M” Halifax, NS B3J 3S3 Re: M0805...

AI summary NS Power provides further comments on Synapse's amended Terms of Reference (TOR) for the Generation Utilization and Optimization Process, noting Synapse's incorporation of stakeholder feedback regarding consultation opportunities and modeling adjustments. The Utility and Review Board (UARB) invited comments on the initial draft TOR, leading to Synapse's revised proposal.

70837Board email approving intervenor status to EfficiencyOne 1 passage
Section 1
From: Kiley, Bruce A To: "Jim Gogan"; Friis, Doreen Cc: Henwood, Crystal D; Emily Mason ([email protected]); Matthew Davidson; Friesen, Christine; Conrod, Laura N Subject: RE: M08059 - Generation Utilization and Omptimization Date: Th...

AI summary Efficiency One is approved as a late intervener in matter M08059 regarding Generation Utilization and Optimization. The Board emphasizes compliance with existing deadlines, including submitting comments on the Terms of Reference by August 10, 2017.

70838Comments from SBA 1 passage
Section 1
Blackburn Law e August 8, 2017 VIA EMAIL Ms. Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 3S3 Dear Ms. Friis: Re: M08059 - Generation Utilization and O...

AI summary The Small Business Advocate (SBA) critiques Synapse's revised Terms of Reference for the 'Generation Utilization and Optimization' proceeding, noting unresolved concerns about modelling transparency and missing metrics for Synapse's conclusions, despite increased stakeholder involvement.

74133Board Letter re Generation Utilization and Optimization Report 2 passages
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, Unit "NT 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3J 3P6 B3J 3S3 1 855 442-4448 (toll-free) [email protected] 902 424-4448 t ht...

AI summary The Nova Scotia Utility and Review Board approved amended Terms of Reference for Synapse Energy Economics Inc.'s Generation Utilization and Optimization Report, extending timelines due to stakeholder input. The Technical Conference occurred in March 2018, and the final report was submitted in May 2018.

Section 2
18”, was received on May 1, 2018 and distributed to participants. The appendices to that report are included with this letter, and the confidential version has been posted in the TitanFile repository. The Board had tentatively reserved the...

AI summary The letter outlines procedural steps for a regulatory proceeding, including the submission deadlines for NSPI's comments on a Synapse report, stakeholder feedback, and Synapse's reply. It also lists the Board panel members assigned to the matter and references the document number and interested parties.

74161Confidential Undertaking 1 passage
Section 5
record which have been designated or agreed to be confidential shall be forwarded to the court in accordance with applicable laws and procedures but under seal and designated confidential. 10. (a) Within 30 days after the Board has reached...

AI summary The text outlines procedures for handling Designated Confidential Information, requiring its return and destruction within 30 days of the Board's final decision, with exceptions for Nova Scotia Barrister’s Society members. Counsel may retain client-related materials under specific conditions, and the information's use is restricted to NSPI regulatory proceedings.

74454NSPI's comments on Synapse Report - Redacted 7 passages
Section 2
21, 2018 and Synapse is to provide a reply submission by July 9, 2018. The Board advised that parties’ submissions are to indicate any further process they consider appropriate regarding this matter. Please accept these comments on behalf...

AI summary NS Power requests discovery of Synapse's analysis to assess the Synapse Report's recommendations, arguing that a hearing process is needed for a substantive evaluation. They do not currently support additional process steps but reserve the right to comment if further proceedings are initiated. The Board previously approved Synapse's Terms of Reference in 2017.

Section 3
ssed concern about the time required to execute the proposed modeling plan. A copy of NS Power’s correspondence to Synapse dated November 3, 2017 is attached at Appendix A for the Board’s reference. Following receipt of comments, on Decemb...

AI summary NS Power and Synapse Energy Economics collaborated on a modeling plan for a Plexos Optimization Analysis, reducing scenarios from 30 to 12 after stakeholder feedback. NS Power submitted comments to Synapse and the Board, aligning with prior input. A technical conference and draft report were part of the process, with further revisions planned based on attendee feedback.

Section 13
through a hearing process on the Synapse Report. NS Power agrees that the proper focus going forward should be on the above-noted nine Recommendations identified at the end of the Synapse Report. The long-term view for NS Power’s thermal u...

AI summary NS Power agrees with the Synapse Report's nine recommendations and emphasizes the need for a comprehensive Integrated Resource Plan (IRP) in 2019, contingent on clarity regarding the Province's carbon regime. The letter highlights the importance of aligning resource planning with future carbon regulations.

Section 18
t Director, Regulatory Affairs Page 4 of 9 REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED - Appendix A NSPI to Synapse GU&O Final Report Page 5 of 9 Appendix A Figure 1: Comments on Analysis Plan & Assumptions Analysis Plan 1. Select...

AI summary Nova Scotia Power Inc. (NSP) requests clarification on selection criteria for reference plans and suggests reducing scenario modeling complexity by integrating DSM, Demand Response, and transmission options as flexible resource inputs in the Long Term module, enabling optimized in-service year calculations.

Section 25
REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED - Appendix A NSPI to Synapse GU&O Final Report Page 9 of 9 Figure 4: Updated Costs & Trends for New Resources Resource Type (2017) Capital Cost (2017) Fixed Percent Change ($/kW) Cost ($...

AI summary The document includes a cost trend analysis for energy resources (e.g., solar, wind, battery storage) showing significant cost reductions by 2030, and a letter from Nova Scotia Power Inc. (NSPI) responding to Synapse Energy Economics' draft report on a Generation Utilization and Optimization study under matter M08059.

Section 26
s entitled “Results of Plexos Modeling and Discussion” dated March 28, 2018 and “Results of Plexos Modeling and Discussion – Supplemental Slides” dated March 28, 2018 Dear Mr. Fagan: In correspondence dated August 22, 2017, the Nova Scotia...

AI summary The UARB approved Synapse's amended Terms of Reference to assess the cost-effectiveness of retaining NSPI's thermal fleet through 2030. Synapse circulated a modeling plan, and NS Power, the Consumer Advocate, and Small Business Advocate provided comments. The analysis relates to integrated resource planning and regulatory approval processes.

Section 27
Analysis – Draft for Comment”. On November 7, 2017, comments were provided to Synapse on its memo by Nova Scotia Power Inc. (NS Power), the Consumer Advocate (CA), the Small Business Advocate (SBA), 1 Terms of Reference, Synapse Energy Eco...

AI summary The document outlines stakeholder involvement in a regulatory proceeding, including NS Power, the Consumer Advocate, and Synapse's engagement process. It references prior proceedings (M07540, M07611, M07745) and ongoing efforts to establish a participant list for M08059. The Terms of Reference were approved by UARB in August 2017, with Synapse's communications copied to Technical Conference participants.

74563Comments - Industrial Group 1 passage
Section 2
e clear and financially sound across all scenarios. There is, of course, uncertainty included in any forecasting exercise but within the sensitivities tested, the general conclusion appears supported. The Industrial Group agrees with NSPI’...

AI summary The Industrial Group and NSPI agree on Synapse's recommended steps for the Integrated Resource Plan (IRP), emphasizing transparency and stakeholder reporting. They argue that the non-prescriptive report does not require Board decisions, and resources should focus on implementing recommendations rather than extended hearings.

74570Comments - PHP 1 passage
Section 3
rror that double counted the costs of new Nova Scotia wind, which significantly affected the NPVRR costs associated with all scenarios with increased wind levels, Scenario 13, 14, 16, 17, 25, and 26.” As active participants throughout this...

AI summary PHP highlights an error in Synapse's analysis that double-counted Nova Scotia wind costs, affecting multiple scenarios. While the error didn't alter conclusions, PHP advocates for proactive disclosure of significant changes post-technical conferences to enhance transparency and stakeholder input in future proceedings.

74573Comments - EOne 1 passage
Section 4
8 Page 3 EfficiencyOne thanks the UARB for the opportunity to provide comments on this matter, all of which are respectfully submitted. Yours Truly, THE BRETON LAW GROUP James R. Gogan JRG/jmd cc. M08059 Participants S. Bruce Outhouse, NSU...

AI summary EfficiencyOne submits comments to the UARB regarding a regulatory matter, acknowledging the opportunity provided. The letter is signed by James R. Gogan of The Breton Law Group and copied to participants in matter M08059.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →