E-12017 DSM Annual Progress Report 5 passages
Section 9
res by Rate Class................................................ 61 22 Table 14: 2018 Planned DSM Expenditures by Rate Class ..................................................................... 62 23 24 LIST OF FIGURES 25 Figure 1 - 2016...

AI summary Efficiency Nova Scotia's 2017 DSM Annual Progress Report details the Nova Scotia Utility and Review Board's (UARB) approval of a $34 million 2017 DSM investment, targeting 136.5 GWh energy savings and 21.0 MW peak demand reduction, as part of the 2016-2018 DSM Resource Plan and Consensus Agreement.

Section 122
Page 61 of 68 Efficiency Nova Scotia 2017 DSM ANNUAL PROGRESS REPORT 1 Table 14: 2018 Planned DSM Expenditures by Rate Class Planned 2018 Rate Code Expenditures ($ million) Residential/Charitable (2,3,4) 19.4 Small General (10) 1.5 General...

AI summary This document presents the 2017 DSM Annual Progress Report by Efficiency Nova Scotia, including planned 2018 DSM expenditures by rate class and updates on items from the 2016-2018 regulatory process. It references the UARB Order, the Consensus Agreement, and the Quantum Agreement.

Section 123
(Consensus Agreement), 34 and the 2016-2018 Quantum 6 Agreement. 35 The statuses of the items that remained open in 2017 are discussed below. 7 8 5.1 Locational DSM E f forts 9 10 In accordance with the UARB’s direction in its Order dated...

AI summary The document discusses the collaborative efforts between ENS and NS Power on locational DSM, as directed by the UARB. They filed reports on geotargeting and agreed to conduct a detailed review of capital expenditures potentially avoided through locational DSM.

Section 124
Power would conduct a detailed review of capital expenditures that could 17 potentially be avoided through locational DSM and convey the results to ENS; 18 and 33 Supra note 1. 34 Ibid at Schedule B. 35 M06733, NSUARB Decision, The Public...

AI summary The document discusses a review of capital expenditures that could be avoided through locational DSM, with results to be conveyed to ENS. It also references past regulatory proceedings, including the 2016-2018 Demand Side Management Resource Plan and the Quantum Agreement, which was not approved by the UARB but had non-financial provisions pursued by stakeholders.

Section 127
y Group 9 on January 31, 2017 and following that, Vermont Energy Investment Corporation (VEIC) 10 was procured by ENS to undertake a study into measure-level non-energy benefits. 11 12 The purpose of this study is to identify the most comp...

AI summary Efficiency Nova Scotia (ENS) commissioned a study on non-energy benefits for energy-efficiency measures and is working with the DSM Advisory Group to integrate these into the TRC test. ENS also initiated research to develop a more rigorous methodology for setting incentive levels in response to a regulatory order.

E-32017 Program Support Process Evaluation Reports 1 passage
Section 118
Table of Contents Page I Practices and Procedures Evaluation Volume 1: Incentive Setting 1. Introduction This evaluation report presents findings from an initial process assessment of the incentive setting process at Efficiency Nova Scotia...

AI summary This report evaluates the incentive setting process at Efficiency Nova Scotia (ENS) based on the CLEAResult Incentive Setting Methodology and EfficiencyOne’s Implementation Plan. ENS submitted these documents in 2016 and revised them in 2017, which were accepted by the Nova Scotia Utility and Review Board (UARB) in July 2017. Research Into Action was contracted to conduct an independent review as part of the 2017 Evaluation and Verification process.

E-4EfficienyOne Application 18 passages
Section 2
d its Annual Progress Report and Evaluation Reports on March 29, 2018, which form part of the record before the Board in this matter. Nova Scotia Utility and Review Board Page 2 of 3 April 6, 2018 Pursuant to the Electricity Plan Implement...

AI summary NS Power and EfficiencyOne are required under the Electricity Plan Implementation Act to enter a 2019 DSM Supply Agreement with a $34.05M expenditure cap. The agreement, negotiated under Section 79 of the Public Utilities Act, mirrors the 2016-2018 DSM Supply Agreement and incorporates legislative requirements, including the EPIA's one-year term extension.

Section 6
ers appropriate. 6. In support of this Application is filed the Evidence of EfficiencyOne, which includes Appendices A through D containing additional materials supporting the Application. 7. On the Evidence filed in support of this Applic...

AI summary EfficiencyOne seeks regulatory approval for a 2019 supply agreement with Nova Scotia Power Inc. (NSPI) to implement electricity efficiency and conservation activities. The application cites public interest and includes supporting evidence with appendices A-D. The agreement is effective January 1, 2019.

Section 16
ny costs, liabilities or damages arising out of a settlement of a claim by 27 the indemnified party, with or without the consent of the indemnifying 28 party. 29 (q) "Law" means the common law, the law of equity and all federal or provinci...

AI summary The text defines legal terms in a supply agreement between NSPI and EfficiencyOne, referencing the EECA and UARB's authority over changes to the EECA Plan. It outlines definitions related to liability, law, and regulatory compliance, emphasizing the role of the UARB in approving significant changes.

Section 17
d change to the EECA Plan for which 5 the UARB orders or directs EfficiencyOne to obtain the approval of the UARB 6 prior to the implementation of such proposed change. 7 (y) "Subcontractor" means any contractor, supplier or consultant hir...

AI summary The text defines terms within an agreement involving EfficiencyOne and the UARB, including requirements for UARB approval of changes to the EECA Plan. It outlines definitions for 'Subcontractor,' 'Term,' and 'UARB,' and references CASL, a Canadian legislative act.

Section 20
(a) Sections 1 to 27; 23 (b) Schedule "A" - Electricity Efficiency and Conservation Activities; and 24 (c) all other Schedules. 25 2. TERM & RESERVATION OF RIGHTS 26 2.1 The term of this Agreement shall be one (1) year from the Effective D...

AI summary This agreement outlines NSPI's obligation to purchase Electricity Efficiency and Conservation Activities (EECA) from EfficiencyOne for one year, with provisions for termination and compliance with the Act. EfficiencyOne must perform EECA professionally, efficiently, and in compliance with applicable laws, while NSPI retains rights under Section 791(3) of the Act.

Section 22
t to harmonized sales tax (as defined in the 27 Excise Tax Act (Canada)) ("HST"). No additional taxes (foreign or domestic), customs, 28 duties or brokerage fees shall apply. 29 4.6 If applicable, NSPI will withhold from payments to Effici...

AI summary The text outlines tax obligations related to the Harmonized Sales Tax (HST), procedures for withholding taxes from non-resident service providers, and requirements for notifying the Utility and Review Board (UARB) of significant changes to the EECA Plan. It also emphasizes EfficiencyOne's responsibility for safety in delivering energy efficiency services.

Section 39
spute and the Parties shall have thirty (30) days to resolve the dispute (or 26 ten (10) days if either Party notifies the other Party that the matter requires urgent 27 resolution). 28 19.2 Unless the parties agree otherwise, in the event...

AI summary The agreement outlines dispute resolution procedures involving the UARB under the Act, requiring EfficiencyOne to continue EECA obligations unless authorized by the UARB. Termination conditions include franchise termination or UARB approval, with no compensation for consequential losses.

Section 42
r other officer having similar powers over either Party its business or 39 assets, or the making of any assignment by either Party for the benefit of its 40 creditors. 14 Supply Agreement 1 20.5 If a breach notified pursuant to Sections 20...

AI summary This section outlines procedures for addressing breaches of the agreement, including correction timelines, submission of acceptable correction plans, and the right of the non-defaulting party to apply for termination with the UARB. It also provides contact details for NSPI and EfficiencyOne for notifications.

Section 47
nstrued to be a consent or waiver of any subsequent or continuing breach or default in 25 such Party's performance. 26 26.6 Time shall be of the essence for purposes of this Agreement. 27 26. 7 This Agreement, upon approval by the UARB, sh...

AI summary The agreement outlines key terms and conditions, including the importance of time, the enforceability of provisions, and the language of the agreement. It also specifies that the agreement, once approved by the UARB, is the entire agreement between the parties and cannot be modified without written approval.

Section 55
low income program participation, expenditures, and savings 74 through a variety of methods, including estimation based on geographic 75 census information. 76 77 Supply Agreement for Compliance Filing - 4- EFFICIENCYONE 2019 DSM PLAN FILI...

AI summary The document outlines a confidentiality and non-disclosure agreement between EfficiencyOne and Nova Scotia Power Incorporated, related to a supply agreement for electricity efficiency and conservation activities. It references relevant legislation and the role of the Nova Scotia Utility and Review Board.

Section 66
Agreement for Compliance Filing -5- EFFICJENCYONE 2019 DSM PLAN FILING Supply Agreement for Compliance Filing 1 SCHEDULE "A" to CONFIDENTIALITY AGREEMENT 2 3 UNDERTAKING 4 5 I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , HAVE READ AND 6 AGREE TO ABIDE...

AI summary The document contains a compliance filing related to the 2019 DSM Plan by EfficiencyOne, including a confidentiality agreement and a schedule for the EECA Plan subject to approval by the UARB.

Section 128
ding committee for a particular end-use [e.g., HVAC]) 26 or Technical Subcommittee (struck for the development of a particular standard) levels, as 27 oppotiunities arise. DATE FILED: April 6, 2018 Page 23 of24 EFFICIENCY ONE 2019 DSM PLAN...

AI summary This section outlines the Regulatory Affairs activities of ENS in 2019, including negotiations with NS Power on the DSM Resource Plan, filing regular reports with the UARB, and hosting DSM Advisory Group meetings to engage stakeholders and manage ongoing initiatives.

Section 135
1 1. INTRODUCTION 2 3 This Evidence is in support of an electricity Demand Side Management (DSM) Resource 4 Plan (2019 DSM Resource Plan) to supply Nova Scotia Power Inc. (NS Power) with 5 electricity efficiency and conservation activities...

AI summary This document is an application for a 2019 Demand Side Management (DSM) Resource Plan, submitted by EfficiencyOne on behalf of Efficiency Nova Scotia (ENS) to the Nova Scotia Utility and Review Board (UARB). The plan is based on a continuation approach under the Electricity Plan Implementation (2015) Act, which supports NS Power’s Rate Stability Period of 2017-2019.

Section 141
1 • The “franchise holder is deemed to be a public utility in relation to its franchise 2 activities” (s. 79G(2)); 3 • The supply of electricity efficiency and conservation activities is administered 4 by the holder of the ENS franchise on...

AI summary The text discusses the legal framework surrounding the ENS franchise, including the franchise holder's status as a public utility, the contractual administration of electricity efficiency and conservation activities by EfficiencyOne with NS Power, and the role of the UARB in cost allocation. It also outlines the ENS franchise grant and its extension in 2015.

Section 152
2018 approved DSM Plan and program mix, it is also based on the same 2014 23 IRP considerations. 24 25 EfficiencyOne recognizes that the 2019 DSM Resource Plan must meet the requirements 26 of the new legislation, provide sound and reasona...

AI summary The 2019 DSM Resource Plan must comply with new legislation and provide sound evidence for regulatory approval, ensuring program continuity without relying on an updated IRP. This approach mirrors the one taken in 2015 under the Electricity Plan Implementation Act.

Section 178
source modelling process rather than investing 23 to repeat this work when the inputs have not materially changed; 24 - investing a reasonable amount of time to develop the 2019 DSM Resource 25 Plan; and 26 - seeking to avoid a lengthy and...

AI summary The document discusses the rationale for continuing the 2019 DSM Plan without repeating the modelling process, emphasizing the need to avoid unnecessary repetition, invest reasonable time in developing the plan, and avoid a lengthy and expensive regulatory proceeding by continuing an existing UARB-approved DSM Plan.

Section 260
D: April 6, 2018 Page 23 of 24 EFFICIENCYONE 2019 DSM PLAN FILING Appendix A 1 4.3.3 Regulatory Affairs 2 3 Regulatory Affairs activities include UARB processes, DSM Advisory Group initiatives and 4 stakeholder consultation work, industry...

AI summary This section outlines the Regulatory Affairs activities for 2019, including negotiations with NS Power on the 2020-2022 DSM Resource Plan, stakeholder and UARB approvals, and the filing of various reports and updates with the UARB.

Section 282
Page 6 of 17 EFFICIENCYONE 2019 DSM PLAN FILING Appendix B

AI summary The document is an appendix to the EfficiencyOne 2019 DSM Plan filing, which outlines demand-side management initiatives in Nova Scotia. It includes details on energy efficiency programs, stakeholder engagement, and regulatory processes.

E-4-(i)2019 Plan RBIA Model - Excel Spreadsheet (Electonic Filing Only) 1 passage
Attribution
Attribution Unnamed: 0 Unnamed: 1 Unnamed: 2 Unnamed: 3 Unnamed: 4 Unnamed: 5 Unnamed: 6 Unnamed: 7 Unnamed: 8 Unnamed: 9 Unnamed: 10 Unnamed: 11 Unnamed: 12 Unnamed: 13 Unnamed: 14 Unnamed: 15 Unnamed: 16 Unnamed: 17 Unnamed: 18 Unnamed:...

AI summary The document presents a table with columns labeled 'New', 'Estimated', and 'Energy Savings Actions3', indicating a focus on energy savings initiatives. It includes data entries such as zeros and NaN values, and references 'ENS allocation of Home Energy Report participants', pointing to a regulatory process involving participant allocation.

E-7NSPI (SBA) RIRs to IR-1 to IR-5 - Redacted 5 passages
Section 4
and 2017 Evaluation Reports (NSUARB M08604) NSPI Responses to SBA Information Requests PARTIALLY CONFIDENTIAL (Attachment Only) 1 Request IR-2: 2 3 Has NSP developed a procedure on allocating DSM costs on the cost-of-service study? 4 5 (a)...

AI summary NSPI confirms it has used a DSM cost allocation procedure since the 2009 DCRR approval, intending to continue this approach. The Board’s 2015 decision in M07151/E-R-15 endorsed annually tracking DSM cost variances during GRA periods, aligning with NSPI’s proposal.

Section 5
proposal to annually track comparisons of DSM cost recoveries to DSM 27 expenditures, and then adjusting any required variances during the next 28 GRA.2 1 Nova Scotia Power Inc. – DSM Cost Allocation and Recovery – M07151/E-R-15, December...

AI summary The text proposes annually tracking DSM cost recoveries against expenditures and adjusting variances in subsequent GRA.2 reviews. It references prior regulatory matters (M07151, NSUARB M08604) and documents including the 2019 DSM Plan Application and 2017 Evaluation Reports, with NSPI responding to SBA information requests.

Section 17
REDACTED 2019 DSM Application SBA IR-2 Attachment 1 Page 2 of 16

AI summary A redacted 2019 Demand Side Management (DSM) application submitted to the Utility and Review Board (SBA) as part of the IR-2 process, with Attachment 1 comprising Page 2 of 16. The content is not visible due to redaction.

Section 26
REDACTED 2019 DSM Application SBA IR-2 Attachment 1 Page 4 of 16

AI summary A redacted 2019 Demand Side Management (DSM) application is attached to SBA IR-2, page 4 of 16. The document pertains to regulatory proceedings involving DSM programs under Nova Scotia Power Inc.'s (NSPI) utility operations.

Section 72
30,090 4.4% $646,879 2.9% $976,969 3.2% $976,969 0 16 Large Industrial $1,256,480 4.2% $475,773 6.3% $942,360 4.2% $1,418,132 4.7% $1,418,132 0 17 Municipal $1,017,170 3.4% $120,451 1.6% $762,878 3.4% $883,328 2.9% $883,328 0 18 Unmetered...

AI summary The text includes financial data and references to regulatory filings related to the 2019 DSM Plan Application, 2017 Annual Progress Report, and 2017 Evaluation Reports. It also mentions NSPI responses to SBA information requests, indicating ongoing regulatory proceedings involving demand-side management and compliance.

E-9E1 (SBA) RIRs to IR-1 to IR-21 6 passages
Section 73
ca 1-888-414-1336 Date Filed: May 30, 2018 SBA IR-08 Attachment 2, Page 2 of 24 Table of Contents

AI summary The document is a regulatory proceeding filing from May 30, 2018, associated with the Small Business Advocate (SBA) and includes an attachment with a table of contents. It appears to be part of a larger submission related to regulatory processes in Nova Scotia.

Section 627
17 Attachment 1, Page 65 of 92 Efficiency Nova Scotia 2017 DSM ANNUAL PROGRESS REPORT 1 Table 14: 2018 Planned DSM Expenditures by Rate Class Planned 2018 Rate Code Expenditures ($ million) Residential/Charitable (2,3,4) 19.4 Small General...

AI summary The document provides details on planned 2018 Demand Side Management (DSM) expenditures by rate class and discusses updates on items from the 2016-2018 DSM Resource Plan regulatory process, including locational DSM efforts.

Section 629
r would conduct a detailed review of capital expenditures that could 17 potentially be avoided through locational DSM and convey the results to ENS; 18 and 33 Supra note 1. 34 Ibid at Schedule B. 35 M06733, NSUARB Decision, The Public Util...

AI summary The text discusses a review of capital expenditures that could be avoided through locational DSM, referencing past regulatory proceedings and agreements involving EfficiencyOne and Nova Scotia Power. It also references past UARB decisions and reports related to demand-side management and efficiency programs.

Section 633
roup in 2018 in relation to ENS’s plans for integrating non- 18 energy benefits into the TRC test in Nova Scotia. 19 20 5.4 Incentive Setting Methodology Study and Implementation 21 22 In response to the UARB’s Order dated October 7, 2015,...

AI summary This text discusses Efficiency Nova Scotia's (ENS) efforts to develop a more rigorous methodology for setting incentive levels in response to a 2015 UARB order. The research involved reviewing how 12 North American jurisdictions set and revise DSM program incentives, as well as ENS’s current practices.

Section 637
Filed: May 30, 2018 SBA IR-17 Attachment 1, Page 73 of 92 Table 1 Attachment 1, Page 1 of 20 Update on Implementation of 2013-2015 Evaluation Recommendations

AI summary The document provides an update on the implementation of recommendations from a 2013-2015 evaluation, likely related to energy efficiency or regulatory processes in Nova Scotia. It appears to be part of a submission or filing in a regulatory proceeding.

Section 679
Table 2 Attachment 1, Page 7 of 20 Update on Implementation of 2013-2015 Verification Recommendations Expected Evaluation/ Year Recommendation Text Source Status Comments Period of Verification Completion 2014 Verification Develop evaluati...

AI summary The document discusses the development of evaluation guidelines as part of the 2013-2015 Verification Recommendations. ENS agrees with the recommendation and is in the process of developing guidelines based on the New York evaluation guidelines and appendices to set evaluation standards for future evaluations. The expected completion period is 2018.

E-10E1 (NSUARB) RIRs to IR-1 to IR-21 8 passages
Section 5
E1 (NSUARB) IR-02 Page 2 of 2 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne (E1) submitted its 2019 Demand Side Management (DSM) Resource Plan (M08604) in response to the Nova Scotia Utility and Review Board (NSUARB), outlining its approach to DSM programs and resource allocation.

Section 19
3 0 0 0 3 8 Direct Installation Small Business Energy Solutions Expenditures ($ thousand) 4 29 0 0 0 52 85 Numbers may not sum due to rounding. 1 Instant Savings rebates are upstream and therefore transactional data, including participant...

AI summary EfficiencyOne submitted its 2019 Demand Side Management (DSM) Resource Plan (M08604) in response to the Nova Scotia Utility and Review Board (NSUARB). The document includes expenditure data for programs like Direct Installation and Small Business Energy Solutions, with notes about data limitations for Instant Savings rebates.

Section 20
icipal utility distribution observed in BER Mail-in. EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne submitted its 2019 Demand Side Management (DSM) Resource Plan (M08604) and responded to the Nova Scotia Utility and Review Board (NSUARB). The proceeding involves regulatory review of DSM program structures and compliance with utility oversight requirements.

Section 23
E1 (NSUARB) IR-06 Page 2 of 2 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne (E1) submitted responses to the Nova Scotia Utility and Review Board (NSUARB) regarding its 2019 Demand Side Management (DSM) Resource Plan under matter M08604.

Section 26
E1 (NSUARB) IR-07 Page 2 of 2 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne (E1) submitted its 2019 Demand Side Management (DSM) Resource Plan to the Nova Scotia Utility and Review Board (NSUARB) as part of regulatory proceedings under matter M08604. The submission outlines E1's approach to DSM programs and compliance with regulatory requirements.

Section 35
E1 (NSUARB) IR-14 Page 1 of 1 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne (E1) submitted its 2019 Demand Side Management (DSM) Resource Plan in response to the Nova Scotia Utility and Review Board (NSUARB) under matter M08604. The document outlines E1's proposals for DSM initiatives as part of the regulatory approval process.

Section 37
EfficiencyOne has not yet reviewed these options with NS Power or other stakeholders 30 and anticipates these discussions will be fulsome and result in modifications to the Date Filed: May 30, 2018 E1 (NSUARB) IR-15 Page 1 of 5 EfficiencyO...

AI summary EfficiencyOne (E1) has not yet reviewed proposed options with NS Power or stakeholders, anticipating detailed discussions that may lead to modifications. The document pertains to E1's 2019 Demand Side Management (DSM) Resource Plan under matter M08604, responding to the Nova Scotia Utility and Review Board (NSUARB).

Section 38
E1 (NSUARB) IR-15 Page 1 of 5 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Nova Scotia Utility and Review Board

AI summary EfficiencyOne (E1) submitted its 2019 Demand Side Management (DSM) Resource Plan (M08604) to the Nova Scotia Utility and Review Board (NSUARB), outlining its proposed energy efficiency initiatives and responding to regulatory scrutiny.

E-11E1 (Synapse) RIRs to IR-1 to IR-22 8 passages
Section 5
E1 (Synapse) IR-02 Page 1 of 1 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Synapse Energy Economics

AI summary EfficiencyOne provides responses to Synapse Energy Economics' analysis of the 2019 Demand Side Management (DSM) Resource Plan under matter M08604. The document outlines EfficiencyOne's position on DSM program evaluation and implementation.

Section 37
E1 (Synapse) IR-08 Page 1 of 2 EfficiencyOne – 2019 Demand Side Management (DSM) Resource Plan M08604 (E-ENS-R-18) E1 Responses to Synapse Energy Economics NON-CONFIDENTIAL 1 EfficiencyOne anticipates the DSM consultant’s modelling effort...

AI summary EfficiencyOne outlines its approach to the 2020-2022 DSM Resource Plan, emphasizing a bottom-up modelling method and a timeline for development and filing. The plan will be filed with the UARB in Q1 2019, preceding NS Power’s next IRP and a DSM Potential Study update.

Section 38
2022. 20 21 c) Please refer to part a). 22 23 d) EfficiencyOne’s 2020-2022 DSM Resource Plan will be filed with the UARB in Q1 24 of 2019, in advance of the next IRP. Date Filed: May 30, 2018 E1 (Synapse) IR-08 Page 2 of 2 Date Filed: May...

AI summary EfficiencyOne's 2020-2022 DSM Resource Plan will be filed with the UARB in Q1 2019. The document includes a Request for Proposal (RFP) dated April 26, 2018, outlining EfficiencyOne's right to reject proposals and disclaim liability for respondent costs.

Section 56
n Nova Scotia in 2015. As a result of this legislation, ENSC ceased to exist as Nova Scotia’s DSM provider on January 1, 2015. In its place, an ENS franchise was created. Highlights include: • As of January 1, 2015, NSPI is required to und...

AI summary In 2015, ENSC ceased to be Nova Scotia’s DSM provider, replaced by an ENS franchise awarded to EfficiencyOne. The franchise grants EfficiencyOne exclusive rights to supply electricity efficiency and conservation activities to NSPI, with regulatory oversight by the UARB. The franchise term was extended to 2025, and a DSM Resource Plan was developed to ensure consistent funding during the Rate Stability Plan.

Section 60
nd customer preferences in Nova Scotia. In addition, a modelling approach that can offer predictive functions with respect to market behaviour and measure uptake will be considered an asset. 4 SCOPE OF WORK EfficiencyOne is seeking an expe...

AI summary EfficiencyOne is seeking a DSM consultant to develop ENS’s 2020-2022 DSM Resource Plan, including a Preferred Plan and an Alternative Plan, both fully modelled. The consultant must use modelling software that allows for input and output inspection by EfficiencyOne, regulatory intervenors, and the UARB. The model must support Total Resource Cost testing for ENS’s six programs.

Section 69
onclusion of this phase, the draft model will be available for EfficiencyOne’s use in, among other things, internal review, Plan negotiation, and sharing with stakeholders. 4.6.3 Phase II, part a – Model Revision Model revisions may be req...

AI summary The document outlines Phase II, part a of the model revision process, which involves revising the model based on internal review, stakeholder input, and negotiations with NS Power. The process is expected to be lengthy, from November 2018 to March 2019, and will result in the development of Alternative Plans based on stakeholder feedback. Final model outputs will be submitted to the UARB as part of the regulatory process.

Section 70
tive Plans. EfficiencyOne intends to proactively submit the model outputs to the UARB, and may be directed to file the models themselves as part of the regulatory process. 4.6.4 Phase II, part b – Regulatory Process The regulatory process...

AI summary EfficiencyOne plans to submit model outputs to the UARB as part of the regulatory process for the 2020-2022 DSM Resource Plan. The successful proponent may be required to answer questions or provide testimony regarding the model and its development. Ongoing support may be required after the regulatory process concludes.

Section 369
c) Please explain why additional costs are needed for this purpose in 2019. 11 d) Do these costs include funds to conduct a potential study? If not, why not? 12 13 Response IR-15: 14 15 a) In 2019, EfficiencyOne expects to incur costs rela...

AI summary EfficiencyOne outlines expected costs for the 2020-2022 DSM Resource Plan filing process in 2019, including legal and consulting costs. The process is expected to follow a similar timeline and structure as the 2016-2018 DSM Resource Plan application, with plan drafting in Q3 2018 and a regulatory hearing anticipated after filing with the UARB.

E-17NSPI - NSPI Reply Submission 2 passages
Section 1
PO Box 910 ● Halifax, Nova Scotia ● Canada ● B3J 2W5 June 20, 2018 Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit “M” Halifax, NS B3J 3S3 Re: M08604...

AI summary Nova Scotia Power (NS Power) submitted a reply to the Nova Scotia Utility and Review Board (UARB) regarding an application for approval of a 2019 Demand Side Management (DSM) supply agreement with EfficiencyOne (E1). The application, under the Electricity Plan Implementation Act (EPIA), includes a 127 GWh efficiency and 20 MW demand savings program. Synapse Energy Economics, the Small Business Advocate (SBA), and the Affordable Energy Coalition (AEC) support the plan, while the Consumer Advocate (CA) raised specific concerns.

Section 4
ows: “E1 should increase focus on capacity savings by implementing demand reduction pilots as soon as feasible, subject to review by stakeholders and the Board.” 5 In addition to demand response, the CA also commented on the need for revis...

AI summary The text discusses E1's need to prioritize capacity savings through demand reduction pilots, the CA's recommendations for revising the RBIA and DSMAG, NS Power's supply agreement with E1 under the EPIA, and a submission by Brian Curry requesting approval of the agreement. It references Exhibit E-13 and matter M08604.

73609Hearing Order 2 passages
Section 1
HEARING ORDER M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by EFFICIENCYONE for Approval of a Supply Agreement for Electricity Efficiency and Conservation Act...

AI summary The Nova Scotia Utility and Review Board sets a timetable for a paper hearing process regarding EfficiencyOne's application to approve a supply agreement with Nova Scotia Power Inc. and the 2019 Demand Side Management Resource Plan. Key deadlines include intervention notices, information requests, and evidence submissions.

Section 2
8 Intervenor Evidence & Submissions Wednesday, June 13, 2018 Reply Evidence & Submissions by E1 & NSPI Wednesday, June 20, 2018 Document: 261845 AND IT IS FURTHER ORDERED that the Board Regulatory Rules will apply to this matter, including...

AI summary The document outlines procedural orders for a regulatory proceeding, including deadlines for intervenor and reply evidence submissions on June 13 and 20, 2018. It mandates application of the Board's Regulatory Rules, distribution of a Notice of Paper Hearing, and specifies the Clerk of the Board's role in communication.

74839Board Order 10 passages
Section 1
ORDER M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by EFFICIENCYONE for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities...

AI summary The Nova Scotia Utility and Review Board is considering EfficiencyOne's application for approval of a supply agreement with Nova Scotia Power Inc. and the 2019 Demand Side Management Resource Plan. The process includes a paper hearing, intervenor participation, and a verification review of 2017 program evaluations.

Section 14
any costs, liabilities or damages arising out of a settlement of a claim by 27 the indemnified party, with or without the consent of the indemnifying 28 party. 29 (q) "Law” means the common law, the law of equity and all federal or provinc...

AI summary The text defines legal terms within a supply agreement between NSPI and EfficiencyOne, covering indemnification, environmental laws, regulatory approvals, and definitions related to liability and compliance. Key terms include 'Law,' 'Release,' and 'Significant Changes' requiring UARB approval.

Section 18
Sections 1 to 27; 23 (b) Schedule “A” - Electricity Efficiency and Conservation Activities; and 24 (c) all other Schedules. 25 2. TERM & RESERVATION OFRIGHTS 26 2.1 The term of this Agreement shall be one (1) year from the Effective Date a...

AI summary This agreement outlines a one-year term (2019) for NSPI to purchase Electricity Efficiency and Conservation Activities (EECA) from EfficiencyOne, with compliance to the Act and UARB oversight. It emphasizes professional execution, environmental safety, and adherence to legal requirements.

Section 20
t to harmonized sales tax (as defined in the 27 Excise Tax Act (Canada)) (“HST”). No additional taxes (foreign or domestic), customs, 28 duties or brokerage fees shall apply. 29 4.6 If applicable, NSPI will withhold from payments to Effici...

AI summary The agreement outlines tax obligations including HST compliance, withholding requirements for non-resident services, notification procedures for Significant Changes to the EECA Plan requiring UARB approval, and safety responsibilities for EfficiencyOne in EECA performance.

Section 40
r other officer having similar powers over either Party its business or 39 assets, or the making of any assignment by either Party for the benefit of its 40 creditors. 14 Supply Agreement 1 20.5 If a breach notified pursuant to Sections 20...

AI summary The text outlines contractual obligations related to breach correction, termination rights, and notification procedures. It specifies conditions for a defaulting party to avoid breach by correcting violations, requiring a plan approved by the UARB. The non-defaulting party may seek termination via the UARB if defaults persist. Notification addresses are provided for NSPI and EfficiencyOne.

Section 41
One 25 230 Brownlow Avenue 26 Suite 300 27 Dartmouth, NS B3B 0G5 28 Attention: CEO 29 Facsimile: (902) 470-3599 30 31 21.2 All notices may be sent by facsimile, a nationally recognized overnight courier service, 32 first class mail or hand...

AI summary The text outlines procedures for delivering notices in a supply agreement, specifying methods such as facsimile, overnight courier, first class mail, and hand delivery. It also includes presumptions for when notices are considered received based on the method used and the timing of receipt.

Section 42
) Business Days 4 after mailing. 5 21.3 Either Party may modify its address for notices by advance written notice to the other 6 Party. 7 22. AUDIT AND INSPECTION 8 22.1 EfficiencyOne shall, during the Term and for a period of thirty-six (...

AI summary The text outlines procedures for audit and inspection, data sharing, and coordination meetings under an agreement between EfficiencyOne and NSPI. It specifies that NSPI may request access to records or inspections through the UARB and that data sharing must align with past practices. Assignment of the agreement requires UARB approval.

Section 43
mation by NSPI, NSPi shall have 26 the right to apply to the UARB to request access to the information and data referred to 27 in 24.1. 28 25. COORDINATION MEETINGS AND REPORTS 29 25.1 During the Term of this Agreement, EfficiencyOne shall...

AI summary The agreement outlines reporting requirements for EfficiencyOne, including quarterly and annual reports to be submitted to the UARB and NSPI. It emphasizes coordination between NSPI and EfficiencyOne to ensure effective planning and compliance with the Act.

Section 45
construed to be a consent or waiver of any subsequent or continuing breach or default in 25 such Party's performance. 26 26.6 Time shall be of the essence for purposes of this Agreement. 27 26.7 This Agreement, upon approval by the UARB, s...

AI summary This section outlines the terms and conditions of the agreement, emphasizing that time is of the essence, the agreement is the entire agreement between the parties, and that any unenforceable provision will not affect the rest of the agreement. It also specifies that the agreement will be in English and may be executed in counterparts.

Section 65
By: Name: Name: Stephen MacDonald Title: 21 Title: Chief Executive Officer Supply Agreement for Compliance Filing -5- EFFICIENCYONE 2019 DSM PLAN FILING Supply Agreement for Compliance Filing 1 SCHEDULE "A" to CONFIDENTIALITY AGREEMENT 2 3...

AI summary The document outlines a confidentiality agreement between EfficiencyOne and Nova Scotia Power Incorporated, including an undertaking to abide by its terms. It also references a schedule related to the EECA Plan, subject to approval by the UARB.

73494Board letter re approval of extension request 1 passage
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, UnitHM" 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3J 3P6 B3J3S3 1 855 442-4448 (toll-free) [email protected] 902 424-4448 t http...

AI summary EfficiencyOne requested an extension to file its 2019 DSM Plan application until April 6, 2018, due to finalizing the 2019 Supply Agreement with NS Power. The Nova Scotia Utility and Review Board granted the extension, ensuring it would not affect the June 2018 hearing dates.

73495Letter from EI requesting extension for filing application 1 passage
Section 1
James R. Gogan Direct Dial: (902) 563-5920 E-Mail: [email protected] File No. 41736-53 March 28, 2018 Nova Scotia Utility & Review Board PO Box 1692, Unit “M” Halifax, Nova Scotia B3J 3S3 Attention: Doreen Friis, Regulatory Affairs Of...

AI summary EfficiencyOne and Nova Scotia Power (NS Power) request an extension to file their 2019 DSM Plan and Supply Agreement with the Nova Scotia Utility & Review Board, originally due March 29, 2018, now seeking April 6, 2018. The 2017 Annual Progress Report and Evaluation Reports will be filed on time. NS Power is deemed a co-applicant under the Public Utilities Act.

73609Hearing Order 1 passage
Section 2
8 Intervenor Evidence & Submissions Wednesday, June 13, 2018 Reply Evidence & Submissions by E1 & NSPI Wednesday, June 20, 2018 Document: 261845 AND IT IS FURTHER ORDERED that the Board Regulatory Rules will apply to this matter, including...

AI summary The document outlines procedural orders for a regulatory proceeding, including deadlines for evidence submissions by EfficiencyOne (E1) and Nova Scotia Power Inc. (NSPI) on June 13 and 20, 2018. It mandates application of the Board's Regulatory Rules, specifically Rule 7(3), and distribution of a Notice of Paper Hearing to stakeholders.

73610Notice of Paper Hearing 1 passage
Section 1
NOVA SCOTIA UTILITY AND REVIEW BOARD NOTICE OF PAPER HEARING EFFICIENCYONE made Application to the Board on April 6, 2018, for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1)...

AI summary EfficiencyOne applied for approval of a supply agreement with Nova Scotia Power Inc. (NSPI) and the 2019 Demand Side Management (DSM) Resource Plan. The Board will conduct a paper hearing with specified deadlines for interventions, evidence submissions, and responses.

73631Notice of Intervention - SBA 1 passage
Section 1
NSUARB Matter No. M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF : The Public Utilities Act, R.S.N.S., 1989, c. 380 as amended - and - IN THE MATTER OF: an Application by EfficiencyOne for Approval of a Supply Agreement for E...

AI summary EfficiencyOne seeks approval for a supply agreement with Nova Scotia Power Inc. and its 2019 DSM Resource Plan. The Small Business Advocate intervenes, representing small businesses affected by the application. The proceeding is under the Public Utilities Act.

73654Notice of Intervention - CA 1 passage
Section 1
1 April 11, 2018 VIA EMAIL 28620 Ms. Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Dear Ms. Friis: Re: M08604 – EfficiencyOne Application for Appro...

AI summary The Consumer Advocate requests intervenor status in M08604, seeking to represent residential ratepayers in EfficiencyOne's application for a DSM Supply Agreement and 2019 DSM Plan. They intend to participate in an oral hearing and will be represented by William L. Mahody, Q.C., of Merrick Jamieson Sterns Washington & Mahody.

73664Notice of Intervention - IG 1 passage
Section 1
2017 M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: An Application by EfficiencyOne for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne and Nova Scotia Power Inc. a...

AI summary The Industrial Group, comprising large and medium industrial customers of Nova Scotia Power Inc., intervenes in a proceeding concerning EfficiencyOne's application for a supply agreement and approval of its 2019 Demand Side Management (DSM) Resource Plan. Their costs are directly impacted by the application, and Stewart McKelvey represents them.

73744Email re Notice of Intervention - AEC 1 passage
Section 2
pate as an intervenor in the paper hearing regarding M08604, EfficiencyOne’s Application for Approval of DSM Supply Agreement and 2019 DSM Plan. Claire McNeil and I will represent AEC in the hearing. NB: This morning I noted that you appea...

AI summary Brian Gifford notifies Crystal Henwood of AEC's participation in the paper hearing for M08604, correcting an outdated intervenor list by replacing Catherine Abreu with Emma Norton and Stephen Thomas. Claire McNeil will join Gifford in representing AEC.

73745Notice of Intervention - EAC 1 passage
Section 1
tel. 902.429.2202 2705 Fern Lane, fax. 902.405.3716 Halifax, NS, B3K 4L3 Re: M08604 – EfficiencyOne- Application for Approval of DSM Supply Agreement and 2019 DSM Plan April 17th, 2018 Ms. Doreen Friis Clerk to the Nova Scotia Utility and...

AI summary Ecology Action Centre notifies intent to intervene in M08604, EfficiencyOne's application for approval of a DSM Supply Agreement and 2019 DSM Plan. The application seeks regulatory approval for energy efficiency programs and supply arrangements.

74059Synapse (E1) IR-1 to IR-22 1 passage
NOVA SCOTIA UTILITY AND REVIEW BOARD
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: AN APPLICATION by EFFICIENCYONE (E1) for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities betwee...

AI summary EfficiencyOne (E1) seeks approval from the Nova Scotia Utility and Review Board for a supply agreement with Nova Scotia Power Inc. and the establishment of a final agreement, including approval of E1's 2019 Demand Side Management (DSM) Resource Plan under the Public Utilities Act.

74060SBA (E1) IR-1 to IR-21 1 passage
2 3 NOVA SCOTIA UTILITY AND REVIEW BOARD The Public Utilities Act, R.S.N.S. 1989, c.380 as amended 4 IN THE MATTER OF: 5 -and - 6 IN THE MATTER OF: E-ENS-R-18 – Efficie
2 3 NOVA SCOTIA UTILITY AND REVIEW BOARD The Public Utilities Act, R.S.N.S. 1989, c.380 as amended 4 IN THE MATTER OF: 5 -and - 6 IN THE MATTER OF: E-ENS-R-18 – EfficiencyOne – 2019 Demand Side Management 7 (DSM) Plan Application, 2017 Ann...

AI summary The Nova Scotia Utility and Review Board has issued information requests to EfficiencyOne regarding the methodology used in setting the investment level, energy savings targets, and budget breakdown for the 2019 Demand Side Management (DSM) Plan. The requests are part of a regulatory proceeding under the Public Utilities Act.

74062CA (NSPI) IR-1 to IR-2 1 passage
Section 1
2018 M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER AN APPLICATION by EFFICIENCYONE for the Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities...

AI summary The Consumer Advocate has requested information from Nova Scotia Power Inc. regarding EfficiencyOne's application for a supply agreement and approval of their 2019 Demand Side Management (DSM) Resource Plan under the Public Utilities Act. Responses are due by May 9, 2018.

74347NSPI Confidentiality Undertaking 2 passages
Section 1
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended - and - IN THE MATTER OF: M08604 ‐ EfficiencyOne ‐ Application for Approval of a Supply Agreement for Electricity Efficiency a...

AI summary The document outlines an application by EfficiencyOne (E1) for approval of a supply agreement with Nova Scotia Power Inc. (NSPI) under the Public Utilities Act. It includes an undertaking to comply with Schedule A terms, which involve NSPI providing Designated Confidential Information to specified recipients.

Section 4
nsent of NSPI. Designated Recipients may take such notes as may be necessary solely for the purposes of this proceeding. Such notes shall be treated as Designated Confidential Information. 7. Where a reference to Designated Confidential In...

AI summary The document outlines procedures for handling Designated Confidential Information in the proceeding, including restrictions on referencing such information in filings, requirements for confidential testimony submissions, and protocols for court appeals involving sealed records. NSPI and the Board emphasize confidentiality preservation and limited disclosure in decision-making.

74348E1 Covering letter with IR Responses 1 passage
Section 1 p. p. 0
James R. Gogan Direct Dial: (902) 563-5920 E-Mail: [email protected] May 30, 2018 Nova Scotia Utility & Review Board PO Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3 Attention: Doreen Friis, Regulatory Affairs Officer / Clerk Dear M...

AI summary The Breton Law Group submits responses to information requests related to EfficiencyOne's 2019 DSM Resource Plan under matter M08604, including replies to the Board, Synapse, Consumer Advocate, and Small Business Advocate IRs.

74839Board Order 9 passages
Section 1
ORDER M08604 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by EFFICIENCYONE for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities...

AI summary The Nova Scotia Utility and Review Board is considering EfficiencyOne's application for approval of a supply agreement with Nova Scotia Power Inc. and the 2019 Demand Side Management Resource Plan, following a paper hearing process and intervenor participation from multiple stakeholders.

Section 15
o the EECA Plan for which 5 the UARB orders or directs EfficiencyOne to obtain the approval of the UARB 6 prior to the implementation of such proposed change. 7 (y) “Subcontractor” means any contractor, supplier or consultant hired by 8 Ef...

AI summary The text defines key terms in an agreement involving EfficiencyOne and the UARB, including the EECA Plan and UARB's authority to approve changes. It references CASL, a federal act regulating electronic commerce, and outlines general agreement provisions.

Section 20
t to harmonized sales tax (as defined in the 27 Excise Tax Act (Canada)) (“HST”). No additional taxes (foreign or domestic), customs, 28 duties or brokerage fees shall apply. 29 4.6 If applicable, NSPI will withhold from payments to Effici...

AI summary The text outlines tax obligations related to the Harmonized Sales Tax (HST), withholding requirements for non-resident services, notification procedures for significant changes to the EECA Plan, and safety responsibilities under the supply agreement between NSPI and EfficiencyOne.

Section 40
r other officer having similar powers over either Party its business or 39 assets, or the making of any assignment by either Party for the benefit of its 40 creditors. 14 Supply Agreement 1 20.5 If a breach notified pursuant to Sections 20...

AI summary The text outlines contractual clauses for breach correction, termination rights upon default, and notification procedures in a supply agreement between Nova Scotia Power Inc. (NSPI) and EfficiencyOne. It specifies conditions for curing breaches, the role of the UARB in termination applications, and detailed mailing addresses for both parties.

Section 41
One 25 230 Brownlow Avenue 26 Suite 300 27 Dartmouth, NS B3B 0G5 28 Attention: CEO 29 Facsimile: (902) 470-3599 30 31 21.2 All notices may be sent by facsimile, a nationally recognized overnight courier service, 32 first class mail or hand...

AI summary The text outlines procedures for sending and receiving notices, including presumptions for different methods of delivery and the ability of either party to update their notice address. It includes definitions for when notices are considered received based on the method used.

Section 43
mation by NSPI, NSPi shall have 26 the right to apply to the UARB to request access to the information and data referred to 27 in 24.1. 28 25. COORDINATION MEETINGS AND REPORTS 29 25.1 During the Term of this Agreement, EfficiencyOne shall...

AI summary The text outlines reporting and coordination requirements between EfficiencyOne and NSPI under an agreement, including quarterly and annual reporting to the UARB, and the importance of ongoing communication for effective planning. The agreement also specifies its renewal terms based on the Act.

Section 45
construed to be a consent or waiver of any subsequent or continuing breach or default in 25 such Party's performance. 26 26.6 Time shall be of the essence for purposes of this Agreement. 27 26.7 This Agreement, upon approval by the UARB, s...

AI summary This section outlines the enforceability and execution of the agreement, emphasizing that time is of the essence, the agreement will be the entire agreement between the parties, and any unenforceable provision will not affect the rest of the agreement. It also specifies that the agreement may be executed in counterparts and delivered electronically.

Section 49
gets 127.2 j 20.2 _ _ 11 12 13 The Performance Targets will be achieved in accordance with the EECA Plan as set out 14 in Schedule E. 15 16 For certainty, in accordance with the performance requirements set cut in Schedule “C” attached her...

AI summary The document outlines performance targets under the EECA Plan, specifying that EfficiencyOne must achieve at least 90% of the targets to be considered in substantial compliance. If this threshold is not met, a regulatory process will be initiated. The text also references a supply agreement and compensation schedule related to the 2019 DSM Plan filing.

Section 65
By: Name: Name: Stephen MacDonald Title: 21 Title: Chief Executive Officer Supply Agreement for Compliance Filing -5- EFFICIENCYONE 2019 DSM PLAN FILING Supply Agreement for Compliance Filing 1 SCHEDULE "A" to CONFIDENTIALITY AGREEMENT 2 3...

AI summary This document contains a confidentiality agreement and undertaking related to EfficiencyOne's 2019 DSM Plan filing with Nova Scotia Power Incorporated. It includes a schedule outlining the EECA Plan, subject to approval by the UARB.

77498Letter from E1 re requesting extension to filing DSM Potential Study 2 passages
Section 1
James R. Gogan Direct Dial: (902) 563-5920 E-Mail: [email protected] File No. 41736-92 May 3, 2019 Nova Scotia Utility & Review Board PO Box 1692, Unit “M” Halifax, Nova Scotia B3J 3S3 Attention: Doreen Friis, Regulatory Affairs Offic...

AI summary EfficiencyOne seeks an extension to complete its DSM Potential Study, citing the need for stakeholder engagement. The Board previously ordered the study in Matter M08604. EfficiencyOne plans to present baseline data in May 2019, with a final report by June 25, 2019, but requests an extension to August 2019 for stakeholder review.

Section 2
eld during the first week of August 2019. Nova Scotia Utility and Review Board Page 2 of 2 May 3, 2019 In keeping with this request, EfficiencyOne proposes the following timeline of activities: Proposed Critical Activities / Milestones Sch...

AI summary EfficiencyOne requests an extension to file the DSM Potential Study, proposing a revised timeline including stakeholder reviews and DSMAG member input. The Breton Law Group submits the request on behalf of EfficiencyOne, emphasizing cooperation with the Board's process.

77526Letter to E1 approving extension for filing study 2 passages
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, Unit "M" 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3J 3P6 B3J3S3 1 855 442-4448 (toll-free) [email protected] 902 424-4448 t htt...

AI summary EfficiencyOne requested to delay the DSM Potential Study filing from July 31, 2019, to September 13, 2019. The Board emphasized that the July 31 deadline was set to allow a full year for the study and stakeholder consultation, referencing its July 23, 2018 order and a prior letter in Matter M08059 requiring NS Power to align pre-IRP tasks with the deadline.

Section 2
ful consultation process. Also, the Board’s subsequent letter of October 5, 2018 in Matter M08059 noted the requirement for NS Power to complete its pre-IRP tasks to coincide with the July 31st date: The Board directs NS Power to undertake...

AI summary The Board directed NS Power to complete pre-IRP tasks by July 31, 2019, emphasizing the DSM Potential Study's role in the IRP process. EfficiencyOne was tasked with stakeholder engagement during the study. A two-week filing extension to August 14, 2019, was granted, rejecting a 6-week delay request.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →