N-12023 Load Forecast Report + Appendecies - Redacted
3 passages
1 2.0 INTRODUCTION 2 3 NS Power annually develops a forecast of energy sales and peak demand requirements to 4 assess the effects of end-use and economic factors on the future power system load and 5 load shape. The forecast is a foundatio...
AI summary NS Power's 2022 Load Forecast Report, covering 2023-2033, was reviewed by the NSUARB through a paper hearing. Intervenors included the Consumer Advocate, Small Business Advocate, Industrial Group, EfficiencyOne, and Heritage Gas. The Board directed NS Power to implement agreed-upon recommendations, emphasizing improved detail on electrification impacts.
n has been submitted by 26 a third party to the NSUARB for approval as a Licensed Retail Supplier (LRS) to provide 27 service under the RtR tariffs starting in 2023. 8 The service is forecast to produce 130 GWh 8 The effective date for sal...
AI summary A third party applied to the NSUARB for a Licensed Retail Supplier (LRS) under RtR tariffs starting in 2023. The license includes conditions preventing sales until the effective date set by the Governor in Council under the Electricity Act, section 3C(1).
of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report Appendix E Page 1 of 21 MARCH 31, 2023 2023 10yr Preliminary Forecast . REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report Appendix E Page 2 of 2...
AI summary This document outlines the timeline and purpose of the 2023 10-year preliminary load forecast report, including stakeholder engagement and submission to the NSUARB. It provides an overview of the forecast updates and improvements, and sets the stage for feedback and discussion.
N-7NSPI (Synapse) RIR-1 to RIR-46 - Redacted
11 passages
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report (NSUARB M11108) NSPI Responses to Synapse Energy Economics Information Requests NON-CONFIDENTIAL 1 Request IR-1: 2 3 Report Tables 4 5 (a) Please provide in electronic s...
AI summary NSPI responds to Synapse Energy Economics' information requests regarding the 2023 Load Forecast Report by providing figures from various attachments and IRs, including tables, graphs, and data sources. The response details the location of specific figures within different report attachments and Synapse IR attachments.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report (NSUARB M11108) NSPI Responses to Synapse Energy Economics Information Requests NON-CONFIDENTIAL
AI summary The 2023 Load Forecast Report (NSUARB M11108) is referenced alongside NSPI's responses to Synapse Energy Economics' information requests. The document pertains to forecasting methodologies and regulatory processes involving NSPI and Synapse.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report (NSUARB M11108) NSPI Responses to Synapse Energy Economics Information Requests NON-CONFIDENTIAL
AI summary The 2023 Load Forecast Report (NSUARB M11108) is referenced alongside NSPI's responses to Synapse Energy Economics' information requests. The document pertains to forecasting methodologies and regulatory processes involving NSPI and Synapse.
124,453 121,590 REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2023 Load Forecast Report Synapse IR-9 Attachment 2 Page 1 of 205 January 31, 2023 REDACTED Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Utility and R...
AI summary The Nova Scotia Utility and Review Board (NSUARB) directed Nova Scotia Power Incorporated (NS Power) to submit semi-annual reports on the Smart Grid Nova Scotia Project, following its decision in matter M09985. Reports are due by July 31 and January 31 each year and should include details on asset deployment, customer selection, economic assumptions, metrics, and demand response programs.
es related to each of the DER asset groups, and a breakdown of specific expenditure allocations against each of the funding partner contributions are to be provided in the reports. The SBA requested that NS Power should publicly share info...
AI summary The NSUARB has directed NS Power to include specific reporting requirements in its project reports, including information on the Smart Grid Atlantic Initiative, EfficiencyOne’s role, and semi-annual reporting starting July 31, 2020. Reports must also be shared with the Board and Intervenors.
the metrics discussed above, Synapse also recommended that NS Power post, on its website, a monthly report about the solar garden's performance, including the following information: • total generation and average generation per kW for each...
AI summary Synapse recommended that NS Power post monthly reports on the solar garden's performance, including generation data and equipment details. NS Power agreed but proposed to include the information in its semi-annual Smart Grid Project Reporting to the Board instead. The Board accepted this proposal.
Attachment 12 – NRCan SG 2021/22 Annual Performance Report • Attachment 13 – NRCan EVID 2021/22 Annual Performance Report • Attachment 14 – SIF 2020/21 Annual Performance Benefits Report 6 Overall Project Update The Project remains on trac...
AI summary The project is on track and within budget, with testing, data collection, and analysis progressing as outlined in previous reports. The timeline has been revised to allow for additional time in testing and evaluation without affecting costs, scope, or project risks.
CI C0010788 – Smart Grid Semi-Annual Report Attachment 8b Page 4 of 4 NATURAL RESOURCES CANADA SGNS Financial & Status Report 4 – WEB HIGHLIGHTS (OPTIONAL) Please provide one to two short paragraphs highlighting progress on the project thi...
AI summary This document is a Smart Grid Semi-Annual Report Attachment 8b from Natural Resources Canada (NRCan), focusing on the SGNS Financial & Status Report. It includes sections for web highlights, knowledge and media products, and instructions for uploading photos and descriptions for the Government of Canada's website.
ering Support Experience Multiple years in T&D and Power Production Operations with NS Power. Email [email protected] Phone (902) 225-9865 Name Ed Cullinan Organization Nova Scotia Power Role on this project Product Development...
AI summary The text lists individuals and their roles at Nova Scotia Power involved in various aspects of a project, including technical, IT, and product development support. It also mentions project contributors such as Natural Resources Canada and Nova Scotia Community College.
ents occurred in 2021, there were minimal impacts to the project in 2020 as preliminary work was being done that could be managed remotely. 3) Between Jan 2020 and Dec 2020, did the company introduced any new products, processes, or servic...
AI summary The text discusses the impact of the COVID-19 pandemic on a company's projects and operations in 2020, including minimal project impacts due to remote work and the absence of new product introductions. It also touches on R&D investment plans amidst the pandemic.
TIAL INFORMATION REMOVED) 2023 Load Forecast Report Synapse IR-36 Attachment 1 Page 1 of 11
AI summary The text references the 2023 Load Forecast Report, specifically Synapse IR-36 Attachment 1, which is part of a regulatory proceeding in Nova Scotia. The document appears to be a technical attachment related to load forecasting and may be used in a regulatory process.
N-9-(i)J. Wilson CV
3 passages
John D. Wilson Grid Strategies, LLC Page 3 “Analysis of Solar Capacity Equivalent Values for Duke Energy Carolinas and Duke Energy Progress Systems,” prepared for and filed by Southern Alliance for Clean Energy, Natural Resources Defense...
AI summary The text lists multiple reports authored or co-authored by the Southern Alliance for Clean Energy (SACE) on solar energy, energy efficiency, and decarbonization in the Southeastern U.S., including a 2021 review of Nova Scotia Power’s Integrated Resource Plan (IRP) for the Nova Scotia Utility and Review Board (NSUARB).
eview of Nova Scotia Power’s 2020 Integrated Resource Plan,” prepared for the Nova Scotia Consumer Advocate, NSUARB Matter No. M08059, with Paul Chernick, January 2021. “Implementing All-Source Procurement in the Carolinas,” prepared for N...
AI summary The text lists documents prepared for various regulatory matters and docket numbers, including analyses of Nova Scotia Power’s Integrated Resource Plan and procurement strategies. It references entities involved in energy advocacy and regulatory processes, highlighting stakeholder engagement in utility proceedings.
Nova Scotia Power’s 2023 Application for Annually Adjusted Rates on behalf of the Nova Scotia Consumer Advocate. Seasonal and time-varying rates. Impact of Maritime Link power delivery. Cost of service study updates. California PUC Docket...
AI summary Nova Scotia Power's 2023 rate applications, testimony on fuel adjustment mechanisms, biomass costs, and the Maritime Link project's impacts. Testimony addresses rate design, electrification effects, and regulatory recovery of customer benefits from infrastructure projects.
N-10Rebuttal Evidence - NSPI
4 passages
1 TABLE OF CONTENTS 2 3 1.0 INTRODUCTION ............................................................................................................... 4 4 2.0 Response ........................................................................
AI summary The document outlines a structured proceeding with sections on introduction, response, and recommendations. It lists multiple numbered recommendations under Synapse, indicating a regulatory process involving stakeholder input and proposed actions. The content reflects a formal regulatory filing with organized sections for analysis and decision-making.
ommendation 22: .......................................................................................................... 17 27 3.1.21 Recommendation 23: .......................................................................................
AI summary The document outlines recommendations from a regulatory proceeding, including Rebuttal Evidence for the 2023 Load Forecast Report filed on September 14, 2023. It references multiple recommendations by the Consumer Advocate, focusing on load management and regulatory processes.
1 1.0 INTRODUCTION 2 3 In accordance with the Nova Scotia Wholesale Electricity and Renewable to Retail Market Rules 1, 4 the Nova Scotia Power System Operator (NSPSO) is required each year to provide the Nova Scotia 5 Utility and Review B...
AI summary The Nova Scotia Power System Operator (NSPSO) submitted its 2023 Load Forecast Report to the Nova Scotia Utility and Review Board (NSUARB), triggering a paper hearing. Interventions were received from stakeholders including the Consumer Advocate and EfficiencyOne. Synapse Energy Economics noted improvements in the report's reasonableness and responsiveness from NS Power, while acknowledging amendments based on prior regulatory directives.
Page 24 of 25 2023 Load Forecast Report – Rebuttal Evidence Non-Confidential 1 4.0 CONCLUSION 2 3 Submission of the Load Forecast Report is an annual requirement under the provisions of the Nova 4 Scotia Wholesale and Renewable to Retail M...
AI summary NS Power submits its 2023 Load Forecast Report as required under Nova Scotia's market rules, highlighting methodological improvements and stakeholder input since 2007. The report incorporates feedback and will be adjusted based on the NSUARB's determination. NS Power requests acceptance of the report.