1 In NS Power’s Wreck Cove LEM capital application, 22 the single-unit winter outages were 2 identified as requiring an offsetting capacity replacement. At the time of the application, NS Power 3 estimated the costs of replacement capacity...
AI summary The text discusses NS Power's Wreck Cove LEM capital application, highlighting the need for capacity replacement due to winter outages. It also addresses the retirement of the Annapolis Tidal Generating Station and the NSUARB's decision on the asset's status. The NSUARB will reconsider the application for amortizing the asset's value over 10 years.
1 Offsets/credits are being considered as an element of the CES framework, which would serve to 2 offset emissions from electricity generation in support of economy wide electrification. In parallel, 3 the OBPS emissions performance standa...
AI summary The document discusses the consideration of offsets/credits under the Clean Electricity Standard (CES) framework to support economy-wide electrification, alongside the review of OBPS emissions performance standards. NS Power is involved in consultations for a Clean Electricity Regulation under CEPA and is refining its electricity strategy to meet 2030 and 2035 targets, including RES and carbon pricing.
s where they live 23 and work. As the governments’ announced policy changes become legislative and regulatory 24 requirements, NS Power will reflect these changes in future planning studies. 25 38 Proposed Frame for the Clean Electricity R...
AI summary The document discusses the impact of government policy changes on future planning studies by NS Power, as well as the proposed frame for the Clean Electricity Regulations in Canada, filed on June 30, 2023.
either Party will be responsible for is 100 percent of its greatest, on-line, net single 28 contingency, and, NSPI shall be responsible for 50 MW of Thirty-Minute Reserve. 29 39 https://www.npcc.org/program-areas/standards-and-criteria/reg...
AI summary The text outlines contingency responsibilities and mentions the amalgamation of the New Brunswick System Operator with NB Power under the Electricity Act, proclaimed on October 1, 2013. It also references a 2023 10-Year System Outlook document.
Page 48 of 59 2023 10-Year System Outlook NON-CONFIDENTIAL 1 7.2.1 Bulk Power System (BPS) 2 3 The NS Power bulk transmission system is planned, designed and operated in accordance with 4 North American Electric Reliability Corporation (NE...
AI summary The document outlines the definitions and operational standards for the Bulk Power System (BPS) and Bulk Electricity System (BES) under NS Power, emphasizing compliance with NERC and NPCC criteria. The NS Exception Procedure is also detailed, which allows for certain exceptions in the NS transmission system, approved by the NSUARB in 2017.