Topic/Matter Intersection

Topic:"Regulatory Approval Processes" in M12660

Matter: Nova Scotia Power Inc. - Natural Gas Report - November 1, 2024 to October 31, 2025
6 passages 5 documents

Regulatory Approval Processes across all matters →

N-1Report - Redacted 1 passage
Figure 29 – November 1, 2024-October 31, 2025, Atlantic Bridge Flows34 5 p. pp. 33-35
Figure 29 – November 1, 2024-October 31, 2025, Atlantic Bridge Flows34 5 8 Source: https://infopost.enbridge.com/infopost/ - 10 To view the FERC filings associated with this project, refer to the following website: - 11 https://ferconline....

AI summary The document references Figure 29, which outlines Atlantic Bridge flows from November 1, 2024, to October 31, 2025, and provides a source for the data. It also includes a link to FERC filings related to the Atlantic Bridge project, specifically CP16-9-000.

N-2NSPI (NSEB) RIR 1 to 11 - Redacted 2 passages
PARTIALLY CONFIDENTIAL p. p. 7
PARTIALLY CONFIDENTIAL 1 Coal units phased out or converted by 2030: • 2 3 Point Tupper converted to gas by November 2028 4 Lingan Units 1,3,4, converted to HFO for January 2030 5 6 Wasoqonatl Intertie reduced minimum online generating uni...

AI summary The document outlines plans for coal unit conversions and new energy infrastructure by 2030, including Point Tupper's conversion to gas by 2028, Lingan units converting to HFO by 2030, and the addition of wind, solar, and battery assets. Some projects require capital investment, while others have received regulatory approval.

David Braziel CEO, RBN Energy p. p. 114
David Braziel CEO, RBN Energy 3900 Essex Lane, Suite 950 Houston, TX, 77027 [email protected] http://www.rbnenergy.com/daily-energy-post November 1, 2024 to October 31, 2025 Natural Gas Report (NSEB M12660) NSPI Responses to NSEB Info...

AI summary This document is a Natural Gas Report from RBN Energy, covering the period from November 1, 2024, to October 31, 2025, and includes NSPI responses to NSEB information requests. It provides insights into natural gas market trends and regulatory interactions.

101001Letter from NSPI requesting extension for filing IR responses 1 passage
Section 1 p. p. 0
February 19, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: M12660 NS Power 2025 Natural Gas Report IRs – Extension Request Dear Ms. Henwood: Nova Scotia Power In...

AI summary Nova Scotia Power Inc. (NS Power) has requested an extension for responding to Information Requests (IRs) related to the 2025 Natural Gas Report in matter M12660. The original due date was February 20, 2026, and NS Power seeks to extend it to February 27, 2026, due to resource constraints.

101003Board letter approving extension request 1 passage
Section 1 p. p. 0
February 19, 2026 [[email protected]](mailto:[email protected]) Jessie Wallace Manager, Regulatory Planning and Innovation Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Ms. Wallace: M12660 - Nova Scotia Power I...

AI summary The Board has approved an extension request from Nova Scotia Power Inc. for the filing deadline of their IR responses related to the 2025 Natural Gas Report, moving the deadline to February 27, 2026.

101083Letter NSPI re: RIRs 1 passage
Section 1 p. p. 0
February 27, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: M12660 – 2025 Natural Gas Report Covering the Period November 1, 2024 to October 31, 2025 – IR Respons...

AI summary NS Power has submitted responses to information requests (IRs) related to the 2025 Natural Gas Report covering the period November 1, 2024, to October 31, 2025. The responses include justification for confidential and partially confidential material, consistent with the original filing.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →