N-1Application
13 passages
1.0 INTRODUCTION - Nova Scotia Power Inc. (NS Power, Company) is applying to the Nova Scotia Energy Board - (NSEB, Board) for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above- - the-line (ATL) tariff available to...
AI summary Nova Scotia Power Inc. (NS Power) seeks approval for the Extra Large Industrial Dispatchable (ELID) Tariff to serve Port Hawkesbury Paper LP (PHP), replacing the expiring ELIADC Tariff. The ELID Tariff includes a Dispatchable Rider (DR) to manage PHP's load flexibility, with a Customer Charge for cost recovery. The application references the 2026-2027 General Rate Application (M12451) and its Settlement Agreement.
2.0 TARIFF COMPONENTS Key elements of the ELID Tariff, provided as Attachment 1 to this Application, include the following: • Customer Charge • Demand Charge • Energy Charge • Interruptible Service • Dispatchable Rider • Other Applicable R...
AI summary The ELID Tariff's Customer Charge recovers costs for dispatch services and tariff administration, including tasks like operating procedure development, PHP engagement, and real-time load optimization. The proposed $10,000 monthly charge for 2026-2027 is based on staff and software costs, with future GRA proceedings determining the final rate.
2.3 Energy Charge - The Energy Charge under the ELID Tariff will apply to all energy supplied to PHP in excess of - the Subject Energy Amount1F 2 deemed to be provided pursuant to the Power Sales Agreement issued - under Section 4AA (now S...
AI summary The Energy Charge under the ELID Tariff applies to PHP's energy consumption beyond the Subject Energy Amount, with proposed rates of 9.977 cents/kWh (2026) and 11.240 cents/kWh (2027). These rates consider embedded costs, energy displacement from the Goose Harbour Lake Wind Farm, and are subject to ongoing court proceedings regarding PHP's liability for the Maritime Link FLG2.
Extra Large Industrial Dispatchable Tariff Application – Attachment 1
AI summary This document outlines an application for an Extra Large Industrial Dispatchable (ELID) Tariff, potentially involving cost recovery mechanisms, regulatory approval processes, and related programs. It may address rate design, energy efficiency initiatives, and compliance with Nova Scotia energy regulations.
Recognizing that the Customer demand will be determined by the Company and the Customer working collaboratively to actively manage the Customer's demand in response to system load conditions, particularly during peak periods, and to reduce...
AI summary The text outlines how customer demand will be collaboratively managed with the company to reduce costs during peak periods. The monthly demand charge is set through regulatory proceedings and remains constant until revised by the Board.
WHEREAS - A. Nova Scotia Power ("NS Power"), along with the Consumer Advocate ("CA"), Small Business Advocate ("SBA"), counsel for the Industrial Group, representing CKF Inc., Crown Fibre Tube Inc., Irving Shipbuilding Inc., K + S Windsor...
AI summary NS Power and customer representatives (including advocates, industrial groups, and municipal utilities) collaborated on a 2026-2027 GRA through meetings, information sharing, technical conferences, and settlement discussions. The process involved standardized filings and expert consultant support, aiming to resolve the GRA on agreed terms.
2026-2027 General Rate Application Settlement Agreement Extra Large Industrial Dispatchable Tariff Application – Attachment 4 Page 2 of 21 - 1. The Parties have reached agreement on the outcomes that will result from the 2026- 2027 GRA as...
AI summary The Parties agree on the 2026-2027 GRA outcomes outlined in Schedule A, with NS Power to file the GRA with NSEB consistent with the Settlement Agreement. Customer Representatives may request information if the GRA deviates from the agreement. A Pre-GRA Letter detailing the collaborative process will be filed prior to GRA submission.
2026-2027 General Rate Application Settlement Agreement
AI summary This document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the rate-setting process and financial arrangements for utility services in Nova Scotia.
All of which is hereby agreed to by the Parties effective as of the ____ day of August, 2025. CONSUMER ADVOCATE SMALL BUSINESS ADVOCATE Melisse II Per: Per: MELISSA P. MACADAM INDUSTRIAL GROUP NOVA SCOTIA POWER INC. Per: Per: PORT HAWKESBU...
AI summary This document outlines a settlement agreement for the 2026-2027 General Rate Application, specifically addressing the Extra Large Industrial Dispatchable Tariff Application. It includes parties involved and is effective as of August 2025.
2026-2027 General Rate Application Settlement Agreement
AI summary This document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the regulatory process and rates and money matters in Nova Scotia.
2026-2027 General Rate Application Settlement Agreement
AI summary The document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the regulatory process for setting electricity rates in Nova Scotia.
2026-2027 General Rate Application Settlement Agreement Extra Large Industrial Dispatchable Tariff Application – Attachment 4 Page 10 of 21 GRA Element Settlement Terms Cost of Service ("COS") a) The COS as set out in the Draft GRA will be...
AI summary The 2026-2027 General Rate Application Settlement Agreement outlines the inclusion of the Cost of Service (COS) in the GRA, subject to future proceedings. Key points include the use of the Minimum System methodology, data collection on PHP's use of the High Voltage transmission system, and the apportionment of assessment costs from the Maritime Link.
RESPONSIBILITIES OF FRANCHISE HOLDER It is the responsibility of the holder of the electric efficiency and conservation franchise granted under Section 79C of the Public Utilities Act (Franchise Holder) to apply to the Nova Scotia Utility...
AI summary The Franchise Holder must apply to NSUAREB for approval of all DSM activities, plans, and programs, including itemizing related costs. NS Power is required to seek annual approval for DSM Cost Recovery Rider amounts by October 1 and remit monthly payments to fund approved DSM costs.
N-4NSPI (BW) RIR 1 to 14 - Redacted
3 passages
NON-CONFIDENTIAL 1 Request IR-1: 2 3 Please refer to Exhibit N-1, section 2.1 and Attachment 3. 4 5 (a) Why did NSPI select the "low range" of costs as the basis for calculating the Customer 6 Charge? 7 8 (b) If the actual costs to adminis...
AI summary NSPI explains its use of a conservative 'low range' cost estimate for the ELID Tariff Customer Charge, citing high-level forecasts and pending Board approval. The charge will be set via General Rate Applications (GRA), not adjusted to actual results, with future refinements dependent on Board approval and data availability.
NSPI Responses to BW Information Requests
AI summary Nova Scotia Power Inc. (NSPI) is responding to information requests from BW within a regulatory proceeding, likely related to rate applications or compliance matters. The context suggests ongoing regulatory scrutiny of NSPI's operations, programs, or financial practices.
NON-CONFIDENTIAL 1 Response IR-3: 2 3 (a-c, e-f) Please refer to BW IR-2. 4 5 (d) Yes, please refer to CA IR-9. Date Filed: April 10, 2026 NSPI (BW) IR-3 Page 2 of 2
AI summary The document contains a response to IR-3, referencing BW IR-2 and CA IR-9. Filed by NSPI on April 10, 2026, it includes procedural acknowledgments without detailed arguments or analysis.
N-5NSPI (CA) RIR 1 to 9 - Redacted
11 passages
NSPI Responses to CA Information Requests
AI summary This document outlines NSPI's responses to information requests from the Nova Scotia Energy Board (NSEB) as part of a regulatory proceeding. It provides details on various aspects of NSPI's operations and compliance with regulatory requirements.
EXHIBIT 6 PAGE 1 OF 6 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (10) OPER. & MAINT HYDRO (11) OPER. & MAINT WIND 2,092 7,450 1,383 4,926 73 261 380 1,353 44 155 40 142 46 164 78 27...
AI summary This exhibit presents a detailed breakdown of operational and maintenance costs across various energy generation and transmission categories, including hydro, wind, biomass, and others, along with depreciation and interest expenses. It also includes allocations related to demand-side management and regulatory affairs.
REDACTED ELID Tariff CA IR-2 Attachment 2 Page 40 of 94 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6 PAGE 4 OF 6
AI summary The document is a redacted section of a regulatory proceeding related to the ELID Tariff CA IR-2, including Exhibit 6, Page 4 of 6. Key details are confidential and removed.
REDACTED ELID Tariff CA IR-2 Attachment 2 Page 46 of 94 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6D Page 1 of 2
AI summary The document is an exhibit (6D) from a Nova Scotia regulatory proceeding related to the ELID Tariff CA IR-2. The content is redacted, with confidentiality notices indicating sensitive information has been removed. The exhibit is part of a larger attachment (Page 46 of 94) in a proceeding involving NSPI and other regulatory matters.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document involves an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission. The content pertains to regulatory processes and tariff design.
NON-CONFIDENTIAL 1 Request IR-3: 2 3 (a) Please provide a summary table showing allocated costs and rates for PHP and all 4 other ATL classes for 2026 and 2027 in these three scenarios: 5 6 (i) NSPI's proposed ELID Tariff as filed; 7 8 (ii...
AI summary The document outlines a request (IR-3) for a comparison of allocated costs and rates for Port Hawkesbury Paper (PHP) under three tariff scenarios (NSPI's ELID Tariff, PHP's modified ELID, and continued BTL tariff) for 2026-2027. It also asks for quantification of implications on NSPI's PHP deferral account balance, with a response noting a $25.2M and $12.8M cost differential in 2026 and 2027 respectively.
NON-CONFIDENTIAL 1 (iii) Please refer to M12451 Undertaking U-2 which provides the effect of PHP as a 2 below-the-line customer in 2026. Please refer to NSEB IR-6. Date Filed: April 10, 2026 NSPI (CA) IR-3 Page 2 of 2 Application for Appro...
AI summary The document references an application for approval of an Above-the-Line Tariff for Port Hawkesbury Paper (PHP) and cites Undertaking U-2 and NSEB IR-6. It also notes the filing date and page reference for NSPI's responses to information requests.
NSPI Responses to CA Information Requests
AI summary The document outlines NSPI's responses to information requests from the Commission for the Environment (CA). It provides details on various aspects of NSPI's operations, including financial data, regulatory compliance, and program initiatives.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document outlines an application for approval of an Above-the-Line Tariff for Port Hawkesbury Paper and includes NSPI's responses to information requests from the Commission for the Environment. The proceeding involves regulatory approval processes and tariff design.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document outlines an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission for the Environment.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary This document pertains to an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission for the Environment.
N-6NSPI (IG) RIR 1 to 31 - Redacted
10 passages
NON-CONFIDENTIAL 1 levels. Subject to the Board's approval of the Tariff and implementation of the PHP 2 Deferral as approved by the Board, subject to the final Board Order, in the 2026-2027 3 General Rate Application (M12451), revenue var...
AI summary The text references a General Rate Application (M12451) and the deferral of revenue variances between settlement agreement assumptions and actual results. It notes that deferral is subject to the Board's final approval of the Tariff and implementation of the PHP (likely a program or mechanism).
REDACTED (Attachment Only) 1 (a) Please refer to the following: ( 6) MEDIUM INDUSTRIAL 4 68 63 $34.9 $22.1 $57.0 468 63 $34.9 $22.1 $57.0 0 0 0.0% 6 0.0% $0.0 $0.0 $0.0 0.0% 0.0% 0.0% ( 7) LARGE INDUSTRIAL 7 22 82 $54.0 $19.0 $72.9 722 82...
AI summary The document contains a table with data related to different customer categories, including medium industrial, large industrial, PHP, municipal, and unmetered, with various costs and figures. It also includes references to matter numbers and other procedural items related to regulatory proceedings.
DETAILED LISTING OF C.O.S.S. INPUT INFORMATION (160) METER DATA SERVICES 440.3 1.6% 638,831 (161) SMART METER OPERATIONS CENTER (SMOC) 1,189.1 4.2% 1,725,124 (162) METER SERVICES - FIELD 1,427.2 5.0% 2,070,655 (163) ELECTRICAL WIRING INSPE...
AI summary The document provides a detailed listing of input information for the Cost of Service Study (C.O.S.S.), including meter data services, smart meter operations, meter services, electrical wiring inspections, and regulatory affairs expenses. The table outlines various costs, percentages, and financial figures for different departments and years.
FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (1) TOTAL DMD.RELATED (2) TOTAL ENG.RELATED (3) UNIT COST ENG.RELATED (4) TOTAL CUST.RELATED (5) TOTAL OPER. (6) TOTAL RATE (7) % REVENUE VARIANCE CALC (174) ELECTRICAL WIRING...
AI summary The document presents financial data related to electrical wiring inspections, meter services, bad debt expenses, customer service, regulatory affairs, and other operational costs for the year ending December 31, 2027. It includes figures for various categories such as total costs, unit costs, and revenue percentages.
-1A (13) OPER. & MAINT OTHER CT's 0 0 0 0 0 0 0 0 0 0 0 E-1A (14) OPER. & MAINT GENERATION BATTERIES 0 0 0 0 0 0 0 0 0 0 0 E-1A (15) OPER. & MAINT RADIAL TO GENERATION TRANS. 1,549 774 52 328 52 38 64 99 114 18 11 E-1A (16) DSM 0 See DSM A...
AI summary The document presents financial data for Nova Scotia Power, including operational and maintenance costs, depreciation, interest, taxes, and revenue from steam and ash sales. It also includes figures related to demand-side management (DSM) and regulatory affairs expenses.
FOR THE YEAR ENDING DECEMBER 31, 2026 (1) TOTAL EXPENSES (2) PROD. EXPENSES (3) TRANS. EXPENSES (4) DIST. (5) RETAIL EXPENSES EXPENSES EXPENSES ALLOCATOR (6) DIRECT (7) (23) EXECUTIVE MANAGEMENT 1,274 534 1,808.4 0.705 1,338 134 309 28 1,8...
AI summary The document presents a detailed breakdown of expenses for various departments and functions for the year ending December 31, 2026, including executive management, legal services, external relations, regulatory affairs, finance, and procurement. It outlines total expenses, production expenses, transmission expenses, and other financial allocations.
REVENUE TO EXPENSE COMPARISON (1) TOTAL DMD.RELATED (2) TOTAL ENG.RELATED (3) UNIT COST ENG.RELATED (4) TOTAL CUST.RELATED (5) TOTAL OPER. (6) TOTAL RATE (7) % REVENUE VARIANCE CALC (148) CUSTOMER SERVICE EXPERIENCE (149) CUSTOMER SOLUTION...
AI summary The document presents a revenue to expense comparison table, focusing on customer service, operations, and regulatory affairs. It details various costs associated with customer service, billing, meter services, and regulatory expenses, including total expenses and percentages of revenue.
0 1,162 26,729 466 (28) (29) (30) OTHER OPERATING (31) (32) CORPORATE GROUPS: (33) EXECUTIVE MANAGEMENT 1,808.4 1,290 133 307 28 51 (34) CORP. SECRETARY & INSURANCE 11,405.2 7,763 1,716 1,033 568 324 (35) LEGAL SERVICES 5,043.0 3,598 370 8...
AI summary The document presents financial data related to Nova Scotia Power Inc.'s operating expenses, including corporate groups, generation services, and depreciation across various energy sources. It includes figures for legal services, regulatory affairs, and other administrative expenses.
NON-CONFIDENTIAL 1 Request IR-14: 2 3 Reference: N-1, ELID Application, page 9 – Priority Interruptible Credit. 4 5 (a) Please provide all workpapers, calculations, and analysis supporting the value of 6 $0.764/kVA and $0.767/kVA as the pr...
AI summary The request seeks clarification on the basis for the priority interruptible credit ($0.764/kVA and $0.767/kVA) and whether it is derived from actual avoided costs or a policy-based 10% uplift over the standard LIIR credit. The response directs to specific filings (M12451, SBA IR-2, and IG IR-13) for detailed calculations and historical context.
NSPI Responses to Industrial Group Information Requests 1 Request IR-18: 1 (iv) Does this mean no increased exposure to FAM costs? 2 3 (e) Please provide all quantitative analyses, models or simulations that demonstrate that 4 ATL customer...
AI summary NSPI responds to an inquiry about whether ATL customers are protected from increased FAM costs. NSPI states it cannot estimate the DR credit for 2026 and 2027, as it depends on multiple factors. It also mentions plans to revise the FAM Plan of Administration pending the Board's approval of the ELID Tariff.
N-10NSPI (Synapse) RIR 1 to 30 - Redacted
12 passages
NSPI Responses to Synapse Energy Economics, Inc. Information Requests 1 Request IR-1: 8 please refer to SR-01 Attachment 3 (Exhibit N-91-(i)); 9 • For 2026 BCF, SR-01 Attachment 5 (Exhibit N-91-(i)); and 10 • For 2027 BCF, SR-01 Attachment...
AI summary NSPI provides responses to information requests from Synapse Energy Economics, Inc., referencing various exhibits and filings related to the 2026 BCF, 2027 BCF, and the COSS methodology. The consultative review of COSS was conducted as directed by the NSEB and led to changes in the COSS as part of the 2026/2027 General Rate Application. The Board's decision was issued in March 2026, and a compliance filing was submitted in April 2026.
Response IR-23: (a) The existing order of interruptibility by rate class was established through regulatory proceedings which gave rise to various interruptible service rates over the last few decades. The priority interruptible status of...
AI summary The document explains the historical basis for interruptible service rate prioritization, noting that the ELID Tariff's second position reflects longstanding practices accommodating large pulp and paper operations. It references regulatory proceedings and specific tariff structures, with GRLF load interruption prioritization detailed in IG IR-25 part (a).
REDACTED (CONFIDENTIAL INFORMATION REMOVED) Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to Synapse Energy Economics, Inc. Information Requests
AI summary The document outlines an application for approval of an above-the-line tariff for Port Hawkesbury Paper (NSEB M12661) and NSPI's responses to information requests from Synapse Energy Economics, Inc. The proceeding involves regulatory approval processes and compliance with information disclosure requirements.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 45 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6A
AI summary A redacted exhibit from a Nova Scotia regulatory proceeding related to the ELID Tariff and Interruptible Rider 30 (IR-30), involving Synapse Energy Economics and Nova Scotia Power Inc. The document is part of a broader regulatory filing and includes confidential information removed.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 84 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 9C Page 2 of 3 NOVA SCOTIA POWER INC.
AI summary A redacted exhibit from a Nova Scotia Power Inc. (NSPI) regulatory proceeding related to the ELID Tariff and Synapse IR-30 Attachment 1. The document is part of a larger submission involving rate design and regulatory approval processes.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 91 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Line # AVERAGE RATE BASE RATE BASE 2025 RATE BASE 2026 (155) Total (156) (157) REVENUE OPERATIONS (158) BILLING SERVICES & PAYMENTS (...
AI summary The document presents a table with line items related to revenue operations, meter data services, electrical wiring inspections, and customer service, including average rate base figures for 2025 and 2026. It also includes details on regulatory affairs expenses and other costs associated with these operations.
(IN THOUSANDS OF DOLLARS) NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2026
AI summary This document presents a detailed listing of input information for Nova Scotia Power Inc.'s Cost of Service Study (COSS) for 2026, including financial data and cost components relevant to regulatory proceedings. It outlines various riders, charges, and adjustments, reflecting the utility's operational and financial structure under Nova Scotia's regulatory framework.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (148) OVERHEAD LINES 58,912.8 0 100% (149) UNDERGROUND LINES 589.0 (150) LINE TRANSFORMERS 0.0 (151) METE...
AI summary The document presents a detailed listing of Cost of Service Study (COSS) input information for Nova Scotia Power Inc. for the year ending December 31, 2027. It includes various categories such as overhead and underground lines, distribution, customer service, revenue operations, and regulatory affairs, with associated costs and percentages.
N-19Evidence - CA
11 passages
1.0 INTRODUCTION This testimony has been prepared for the Consumer Advocate ("CA") by or under the direction of Hayitboy Mahmudov and Andrew McLaren of InterGroup Consultants Ltd. ("InterGroup"). This report reviews Nova Scotia Power Inc.'...
AI summary This testimony, prepared for the Consumer Advocate by InterGroup Consultants Ltd., reviews Nova Scotia Power Inc.'s Application for Approval of an Above-the-Line Tariff for Port Hawkesbury Paper in Proceeding M12661. The review focuses on residential customer interests and adheres to regulatory fairness principles.
2.0 SUMMARY OF RECOMMENDATIONS Based on the analysis summarized in this report, InterGroup makes the following recommendations to the Board: - Recommendation 1: InterGroup recommends that the Board reject PHP's proposed modifications for t...
AI summary InterGroup recommends rejecting PHP's modifications, assessing DR savings reasonableness, requiring Board approval for Operating Procedures, approving ELID Tariff's Interruptible Service component for 2026-2027 with a 2028 review, and reviewing the ELID Tariff post-implementation. These actions aim to ensure transparency, fairness, and alignment with regulatory standards.
3.1 NSP APPLICATION NSP is applying to the Board for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line (ATL) tariff available to Port Hawkesbury Paper LP (PHP). NSP states it is intended that PHP will sub...
AI summary NSP seeks Board approval for the ELID Tariff for PHP, replacing the expiring ELIADC Tariff. The proposed tariff includes customer, demand, and energy charges, interruptible service, and provisions for wind farm energy. NSP cites a settlement agreement (SA) with PHP for cost modeling, while InterGroup highlights load characteristics and credit calculations in the SA. Alternative plans are needed if approval fails.
clear why derivation of an interruptible credit rate to PHP would use the same kW demand figure for both coincident and non-coincident PHP peaks, which is not supported by PHP's historical peak load. 2. The proposed cost-based demand charg...
AI summary The text critiques the methodology for deriving an interruptible credit rate for PHP, arguing that using the same kW demand figure for coincident and non-coincident peaks is unsupported by historical data. It highlights that the proposed interruptible credit rate exceeds cost-based demand charges for 2026 and 2027, which is deemed unreasonable. PHP responds that its position aligns with the 2026-2027 GRA SA and references the Board's decision on M12451 regarding a deferral account.
Recommendation: The Board should consider reasonableness of the DR savings to be fully credited to PHP. Further, NSP states that consistent with the ELIADC Tariff, PHP operations under the DR will be governed by Operating Procedures develo...
AI summary The Board is urged to assess the reasonableness of DR savings credits to PHP. NSP argues Operating Procedures for PHP under DR should not require NSEB approval, as benefits/costs flow solely to PHP. However, stakeholders recommend Board approval to ensure transparency and protect other ATL customers from potential revisions favoring PHP.
p>40 NSP Response to Information Request Synapse-23. 41 NSP Response to Information Request IG-13. 42 NSP Response to Information Request Synapse-14. 43 See NSP Response to Information Request Synapse-14, Synapse-15, SBA-6. 44 NSP Response...
AI summary NSP proposes an Interruptible Rider with a Dispatchable Rider mechanism, increasing savings transferred to PHP from 25% to 100%. InterGroup argues this risks double-counting benefits for PHP, potentially disadvantaging other customers. NSP acknowledges PI service reduces interruption risks for other customers but has not quantified its value, prompting InterGroup to call for revisiting the PI credit in future proceedings.
nd calculate firm capacity requirements to assist QEC in plant capacity planning to meet energy demands by community. Prepare semi-annual Fuel Stabilization Fund rider applications and review support. For Jamaica Public Service Company Ltd...
AI summary The text outlines utility regulatory activities including rate case submissions, fuel stabilization fund management, and cost allocation analyses for JPS, Nelson Hydro, YEC, and QEC. Tasks involve technical analysis, tariff design, stakeholder engagement, and regulatory filings under frameworks like PBR.
Hayitboy Mahmudov - Utility Regulation Experience Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2012/13 and 2013/14 Phase I General Rate Application Analysis; Assistance in preparation of application and company...
AI summary Hayitboy Mahmudov has extensive experience in utility regulation, including work on general rate applications and compliance filings for NTPC and Qulliq Energy Corporation. He has provided analysis, prepared evidence, and assisted with regulatory proceedings in the Northwest Territories and other jurisdictions.
and the 2022/23 General Rate Application and. Andrew is currently involved in QEC's 2025/26 General Rate Application providing analytical and advisory support as the Senior consultant on the project. For Saskatchewan Rate Review Panel (201...
AI summary Andrew provides technical advisory services on utility rate applications and regulatory proceedings, including QEC's 2025/26 General Rate Application, Saskatchewan Rate Review Panel cases, City of Penticton utility planning, and Nova Scotia Consumer Advocate proceedings. His work spans rate design, financial forecasting, and regulatory compliance.
For the Ontario Energy Board (2024) Study director for a review of cost award processes, consultant and legal fee tariffs and options for improving regulatory efficiency. Reviewed practices in a number of Canadian and American jurisdiction...
AI summary The text outlines consulting roles in regulatory reviews, including cost award processes, tariff improvements, and efficiency reforms for the Ontario Energy Board and other jurisdictions. It highlights work on revenue requirements, rate design, and cost-of-service analyses for various utilities and governments.
Andrew McLaren Utility Regulation Experience Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2004/02 Phase I Canaval Bata Application Analysis and Casa Preparation Newhouset Territories Dublic Hillities NTPC 2000 0...
AI summary Andrew McLaren has extensive experience in utility regulation, having worked on various rate applications and proceedings for utilities such as NTPC, Manitoba Hydro, and Nunavut Power. His work includes analysis, preparation of evidence, and providing expert testimony in regulatory processes.
N-25Evidence - IG
4 passages
- NSP has estimated that the fully optimized credit could be up to $11 million per year, but is unable to - provide the calculation of this value.[18](#page 1-14) NSP estimates half of this may be reasonably achieved by PHP each - year, bu...
AI summary NSP proposes a Dispatchable Rider (DR) mechanism with PHP, estimating $11M annual savings but lacking detailed calculations. The DR's economic value requires NSP to have control over PHP's load during system stress. The recommendation emphasizes practical dispatch control for NSP during reserve margin periods, with concerns over 100% DR credit allocation to PHP.
ustrial energy users. For Industrial Gas Users Association of Manitoba (2020 - present): Support for cost of service and rate design matters. Testimony before the Manitoba Public Utilities Board. For Northwest Territories Power Corporation...
AI summary The text outlines the involvement of Bowman Economic Consulting Inc. in various regulatory and technical support roles across multiple provinces and organizations, focusing on cost of service, rate design, depreciation, revenue requirements, and system planning reviews. It highlights technical analysis, expert testimony, and negotiation support in energy-related proceedings.
Utility Regulation Conducted research and analysis for regulatory and rate reviews of electric, gas and water utilities in eight Canadian provinces and territories and international. Prepared evidence and expert testimony for regulatory he...
AI summary The text outlines a firm's extensive experience in utility regulation, including rate reviews, regulatory hearings, and analysis for various utilities across Canada and internationally. It highlights expertise in cost of service, revenue requirements, depreciation, and rate design, as well as involvement in regulatory processes and resource planning.
Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2001/03 Phase I General Rate Application Analysis and Case Preparation NWTPUB NTPC 2000 - 2002 No - Negotiated Settlement Newfoundland Hydro 2002 General Rate Applica...
AI summary The document outlines various utility proceedings and the work performed by different entities, including analysis, case preparation, and expert testimony before multiple regulatory bodies such as the NWTPUB, NLPUB, MPUB, and YUB. These proceedings span from 2000 to 2004 and involve entities like NTPC, Newfoundland Hydro, Manitoba Hydro, and Yukon Energy.
N-38Reply Evidence - NS Power
6 passages
DATE FILED: July 8, 2026 Page 3 of 25 1 (2) Given that service to PHP under the proposed ELID Tariff has been costed and priced in 2 accordance with well-established ATL embedded cost-based practices, examined and 3 approved by the Board i...
AI summary The document discusses the proposed ELID Tariff and compensation for PHP's Priority Interruptible (PI) service. It argues that PHP should be compensated for PI service due to its reliability benefits and that the ELID Tariff aligns with established cost-based practices. The document also references the PHP Power Purchase and Sales Agreements and the Prescribed Generation Facilities and Energy-Storage Projects Regulations.
DATE FILED: July 8, 2026 Page 5 of 25 1 2.0 ISSUES 2 3 This Reply addresses issues raised by parties, including in the evidence of Board Counsel 4 consultants Bates White Economic Consulting (BW) and Synapse Energy Economics, Inc. 5 (Synap...
AI summary This document outlines the issues addressed in a regulatory proceeding, including the GRA Settlement Agreement provisions, ELID Tariff Dispatchable Rider, and ELID Tariff Priority Interruptible service. NS Power, PHP, and various consultants have differing positions on the latitude provided by the GRA SA for signatories in the proceeding.
ELID Tariff Application, Attachment 4, page 12, "PHP Treatment," item f. 1 The Settlement Agreement does not provide that parties are able to take whatever position they so 2 choose on all ELID Tariff issues but rather whether the applicat...
AI summary The document discusses the interpretation of a Settlement Agreement (SA) regarding the ELID Tariff and the positions taken by various parties, including NS Power, PHP, InterGroup, and others. It emphasizes that the SA does not allow parties to take arbitrary positions on all ELID Tariff issues, but rather requires consistency with the basic tariff structure. InterGroup supports NS Power's position that the SA requires a written tariff reflecting the agreed terms.
n operational foundation (Bowman, approximate average PHP DATE FILED: July 8, 2026 Page 8 of 25 InterGroup Evidence (CA Consultant), page 6. The Application at pages 5-6, provided "[i]t is proposed that the PHP demand determinant be review...
AI summary The document discusses the review and setting of the PHP demand determinant as part of the GRA process or Fuel Adjustment Mechanism (FAM). It references NS Power's proposal for a standardized, formula-based metric for the 3CP demand determinant and mentions the Board's directive for NS Power to file an application for the ELIADC successor tariff by December 31, 2025.
2.2.3 Concern with ELID Tariff Complexity - Bowman provides: "[t]he proposed ELID rate is complicated and unusual in utility rate regulation. - No comparable rate could be identified in Canada, particularly for a major customer on a regula...
AI summary The document discusses concerns about the complexity of the ELID Tariff, noting that while Bowman finds it complicated, the Company argues it is an evolution of the ELIADC Tariff and not a dramatic change. It also addresses the recommendation for Board approval of DR operating procedures, though no process is proposed for this approval.
Bowman Evidence (IG Consultant), page 15, lines 25-26 and lines 27-28. 1 The Company submits the Board's approval of the Operating Procedures will not limit or expand 2 the Board's oversight of tariff operation, while the process required...
AI summary The Company argues that the Board's approval of Operating Procedures will not enhance regulatory oversight and emphasizes the importance of analyzing the implications of eliminating Priority Interruptible (PI) service for all customers, given the size of PHP's load and the potential risks to the power system.
100679Hearing Order
3 passages
HEARING ORDER Nova Scotia Power Incorporated applied to the Nova Scotia Energy Board on December 29, 2025, for approval of an Extra Large Industrial Dispatchable (ELID) Above-the-Line Tariff to Port Hawkesbury Paper (PHP). The Board has de...
AI summary Nova Scotia Power Incorporated applied for approval of an ELID Above-the-Line Tariff to Port Hawkesbury Paper. The proceeding will be conducted via a paper hearing, with specific deadlines for intervention, evidence submission, and responses to information requests.
PHP Letters of Comment Tuesday, April 21, 2026 Evidence from Intervenors (other than PHP) and Board Counsel Consultants Thursday, April 30, 2026 IRs to Intervenors and Board Counsel Consultants Wednesday, May 20, 2026 Responses to IRs from...
AI summary This document outlines the schedule for a regulatory proceeding, including key dates for submissions, interventions, and hearings. The timeline includes deadlines for letters of comment, evidence, and responses, with a final submission date for PHP on August 6, 2026.
Reply Submissions by NS Power Monday, August 17, 2026 The Board's Regulatory Rules will apply to this application, including Rule 7(3) with respect to filing by 2:00 pm on any date a document is due. The Clerk of the Board will distribute...
AI summary NS Power submitted a reply on August 17, 2026, indicating compliance with the Board's Regulatory Rules, including Rule 7(3), and noting the distribution of a Notice of Paper Hearing related to the Electricity mandate.
102802Letter IG re: Request oral hearing
3 passages
1. No Consensus Proposal and Competing Expert Opinions The GRA Settlement Agreement was understood by parties to contemplate a collaboratively developed ELID tariff to be filed and in place by January 1, 2027. Instead, there is no consensu...
AI summary The GRA Settlement Agreement aimed for a collaboratively developed ELID tariff by 2027, but no consensus exists. NSPI and PHP have filed competing proposals on tariff elements. Multiple expert consultants have critiqued both proposals, presenting differing conclusions. The Board faces five distinct expert perspectives on an unprecedented tariff structure, necessitating oral examination to resolve outstanding issues.
2. Credibility and Factual Disputes Cannot Be Fairly Resolved on the Written Record Several of the disputes on the record are not merely differences of regulatory philosophy; they rest on contested factual representations and underlying as...
AI summary The document highlights a dispute over the demand determinant in a regulatory proceeding, with NSPI, PHP, and Bowman proposing different figures (65 MW, 8 MW, and 120 MW, respectively). Synapse Energy Economics also disagrees with PHP's 8 MW proposal, arguing it underestimates PHP's contribution to system costs. The written record lacks a mechanism to test these competing figures or assumptions.
Conclusion and Request The Industrial Group submits that the current written record does not give the Board, or Intervenors, the adequate tools needed to resolve the outstanding disputes with confidence or clarity. While paper processes ha...
AI summary The Industrial Group argues that the current written record is insufficient for resolving disputes and requests an oral hearing to allow for a more thorough examination of evidence and assumptions. They emphasize the need for a fuller evaluation of the record and propose cooperation in establishing a hearing schedule.
102833Letter NSPI re: Response to oral hearing request
4 passages
July 17, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: M12661 Extra Large Industrial Dispatchable (ELID) Tariff Application – Reply to Requests for an Oral Heari...
AI summary Nova Scotia Power Inc. (NS Power) received requests from the Industrial Group (IG), Consumer Advocate (CA), and Small Business Advocate (SBA) to convert the M12661 ELID Tariff Application proceeding to an oral hearing. NS Power argues that an oral hearing is unnecessary given the extensive review process already undertaken, which has included evidence submissions, information requests, and technical conferences.
a round of IRs on intervenor and Board Counsel consultants' evidence, and reply evidence from both NS Power and PHP. The process established by the Board has now been underway for nearly seven months. Importantly, this process is in additi...
AI summary A round of intervenor and Board Counsel consultants' evidence, along with reply evidence from NS Power and PHP, is being reviewed. This process is separate from the 2026-2027 General Rate Application (GRA), which involved extensive consultation and led to the ELID Tariff. The IG's request revisits issues already discussed during the GRA process.
matters for which a thorough examination has already been completed through this regulatory proceeding on the written record, and which do not require oral examination to be understood or adjudicated. Finally, the IG also points to discuss...
AI summary The document discusses the regulatory proceeding involving NS Power, noting that some matters have already been thoroughly examined and do not require oral examination. The Industrial Group (IG) mentions a methodology for quantifying load shifting, but it does not alter the tariff proposal. NS Power emphasizes the importance of avoiding unnecessary oral proceedings due to their cost and complexity.
asing the length of the proceeding. It is this outcome that NS Power has sought to avoid by providing a complete and clear application in this matter and comprehensive IR responses and Reply Evidence. Consistent with this, the Company also...
AI summary NS Power argues that converting the proceeding to an oral hearing would introduce unnecessary delays in establishing a successor tariff effective by January 1, 2027, and proposes a structured settlement process to address outstanding issues. The Company emphasizes the extensive record already developed and prior successful collaboration between parties.