N-1Application
13 passages
1.0 INTRODUCTION - Nova Scotia Power Inc. (NS Power, Company) is applying to the Nova Scotia Energy Board - (NSEB, Board) for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above- - the-line (ATL) tariff available to...
AI summary Nova Scotia Power Inc. (NS Power) seeks approval for the Extra Large Industrial Dispatchable (ELID) Tariff to serve Port Hawkesbury Paper LP (PHP), replacing the expiring ELIADC Tariff. The ELID Tariff includes a Dispatchable Rider (DR) to manage PHP's load flexibility, with a Customer Charge for cost recovery. The application references the 2026-2027 General Rate Application (M12451) and its Settlement Agreement.
2.0 TARIFF COMPONENTS Key elements of the ELID Tariff, provided as Attachment 1 to this Application, include the following: • Customer Charge • Demand Charge • Energy Charge • Interruptible Service • Dispatchable Rider • Other Applicable R...
AI summary The ELID Tariff's Customer Charge recovers costs for dispatch services and tariff administration, including tasks like operating procedure development, PHP engagement, and real-time load optimization. The proposed $10,000 monthly charge for 2026-2027 is based on staff and software costs, with future GRA proceedings determining the final rate.
2.3 Energy Charge - The Energy Charge under the ELID Tariff will apply to all energy supplied to PHP in excess of - the Subject Energy Amount1F 2 deemed to be provided pursuant to the Power Sales Agreement issued - under Section 4AA (now S...
AI summary The Energy Charge under the ELID Tariff applies to PHP's energy consumption beyond the Subject Energy Amount, with proposed rates of 9.977 cents/kWh (2026) and 11.240 cents/kWh (2027). These rates consider embedded costs, energy displacement from the Goose Harbour Lake Wind Farm, and are subject to ongoing court proceedings regarding PHP's liability for the Maritime Link FLG2.
Extra Large Industrial Dispatchable Tariff Application – Attachment 1
AI summary This document outlines an application for an Extra Large Industrial Dispatchable (ELID) Tariff, potentially involving cost recovery mechanisms, regulatory approval processes, and related programs. It may address rate design, energy efficiency initiatives, and compliance with Nova Scotia energy regulations.
Recognizing that the Customer demand will be determined by the Company and the Customer working collaboratively to actively manage the Customer's demand in response to system load conditions, particularly during peak periods, and to reduce...
AI summary The text outlines how customer demand will be collaboratively managed with the company to reduce costs during peak periods. The monthly demand charge is set through regulatory proceedings and remains constant until revised by the Board.
WHEREAS - A. Nova Scotia Power ("NS Power"), along with the Consumer Advocate ("CA"), Small Business Advocate ("SBA"), counsel for the Industrial Group, representing CKF Inc., Crown Fibre Tube Inc., Irving Shipbuilding Inc., K + S Windsor...
AI summary NS Power and customer representatives (including advocates, industrial groups, and municipal utilities) collaborated on a 2026-2027 GRA through meetings, information sharing, technical conferences, and settlement discussions. The process involved standardized filings and expert consultant support, aiming to resolve the GRA on agreed terms.
2026-2027 General Rate Application Settlement Agreement Extra Large Industrial Dispatchable Tariff Application – Attachment 4 Page 2 of 21 - 1. The Parties have reached agreement on the outcomes that will result from the 2026- 2027 GRA as...
AI summary The Parties agree on the 2026-2027 GRA outcomes outlined in Schedule A, with NS Power to file the GRA with NSEB consistent with the Settlement Agreement. Customer Representatives may request information if the GRA deviates from the agreement. A Pre-GRA Letter detailing the collaborative process will be filed prior to GRA submission.
2026-2027 General Rate Application Settlement Agreement
AI summary This document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the rate-setting process and financial arrangements for utility services in Nova Scotia.
All of which is hereby agreed to by the Parties effective as of the ____ day of August, 2025. CONSUMER ADVOCATE SMALL BUSINESS ADVOCATE Melisse II Per: Per: MELISSA P. MACADAM INDUSTRIAL GROUP NOVA SCOTIA POWER INC. Per: Per: PORT HAWKESBU...
AI summary This document outlines a settlement agreement for the 2026-2027 General Rate Application, specifically addressing the Extra Large Industrial Dispatchable Tariff Application. It includes parties involved and is effective as of August 2025.
2026-2027 General Rate Application Settlement Agreement
AI summary This document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the regulatory process and rates and money matters in Nova Scotia.
2026-2027 General Rate Application Settlement Agreement
AI summary The document outlines the 2026-2027 General Rate Application Settlement Agreement, which pertains to the regulatory process for setting electricity rates in Nova Scotia.
2026-2027 General Rate Application Settlement Agreement Extra Large Industrial Dispatchable Tariff Application – Attachment 4 Page 10 of 21 GRA Element Settlement Terms Cost of Service ("COS") a) The COS as set out in the Draft GRA will be...
AI summary The 2026-2027 General Rate Application Settlement Agreement outlines the inclusion of the Cost of Service (COS) in the GRA, subject to future proceedings. Key points include the use of the Minimum System methodology, data collection on PHP's use of the High Voltage transmission system, and the apportionment of assessment costs from the Maritime Link.
RESPONSIBILITIES OF FRANCHISE HOLDER It is the responsibility of the holder of the electric efficiency and conservation franchise granted under Section 79C of the Public Utilities Act (Franchise Holder) to apply to the Nova Scotia Utility...
AI summary The Franchise Holder must apply to NSUAREB for approval of all DSM activities, plans, and programs, including itemizing related costs. NS Power is required to seek annual approval for DSM Cost Recovery Rider amounts by October 1 and remit monthly payments to fund approved DSM costs.
N-4NSPI (BW) RIR 1 to 14 - Redacted
3 passages
NON-CONFIDENTIAL 1 Request IR-1: 2 3 Please refer to Exhibit N-1, section 2.1 and Attachment 3. 4 5 (a) Why did NSPI select the "low range" of costs as the basis for calculating the Customer 6 Charge? 7 8 (b) If the actual costs to adminis...
AI summary NSPI explains its use of a conservative 'low range' cost estimate for the ELID Tariff Customer Charge, citing high-level forecasts and pending Board approval. The charge will be set via General Rate Applications (GRA), not adjusted to actual results, with future refinements dependent on Board approval and data availability.
NSPI Responses to BW Information Requests
AI summary Nova Scotia Power Inc. (NSPI) is responding to information requests from BW within a regulatory proceeding, likely related to rate applications or compliance matters. The context suggests ongoing regulatory scrutiny of NSPI's operations, programs, or financial practices.
NON-CONFIDENTIAL 1 Response IR-3: 2 3 (a-c, e-f) Please refer to BW IR-2. 4 5 (d) Yes, please refer to CA IR-9. Date Filed: April 10, 2026 NSPI (BW) IR-3 Page 2 of 2
AI summary The document contains a response to IR-3, referencing BW IR-2 and CA IR-9. Filed by NSPI on April 10, 2026, it includes procedural acknowledgments without detailed arguments or analysis.
N-5NSPI (CA) RIR 1 to 9 - Redacted
11 passages
NSPI Responses to CA Information Requests
AI summary This document outlines NSPI's responses to information requests from the Nova Scotia Energy Board (NSEB) as part of a regulatory proceeding. It provides details on various aspects of NSPI's operations and compliance with regulatory requirements.
EXHIBIT 6 PAGE 1 OF 6 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (10) OPER. & MAINT HYDRO (11) OPER. & MAINT WIND 2,092 7,450 1,383 4,926 73 261 380 1,353 44 155 40 142 46 164 78 27...
AI summary This exhibit presents a detailed breakdown of operational and maintenance costs across various energy generation and transmission categories, including hydro, wind, biomass, and others, along with depreciation and interest expenses. It also includes allocations related to demand-side management and regulatory affairs.
REDACTED ELID Tariff CA IR-2 Attachment 2 Page 40 of 94 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6 PAGE 4 OF 6
AI summary The document is a redacted section of a regulatory proceeding related to the ELID Tariff CA IR-2, including Exhibit 6, Page 4 of 6. Key details are confidential and removed.
REDACTED ELID Tariff CA IR-2 Attachment 2 Page 46 of 94 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6D Page 1 of 2
AI summary The document is an exhibit (6D) from a Nova Scotia regulatory proceeding related to the ELID Tariff CA IR-2. The content is redacted, with confidentiality notices indicating sensitive information has been removed. The exhibit is part of a larger attachment (Page 46 of 94) in a proceeding involving NSPI and other regulatory matters.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document involves an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission. The content pertains to regulatory processes and tariff design.
NON-CONFIDENTIAL 1 Request IR-3: 2 3 (a) Please provide a summary table showing allocated costs and rates for PHP and all 4 other ATL classes for 2026 and 2027 in these three scenarios: 5 6 (i) NSPI's proposed ELID Tariff as filed; 7 8 (ii...
AI summary The document outlines a request (IR-3) for a comparison of allocated costs and rates for Port Hawkesbury Paper (PHP) under three tariff scenarios (NSPI's ELID Tariff, PHP's modified ELID, and continued BTL tariff) for 2026-2027. It also asks for quantification of implications on NSPI's PHP deferral account balance, with a response noting a $25.2M and $12.8M cost differential in 2026 and 2027 respectively.
NON-CONFIDENTIAL 1 (iii) Please refer to M12451 Undertaking U-2 which provides the effect of PHP as a 2 below-the-line customer in 2026. Please refer to NSEB IR-6. Date Filed: April 10, 2026 NSPI (CA) IR-3 Page 2 of 2 Application for Appro...
AI summary The document references an application for approval of an Above-the-Line Tariff for Port Hawkesbury Paper (PHP) and cites Undertaking U-2 and NSEB IR-6. It also notes the filing date and page reference for NSPI's responses to information requests.
NSPI Responses to CA Information Requests
AI summary The document outlines NSPI's responses to information requests from the Commission for the Environment (CA). It provides details on various aspects of NSPI's operations, including financial data, regulatory compliance, and program initiatives.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document outlines an application for approval of an Above-the-Line Tariff for Port Hawkesbury Paper and includes NSPI's responses to information requests from the Commission for the Environment. The proceeding involves regulatory approval processes and tariff design.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary The document outlines an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission for the Environment.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to CA Information Requests
AI summary This document pertains to an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to information requests from the Commission for the Environment.
N-6NSPI (IG) RIR 1 to 31 - Redacted
10 passages
NON-CONFIDENTIAL 1 levels. Subject to the Board's approval of the Tariff and implementation of the PHP 2 Deferral as approved by the Board, subject to the final Board Order, in the 2026-2027 3 General Rate Application (M12451), revenue var...
AI summary The text references a General Rate Application (M12451) and the deferral of revenue variances between settlement agreement assumptions and actual results. It notes that deferral is subject to the Board's final approval of the Tariff and implementation of the PHP (likely a program or mechanism).
REDACTED (Attachment Only) 1 (a) Please refer to the following: ( 6) MEDIUM INDUSTRIAL 4 68 63 $34.9 $22.1 $57.0 468 63 $34.9 $22.1 $57.0 0 0 0.0% 6 0.0% $0.0 $0.0 $0.0 0.0% 0.0% 0.0% ( 7) LARGE INDUSTRIAL 7 22 82 $54.0 $19.0 $72.9 722 82...
AI summary The document contains a table with data related to different customer categories, including medium industrial, large industrial, PHP, municipal, and unmetered, with various costs and figures. It also includes references to matter numbers and other procedural items related to regulatory proceedings.
DETAILED LISTING OF C.O.S.S. INPUT INFORMATION (160) METER DATA SERVICES 440.3 1.6% 638,831 (161) SMART METER OPERATIONS CENTER (SMOC) 1,189.1 4.2% 1,725,124 (162) METER SERVICES - FIELD 1,427.2 5.0% 2,070,655 (163) ELECTRICAL WIRING INSPE...
AI summary The document provides a detailed listing of input information for the Cost of Service Study (C.O.S.S.), including meter data services, smart meter operations, meter services, electrical wiring inspections, and regulatory affairs expenses. The table outlines various costs, percentages, and financial figures for different departments and years.
FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (1) TOTAL DMD.RELATED (2) TOTAL ENG.RELATED (3) UNIT COST ENG.RELATED (4) TOTAL CUST.RELATED (5) TOTAL OPER. (6) TOTAL RATE (7) % REVENUE VARIANCE CALC (174) ELECTRICAL WIRING...
AI summary The document presents financial data related to electrical wiring inspections, meter services, bad debt expenses, customer service, regulatory affairs, and other operational costs for the year ending December 31, 2027. It includes figures for various categories such as total costs, unit costs, and revenue percentages.
-1A (13) OPER. & MAINT OTHER CT's 0 0 0 0 0 0 0 0 0 0 0 E-1A (14) OPER. & MAINT GENERATION BATTERIES 0 0 0 0 0 0 0 0 0 0 0 E-1A (15) OPER. & MAINT RADIAL TO GENERATION TRANS. 1,549 774 52 328 52 38 64 99 114 18 11 E-1A (16) DSM 0 See DSM A...
AI summary The document presents financial data for Nova Scotia Power, including operational and maintenance costs, depreciation, interest, taxes, and revenue from steam and ash sales. It also includes figures related to demand-side management (DSM) and regulatory affairs expenses.
FOR THE YEAR ENDING DECEMBER 31, 2026 (1) TOTAL EXPENSES (2) PROD. EXPENSES (3) TRANS. EXPENSES (4) DIST. (5) RETAIL EXPENSES EXPENSES EXPENSES ALLOCATOR (6) DIRECT (7) (23) EXECUTIVE MANAGEMENT 1,274 534 1,808.4 0.705 1,338 134 309 28 1,8...
AI summary The document presents a detailed breakdown of expenses for various departments and functions for the year ending December 31, 2026, including executive management, legal services, external relations, regulatory affairs, finance, and procurement. It outlines total expenses, production expenses, transmission expenses, and other financial allocations.
REVENUE TO EXPENSE COMPARISON (1) TOTAL DMD.RELATED (2) TOTAL ENG.RELATED (3) UNIT COST ENG.RELATED (4) TOTAL CUST.RELATED (5) TOTAL OPER. (6) TOTAL RATE (7) % REVENUE VARIANCE CALC (148) CUSTOMER SERVICE EXPERIENCE (149) CUSTOMER SOLUTION...
AI summary The document presents a revenue to expense comparison table, focusing on customer service, operations, and regulatory affairs. It details various costs associated with customer service, billing, meter services, and regulatory expenses, including total expenses and percentages of revenue.
0 1,162 26,729 466 (28) (29) (30) OTHER OPERATING (31) (32) CORPORATE GROUPS: (33) EXECUTIVE MANAGEMENT 1,808.4 1,290 133 307 28 51 (34) CORP. SECRETARY & INSURANCE 11,405.2 7,763 1,716 1,033 568 324 (35) LEGAL SERVICES 5,043.0 3,598 370 8...
AI summary The document presents financial data related to Nova Scotia Power Inc.'s operating expenses, including corporate groups, generation services, and depreciation across various energy sources. It includes figures for legal services, regulatory affairs, and other administrative expenses.
NON-CONFIDENTIAL 1 Request IR-14: 2 3 Reference: N-1, ELID Application, page 9 – Priority Interruptible Credit. 4 5 (a) Please provide all workpapers, calculations, and analysis supporting the value of 6 $0.764/kVA and $0.767/kVA as the pr...
AI summary The request seeks clarification on the basis for the priority interruptible credit ($0.764/kVA and $0.767/kVA) and whether it is derived from actual avoided costs or a policy-based 10% uplift over the standard LIIR credit. The response directs to specific filings (M12451, SBA IR-2, and IG IR-13) for detailed calculations and historical context.
NSPI Responses to Industrial Group Information Requests 1 Request IR-18: 1 (iv) Does this mean no increased exposure to FAM costs? 2 3 (e) Please provide all quantitative analyses, models or simulations that demonstrate that 4 ATL customer...
AI summary NSPI responds to an inquiry about whether ATL customers are protected from increased FAM costs. NSPI states it cannot estimate the DR credit for 2026 and 2027, as it depends on multiple factors. It also mentions plans to revise the FAM Plan of Administration pending the Board's approval of the ELID Tariff.
N-10NSPI (Synapse) RIR 1 to 30 - Redacted
12 passages
NSPI Responses to Synapse Energy Economics, Inc. Information Requests 1 Request IR-1: 8 please refer to SR-01 Attachment 3 (Exhibit N-91-(i)); 9 • For 2026 BCF, SR-01 Attachment 5 (Exhibit N-91-(i)); and 10 • For 2027 BCF, SR-01 Attachment...
AI summary NSPI provides responses to information requests from Synapse Energy Economics, Inc., referencing various exhibits and filings related to the 2026 BCF, 2027 BCF, and the COSS methodology. The consultative review of COSS was conducted as directed by the NSEB and led to changes in the COSS as part of the 2026/2027 General Rate Application. The Board's decision was issued in March 2026, and a compliance filing was submitted in April 2026.
Response IR-23: (a) The existing order of interruptibility by rate class was established through regulatory proceedings which gave rise to various interruptible service rates over the last few decades. The priority interruptible status of...
AI summary The document explains the historical basis for interruptible service rate prioritization, noting that the ELID Tariff's second position reflects longstanding practices accommodating large pulp and paper operations. It references regulatory proceedings and specific tariff structures, with GRLF load interruption prioritization detailed in IG IR-25 part (a).
REDACTED (CONFIDENTIAL INFORMATION REMOVED) Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to Synapse Energy Economics, Inc. Information Requests
AI summary The document outlines an application for approval of an above-the-line tariff for Port Hawkesbury Paper (NSEB M12661) and NSPI's responses to information requests from Synapse Energy Economics, Inc. The proceeding involves regulatory approval processes and compliance with information disclosure requirements.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 45 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 6A
AI summary A redacted exhibit from a Nova Scotia regulatory proceeding related to the ELID Tariff and Interruptible Rider 30 (IR-30), involving Synapse Energy Economics and Nova Scotia Power Inc. The document is part of a broader regulatory filing and includes confidential information removed.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 84 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) EXHIBIT 9C Page 2 of 3 NOVA SCOTIA POWER INC.
AI summary A redacted exhibit from a Nova Scotia Power Inc. (NSPI) regulatory proceeding related to the ELID Tariff and Synapse IR-30 Attachment 1. The document is part of a larger submission involving rate design and regulatory approval processes.
REDACTED ELID Tariff Synapse IR-30 Attachment 1 Page 91 of 96 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Line # AVERAGE RATE BASE RATE BASE 2025 RATE BASE 2026 (155) Total (156) (157) REVENUE OPERATIONS (158) BILLING SERVICES & PAYMENTS (...
AI summary The document presents a table with line items related to revenue operations, meter data services, electrical wiring inspections, and customer service, including average rate base figures for 2025 and 2026. It also includes details on regulatory affairs expenses and other costs associated with these operations.
(IN THOUSANDS OF DOLLARS) NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2026
AI summary This document presents a detailed listing of input information for Nova Scotia Power Inc.'s Cost of Service Study (COSS) for 2026, including financial data and cost components relevant to regulatory proceedings. It outlines various riders, charges, and adjustments, reflecting the utility's operational and financial structure under Nova Scotia's regulatory framework.
NOVA SCOTIA POWER INC.
AI summary The document pertains to Nova Scotia Power Inc., a utility company involved in regulatory proceedings. It includes acronyms and contextual information relevant to energy management, pricing, and regulatory frameworks in Nova Scotia.
NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (148) OVERHEAD LINES 58,912.8 0 100% (149) UNDERGROUND LINES 589.0 (150) LINE TRANSFORMERS 0.0 (151) METE...
AI summary The document presents a detailed listing of Cost of Service Study (COSS) input information for Nova Scotia Power Inc. for the year ending December 31, 2027. It includes various categories such as overhead and underground lines, distribution, customer service, revenue operations, and regulatory affairs, with associated costs and percentages.
N-19Evidence - Intergroup Consultants (CA)
11 passages
1.0 INTRODUCTION This testimony has been prepared for the Consumer Advocate ("CA") by or under the direction of Hayitboy Mahmudov and Andrew McLaren of InterGroup Consultants Ltd. ("InterGroup"). This report reviews Nova Scotia Power Inc.'...
AI summary This testimony, prepared for the Consumer Advocate by InterGroup Consultants Ltd., reviews Nova Scotia Power Inc.'s Application for Approval of an Above-the-Line Tariff for Port Hawkesbury Paper in Proceeding M12661. The review focuses on residential customer interests and adheres to regulatory fairness principles.
2.0 SUMMARY OF RECOMMENDATIONS Based on the analysis summarized in this report, InterGroup makes the following recommendations to the Board: - Recommendation 1: InterGroup recommends that the Board reject PHP's proposed modifications for t...
AI summary InterGroup recommends rejecting PHP's modifications, assessing DR savings reasonableness, requiring Board approval for Operating Procedures, approving ELID Tariff's Interruptible Service component for 2026-2027 with a 2028 review, and reviewing the ELID Tariff post-implementation. These actions aim to ensure transparency, fairness, and alignment with regulatory standards.
3.1 NSP APPLICATION NSP is applying to the Board for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line (ATL) tariff available to Port Hawkesbury Paper LP (PHP). NSP states it is intended that PHP will sub...
AI summary NSP seeks Board approval for the ELID Tariff for PHP, replacing the expiring ELIADC Tariff. The proposed tariff includes customer, demand, and energy charges, interruptible service, and provisions for wind farm energy. NSP cites a settlement agreement (SA) with PHP for cost modeling, while InterGroup highlights load characteristics and credit calculations in the SA. Alternative plans are needed if approval fails.
clear why derivation of an interruptible credit rate to PHP would use the same kW demand figure for both coincident and non-coincident PHP peaks, which is not supported by PHP's historical peak load. 2. The proposed cost-based demand charg...
AI summary The text critiques the methodology for deriving an interruptible credit rate for PHP, arguing that using the same kW demand figure for coincident and non-coincident peaks is unsupported by historical data. It highlights that the proposed interruptible credit rate exceeds cost-based demand charges for 2026 and 2027, which is deemed unreasonable. PHP responds that its position aligns with the 2026-2027 GRA SA and references the Board's decision on M12451 regarding a deferral account.
Recommendation: The Board should consider reasonableness of the DR savings to be fully credited to PHP. Further, NSP states that consistent with the ELIADC Tariff, PHP operations under the DR will be governed by Operating Procedures develo...
AI summary The Board is urged to assess the reasonableness of DR savings credits to PHP. NSP argues Operating Procedures for PHP under DR should not require NSEB approval, as benefits/costs flow solely to PHP. However, stakeholders recommend Board approval to ensure transparency and protect other ATL customers from potential revisions favoring PHP.
p>40 NSP Response to Information Request Synapse-23. 41 NSP Response to Information Request IG-13. 42 NSP Response to Information Request Synapse-14. 43 See NSP Response to Information Request Synapse-14, Synapse-15, SBA-6. 44 NSP Response...
AI summary NSP proposes an Interruptible Rider with a Dispatchable Rider mechanism, increasing savings transferred to PHP from 25% to 100%. InterGroup argues this risks double-counting benefits for PHP, potentially disadvantaging other customers. NSP acknowledges PI service reduces interruption risks for other customers but has not quantified its value, prompting InterGroup to call for revisiting the PI credit in future proceedings.
nd calculate firm capacity requirements to assist QEC in plant capacity planning to meet energy demands by community. Prepare semi-annual Fuel Stabilization Fund rider applications and review support. For Jamaica Public Service Company Ltd...
AI summary The text outlines utility regulatory activities including rate case submissions, fuel stabilization fund management, and cost allocation analyses for JPS, Nelson Hydro, YEC, and QEC. Tasks involve technical analysis, tariff design, stakeholder engagement, and regulatory filings under frameworks like PBR.
Hayitboy Mahmudov - Utility Regulation Experience Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2012/13 and 2013/14 Phase I General Rate Application Analysis; Assistance in preparation of application and company...
AI summary Hayitboy Mahmudov has extensive experience in utility regulation, including work on general rate applications and compliance filings for NTPC and Qulliq Energy Corporation. He has provided analysis, prepared evidence, and assisted with regulatory proceedings in the Northwest Territories and other jurisdictions.
and the 2022/23 General Rate Application and. Andrew is currently involved in QEC's 2025/26 General Rate Application providing analytical and advisory support as the Senior consultant on the project. For Saskatchewan Rate Review Panel (201...
AI summary Andrew provides technical advisory services on utility rate applications and regulatory proceedings, including QEC's 2025/26 General Rate Application, Saskatchewan Rate Review Panel cases, City of Penticton utility planning, and Nova Scotia Consumer Advocate proceedings. His work spans rate design, financial forecasting, and regulatory compliance.
For the Ontario Energy Board (2024) Study director for a review of cost award processes, consultant and legal fee tariffs and options for improving regulatory efficiency. Reviewed practices in a number of Canadian and American jurisdiction...
AI summary The text outlines consulting roles in regulatory reviews, including cost award processes, tariff improvements, and efficiency reforms for the Ontario Energy Board and other jurisdictions. It highlights work on revenue requirements, rate design, and cost-of-service analyses for various utilities and governments.
Andrew McLaren Utility Regulation Experience Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2004/02 Phase I Canaval Bata Application Analysis and Casa Preparation Newhouset Territories Dublic Hillities NTPC 2000 0...
AI summary Andrew McLaren has extensive experience in utility regulation, having worked on various rate applications and proceedings for utilities such as NTPC, Manitoba Hydro, and Nunavut Power. His work includes analysis, preparation of evidence, and providing expert testimony in regulatory processes.
N-25Evidence - Bowman Economic Consulting (IG)
4 passages
- NSP has estimated that the fully optimized credit could be up to $11 million per year, but is unable to - provide the calculation of this value.[18](#page 1-14) NSP estimates half of this may be reasonably achieved by PHP each - year, bu...
AI summary NSP proposes a Dispatchable Rider (DR) mechanism with PHP, estimating $11M annual savings but lacking detailed calculations. The DR's economic value requires NSP to have control over PHP's load during system stress. The recommendation emphasizes practical dispatch control for NSP during reserve margin periods, with concerns over 100% DR credit allocation to PHP.
ustrial energy users. For Industrial Gas Users Association of Manitoba (2020 - present): Support for cost of service and rate design matters. Testimony before the Manitoba Public Utilities Board. For Northwest Territories Power Corporation...
AI summary The text outlines the involvement of Bowman Economic Consulting Inc. in various regulatory and technical support roles across multiple provinces and organizations, focusing on cost of service, rate design, depreciation, revenue requirements, and system planning reviews. It highlights technical analysis, expert testimony, and negotiation support in energy-related proceedings.
Utility Regulation Conducted research and analysis for regulatory and rate reviews of electric, gas and water utilities in eight Canadian provinces and territories and international. Prepared evidence and expert testimony for regulatory he...
AI summary The text outlines a firm's extensive experience in utility regulation, including rate reviews, regulatory hearings, and analysis for various utilities across Canada and internationally. It highlights expertise in cost of service, revenue requirements, depreciation, and rate design, as well as involvement in regulatory processes and resource planning.
Utility Proceeding Work Performed Before Client Year Oral Testimony NTPC 2001/03 Phase I General Rate Application Analysis and Case Preparation NWTPUB NTPC 2000 - 2002 No - Negotiated Settlement Newfoundland Hydro 2002 General Rate Applica...
AI summary The document outlines various utility proceedings and the work performed by different entities, including analysis, case preparation, and expert testimony before multiple regulatory bodies such as the NWTPUB, NLPUB, MPUB, and YUB. These proceedings span from 2000 to 2004 and involve entities like NTPC, Newfoundland Hydro, Manitoba Hydro, and Yukon Energy.
N-38Reply Evidence - NS Power
6 passages
DATE FILED: July 8, 2026 Page 3 of 25 1 (2) Given that service to PHP under the proposed ELID Tariff has been costed and priced in 2 accordance with well-established ATL embedded cost-based practices, examined and 3 approved by the Board i...
AI summary The document discusses the proposed ELID Tariff and compensation for PHP's Priority Interruptible (PI) service. It argues that PHP should be compensated for PI service due to its reliability benefits and that the ELID Tariff aligns with established cost-based practices. The document also references the PHP Power Purchase and Sales Agreements and the Prescribed Generation Facilities and Energy-Storage Projects Regulations.
DATE FILED: July 8, 2026 Page 5 of 25 1 2.0 ISSUES 2 3 This Reply addresses issues raised by parties, including in the evidence of Board Counsel 4 consultants Bates White Economic Consulting (BW) and Synapse Energy Economics, Inc. 5 (Synap...
AI summary This document outlines the issues addressed in a regulatory proceeding, including the GRA Settlement Agreement provisions, ELID Tariff Dispatchable Rider, and ELID Tariff Priority Interruptible service. NS Power, PHP, and various consultants have differing positions on the latitude provided by the GRA SA for signatories in the proceeding.
ELID Tariff Application, Attachment 4, page 12, "PHP Treatment," item f. 1 The Settlement Agreement does not provide that parties are able to take whatever position they so 2 choose on all ELID Tariff issues but rather whether the applicat...
AI summary The document discusses the interpretation of a Settlement Agreement (SA) regarding the ELID Tariff and the positions taken by various parties, including NS Power, PHP, InterGroup, and others. It emphasizes that the SA does not allow parties to take arbitrary positions on all ELID Tariff issues, but rather requires consistency with the basic tariff structure. InterGroup supports NS Power's position that the SA requires a written tariff reflecting the agreed terms.
n operational foundation (Bowman, approximate average PHP DATE FILED: July 8, 2026 Page 8 of 25 InterGroup Evidence (CA Consultant), page 6. The Application at pages 5-6, provided "[i]t is proposed that the PHP demand determinant be review...
AI summary The document discusses the review and setting of the PHP demand determinant as part of the GRA process or Fuel Adjustment Mechanism (FAM). It references NS Power's proposal for a standardized, formula-based metric for the 3CP demand determinant and mentions the Board's directive for NS Power to file an application for the ELIADC successor tariff by December 31, 2025.
2.2.3 Concern with ELID Tariff Complexity - Bowman provides: "[t]he proposed ELID rate is complicated and unusual in utility rate regulation. - No comparable rate could be identified in Canada, particularly for a major customer on a regula...
AI summary The document discusses concerns about the complexity of the ELID Tariff, noting that while Bowman finds it complicated, the Company argues it is an evolution of the ELIADC Tariff and not a dramatic change. It also addresses the recommendation for Board approval of DR operating procedures, though no process is proposed for this approval.
Bowman Evidence (IG Consultant), page 15, lines 25-26 and lines 27-28. 1 The Company submits the Board's approval of the Operating Procedures will not limit or expand 2 the Board's oversight of tariff operation, while the process required...
AI summary The Company argues that the Board's approval of Operating Procedures will not enhance regulatory oversight and emphasizes the importance of analyzing the implications of eliminating Priority Interruptible (PI) service for all customers, given the size of PHP's load and the potential risks to the power system.
N-52Vincent Musco's CV
3 passages
rts (with co-author) in the matter of Newfoundland and Labrador Hydro's 2025 Application for Capital Expenditures for the Purchase and Installation of Bay d'Espoir Unit 8 and Avalon Combustion Turbine - On behalf of the Nova Scotia Utility...
AI summary The text outlines various testifying experiences related to regulatory proceedings, including appeals, audits, and applications involving utility companies and regulatory bodies in different jurisdictions. It highlights testimony provided on behalf of the Nova Scotia Utility and Review Board and other commissions.
nts on the Summer 2025 Through Spring 2026 Renewable Resource Procurement Events, Pursuant to Section 16-111.5(o) of the Illinois Public Utilities Act. For the Illinois Commerce Commission (May 2026). - Independent Observer's First Supplem...
AI summary The text lists various consulting reports and submissions related to renewable energy procurement events and tariff applications. These reports were submitted to regulatory bodies in Illinois, Hawaii, and Nova Scotia, focusing on topics such as renewable generation, energy storage, and tariff approvals.
Selected experience - Served as Consulting Expert on behalf of the Public Utilities Commission of Texas in assessing a proposed acquisition of Texas New Mexico Power by Blackstone, Inc. - Led efforts as Procurement Monitor on behalf of the...
AI summary The text outlines the professional experience of an individual who has served as a consulting expert and auditor in various regulatory and utility-related matters across multiple states and regions, including Texas, Illinois, Massachusetts, Nova Scotia, and Hawaii, focusing on energy procurement, market design, and regulatory compliance.
N-55Response to Undertakings 1-15 - NSPI - Redacted
5 passages
(193) (194) VP HUMAN RESOURCES DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2026 (IN THOUSANDS OF DOLLARS) 2022-2024 Transmission Rate Base Adjustment .xlsx OM&G Master Summary (GRA).xlsx 2022-2024 Subfun...
AI summary The document presents detailed listings of input information for the year ending December 31, 2026, focusing on customer service costs, revenue operations, and regulatory affairs expenses. It includes data on various operational and financial aspects such as billing, meter services, and advocacy costs.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to IG Undertakings
AI summary The document outlines an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to IG Undertakings. It involves regulatory considerations related to tariff structures and compliance with regulatory requirements.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to IG Undertakings
AI summary The document concerns an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, with NSPI providing responses to IG Undertakings. Key topics include tariff design and regulatory approval processes.
REDACTED Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to IG Undertakings
AI summary The document details an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, with responses from NSPI to IG Undertakings. This involves regulatory proceedings related to tariff structures and compliance with regulatory requirements.
Application for Approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (NSEB M12661) NSPI Responses to NSEB Undertakings
AI summary The document outlines an application for the approval of an Above-the-Line Tariff for Port Hawkesbury Paper, along with NSPI's responses to NSEB Undertakings. This proceeding involves regulatory considerations related to tariff design and the approval process.
100679Hearing Order
3 passages
HEARING ORDER Nova Scotia Power Incorporated applied to the Nova Scotia Energy Board on December 29, 2025, for approval of an Extra Large Industrial Dispatchable (ELID) Above-the-Line Tariff to Port Hawkesbury Paper (PHP). The Board has de...
AI summary Nova Scotia Power Incorporated applied for approval of an ELID Above-the-Line Tariff to Port Hawkesbury Paper. The proceeding will be conducted via a paper hearing, with specific deadlines for intervention, evidence submission, and responses to information requests.
PHP Letters of Comment Tuesday, April 21, 2026 Evidence from Intervenors (other than PHP) and Board Counsel Consultants Thursday, April 30, 2026 IRs to Intervenors and Board Counsel Consultants Wednesday, May 20, 2026 Responses to IRs from...
AI summary This document outlines the schedule for a regulatory proceeding, including key dates for submissions, interventions, and hearings. The timeline includes deadlines for letters of comment, evidence, and responses, with a final submission date for PHP on August 6, 2026.
Reply Submissions by NS Power Monday, August 17, 2026 The Board's Regulatory Rules will apply to this application, including Rule 7(3) with respect to filing by 2:00 pm on any date a document is due. The Clerk of the Board will distribute...
AI summary NS Power submitted a reply on August 17, 2026, indicating compliance with the Board's Regulatory Rules, including Rule 7(3), and noting the distribution of a Notice of Paper Hearing related to the Electricity mandate.
102802Letter IG re: Request oral hearing
3 passages
1. No Consensus Proposal and Competing Expert Opinions The GRA Settlement Agreement was understood by parties to contemplate a collaboratively developed ELID tariff to be filed and in place by January 1, 2027. Instead, there is no consensu...
AI summary The GRA Settlement Agreement aimed for a collaboratively developed ELID tariff by 2027, but no consensus exists. NSPI and PHP have filed competing proposals on tariff elements. Multiple expert consultants have critiqued both proposals, presenting differing conclusions. The Board faces five distinct expert perspectives on an unprecedented tariff structure, necessitating oral examination to resolve outstanding issues.
2. Credibility and Factual Disputes Cannot Be Fairly Resolved on the Written Record Several of the disputes on the record are not merely differences of regulatory philosophy; they rest on contested factual representations and underlying as...
AI summary The document highlights a dispute over the demand determinant in a regulatory proceeding, with NSPI, PHP, and Bowman proposing different figures (65 MW, 8 MW, and 120 MW, respectively). Synapse Energy Economics also disagrees with PHP's 8 MW proposal, arguing it underestimates PHP's contribution to system costs. The written record lacks a mechanism to test these competing figures or assumptions.
Conclusion and Request The Industrial Group submits that the current written record does not give the Board, or Intervenors, the adequate tools needed to resolve the outstanding disputes with confidence or clarity. While paper processes ha...
AI summary The Industrial Group argues that the current written record is insufficient for resolving disputes and requests an oral hearing to allow for a more thorough examination of evidence and assumptions. They emphasize the need for a fuller evaluation of the record and propose cooperation in establishing a hearing schedule.
102833Letter NSPI re: Response to oral hearing request
4 passages
July 17, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: M12661 Extra Large Industrial Dispatchable (ELID) Tariff Application – Reply to Requests for an Oral Heari...
AI summary Nova Scotia Power Inc. (NS Power) received requests from the Industrial Group (IG), Consumer Advocate (CA), and Small Business Advocate (SBA) to convert the M12661 ELID Tariff Application proceeding to an oral hearing. NS Power argues that an oral hearing is unnecessary given the extensive review process already undertaken, which has included evidence submissions, information requests, and technical conferences.
a round of IRs on intervenor and Board Counsel consultants' evidence, and reply evidence from both NS Power and PHP. The process established by the Board has now been underway for nearly seven months. Importantly, this process is in additi...
AI summary A round of intervenor and Board Counsel consultants' evidence, along with reply evidence from NS Power and PHP, is being reviewed. This process is separate from the 2026-2027 General Rate Application (GRA), which involved extensive consultation and led to the ELID Tariff. The IG's request revisits issues already discussed during the GRA process.
matters for which a thorough examination has already been completed through this regulatory proceeding on the written record, and which do not require oral examination to be understood or adjudicated. Finally, the IG also points to discuss...
AI summary The document discusses the regulatory proceeding involving NS Power, noting that some matters have already been thoroughly examined and do not require oral examination. The Industrial Group (IG) mentions a methodology for quantifying load shifting, but it does not alter the tariff proposal. NS Power emphasizes the importance of avoiding unnecessary oral proceedings due to their cost and complexity.
asing the length of the proceeding. It is this outcome that NS Power has sought to avoid by providing a complete and clear application in this matter and comprehensive IR responses and Reply Evidence. Consistent with this, the Company also...
AI summary NS Power argues that converting the proceeding to an oral hearing would introduce unnecessary delays in establishing a successor tariff effective by January 1, 2027, and proposes a structured settlement process to address outstanding issues. The Company emphasizes the extensive record already developed and prior successful collaboration between parties.
20260921-1Hearing Transcript — 09/21/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD)
13 passages
OPENING STATEMENT 39 NOVA SCOTIA POWER 1 oversight processes already used elsewhere within Nova 12 13 14 15 16 17 18 19 20 As noted in the [Settlement Agreement], for 2026 and 2027, the proposed interruptible credit applicable to PHP is th...
AI summary Nova Scotia Power is proposing a lower interruptible credit for PHP compared to their established practice, which would have been $13.107 per kVA demand. The company acknowledges this deviation and states that the credit may be revisited in the next GRA, subject to a Board decision.
1 BY MR. MacDOUGALL: 2 And here at line 22 you state in Q. 3 your reply: 4 5 6 Specifically the GRA SA [that's the Settlement Agreement] provides: 7 8 9 10 11 12 13 In the PHP ADC and tariff processes that will be brought forward for appro...
AI summary The discussion revolves around the interpretation of a Settlement Agreement (GRA SA) and its implications for the PHP ADC and tariff filings. The parties are debating whether the agreement allows for any position on ELID tariff issues or restricts them to the 'basic tariff structure' outlined in the agreement. Nova Scotia Power's position is that the parameters for the ELID tariff were established in the Settlement Agreement.
NOVA SCOTIA POWER PANEL 63 Cr-ex, (MacDougall) 1 perspective and position with respect to the 5 you could go to PDF page 1470. Because I guess we should 6 be careful not to show any other confidential information. 7 THE CHAIR: Yeah, just p...
AI summary The proceeding involves Nova Scotia Power Inc. (NSPI) and its responses to Industrial Group IR-30, with references to a large document (PDF page 1470) containing a confidential chart. The discussion centers on the handling of large attachments in regulatory filings.
NOVA SCOTIA POWER PANEL 169 Cr-ex, (Powell) have a historical base. It's kind of in the middle of what Port Hawkesbury Paper and Mr. Bowman are recommending. It may be more representative of where they'll land, but we'll have a better sens...
AI summary The discussion centers on Nova Scotia Power's approach to determining appropriate rates under different tariff regimes, particularly in the absence of a Settlement Agreement. The witness emphasizes the need for a regulatory process to develop a position on the appropriate mechanism for rate-setting.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 of operating reserve. And with the introduction of 2 telemetry and control, we're able to reduce the actual 3 number of interruptions by carrying, for example, PHP and 4 Large Indust...
AI summary The discussion addresses the impact of the Maritime Link matter decision on costs, with the witness stating that no changes have been calculated as a result of the decision. The context involves operating reserve management and the use of telemetry and control for interruptible customers.
NOVA SCOTIA POWER PANEL 177 Cr-ex, (Powell) 1 were included in in the tariff. included in cost-of-service work that had been done in advance of that, but yes, the tariff was not developed. Okay. Q. MS. RUDDERHAM: Now, Mr. Norwood, if you d...
AI summary The discussion centers on the Settlement Agreement (SA) and the initial demand assumption of 65 megawatts, noting that the terms of the ultimate tariff proposal were not known at the time the SA was drafted. The need for a formal analysis and expert evidence to support the demand assumption is highlighted.
NSPI, and then NSPI would provide a response to each one of those data requests that they were able to do to the best of their ability. You'd agree? A. (Willett) Yeah. So I would say there's two processes, one would have been the cost-of-...
AI summary The discussion focuses on data requests made to NSPI in the context of the General Rate Application (GRA), which were part of settlement discussions and not formally filed as part of the record. These requests were aimed at clarifying issues prior to the GRA, not for reaching a settlement agreement.
NOVA SCOTIA POWER PANEL 203 Cr-ex, (Rudderham) 1 A. (Willett) I wouldn't necessarily INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 MS. POWER: Do you mind if I just make the 2 point that we're happy to have Ms. Rudderham proceed...
AI summary The document discusses data exchange between Nova Scotia Power and stakeholders, including the Public Utilities Board (PHP), in the context of a proceeding. It references the modeling of PHP as an above-the-line customer in a cost-of-service study using revenue requirements from 2026/2027.
exercises that took place of modelling PHP as an above- the-line, but that was using '23 test year data for that. Q. Correct. Yes, I was distinguishing that. MS. RUDDERHAM: Mr. Norwood, if you don't mind pulling up the I believe it's label...
AI summary The text discusses a data request response related to PHP (Public Utilities Board) and includes a conversation between MS. RUDDERHAM and Mr. Norwood regarding a document labeled PHP DR 4.01. The response was part of the July 11, 2025 data submissions.
PHP being moved to above-the-line. It's a fair summary of what the question is rather than reading them all in? A. (Willett) Yes. Q. Okay. MS. RUDDERHAM: And Mr. Norwood, if you don't mind scrolling down. I'm looking at the, yeah, that ans...
AI summary The discussion revolves around the ongoing work by Nova Scotia Power (NSP) and PHP on a potential above-the-line successor to the ELIADC, with a focus on step one of the process, which involves cost-of-service treatment. The information provided is described as indicative, meaning it is directional but not final, as the pricing and costing remain under development and will be examined in a future regulatory proceeding.
NOVA SCOTIA POWER PANEL 263 Cr-ex, (Rudderham) 1 those three scenarios occur where we have to actually 15 understand the hypothetical around should the Board, but 16 the company is not supporting 10 percent on a larger 17 number. It's $500...
AI summary The text discusses a proposed $500,000 increase, with a 10 percent rate on $760,000, which the company is not supporting. The context is a regulatory proceeding involving Nova Scotia Power and the Public Utilities Board.
Q. Yeah. And I guess what I am trying to get at with my questions about the interruptible priority credit, assuming and knowing that Nova Scotia Power cannot act discriminately before or sorry; discriminatively before or to customers, if a...
AI summary The discussion revolves around the interruptible priority credit and whether Nova Scotia Power can offer it without discriminatory practices. Concerns are raised about the potential financial burden on other above-the-line customers who may be funding this credit. The response references legislation against undue discrimination and the need for Board approval of the tariff.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 MS. RUDDERHAM: I am cognizant of the time. 2 It says it's 4:30. I do still have a number of questions. 3 I hope I won't be too long, but if I'm able to continue or 4 if...? 5 THE CHA...
AI summary The discussion involves the operating procedures for ELID and whether they require Board approval. The witness confirms that NSPI does not require Board approval for these procedures. The speaker references Exhibit N-6, specifically IR-12 and Attachment 1, in relation to Nova Scotia Power's responses to the Industrial Group.
20260922-1Hearing Transcript — 09/22/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD, MICHAEL GORMAN, COLIN FITZHENRY)
4 passages
NOVA SCOTIA POWER PANEL 89 Cr-ex, (Mahody) 1 Goose Harbour RECs are compliant with the renewable energy 2 standard and, secondly, that the RECs purchased by Nova 3 Scotia Power from Newfoundland were also compliant. 4 Were you prepared to...
AI summary The Nova Scotia Power Panel discusses the compliance of Renewable Energy Certificates (RECs) purchased from Newfoundland and the implications of the Board's potential refusal to approve a tariff, which could lead to service under the LIIR or an extension of the ELIADC. These discussions involve Nova Scotia Power and other stakeholders.
Power, if we make all or any of the adjustments some are you know, you can't do one two at the same time, but if you make some of these adjustments that are requested, because of the deferral account, would Nova Scotia Power be kept whole...
AI summary The discussion revolves around deferral accounts and their impact on Nova Scotia Power, particularly regarding whether the company would be kept whole with the deferral mechanism and concerns about the number and flexibility implications of deferrals. The conversation also touches on the Settlement Agreement and its potential influence on the Board's decision-making.
NOVA SCOTIA POWER PANEL 147 Cr-ex, (Rubin) 1 peak, the December, January, February? 2 questions. 3 THE CHAIR: Port Hawkesbury Paper? 4 MR. MacDOUGALL: Thank you, Mr. Chair. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 FURTHER CROSS-EXAMINATIO...
AI summary The document contains a portion of a regulatory proceeding involving Nova Scotia Power (NSP) and discussions around the Green Choice approval process. The panel is considering whether NSP has commented on the renewable attribute loss rate in this process, with an undertaking requested to provide clarification.
PHP EXPERT PANEL 267 Cr-ex, (Rubin) 1 ready, I think, Ms. Rubin. 2 MS. RUBIN: Okay. I think we'll stick 3 with the reply evidence, which is Exhibit N-36. And if we 4 can turn to PDF page 8, which is page 7. Right, okay. 5 CROSS-EXAMINATION...
AI summary Ms. Rubin is cross-examining Fitzhenry regarding Mr. Bowman's proposal to use PHP average demand instead of the standard three coincident peak (3CP) methodology for demand allocation. Fitzhenry agrees that Mr. Bowman admits the 3CP method is standard for other customers but argues that PHP's unique load characteristics make the proposed method inappropriate.
20260928-1Hearing Transcript — 09/28/2026 (BEVAN LOCK, JOHN ESAIW, ANDREW McLAREN, HAYITBOY MAHMUDOV)
5 passages
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS the Application, correct. Q. And then if you can scroll down to €. And so you might be able to help me understand here. So (e) says: [Nova Scotia] Power and PHP shall reflect the foreg...
AI summary The discussion revolves around a commitment by Nova Scotia Power and PHP to develop a written tariff including priority interruptible service, to be approved by the Board and effective January 1, 2026. PHP acknowledges this was an optional commitment, subject to the resolution of ADC and tariff processes, which did not occur by the original deadline.
1 can certainly look that up, if you'd like. 2 Okay. And that'd be helpful if A. 3 you could provide an undertaking on that. 4 (Lock) Yes, we can. A. 5 THE CHAIR: Just for clarity on the 6 record, Mr. Murphy, the undertaking is for a date...
AI summary The discussion revolves around PHP's undertaking to provide the date when their modelling results changed their view on load parameters, in response to questions from the BAI. The timeline of events, including the GRA filing and the Settlement Agreement, is also explored, though specific dates remain unclear.
is see subject to a satisfactory conclusion of, and resolution of, this process. Q. Right. So PHP commits to taking service and PHP's commitment is subject to satisfactory conclusion of the resolution of the PHP ADC and tariff processes. T...
AI summary PHP's commitment to take service under a tariff is conditional on the satisfactory conclusion of the PHP ADC and tariff processes. The discussion centers on PHP's intention to become an above-the-line customer starting January 1, 2026, and the conditions attached to its commitment.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS there's no build, nor is there a reduction in that storage level. In OM-4, for example, there's on average, a 3.4 percent decline in the storage level over an hour. So these are hourly...
AI summary The text discusses the operation of energy storage systems, specifically the changes in storage levels under different operating modes (OMs), with a focus on the range between 30% and 90% and the effects of operating below or above these thresholds. It also includes procedural elements of a regulatory proceeding, such as recesses and resumptions of hearings.
CONSUMER ADVOCATE PANEL 293 Cr-ex, (Rudderham) 1 that any element of it were, you know, unjustly 2 discriminatory or unduly preferential or otherwise not in 3 the public interest, then, yes, the Board can and should 4 make changes. But I a...
AI summary The Consumer Advocate Panel discusses the Board's discretion in reviewing a Settlement Agreement, emphasizing deference to negotiated terms unless they are unjust, discriminatory, or not in the public interest. There is also discussion about the merits of PHP's position and the reasonableness of load assumptions, particularly regarding the 57 megawatts agreed upon in the Settlement Agreement.
20260929-1Hearing Transcript — 09/29/2026 (ANDREW McLAREN, HAYITBOY MAHMUDOV, PATRICK BOWMAN, MELISSA WHITED, VINCENT MUSCO, COLLIN CAIN)
5 passages
1 you refer in footnote 15 to Exhibit N-5, PDF page 204, 2 correct? 3 A. Yes. 4 Q. Okay. And N-5 is NSPI's response 5 to CA information requests. 6 MR. MacDOUGALL: So, Mr. Norwood, if we 7 could bring up Exhibit N-5e. 8 And your reference...
AI summary The text references Exhibit N-5, which contains NSPI's response to CA information requests. The discussion involves a reference to PHP's average load being approximately, though the value is blanked out. The exchange occurs during a regulatory proceeding, with MR. MacDOUGALL leading the questioning.
1 The latter problem you identified Q. 12 appropriate. 13 Q. Thank you very much. 14 THE CHAIR: Small Business Advocate? 15 MS. MacADAM: No questions. Thank you. 16 THE CHAIR: Industrial Group? 17 MS. RUDDERHAM: We do have questions. 18 Ca...
AI summary The Industrial Group's representative, Ms. Rudderham, is conducting cross-examination regarding concerns raised by Bates White about load forecasting for 2027 and its impact on energy charges for PHP. She is consulting with Mr. Cain and referencing specific exhibit pages.
Bates White 17 recommendation, an audit recommendation and they reasonably 18 will will provide us a sort of access to what they're 19 working on. And then and can sometimes follow up INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS...
AI summary The discussion involves Bates White's potential involvement in reviewing a new methodology proposed by Nova Scotia Power, which would be subject to SWG review, Board approval through the ELID tariff application, and future audits. No formal opinion has been provided yet.
1 stakeholders, interested stakeholders to ensure that the 2 results reflect the goal of the tariff itself and fairness, 3 then I think that that's one way to go. 4 Of course, you could put I don't see 5 any reason you couldn't file have t...
AI summary The discussion centers on the appropriate level of Board review for operating protocols, specifically those provided by NSPI in draft form. The speaker suggests that while some aspects of the protocols may require Board approval, others may be considered operational and not necessitate formal review.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 question? I'm not sure I follow. 2 Q. First, NSPI's position is that the 3 operating procedures don't need to be reviewed or approved 4 by the Board; correct? 5 A. (Musco) That's my...
AI summary The discussion centers on whether the operating procedures related to demand response (DR) and capacity-based load (CBL) calculations should be reviewed and approved by the Board. The witness suggests that without an after-the-fact review, the risk of unreasonable results increases, and the DR mechanism's impact on payments to other FAM customers is significant.
20261021-1Hearing Transcript — 10/21/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD)
9 passages
OPENING STATEMENT 17 INDUSTRIAL GROUP 1 interruptibility. 14 Q. Can you please describe your 15 background, qualifications, and experience for the Board? 16 (Willett) I have a Bachelor of A. 17 Commerce degree from McMaster University, a M...
AI summary The document is an opening statement from the Industrial Group in a regulatory proceeding. It includes testimony from Mr. Willett, who discusses his background and current role at Nova Scotia Power, and Mr. Ferguson, who confirms responsibility for Nova Scotia Power's evidence submissions in the matter.
1 BY MR. MacDOUGALL: 2 And here at line 22 you state in Q. 3 your reply: 4 5 6 Specifically the GRA SA [that's the Settlement Agreement] provides: 7 8 9 10 11 12 13 In the PHP ADC and tariff processes that will be brought forward for appro...
AI summary The discussion revolves around the interpretation of the Settlement Agreement (GRA SA) and its implications for the PHP ADC and tariff filings. NSPI argues that the agreement restricts positions taken on ELID tariff issues to those consistent with the 'basic tariff structure' set out in the agreement, while the opposing party suggests that the language allows for broader positions.
NOVA SCOTIA POWER PANEL 59 Cr-ex, (MacDougall) 1 credit. 2 Okay. So let's take a look, Q. 3 maybe, what some of the other parties did say, though, 4 rather than what they didn't say. 5 MR. MacDOUGALL: If we could go to 6 Exhibit N-43? And...
AI summary The document discusses the Industrial Group's position in the Nova Scotia Power proceeding, emphasizing that the settlement in NSPI's General Rate Application does not prevent parties from submitting positions in this matter. NSP disagrees with this stance, and references evidence from Synapse's Ms. Whited.
NOVA SCOTIA POWER PANEL 63 Cr-ex, (MacDougall) 1 perspective and position with respect to the 5 you could go to PDF page 1470. Because I guess we should 6 be careful not to show any other confidential information. 7 THE CHAIR: Yeah, just p...
AI summary The Nova Scotia Power Panel discussion involves a reference to a document (PDF page 1470) containing a confidential chart related to NSPI's responses to Industrial Group IR-30. The discussion highlights challenges with document management and the need for better organization of large attachments in regulatory filings.
NOVA SCOTIA POWER PANEL 169 Cr-ex, (Powell) have a historical base. It's kind of in the middle of what Port Hawkesbury Paper and Mr. Bowman are recommending. It may be more representative of where they'll land, but we'll have a better sens...
AI summary The discussion revolves around the determination of appropriate cost mechanisms for PHP under different tariff scenarios, referencing a Settlement Agreement and the need for regulatory input. The speaker suggests that the current approach is reasonable but acknowledges uncertainty in the final outcome.
NOVA SCOTIA POWER PANEL 177 Cr-ex, (Powell) 1 were included in in the tariff. included in cost-of-service work that had been done in advance of that, but yes, the tariff was not developed. Okay. Q. MS. RUDDERHAM: Now, Mr. Norwood, if you d...
AI summary The discussion centers on the Settlement Agreement (SA) and its initial demand assumption of 65 megawatts, noting that the tariff provisions, particularly those related to credits for the ADC and Dispatchable Rider, were not known when the SA was drafted. There is a recognition that a formal analysis and expert evidence would be needed to support the SA in a regulatory proceeding.
NOVA SCOTIA POWER PANEL 195 Cr-ex, (Rudderham) 1 (Ferguson) I do. A. 2 And that there had been periodically Q. 3 confirmed to remained reasonable quantities. Recall 4 reading that? 5 (Ferguson) Yes. Q. 6 Okay. So first this 2012 study, has...
AI summary The discussion revolves around the 2012 Stern Paper Mill study and its inclusion in the proceeding. The panel is being asked to provide a copy of the study, which may have been produced confidentially in a previous proceeding. The study's data, specifically the 65 megawatts figure, has been carried forward in load forecasts and is considered reasonable despite volatility.
NSPI, and then NSPI would provide a response to each one of those data requests that they were able to do to the best of their ability. You'd agree? A. (Willett) Yeah. So I would say there's two processes, one would have been the cost-of-...
AI summary The discussion revolves around data requests made by stakeholders to NSPI in preparation for the General Rate Application (GRA), which were answered but not part of the formal record. These requests were for factual clarification rather than to reach a settlement. The responses were part of confidential settlement discussions.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 MS. RUDDERHAM: I am cognizant of the time. 2 It says it's 4:30. I do still have a number of questions. 3 I hope I won't be too long, but if I'm able to continue or 4 if...? 5 THE CHA...
AI summary The discussion focuses on the operating procedures for the Electric Load Incremental Demand (ELID) and whether they require Board approval. The witness confirms that Nova Scotia Power Inc. (NSPI) does not believe approval is needed.