Preamble p. p. 2
- This is Nova Scotia Power Incorporated's (NS Power or Company) 2025 Power Line Technician - (PLT) Staffing and Reliability Report (PLT Report). - In its letter dated July 20, 2017, the Nova Scotia Utility and Review Board (NSUARB, Board)...

AI summary Nova Scotia Power (NS Power) submitted a 2025 Power Line Technician (PLT) Staffing and Reliability Report. The Nova Scotia Utility and Review Board (NSUARB) requested changes to the report, including condensing it and removing the ESRP component. NS Power proposed a condensed template with specific tables and narratives. The Board accepted the proposal, with some modifications.

1 2.3 System Data p. pp. 9-10
1 2.3 System Data 2 3 In its letter dated July 15, 2020 with respect to the 2020 PLT Report, the NSUARB also directed 4 as follows: 5 In addition, when preparing future PLT reports, the Board directs NS Power to identify the number of cust...

AI summary The NSUARB directed NS Power to include specific system data in future PLT reports, such as the number of customers, distribution and transmission line lengths, substations, and peak load, broken down by operating regions. The report also highlighted an unusually high number of outage-related supervisor call-backs in the Metro region and requested explanations and potential solutions.

101782Decision letter 1 passage
M12775 – Nova Scotia Power Inc. – Annual Power Line Technician (PLT) Staffing Levels and Reliability of Service – 2025 Report p. p. 0
M12775 – Nova Scotia Power Inc. – Annual Power Line Technician (PLT) Staffing Levels and Reliability of Service – 2025 Report On March 31, 2026, Nova Scotia Power Inc. (NS Power) filed a report on its Power Line Technician Staffing Levels...

AI summary Nova Scotia Power Inc. (NS Power) filed a 2025 report on Power Line Technician (PLT) staffing levels and reliability of service, as required by the Board. The report includes staffing data, customer surveys, and regional breakdowns, following directives from the Sherrod Report and subsequent Board letters.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →