Topic:"Regulatory Approval Processes" in M12799

Matter: Nova Scotia Power Inc. - CI C0080101 – 539N-201 Big Island Subsea Cable Replacement - $4,388,679
3 passages 3 documents

Regulatory Approval Processes across all matters →

N-2NSPI (NSEB) RIR 1 to 16 - Redacted 1 passage
CI C0080101 – 539N-210 Big Island Subsea Cable Replacement (NSEB M12799) NSPI Responses to NSEB Information Requests
CI C0080101 – 539N-210 Big Island Subsea Cable Replacement (NSEB M12799) NSPI Responses to NSEB Information Requests 1 Request IR-1: 11 12 (d) Please provide the relevant cable engineering design, load study and system planning 13 reports....

AI summary NSPI is responding to NSEB information requests regarding the Big Island Subsea Cable Replacement project. The response includes details on the proposed AC cable, its compliance with technical specifications, and the planned marine survey to finalize the cable route.

101647NSEB (NSPI) IR-1 to IR-16 1 passage
Request IR-2:
Request IR-2: - a. Please explain whether the new subsea cable(s) is an AC or DC cable. - b. Please identify the number of cable(s) to be installed and provide the related technical specifications, including but not limited to voltage rati...

AI summary Request IR-2 seeks detailed information about proposed subsea cables, including technical specifications, compliance with standards, contingency plans for service disruptions, and required permits. Questions focus on cable type (AC/DC), routing maps, engineering reports, environmental regulations, and restoration strategies for Big Island.

102100NSEB (NSPI) IR 17 to 18 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INCORPORATED (NS Power) for Subsequent Approval of an ACE Plan Capital Item CI C0080101 – 539N-210 Big Island...

AI summary The Nova Scotia Energy Board has issued information requests to Lana Myatt regarding NS Power's application for subsequent approval of a capital item under the Public Utilities Act, specifically the Big Island Subsea Cable Replacement project (CI C0080101 – 539N-210). Responses are due by June 12, 2026.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →