Topic:"Regulatory Approval Processes" in M12829

Matter: NSPI DRO Appeal - Meter and Billing Issues - Jaspal SinghLinked to query Q05333
7 passages 5 documents

Regulatory Approval Processes across all matters →

S-1Notice of Appeal (redacted) 1 passage
\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \ p. p. 0
s appeal and guidance on any additional information or steps required. Thank you for your time and consideration. Sincerely, Jaspal Singh Don Farmer, P. Eng., Dispute Resolution Officer (D.R.O.) Telephone (902) 428-6202, Toll-free 1-877-42...

AI summary Don Farmer, Dispute Resolution Officer (DRO), outlines his role in resolving disputes between Nova Scotia Power (NSP) and customers. He clarifies that his decisions are binding on NSP but not customers, who may appeal to the Board within 12 days. He emphasizes his independence from NSP and the Energy Board, focusing on interpreting Board regulations.

S-3DRO Decision d. April 20, 2026 (redacted) 1 passage
Jaspel Singh
rescribed accuracy limits. Board approved Regulations relevant to this matter are 5.1, 5.5, and 6.4 – copy attached. Also relevant and attached are the Electricity and Gas Inspection Act Regulations. Specific bills can be other than expect...

AI summary The Board approved regulations 5.1, 5.5, and 6.4, along with the Electricity and Gas Inspection Act Regulations. Estimated meter readings may lead to discrepancies in billing, which are reconciled through subsequent bills based on actual readings due to the self-reconciling nature of the meter reading process.

S-6NSPI (NSEB) RIR-1 to RIR-3 (redacted) 3 passages
Section 1
Singh DRO Appeal (NSEB M12829) NSPI Responses to NSEB Information Requests

AI summary This document pertains to the Singh DRO Appeal (NSEB M12829) and includes NSPI's responses to NSEB information requests. It outlines the procedural context and the entities involved in the appeal process.

REDACTED
REDACTED 1 Request IR-1: 2 3 On May 12, 2026, NS Power included its response to the DRO dated March 27, 2026 which 4 said Mr. Singh connected service at on December 10, 2025 and the meter 5 read of 81,175 kWh obtained on that date was a tr...

AI summary The document outlines a series of information requests from the DRO to NS Power regarding meter #2039876, including its type, installation date, testing history, and replacement with meter #2567965. The requests also seek details on the timing and process of meter testing.

REDACTED
REDACTED 1 for a 10-year certification period. Based on NS Power's meter certification 2 schedule, meter #2567965 is not due for recertification testing until April 2, 2035. 3 4 (g) NS Power can generally arrange for a meter to be removed...

AI summary The text discusses the recertification schedule for a specific meter, noting that it is not due for testing until 2035. It also outlines the timeframes for meter removal, submission for testing, and reporting of results. Additionally, it references a regulatory proceeding involving NSPI and the NSEB.

102403NSEB (NSPI) IR-1 to IR-3 (redacted) 1 passage
INFORMATION REQUESTS – Non-Confidential
INFORMATION REQUESTS – Non-Confidential To: Nova Scotia Power Inc. Kathleen Murray Regulatory Counsel By email: [email protected] From: Nova Scotia Energy Board Board Staff Responses Due: Wednesday, July 8, 2026 Contact Person: An...

AI summary The Nova Scotia Energy Board has issued a non-confidential information request to Nova Scotia Power Inc., seeking responses by July 8, 2026. The request is directed to Kathleen Murray, Regulatory Counsel, and contact details for Anh Nguyen, Analyst, are provided.

103048Board Decision (redacted) 1 passage
CONCLUSION p. pp. 1-3
CONCLUSION Pursuant to the Public Utilities Act , the Board is responsible for the general supervision of all public electric utilities operating in Nova Scotia, including NS Power. Among other things, the Board's jurisdiction includes app...

AI summary The Board upholds the DRO's decision and dismisses the appeal, finding that NS Power complied with regulations by using historical data to estimate consumption. The Board also notes a separate investigation into a cybersecurity incident under Matter M12273 and directs NS Power to contact the customer for a payment arrangement.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →