Topic/Matter Intersection

Topic:"Regulatory Compliance" in M03097

Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
12 passages 3 documents

Regulatory Compliance across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 10 passages
2.1.1.13. Test or Inspections to Prove Compliance. p. p. 43
2.1.1.13. Test or Inspections to Prove Compliance. Every owner shall make, or have made at their own expense, the tests or inspections necessary to prove compliance with these regulations and shall promptly file a copy of all such test or...

AI summary The regulations require owners to conduct tests or inspections to prove compliance and submit reports to the authority having jurisdiction. This ensures adherence to regulatory requirements and facilitates oversight.

2.3.1.1. Construction Safety Regulations . p. p. 43
2.3.1.1. Construction Safety Regulations . Every constructor shall ensure that all construction safety requirements of the Department of Labour [and Workforce Development], Occupational Health and Safety Division, are complied with.

AI summary This section outlines the requirement for constructors to comply with construction safety regulations set by the Department of Labour and Workforce Development's Occupational Health and Safety Division.

2.4.2.2. Copies of Applications, Inspections, and Tests p. p. 43
2.4.2.2. Copies of Applications, Inspections, and Tests The authority having jurisdiction shall keep copies of all applications received, permits and orders issued, inspections and tests made and of all papers and documents connected with...

AI summary The authority having jurisdiction is required to maintain copies of applications, permits, orders, inspections, tests, and related documents for a period mandated by law, as part of the regulatory framework.

2.4.2.3. Notices and Orders p. p. 43
2.4.2.3. Notices and Orders The authority having jurisdiction shall issue, in writing, such notices or orders as may be necessary to inform the owner where a contravention of these regulations has been observed. Such notices or orders may...

AI summary The authority having jurisdiction is required to issue written notices or orders to inform the owner, designer, architect, professional engineer, or constructor of any contravention of regulations. These notices must be sent by regular mail or delivered in person if the constructor is present during the inspection.

2.5.1.2. Orders p. p. 43
2.5.1.2. Orders - (1) The authority having jurisdiction is empowered to order - (a) a person who contravenes these regulations to comply with them within the time period that may be specified, - (b) work to stop on the building or any part...

AI summary This section outlines the powers of the authority having jurisdiction to enforce compliance with regulations, including halting unsafe work, removing unauthorized structures, and ensuring corrective actions are taken by property owners.

2.5.1.3. Tests Required to Prove Compliance p. p. 43
2.5.1.3. Tests Required to Prove Compliance The authority having jurisdiction may direct that tests of materials, equipment, devices, construction methods, structural assemblies or foundation conditions be made, or sufficient evidence or p...

AI summary The authority having jurisdiction may require tests or evidence to ensure compliance with regulations, at the expense of the owner, to verify that materials, equipment, or construction meet regulatory standards.

time during construction. p. p. 43
time during construction. Print Name Signature Initials Sample Affix below the seal of the licensed Professional Engineer in accordance Print Name of Firm or Company with provincial legislation. Print Address Print Municipality Postal Code...

AI summary The text provides a template for a construction inspection commitment certificate related to fire suppression systems design requirements, including fields for signatures, firm information, and compliance with provincial legislation.

Division B Part 1 - Acceptable Solutions p. p. 43
Division B Part 1 - Acceptable Solutions

AI summary This section outlines acceptable solutions under Division B Part 1, likely related to regulatory compliance, technical standards, and environmental assessments. It may involve utility operations, infrastructure planning, and adherence to provincial and national building codes.

2.0 CODES AND STANDARDS p. p. 160
2.0 CODES AND STANDARDS

AI summary This section of the document introduces the topic of codes and standards relevant to the regulatory proceeding in Nova Scotia. It outlines the importance of adhering to various building and energy efficiency codes and standards.

2.4 SITEWORK DEMOLITION AND REMOVAL p. pp. 161-162
2.4 SITEWORK DEMOLITION AND REMOVAL - CSA-S350-M1980(R2003) Code of Practice for Safety in Demolition of Structures - Nova Scotia Department of Environment Construction and Demolition Debris Disposal Guidelines Author: SLM - File: 04.03.03

AI summary This section outlines the relevant standards and guidelines for site work demolition and removal, including the CSA-S350-M1980(R2003) code and Nova Scotia's construction and demolition debris disposal guidelines.

05797Board Decision 1 passage
Preamble p. p. 0
which the Board approved. Written submissions were received from NPB, Avon and NSDOE on July 22, 2010. NSPl's reply submission was received on August 6, 2010. - [11] On August 20, 2010, NSPI requested an opportunity to make oral submission...

AI summary The document outlines the timeline and process for a regulatory proceeding involving a request for an Authority to Overspend (ATO) for the TUC6 Waste Heat Recovery Project. Written submissions were received from various parties, and an opportunity for oral submissions was granted. The Board requested additional information and accepted a brief written submission from MEUNSC instead of an oral appearance.

05797Board Decision 1 passage
- [9] The Board then set the following timetable for review of the application: p. p. 0
- [9] The Board then set the following timetable for review of the application: • Information Requests (IRs) to NSPI Wednesday, June 30,2010 • Responses to IRs from NSPI Thursday, July 15, 2010 • Written Submissions from Participants Thurs...

AI summary The Board established a timetable for the review of the application, including deadlines for information requests, responses, and written submissions. NSPI requested an extension for its response to submissions, which was granted until August 6, 2010.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →