Matter: CI# 38724 - P-128.10 - NSPI WO - TRE 5 Superheater, Reheater and Boiler Upgrades - $796,383
1 passage 1 document

Regulatory Compliance across all matters →

N-1Redacted Work Order 1 passage
Blow-down Tank p. p. 12
Blow-down Tank A visual inspection was carried out in the blow-down tank. There was no liner in this vessel. Minor wall loss was noted on the bottom discharge line and minor pitting on the bottom head. Results of the blow-down tank are fou...

AI summary A visual inspection of the blow-down tank revealed no liner, minor wall loss on the bottom discharge line, and minor pitting on the bottom head. Findings are documented in Tab #30 of the attached NDE Report.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →