N-1Report
2 passages
he compliance gaps identified above or determined the compliance 22 is no longer required based on the current BES status of the transmission bus in question: 23 24 a) 14H-Burnside and 83S-VJ: 25 Disturbance monitoring equipment is no long...
AI summary The document identifies compliance gaps related to disturbance monitoring equipment at specific transmission buses, noting that such equipment is no longer required as the generators are not connected to BES buses. The text is part of a 2022 10-Year System Outlook filing.
30, 2022 Page 49 of 60 2022 10-Year System Outlook NON-CONFIDENTIAL 1 c) 79N-Hopewell and 103H-Lakeside: 2 Disturbance monitoring is now in service at the 101S-Woodbine 230kV bus; the 101S- 3 Woodbine 345kV bus; and at the 120H-Brushy Hill...
AI summary The document outlines the completion of various projects to bring substations and systems into compliance with NPCC BPS and BES standards, eliminating compliance gaps identified by the NSUARB within the five-year timeframe. Special Protection Systems (SPS) are also referred to as Remedial Action Schemes (RAS) in NERC documentation.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →