M-4Air Handler Product Specifications 1 passage
Circuit Breaker (CB) Models p. p. 6
Circuit Breaker (CB) Models - All "CB" model heaters are equipped with circuit breakers for overload and short circuit protection - Factory wired and mounted on electric heat unit - Current sensitive and temperature actuated - Manual reset...

AI summary The document outlines specifications for Circuit Breaker (CB) models, emphasizing their role in overload and short circuit protection, factory installation, compliance with electrical codes, and their function as disconnect means. It advises consulting local electrical codes for proper installation.

M-8Heat Pump Product Specifications 1 passage
FIELD WIRING p. p. 8
FIELD WIRING - A Two Wire Power - B Two or Three Wire Power (size to heater capacity) - C iComfort® Communicating Thermostat: - Four Wire, 18AWG (RSBus) - D iComfort® Communicating Thermostat: - Two Wire, 18AWG (RSBus) unshielded thermosta...

AI summary The document outlines wiring configurations for thermostats and heaters, specifying wire sizes, types (shielded/unshielded), and compliance with NEC/CEC standards. It emphasizes adherence to electrical codes and references AHRI standards for sound ratings and pressure levels. Field wiring is noted as not being provided by the entity.

M-9DRO Decision d. March 10, 2026 (redacted) 2 passages
Emily Martin p. p. 0
Emily Martin After review and consideration of all of the following and attached, my Final Written Decision in the matter follows. I will begin by stating my role as Dispute Resolution Officer (DRO) in matters of dispute between N.S.Power...

AI summary Emily Martin, as Dispute Resolution Officer (DRO), addresses a billing dispute between Nova Scotia Power (NSP) and a customer. The customer disputes a $1,865.48 bill, citing discrepancies between estimated and actual readings, while NSP asserts compliance with Board regulations. Martin notes meter testing confirmed accuracy within prescribed limits and outlines the DRO's role in resolving disputes per regulatory frameworks.

N.S.Power p. p. 0
N.S.Power N.S.Power is hereby Instructed to test for accuracy and report test results to the Customer and the DRO Don Farmwer, P.Eng.

AI summary N.S.Power is instructed to conduct accuracy tests and report results to the customer and the Dispute Resolution Officer (DRO). The directive is issued by Don Farmwer, P.Eng.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →