Topic:"Regulatory Compliance" in M13183

Matter: North American Electric Reliability Corporation of Revisions to the NERC Rules of Procedure Regarding Computational Load
16 passages 1 document

Regulatory Compliance across all matters →

N-1Application 16 passages
VIA ELECTRONIC FILING p. p. 5
VIA ELECTRONIC FILING Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 3rd Floor 1601 Lower Water Street P.O. Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3 RE: North American Electric Reliability Corporation...

AI summary The North American Electric Reliability Corporation (NERC) submitted a notice of filing to the Nova Scotia Energy Board regarding revisions to its Rules of Procedure concerning Computational Load. The revisions introduce two new functional entities to the NERC registry: Computational Load Owner and Computational Load Operator. NERC is requesting a waiver of applicable filing requirements and invites the Board to communicate any concerns or anticipated impacts resulting from these registry criteria changes.

NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF REVISIONS TO THE NERC RULES OF PROCEDURE REGARDING COMPUTATIONAL LOAD p. p. 5
NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF REVISIONS TO THE NERC RULES OF PROCEDURE REGARDING COMPUTATIONAL LOAD Lauren A. Perotti Assistant General Counsel Sarah P. Crawford Senior Counsel Marisa Hecht Seni...

AI summary The North American Electric Reliability Corporation (NERC) has filed a notice regarding revisions to its Rules of Procedure specifically concerning 'computational load.' The filing is submitted by counsel representing NERC and outlines updates to the procedures governing how computational loads are handled within the corporation's regulatory framework.

Preamble p. p. 5
The North American Electric Reliability Corporation ("NERC")1 hereby submits proposed revisions to the NERC Rules of Procedure Appendices 2, 5A, and 5B. NERC submits that the proposed revisions, provided in Attachment 2 hereto, are just, r...

AI summary The North American Electric Reliability Corporation (NERC) has submitted proposed revisions to its Rules of Procedure Appendices 2, 5A, and 5B. NERC asserts that these revisions are just, reasonable, non-discriminatory, and serve the public interest.

I. SUMMARY p. p. 5
I. SUMMARY NERC herein submits proposed Rules of Procedure revisions that add two new functional entities to the NERC registry criteria – Computational Load Owner and Computational Load Operator. Through this proposal, NERC takes steps to...

AI summary NERC is proposing revisions to its Rules of Procedure to introduce two new functional entities to its registry: Computational Load Owner and Computational Load Operator. This initiative aims to mitigate reliability risks posed by the rapid growth of large computational loads, such as data centers and large industrial facilities, on the Bulk Power System (BPS). The proposal is based on findings from NERC's Long-Term Reliability Assessments (LTRAs), which identified these large loads as significant emerging risks to grid stability.

III. BACKGROUND p. p. 10
III. BACKGROUND The following background information is provided below: (1) an overview of the NERC registration process and NERC registry criteria; and (2) the development process for the proposed Rules of Procedure revisions in this peti...

AI summary This section introduces the background information for the petition, which encompasses two primary areas: an overview of the NERC registration process and the specific criteria required for the NERC registry. Additionally, it outlines the development process used to create the proposed revisions to the Rules of Procedure.

A. Overview of NERC Registration Process and Registry Criteria p. p. 10
A. Overview of NERC Registration Process and Registry Criteria NERC follows the process in the Rules of Procedure Appendix 5A to identify and register owners, operators, and users of the BPS that could materially impact the reliability of...

AI summary The text outlines the North American Electric Reliability Corporation (NERC) process for identifying and registering entities that impact the reliability of the Bulk Power System (BPS). It describes the use of Rules of Procedure Appendix 5A and 5B (Registry Criteria) to categorize owners, operators, and users. Registration is based on functional entity types and specific threshold criteria; once registered, these entities are listed on the NERC Compliance Registry and become subject to mandatory reliability standards and enforcement.

IV. THE NEED TO ADDRESS COMPUTATIONAL LOAD p. pp. 11-12
IV. THE NEED TO ADDRESS COMPUTATIONAL LOAD NERC, through its engineering staff and technical industry groups, assessed the impacts to the BPS of unprecedented load growth that has occurred over the past few years. Through that work, NERC d...

AI summary The text discusses the growing risks posed to the Bulk Power System (BPS) due to unprecedented load growth from computational loads. NERC, in coordination with the U.S. Department of Energy and FERC, identified unique electrical characteristics of these loads that necessitate new mandatory Reliability Standards for owners and operators of Computational Load Sites. NERC is proposing the development of new functional entities within its Compliance Registry and has initiated the 'Large Loads Action Plan' to address these interconnection and reliability risks.

2. NERC Alerts and Incident Reviews p. pp. 14-16
2. NERC Alerts and Incident Reviews Another component of the NERC Large Loads Action Plan, NERC published a Level 2 Alert on September 9, 2025 that provided additional insight into the impacts of the integration of large loads and industry...

AI summary The text discusses NERC's Level 2 Alert and subsequent public report regarding the integration of large loads into the Bulk Power System (BPS). NERC identified significant risks to reliability and highlighted gaps in current industry preparedness, specifically noting that registered entities often lack the necessary modeling information or direct coordination with large load entities. The findings emphasize the need for new functional entities and updated Reliability Standards to mitigate these risks.

3. Need for New Functional Entities p. pp. 16-18
3. Need for New Functional Entities The severity of the aggregate risk posed by the types of occurrences outlined in the incident reviews grows with the amount of computational load expected on the system. In the Level 2 Alert report, NERC...

AI summary The text discusses the increasing reliability risks posed by the proliferation of large computational loads on the Bulk Power System (BPS). NERC identifies that computational loads may account for 90% of large loads by 2027, presenting unique electrical behaviors and geographic concentrations that threaten grid stability. To mitigate these risks, NERC is proposing new registry criteria and Reliability Standards to help grid planners understand load profiles. Interim measures include Level 3 Essential Action Alerts and Reliability Guidelines to manage load reductions and oscillations.

V. AUTHORITY TO REGISTER COMPUTATIONAL LOAD p. p. 22
"47 Consistent with that intent, when FERC reviewed the initial suite of NERC Reliability Standards, it declined to define user of the BPS, leaving it to a case-by-case, risk-based analysis, stating: While we recognize the desire of some c...

AI summary The text discusses the regulatory framework surrounding the definition of 'users' of the Bulk Power System (BPS). It highlights FERC's decision to avoid a generic, universal definition of 'user' to prevent the scope from being too broad or too narrow. Instead, FERC favors a case-by-case, risk-based analysis where individual Reliability Standards identify specific applicable entities. However, the text notes that FERC precedent suggests large end-use customers can be considered BPS users if they directly impact grid reliability.

VI. PROPOSED REVISIONS TO THE NERC RULES OF PROCEDURE p. pp. 22-24
VI. PROPOSED REVISIONS TO THE NERC RULES OF PROCEDURE NERC respectfully submits that the proposed revisions to Appendices 2, 5A, and 5B satisfy the directive in the Computational Loads Order to develop registry criteria to address the risk...

AI summary NERC is proposing revisions to its Rules of Procedure, specifically Appendices 2, 5A, and 5B, to establish registry criteria for computational load entities. These changes are intended to comply with the Computational Loads Order by addressing risks posed by these loads. The proposal includes new definitions, an updated registration process involving Regional Entities, and specific technical criteria for capacity and voltage thresholds for Computational Load Sites to ensure compliance with Reliability Standards.

1. Computational Load Site p. p. 25
1. Computational Load Site NERC proposes the following new definition in Appendix 2 of the NERC Rules of Procedure: "Computational Load Site" means one or more buildings, structures, or installations at a single location that - 1) Primaril...

AI summary The text outlines a proposed new definition by NERC for a 'Computational Load Site.' This definition is intended to provide clarity on site boundaries for identifying ownership and calculating total connected load. A site qualifies if it is at a single location, primarily contains information technology infrastructure (such as for AI training, software services, or cryptocurrency mining), and is connected to the Bulk Power System (BPS). The proposal responds to requests for clearer distinctions between various types of computational activities.

2. Computational Load Operator and Computational Load Owner p. pp. 25-28
2. Computational Load Operator and Computational Load Owner In feedback on the April posting, commenters recommended the proposed criteria use the same "Owner" and "Operator" model for computational loads to remain consistent with the regi...

AI summary The text discusses NERC's proposal to establish distinct definitions for 'Computational Load Operator' and 'Computational Load Owner' within Appendix 2. This distinction aims to mirror existing models for transmission and generation, allowing for scenarios where ownership and operations are separate. The 'owns and maintains' criteria for owners is intended to identify active participants rather than passive financial interests, ensuring that only entities with significant operational responsibility are registered for compliance.

B. Appendix 5A p. pp. 28-29
B. Appendix 5A Appendix 5A ( Attachments 2-B and 3-B ) contains the process used by NERC and the Regional Entities to register certain functional entity types to which mandatory and enforceable Reliability Standards apply. NERC proposes to...

AI summary The document describes proposed revisions to Appendix 5A of the NERC Rules of Procedure. The primary change is the addition of 'Computational Load Owner (CLO)' and 'Computational Load Operator (CLOP)' as entity types required to register on the NERC Compliance Registry to ensure mandatory and enforceable Reliability Standards apply to them. The revision also includes minor administrative corrections regarding the removal of figures from the Rules of Procedure.

C. Appendix 5B p. pp. 29-30
C. Appendix 5B Appendix 5B ( Attachments 2-C and 3-C ) contains the specific criteria NERC and the Regional Entities use to identify which organizations may be candidates for registration for functional entity types. In accordance with the...

AI summary The text outlines proposed revisions to Appendix 5B regarding the criteria for identifying organizations eligible for registration as Computational Load Owners and Computational Load Operators. In alignment with the United States Federal Power Act, NERC aims to identify Bulk Power System (BPS) users with material impacts. The proposed thresholds for registration are set at a total connected load of at least 50 MW and a voltage level of 100 kV or higher, adjusted from previous recommendations based on NERC Level 2 Alert data and stakeholder feedback.

Counsel for the North American Electric Reliability Corporation p. p. 30
Counsel for the North American Electric Reliability Corporation Date: November 13, 2026 Please find the attachments at this link: [Attachments 1-5](https://www.nerc.com/globalassets/who-we-are/legal regulatory/ca/filings orders/2026/clo-cl...

AI summary The document is a formal submission from Counsel for the North American Electric Reliability Corporation (NERC) dated November 13, 2026. It serves as a transmittal notice providing a link to five specific attachments related to the Computational Load Owner (CLO) and Computational Load Operator (CLOP) Rules of Practice (ROP).

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →