B-1Proposed Tariffs - Amended March 2, 2011 2/28/2011 2 passages
6 Q. PLEASE DESCRIBE YOUR RESEARCH AND CONCLUSIONS ABOUT RETURN ON 7 EQUITY.
sks above those faced by a "mature utility." Heritage argued that these risks justified an ROE of 14%. The Board allowed 13%.4 26 The Board maintained this ROE for Heritage in a 2009 decision.5 27 28 Nova Scotia Utility and Review Board (N...

AI summary Heritage argued for a 14% ROE due to risks, but the Board allowed 13%, maintaining it in 2009. COMFIT projects face higher risks than NSPI projects due to smaller scale, lack of diversification, no rate-petitioning ability, and inexperience. NSURB decisions from 2003 and 2009 are cited.

SUMMARY OF TESTIMONY, PUBLICATIONS, AND PRESENTATIONS
SUMMARY OF TESTIMONY, PUBLICATIONS, AND PRESENTATIONS Expert testimony on energy, economic, and environmental issues in more than one hundred utility regulatory proceedings in twenty six states and two Canadian provinces, in cases in State...

AI summary The text outlines an expert's extensive experience in over 100 utility regulatory proceedings across 26 U.S. states and two Canadian provinces, including court cases and federal regulatory body proceedings. They co-authored reports for institutions like the U.S. Department of Energy and published in journals such as Energy Policy, with invitations to speak at numerous professional and governmental organizations.

B-3-(ii)Antigonish 8 MW - Biomass Cogeneration Plant - Feasibility Study Final Report - Revised - March 15, 2011 I 3/17/2011 1 passage
3.3 Plant Operations p. p. 12
3.3 Plant Operations The operation of the plant will be governed by the Government of Nova Scotia Boiler and Pressure Vessel Regulations. Under the act the plant would be considered a "power plant" because it operates with steam at greater...

AI summary The plant's operations are regulated by Nova Scotia's Boiler and Pressure Vessel Regulations due to its use of steam above 15 psig, requiring constant staff attendance and specific engineering certifications for personnel.

B-4Redacted Direct Testimony and Exhibits of Paul Chernick - on behalf of CA 3/17/2011 2 passages
PUBLICATIONS p. p. 22
- "ESCos or Utility Programs: Which Are More Likely to Succeed?" (with Sabrina Birner), The Electricity Journal 5:2, March 1992. - "Determining the Marginal Value of Greenhouse Gas Emissions" (with Jill Schoenberg), Energy Developments in...

AI summary The text lists various publications related to energy efficiency, environmental externalities, and utility regulation, authored by multiple researchers and published in academic and industry journals and conferences between 1990 and 1992. Topics include demand-side management, environmental externalities, and fuel-switching analysis.

EXPERT TESTIMONY p. p. 22
oal technologies; support for the study "The Externalities of Four Power Plants." 125. Michigan PSC U-10671, Detroit Edison Company DSM Programs; Michigan United Conservation Clubs. January 1995. Critique of proposal to scale back DSM effo...

AI summary This section presents various regulatory proceedings from 1995 involving energy efficiency, demand-side management (DSM), and hydropower licensing. Topics include critiques of DSM scaling back, cost-effectiveness measurements, avoided costs for small hydro producers, and environmental impact statements for hydropower projects.

B-9Evidence filed by Kwilmu'kw Maw-klusuaqn (KMKNO) 3/18/2011 5 passages
Preamble p. p. 19
The KMKNO is mandated by the ANSMC to engage project proponents (in both federal and provincial regulatory jurisdictions) in meaningful negotiation and consultations in the province of Nova Scotia. The ANSMC have ratified a tripartite agre...

AI summary The KMKNO, acting on behalf of the ANSMC, is participating in the Nova Scotia Utility and Review Board's hearings on community feed-in tariffs as formal interveners. They have raised concerns that the UARB consultant's assumptions about economic and social variables may not align with the realities of the Mi'kmaq community and could hinder meaningful participation in the renewable energy sector.

ABORIGINAL FINANCE AND REGULATION – WHAT ARE THE REGULATORY IMPEDIMENTS TO ESTABLISHING AN ATLANTIC CANADIAN ABORIGINAL FINANCIAL INSTITUTION? p. p. 19
ABORIGINAL FINANCE AND REGULATION – WHAT ARE THE REGULATORY IMPEDIMENTS TO ESTABLISHING AN ATLANTIC CANADIAN ABORIGINAL FINANCIAL INSTITUTION? Tom Cooper Alex Faseruk Patrick Phillips

AI summary The document explores the regulatory challenges faced in establishing an Aboriginal financial institution in Atlantic Canada. It is authored by Tom Cooper, Alex Faseruk, and Patrick Phillips, and likely addresses legal, financial, and regulatory barriers from the perspective of Indigenous communities.

Memorial University p. p. 19
Memorial University We explore the regulatory and legislative barriers to address accessibility of capital for First Nations businesses and communities in Atlantic Canada. Specifically, we examine the legal and regulatory impediments that...

AI summary This text explores regulatory and legislative barriers affecting the accessibility of capital for First Nations businesses and communities in Atlantic Canada, focusing on legal impediments to establishing an Aboriginal-owned financial institution.

Section 37 states: p. p. 19
Section 37 states: - (1) Lands in a reserve shall not be sold nor title to them conveyed until they have been absolutely surrendered to Her Majesty pursuant to subsection 38(1) by the band for whose use and benefit in common the reserve wa...

AI summary Section 37 and 89 of the Indian Act restrict the sale, lease, and taxation of reserve lands and assets, limiting First Nations' access to capital and financial services. Amendments to section 89 have eased some restrictions, but challenges remain, including taxation differences between on-reserve and off-reserve businesses.

Conclusion p. p. 19
Conclusion Banking which occurs inter-provincially is federally regulated and that which occurs only within a province is regulated by that province. The scheme of provincial legislation discourages provincially regulated financial institu...

AI summary The document discusses the regulatory challenges faced by Aboriginal peoples in accessing capital through financial institutions. It highlights the limitations of current provincial and federal legislation, the need for legislative reform, and the potential for exemptions or proportionality for Aboriginal credit unions. It also references a funding initiative by the Government of Canada to support First Nations businesses.

B-11Evidence of Alliance of Nova Scotia Sawmillers 3/22/2011 1 passage
Q. What are the apparent differences in the ESI capital estimate and the one provided by Synapse? p. p. 29
Q. What are the apparent differences in the ESI capital estimate and the one provided by Synapse? A. The estimate given in the Testimony by Synapse was too general to draw many direct conclusions, but based on the four categories included...

AI summary The response outlines differences between the ESI capital estimate and Synapse's estimate, noting that Synapse's estimate was too general. The responder grouped their detailed estimate into categories to compare and identify primary differences.

B-13Letters of Comment 1 passage
Municipality of Clare p. p. 3
Municipality of Clare P.O. Box 458 Little Brook, N.S. BOW 1Z0 Tel: (902) 769-2031 Fax: (902) 769-3773 Email: [email protected] Website: www.clarenovascotia.com March 17, 2011 Nancy McNeil Regulatory Affairs Officer/Clerk Nov...

AI summary The document is a letter from the Municipality of Clare to the Nova Scotia Utility and Review Board, dated March 17, 2011, sent by Nancy McNeil, Regulatory Affairs Officer/Clerk.

B-14Evidence filed on behalf of Ecology Action Centre 3/25/2011 1 passage
Evidence as Prepared by E3 Analytics p. p. 8
sh to be considered by the Board at a later date to ensure a wider diversity of projects is developed under the COMFIT. However, it should be recalled that limits in any form also create uncertainty. 17. Greater transparency as to the stat...

AI summary The text emphasizes the importance of transparency and clarity in grid access rules for the success of the COMFIT program. It highlights that delays in grid interconnection can deter investors and increase project risks. Clear procedures and penalties for delays are recommended to reduce costs and accelerate project deployment.

B-22Opening Statement of Paul Chernick 4/6/2011 1 passage
Issues Raised by Synapse Energy Economics Panel
Issues Raised by Synapse Energy Economics Panel

AI summary The document outlines the issues raised by the Synapse Energy Economics Panel in a regulatory proceeding. It highlights concerns related to energy efficiency, demand-side management, and the overall regulatory framework governing energy programs and customer services in Nova Scotia.

B-24Excerpts from Ex. B-23 - Renewable Electricity Plan (pages 2, 10 & 25) 4/7/2011 1 passage
Things This Plan Does Not Do 9 p. pp. 1-3
Things This Plan Does Not Do 9 Planning involves choices, and in developing this Renewable Electricity Plan, the government has chosen not to do several things. The province has decided to maintain a regulated electricity marketplace and n...

AI summary The Renewable Electricity Plan does not open the electricity market to competition, limits independent power producers' roles in large projects, and does not extend COMFIT to larger projects or solar. It emphasizes small-scale projects for rural development and maintains a regulated marketplace due to grid limitations.

07337Board Decision 7 passages
4A (1) A public utility shall p. p. 0
- (b) a municipality; - (c) a not-for-profit body corporate; - (d) a community economic-development corporation; - (e) a co-operative; or - (f) any other entity permitted by the regulations. [5] A total of 35 formal intervenors responded t...

AI summary The document outlines the entities that can be served under section 4A(1) and lists the intervenors who participated in the hearing, including organizations, municipalities, and advocacy groups. It highlights the involvement of various stakeholders in the regulatory proceeding.

Board powers p. p. 0
Board powers - 49 The powers of the Board respecting a hearing or an appeal under the Utility and Review Board Act and the Public Utilities Act and regulations made under those Acts apply to hearings and appeals under the Act and these reg...

AI summary The Board's powers under the Utility and Review Board Act and the Public Utilities Act apply to hearings and appeals under the Act and these regulations. Section 4A(5) allows the Board to use the same powers as under the Public Utilities Act when setting a tariff. However, the Electricity Act takes precedence in case of conflicts with the Public Utilities Act.

4.0 ADOPTION OF MODEL BY CONSULTATIVE PROCESS p. p. 0
4.0 ADOPTION OF MODEL BY CONSULTATIVE PROCESS

AI summary This section outlines the adoption of a model through a consultative process, involving various stakeholders and entities in Nova Scotia.

5.5 Consideration of tariffs in other jurisdictions p. p. 0
5.5 Consideration of tariffs in other jurisdictions - [61] In assessing whether the proposed COMFIT tariffs are reasonable, Synapse, in addition to considering stakeholder feedback, compared the proposed tariffs "...to FIT prices adopted i...

AI summary The document discusses the comparison of Nova Scotia's proposed COMFIT tariffs with those in other jurisdictions such as Vermont and Ontario. Key differences include eligibility for tax credits, ownership requirements, and project size, which influence tariff levels. The Province supports benchmarking as a necessary approach, despite uncertainties in project cost estimates.

7.0 WIND PROJECTS GREATER THAN 50 kW p. p. 0
7.0 WIND PROJECTS GREATER THAN 50 kW

AI summary This section of the document addresses wind projects greater than 50 kW, likely discussing regulatory considerations, compliance, and potential impacts on the energy grid and stakeholders.

8.3 Tariff Overlap Between Small and Large Wind Projects p. p. 0
es, then the directive in s.18(3) would not be set up as an exception to the Board's general duty in s.18(2) (ie: the duty in s.18(2) is "subject to" the requirement imposed upon the board by s.18(3».

AI summary The text discusses the relationship between sections 18(2) and 18(3) of the relevant legislation, indicating that the directive in s.18(3) does not act as an exception to the Board's general duty outlined in s.18(2), but rather is subject to the requirements imposed by s.18(3).

9.7 Fuel Escalator p. p. 0
port this information to you as the Board. You know, if we're going to ask for, you know, a formula to be to readjust the rate then I think, you know, you guys need to have our costs in the market. That will establish start to establish a...

AI summary The discussion revolves around the need for a fuel escalator formula to adjust rates based on market costs, with a reference to the Public Utilities Act and the need for regulatory oversight over information from regulated utilities like Nova Scotia Power. There is also mention of the need for future revisions to the escalator formula due to changing factors like CPI and diesel prices.

U-3 - Engagement Contract for Ms Susan Shaw Describing the Scope of Work Required06751 4/14/2011 1 passage
Section 2 p. p. 1
g., 421 Baker Street, London, Ontario N6C 1X8 ("Contractor") for work regarding feed-in tariffs for the Nova Scotia Utility and Review Board ("Client"). Contractor and Synapse agree to the following: - 1. Term . This agreement shall be dee...

AI summary This agreement outlines the terms between Synapse and a Contractor for work on feed-in tariffs for the Nova Scotia Utility and Review Board. It includes the effective date, termination conditions, compensation rates, and billing procedures.

06669Correspondence from Board Counsel to All Participants 3/30/2011 1 passage
Section 2
in this proceeding, many of whom have had limited or no exposure to Board proceedings. Consequently, for their benefit and as a reminder to all participants, I wish to make the following observations: - (1) The Board's authority (usually r...

AI summary The Board's jurisdiction is strictly statutory, derived from the Electricity Act and its regulations. It can only set feed-in tariffs for specified technologies, such as wind power, and cannot set tariffs for other technologies like solar power or for Band Councils. Participants are reminded to focus on issues within the Board's authority.

06822Final Submission - CBEX 4/22/2011 1 passage
Section 3
- 1 The Electricity Market Governance Committee (EMGC) representing the views of a large number of stakeholders, made a number of recommendations which were endorsed by the Government of the day. One of these recommendations was to open th...

AI summary The document discusses the Electricity Market Governance Committee's recommendations to open the market to Independent Power Producers, the issues with NSPI's RFP process, the high cost of energy procurement, stakeholder lobbying for a Feed In Tariff, and the introduction of COMFIT and the Renewable Electricity Regulations in 2010.

06848Final Submission - NSDOE and NSE 4/29/2011 1 passage
EVIDENCE OF E3 ANALYTICS
EVIDENCE OF E3 ANALYTICS 35. Mr. Toby Couture, Director of Energy Analysis with E3 Analytics filed evidence on behalf of the Ecology Action Centre ("EAC") and the Nova Scotia Sustainable Electricity Alliance ("NovaSEA"). In this evidence,...

AI summary Mr. Toby Couture from E3 Analytics submitted evidence on behalf of the Ecology Action Centre and Nova Scotia Sustainable Electricity Alliance, raising concerns noted by NSDOE. A specific issue highlighted was the lack of data sharing in Nova Scotia's electricity markets, as noted in a transcript from April 6, 2011.

06849Final Submission Consumer Advocate 4/29/2011 1 passage
JURISDICTION OF THE BOARD
JURISDICTION OF THE BOARD The jurisdiction and obligation of the Board in setting tariffs is to ensure that the tariffs are just. The Board may make from time to time such orders as it deems just in respect to the tolls, rates and charges...

AI summary The document discusses the Nova Scotia Utility and Review Board's (NSUARB) responsibility to ensure that tariffs are just and reasonable. It references a court decision emphasizing that all rates must be fair and not discriminatory. The amendments to the Electricity Act are noted, but the requirement for just rates remains unchanged.

06875Final Submission - Ecology Action Centre 5/2/2011 1 passage
Wind
Wind $0.452 per kWh for wind projects ≤50 kW $0.139 per kWh for wind projects >50 kW - 1. EAC strongly supports the utilization of the linear interpolation model suggested by Mr. Couture of E3 Analytics to prevent clustering around the 50k...

AI summary The EAC supports using a linear interpolation model for COMFIT wind projects to avoid clustering around the 50kW threshold and improve scalability. The amended Electricity Act allows the Board to set multiple wind power tariffs. Legal interpretations of the regulations are discussed, emphasizing the Board's discretion in tariff-setting.

06886Black River Wind Reply Submission 5/6/2011 1 passage
Section 1
Black River Wind Limited Box 55, Mabou, N.S. B0E 1X0, Tel.- 902-258-3354 [email protected] May 5, 2011 Nancy McNeil Regulatory Affairs NS URB Box 1692 Halifax NS B3J 3S3 Dear Ms. McNeil: RE: Renewable Energy Community Feed-in Tariffs-...

AI summary Black River Wind Limited expresses concerns about the Government of Nova Scotia's involvement in the Renewable Energy Community Feed-in Tariffs hearing, noting limited participation and scrutiny. It criticizes the government's model as problematic and calls on the Utility and Review Board to improve it, citing the 2009 New Page biomass project as an example of risk assessment.

06887Consumer Advocate Reply Submission 5/6/2011 1 passage
MERRICK JAMIESON STERNS WASHINGTON & MAHODY
MERRICK JAMIESON STERNS WASHINGTON & MAHODY BARRISTERS John Merrick, Q.c. Direct Line: (902) 429-3178 [email protected] May 6, 2011 VIA EMAIL 25475 Ms. Nancy McNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 160...

AI summary A legal letter dated May 6, 2011, from John Merrick, Q.c., to Ms. Nancy McNeil of the Nova Scotia Utility and Review Board, regarding regulatory affairs.

06888Ecology Action Centre Reply Submission 5/6/2011 2 passages
Section 3 p. pp. 0-1
Therefore, given the lack of substantive participation on the part of the Government, and, the powers granted to the Board within the Public Utilities Act, the Ecology Action Centre suggests that it is well within the scope and mandate of...

AI summary The Ecology Action Centre argues that the Board has the authority to set multiple wind tariffs using linear interpolation and to interpret COMFIT ratesetting in the public interest, despite outstanding issues with COMFIT. They also suggest that higher-level policy changes are needed to support electricity market restructuring and achieve sustainable prosperity goals.

Section 4 p. p. 1
va Scotians interested in a sustainable, local, renewable energy economy. However, the Ecology Action Centre recognizes that these higher-level considerations are beyond the jurisdiction of the Board. It is truly perplexing that, after the...

AI summary The Ecology Action Centre submits that the Board should use its discretionary powers to ensure the success of the COMFIT policy, which aims to grow renewable electricity supplies in Nova Scotia. The Centre emphasizes the importance of aggressive and efficient renewable electricity policies to mitigate the global climate crisis.

07337Board Decision 3 passages
Board powers p. p. 0
Board powers - 49 The powers of the Board respecting a hearing or an appeal under the Utility and Review Board Act and the Public Utilities Act and regulations made under those Acts apply to hearings and appeals under the Act and these reg...

AI summary The text outlines the Board's powers under the Utility and Review Board Act and the Public Utilities Act, noting that the Electricity Act takes precedence in case of conflicts. It references Section 4A(5) of the Act, which allows the Board to use the same powers granted under the Public Utilities Act when setting tariffs.

4.0 ADOPTION OF MODEL BY CONSULTATIVE PROCESS p. p. 0
4.0 ADOPTION OF MODEL BY CONSULTATIVE PROCESS

AI summary This section discusses the adoption of a model through a consultative process, involving various stakeholders in Nova Scotia.

Preamble p. p. 0
e is going to be not just [a] capital cost, it's also going to be an operating cost, and there will be a difference to some extent in, for example, labour as well. [Transcript, April 5, 2011, p. 465] [194] The rating of the boiler (essenti...

AI summary The text discusses the distinction between capital and operating costs, with a focus on labour implications. It also references the classification of boiler facilities and the regulatory requirements for operator attendance, including the possibility of obtaining dispensation for periodic supervision.

20110404-1Hearing Transcript — 4/4/2011 (Synapse) 3 passages
DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS THE CHAIR: I think we'll mark the
DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS THE CHAIR: I think we'll mark the 1 NSUARB-BRD-E-R.10 Page 27 Opening Statement as Exhibit B-16. 2 EXHIBIT NO. B-16: 3 Opening Statement of the Synapse 4 Consulting Team 5 MR. OUTHOUSE: Mr. Cha...

AI summary The document outlines a portion of a regulatory proceeding involving the Synapse Consulting Team's opening statement, with cross-examination initiated by Mr. Merrick, the Consumer Advocate, focusing on the team's report and the concept of a 'reasonable level of activity'.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS fact to inquire about? When size of the project is a risk
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS fact to inquire about? When size of the project is a risk 1 NSUARB-BRD-E-R.10 Page 201 factor, would you not inquire about the size of the 17 has ample record before it on what Heritage has a...

AI summary The discussion revolves around Heritage Gas's construction cost risks, its duty to serve the entire province, and the potential risks associated with serving large industrial loads first. The conversation also touches on the company's past failures and the need for a thorough understanding of risk factors in determining a return on equity.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS it. SDIFs are great." They've been holding, you know,
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS it. SDIFs are great." They've been holding, you know, 1 public information sessions before this hearing, but 3 MR. LIVINGSTON: Oh, I guess my point 4 is, as consultants to the Board, if when...

AI summary The discussion revolves around the Synapse model and assumptions used by consultants for the Board. Mr. Livingston suggests that different assumptions, such as those from Synapse, could influence the Board's decision on setting rates and ensuring returns for SDIF shareholders. Other stakeholders also used the model to run their assumptions.

20110405-1Hearing Transcript — 4/5/2011 (Synapse Panel, ANSS Panel) 6 passages
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS You know, I'm a fisherman. You want
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS You know, I'm a fisherman. You want 1 NSUARB-BRD-E-R.10 Page 301 to find good bait, you want to cast it out there and get 16 In preparation for the COMFIT contract 17 and this process, what p...

AI summary The text discusses the preparation process for the COMFIT contract, including reviewing regulations, documents from the Nova Scotia Government website, and models for feed-in tariffs. It also mentions stakeholder engagement and information conveyed between November and March.

Development Corporation?
Development Corporation? 1 Page 336 NSUARB-BRD-E-R.10 Minas Basin Pulp & Power? 17 It's not becoming clear to me, from what Mr. Biewald was 18 saying, whether or not you did have that conversation with 19 government to clarify that this re...

AI summary The discussion revolves around whether the Development Corporation had conversations with the government regarding the scope of its activities. It also touches on the possibility of setting more tariff rates, with the responsibility seemingly resting with the government.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS So if someone has a field of four 12
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS So if someone has a field of four 12 1 NSUARB-BRD-E-R.10 Page 449 and a half kilowatts is that or let's say a field of 17 MR. RICKERSON: The ultimate solution 18 has typically been in policy...

AI summary The discussion addresses the issue of rate arbitrage and how some jurisdictions handle it through policy rather than tariffs. It references the Ontario FIT program and its admittance criteria, which are separate from the rate structure itself.

- tariff.
- tariff. Page 490 NSUARB-BRD-E-R.10 21 MR. RICKERSON: Yeah. For others, I'm 22 sorry, I don't have them with me. DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS Page 494 NSUARB-BRD-E-R.10 1 MR. KEITH: Yes. 2 MR. DEVEAU: And I'm just wonderi...

AI summary The discussion centers on the source of a policy related to biomass usage, referencing the Renewable Energy Plan and Section 8 of the Regulations, which imposes a cap of 500,000 dry tonnes on biomass. The conversation explores whether this cap is intended to encourage efficient use of biomass resources.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS set by the Board; is that possible the way you see it?
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS set by the Board; is that possible the way you see it? 1 NSUARB-BRD-E-R.10 Page 549 MR. TRAVIS: Well, no. I mean, we 19 I mean, the regulations speak of the 20 forest biomass cap. I don't thi...

AI summary The discussion revolves around the interpretation of regulations, specifically the 'forest biomass cap,' with concerns about whether lay witnesses should provide legal interpretations. The chair of the board emphasizes that regulations should be interpreted by legal parties, not lay witnesses, during the hearing.

- evidentiary issues.
- evidentiary issues. 1 Page 604 NSUARB-BRD-E-R.10 THE CHAIR: Yeah, but we started this 2 process in October. 3 MS. RUBIN: But we didn't have the 4 capital cost information because the first draft came in 5 based on an EPA study from 2007,...

AI summary The discussion revolves around evidentiary issues in a regulatory proceeding, specifically the lack of capital cost information due to delays in retaining experts and reliance on outdated studies. The Chair requests an approximation of the new proposed tariff to replace the existing rate of $339/MWh.

20110406-1Hearing Transcript — 4/6/2011 (ANSS Panel, St. Francis Xavier Univ, Consumer Adv. Panel) 4 passages
NSUARB-BRD-E-R.10 Page 631
hand that I was supposed to assume that it was non- NSUARB-BRD-E-R.10 Page 631 16 of a generic biomass generation 17 facility for the Alliance." 18 MR. HAYES: Yes, sir. 19 MR. OUTHOUSE: Now, I'm just 20 interested in the term "generic." 21...

AI summary The discussion revolves around the assumption of a biomass generation facility being a brownfield project rather than a greenfield project, with specific considerations regarding steam pressure, infrastructure, and compliance with Canadian boiler code and ABMA standards.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. CHERNICK: I suppose that would be
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. CHERNICK: I suppose that would be NSUARB-BRD-E-R.10 Page 889 - the case. But I think there's a large conceptual

AI summary The text references a proceeding involving the Nova Scotia Utility and Review Board (NSUARB) and mentions a certified court reporter, Mr. Chernick, discussing a case. The context suggests a legal or regulatory discussion, though specific details are limited.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS whether these turbines last 20 years or less, five years,
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS whether these turbines last 20 years or less, five years, 1 the ones that would be installed in the next few years are 14 NSPI hasn't published that information. 15 MR. VOGEL: In your example...

AI summary The discussion revolves around the lack of information provided by NSPI regarding turbine longevity and the regulatory expectations for transparency. The conversation includes suggestions for the Board and government on how to address this issue and highlights the absence of evidence filed by NSPI.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS By NSPI new construction I was talking
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS By NSPI new construction I was talking 1 NSUARB-BRD-E-R.10 Page 911 about construction of wind or possibly small hydro. And 2 for the wind, we have three projects that NSPI has 3 completed, e...

AI summary The discussion centers on the COMFIT rate eligibility and potential unfair damages to stakeholders. Mr. Chernick notes that eligible groups face significant barriers to participation, including lack of capital for Bands, high costs for universities, and disinterest from municipalities.

20110407-1Hearing Transcript — 4/7/2011 (Consumer Adv. Panel, Cdn. Wind Energy Panel, EAC - T. Couture) 11 passages
Halifax, Nova Scotia
Halifax, Nova Scotia PAGE NO. April 4, 2011 Hearing opens 1 Discussions 1 SYNAPSE ENERGY ECONOMICS PANEL Direct Examination by Mr. Outhouse (Quals.) Cross-Examination by Ms. Cameron (Quals.) Direct Examination by Mr. Outhouse 12 17 18 Open...

AI summary The document outlines a regulatory hearing in Halifax, Nova Scotia, on April 4 and 5, 2011, involving the Synapse Energy Economics Panel and the Alliance of Nova Scotia Sawmillers Panel. It details the proceedings, including direct and cross-examinations by various individuals, and the opening statement by Synapse.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. TOWSE : Thank you. Thank you for
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. TOWSE : Thank you. Thank you for 1 Page 950 NSUARB-BRD-E-R.10 MR. CHERNICK: Yes. 19 essential in walking an application through the permitting 20 process and getting local permits of iden...

AI summary The text includes a reference to the NSUARB-BRD-E-R.10 document and mentions Mr. Chernick discussing the importance of navigating the permitting process and obtaining local permits.

report back.
report back. 1 If NSPI is prepared to undertake to 2 produce it, that would be the more direct way, I would 3 think. 4 THE CHAIR: Why don't you and 5 Ms. Godbout chat about it and see how we might most 6 effectively do it? NSPI hasn't prod...

AI summary The discussion revolves around NSPI's reluctance to produce a witness due to confidentiality concerns and a question about community eligibility requirements for feed-in tariffs in other jurisdictions, specifically mentioning Ontario's provisions.

- percent.
- percent. NSUARB-BRD-E-R.10 Page 1029 12 of problems with the studies on the transmission access? 13 MR. CHERNICK: I believe that the ones 14 that had the problems, that some of those wound up being 15 completed by NSPI. The only one of t...

AI summary The discussion involves concerns about transmission access studies and their completion by NSPI. There is a request to identify any projects that may have issues, with clarification that NSPI was not responsible for the failure of Layman Brothers.

Section 268
- it. I believe it's Atlantic Canada. - No, I don't have it here. - MR. DEVEAU: Okay. Perhaps as an - undertaking could you confirm whether that information is - available for Nova Scotia particularly or parts of Nova - Scotia, and if it i...

AI summary Mr. Deveau asks Mr. Levy to confirm whether data presented by Natural Resources Canada is available specifically for Nova Scotia. Mr. Levy clarifies that the data was presented in tabular format and may not be robust enough, but agrees to check with Natural Resources Canada for Nova Scotia-specific information.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. COUTURE : Yes.
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. COUTURE : Yes. 1 NSUARB-BRD-E-R.10 Page 1119 (SHORT PAUSE) 14 that aren't dependent on a fuel." 15 MR. COUTURE: Yes. 16 MS. RUBIN: "This can be done by 17 automatic adjustments based on a...

AI summary The discussion revolves around mechanisms for adjusting rates, including automatic formula-based adjustments and administrative revisions, with examples provided on how market fluctuations can affect these mechanisms and the need for regulatory oversight.

Section 326
- the moment CB Explorations and it came under that - the Board tended to say that there was significant rate - risks and that they should come back once they had it - figured out better. - That's I guess my reference for making - my point...

AI summary The discussion revolves around the legal considerations of setting tariffs under the regulations, with a focus on the risks involved for ratepayers due to the small scale and limited impact of electricity production from small turbine units.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS So there's significantly higher risk,
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS So there's significantly higher risk, 1 and that risk means that the investors that are investing 11 regulated utilities that have the right to bring that 12 forward as evidence when they mak...

AI summary The discussion highlights the risk associated with regulated utilities presenting evidence for rate increases, specifically referencing Nova Scotia Power's potential need to increase procurement costs. It also clarifies the current structure where municipalities generate their own power but primarily purchase from Nova Scotia Power.

Section 339
- up. Mr. Reynolds is putting to him a question. I don't - disagree with Mr. Reynolds in terms that if Berwick did - this, but it would be its ratepayers and not the whole - province - MR. COUTURE : Okay. - MR. OUTHOUSE : would be affected...

AI summary The discussion revolves around the potential impact of feed-in rates on customer rates, with Mr. Reynolds inquiring if Mr. Couture has encountered instances where feed-in rates led to increased customer rates, and Mr. Outhouse questioning the relevance of the discussion to the Board's function.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS With that cap, it does mitigate the
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS With that cap, it does mitigate the Page 1198 NSUARB-BRD-E-R.10 1 MR. COUTURE: No, I would suggest that 2 the periodic review is an opportunity to revise more 3 comprehensively the success an...

AI summary The discussion revolves around the periodic review of a policy, emphasizing the need for a comprehensive evaluation beyond just financing. The participants question the assumption of a straight line in a graph, suggesting that real-world data may require a different curve or intermediate points.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS say, for instance, that they got in before the next guy
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS say, for instance, that they got in before the next guy 1 NSUARB-BRD-E-R.10 Page 1213 and therefore their project should receive precedence. 2 So caps inherently create this 3 finitude that i...

AI summary The text discusses concerns about caps in energy programs, particularly how they create uncertainty and conflict among communities and developers. It suggests that clear provisions for addressing cap limits would reduce uncertainty. The discussion also references a tidal tariff and degression rates.

20110408-1Hearing Transcript — 4/8/2011 (Black River Panel, Jonathan Barry, Daniel Roscoe, Paul Pynn & J. Barry) 7 passages
Halifax, Nova Scotia
Halifax, Nova Scotia PAGE NO. April 4, 2011 Hearing opens 1 Discussions 1 SYNAPSE ENERGY ECONOMICS PANEL Direct Examination by Mr. Outhouse (Quals.) Cross-Examination by Ms. Cameron (Quals.) Direct Examination by Mr. Outhouse 12 17 18 Open...

AI summary The document outlines the proceedings of a regulatory hearing in Halifax, Nova Scotia, held on April 4 and 5, 2011, involving the Synapse Energy Economics Panel. The hearing included direct and cross-examinations by various individuals, as well as opening statements and questions from the chair.

April 7, 2011
April 7, 2011 Questions from Mr. Doehler 1014 Questions from Mr. Deveau 1017 Questions from The Chair 1022 Further Cross-Examination by Mr. Outhouse 1029 Further Cross-Examination by Mr. Reynolds 1035 Further Cross-Examination by Mr. Towse...

AI summary The document contains a list of questions and exhibits from a regulatory proceeding on April 7, 2011, including cross-examinations and various documents referenced. It outlines the structure and content of the proceeding, highlighting key items such as capital cost tables, opening statements, and policy design guides.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS wind producers is how they structured their project,
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS wind producers is how they structured their project, 1 NSUARB-BRD-E-R.10 Page 1223 whether they did it by a debt or equity and, if so, what 12 ask you questions. If one comes up that you thin...

AI summary The testimony involves Dan Roscoe from Scotian WindFields discussing how wind producers structured their projects, specifically regarding whether they used debt or equity. The discussion includes procedures for handling confidential information during questioning.

Section 17
public, but if there is, I'd still choose to answer it in - a confidential way. - THE CHAIR : So handle your questioning - the same way. Mr. Merrick can ask his questions. If he - gets to one where you're uncomfortable, tell us, and then -...

AI summary The discussion revolves around the handling of questions during a regulatory proceeding, with emphasis on confidentiality and the types of questions that may be asked, particularly those related to the Watts Wind Energy Project.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS record, we'll note it and then we'll come back we'll
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS record, we'll note it and then we'll come back we'll 1 clear the room at the end of your cross-examination and 1 NSUARB-BRD-E-R.10 Page 1229 MR. NEAL LIVINGSTON, Affirmed: 2 OPENING STATEMENT...

AI summary Neal Livingston, President of Black River Wind Limited and other renewable energy companies, presents evidence about the exclusion of independent power producers from policy discussions, expressing concern about the Board's responsibility to ratepayers and the impact on cost and risk.

Section 23
- go down because of the cost of equity going down, one of - those drivers can come from government playing a role. - I also wanted to say that I find - Mr. Pynn's evidence very interesting because our situation - as Black River Wind is th...

AI summary The speaker discusses the impact of government involvement on the cost of equity and highlights alignment with Mr. Pynn's evidence regarding financial realities. They emphasize the importance of a strong renewable energy policy to foster economic development and reduce risk for ratepayers, suggesting the province is not currently getting it right.

may have, and to encourage and stimulate community
may have, and to encourage and stimulate community 1 organization ownership, then arguably it may require a 2 higher tariff. But then how does the Board do that 3 without giving such a high tariff that the lambs the 4 wolves come in and ea...

AI summary The text discusses concerns about the Board's ability to set appropriate tariffs without creating incentives for market exploitation, and highlights the lack of government involvement in policy development. It suggests that government should take an equity role through industrial finance funds to ensure fair outcomes.

20110408-2Hearing Transcript — 4/8/2011 (Luciano Lisi (Tel Conf.), Brian Giroux) 1 passage
Page 1354 NSUARB-BRD-E-R.10
Page 1354 NSUARB-BRD-E-R.10 1 done our thing; we've built it and they didn't come." 2 So let's just I'm willing to work 3 with it, I just want to keep anyway, throughout this 4 hearing process I've heard, you know, set the rates for a 5 ro...

AI summary The speaker discusses the need for a reasonable and diverse approach to renewable energy projects, emphasizing geographic and technological diversity, and mentions a lack of understanding of the Department of Energy's operations, noting mixed experiences over the past 15 years.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →