N-3NSPI (CA) RIR-1 to 18 - Redacted
9 passages
NON-CONFIDENTIAL 1 Request IR-4: 2 3 Reference: "Subsequent to the approval of the original filing, NS Power was required to 4 obtain a Fisheries Act Authorization (FAA) for the work from DFO, which was not required 5 at the time of origin...
AI summary The text discusses the requirement for NS Power to obtain a Fisheries Act Authorization (FAA) for the Ruth Project, which included new conditions related to fish passage and an Environmental Offsetting Program. The modernized Fisheries Act, enacted in 2019, led to these requirements. NS Power became aware of the need for FAA in March 2020 and submitted an application in June 2020.
SECTIO ECTION A (FOR ALL APPLICATIONS) ALL INFORMATION MUST BE PROVIDED: 1.3 2 ctivities Designation Regulations, including design and
AI summary The text includes a partially visible table with section headers and a reference to the Activities Designation Regulations, though the content is incomplete and contains image placeholders.
OTHER STAKEHOLDER ENGAGEMENT NS Power is committed to proactively communicating and engaging with community stakeholders, the Mi'kmaq, regulators and the public on the Ruth Falls Dam Refurbishment Project. As part of this commitment, NS Po...
AI summary NS Power is committed to engaging with stakeholders on the Ruth Falls Dam Refurbishment Project. A communication plan has been developed and shared with NSECC. Phase 2 work has been deferred to 2023, impacting local homeowners and community stakeholders, while Phase 1 work proceeds without disruption.
During future monitoring events, the locations of water quality measurements (Lakeshore during baseline monitoring), Open Water, and Lakeshore are likely to change, sometimes in a significant way. Pre-construction and post-construction mon...
AI summary The text discusses changes in water quality monitoring locations during future events, noting that pre- and post-construction locations will remain consistent, while during construction, changes may occur. It also highlights the presence of fish at specific locations and the role of wetlands in providing fish habitat.
Table6: Monitoring and Reporting Schedule for Wetland Monitoring Monitoring Event Wetland and Wetland Fish Habitat Monitoring WESP-AC Reporting Submission to NSECC Pre-construction Baseline ✓ ✓ During Construction ✓ Memo Post-construction...
AI summary This table outlines the monitoring and reporting schedule for wetland monitoring during and after construction. Monitoring events include baseline data collection before construction, ongoing monitoring during construction, and annual follow-ups for five years post-construction. Post-construction data is compared to baseline data to evaluate impacts on vegetation, hydrology, and soils, with a follow-up WESP-AC program and consultation with NSECC after Year 5.
Table 7: Monitoring and Reporting Schedule for Wetland Fish Habitat Monitoring Monitoring Event Fish Habitat Transect Monitoring Desktop Review of Fish Data Reporting Submission to NSECC & DFO Baseline ✓ ✓ ✓ Pre-construction 1 week before...
AI summary Table 7 outlines a monitoring and reporting schedule for wetland fish habitat monitoring, including baseline, pre-construction, during construction, and post-construction phases, with specific monitoring events and reporting requirements to NSECC and DFO.
CI 50518 CA IR-5 Attachment 21 Page 134 of 465 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2 Erosion from plowed fields, fill, timber harvest, dirt roads, vegetation clearing, fires. Erosion from construction, in-channel machinery in the C...
AI summary The text lists various sources of erosion and sedimentation within a specific area, likely related to environmental or regulatory impact assessments. It includes activities such as plowing, construction, and off-road vehicle use, and provides a scoring system for assessing their impact on sediment and suspended solids.
CI 50518 CA IR-5 Attachment 21 Page 174 of 465 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 3 # Indicators Condition Choices Data Definitions/Explanations
AI summary This document is a redacted page from a regulatory proceeding in Nova Scotia, containing a table with indicators, condition choices, data, and definitions. The content is related to regulatory processes and includes confidential information that has been removed.
drawdown and associated in place. A project email has construction activities been provided for reach out at including expected anytime. timeframes and duration. [email protected] Mi'kmaq Community Contact Website Method Frequenc...
AI summary The text includes a table with information about the Ruth Falls Head Pond drawdown and associated construction activities, including contact details for the Mi'kmaq community and NSP. It outlines communication methods and frequencies for project updates.
N-6NSPI (NSUARB) RIR-1 to 13 - Redacted
19 passages
5.0 Communication Communication will immediately be made with Nova Scotia Power project manager if any employee reports symptoms or is tested for Covid-19 with appropriate follow up information as it becomes available. Elliot Excavators ac...
AI summary The communication plan outlines procedures for handling health-related issues, specifically related to Covid-19, during the Ruth Falls Refurbishment project. Elliot Excavators will coordinate with Nova Scotia Power and follow government guidelines to ensure safety and information sharing.
CI 50518 NSUARB IR-12 Attachment 4 Page 53 of 57REDACTED (CONFIDENTIAL INFORMATION REMOVED) ZƵƚŚ&ĂůůƐĂŵZĞĨƵƌďŝƐŚŵĞŶƚ^ϯϱ;ϮͿ;ďͿ&ŝƐŚĞƌŝĞƐĐƚƵƚŚŽƌŝnjĂƚŝŽŶ ^ƵƉƉŽƌƚŝŶŐ/ŶĨŽƌŵĂƚŝŽŶηϭ DŽŶŝƚŽƌŝŶŐĐƚŝǀŝƚŝĞƐ WWE/yʹWƌŽƉŽƐĞĚtĂƚĞƌDĂŶĂŐĞŵĞŶƚ^ƚƌƵĐƚƵƌĞƐ CI 50...
AI summary The document appears to be a regulatory proceeding attachment containing redacted confidential information. It includes technical and financial data related to utility and review board matters, potentially involving rate calculations, cost evaluations, and other regulatory considerations.
CI 50518 CA IR-5 Attachment 1 Page 90 of 132 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Ruth Falls Dam Refurbishment S 35(2)(b) Fisheries Act Authorization Monitoring Plan data collected with respect to changes in habitat characteristics...
AI summary The document outlines a monitoring plan for the Ruth Falls Dam Refurbishment under the Fisheries Act, focusing on collecting data about changes in habitat characteristics to determine offsetting requirements.
Ruth Falls Dam Rebuild DRAFT: Fish Entrainment Monitoring Program - Field Plan March 24, 2022 Prepared for: Nova Scotia Power Incorporated Prepared by: Stantec Consulting Ltd. 102-40 Highfield Park Drive Dartmouth NS B3A 0A3 CI 50518 NSUAR...
AI summary This document outlines a draft Fish Entrainment Monitoring Program field plan prepared for Nova Scotia Power Incorporated by Stantec Consulting Ltd. as part of the Ruth Falls Dam Rebuild project.
3.3 SHORELINE HABITAT CHARACTERIZATION Aerial imagery will be collected within the reservoir at set intervals to allow NS Power to document changes to aquatic habitat. Aerial imagery collection will consist of three surveys conducted durin...
AI summary Aerial imagery will be collected at specific intervals within the Ruth Falls Flowage reservoir to document changes in aquatic habitat. The imagery will be captured using a fixed-wing remotely piloted aircraft system and processed into a geo-referenced orthomosaic for habitat analysis by NS Power.
CI 50518 NSUARB IR-12 Attachment 9 Page 7 of 7 REDACTED (CONFIDENTIAL INFORMATION REMOVED) fish habitat functions). If this is to be part of the post-construction monitoring to be submitted later, state that in the plan.
AI summary The text discusses the requirement for post-construction monitoring of fish habitat functions and suggests that this should be explicitly stated in the plan if it is to be included.
CI 50518 NSUARB IR-12 Attachment 10 Page 316 of 591 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Ruth Falls Dam Refurbishment S 35(2)(b) Fisheries Act Authorization Monitoring Plan Figure 2: NS Department of Lands and Forestry Wetland Inven...
AI summary The document discusses the potential short-term impacts of a 9-month water level drawdown on wetlands near the Ruth Falls Headpond, acknowledging uncertainty about the extent of these impacts, while noting that long-term changes are not anticipated.
Desktop Fish Habitat Suitability Review Prior to the commencement of monitoring, a desktop fish habitat suitability review was completed to assess the quality of fish habitat provided by both the Ruth Falls Reservoir and the wetlands conti...
AI summary A desktop fish habitat suitability review was conducted prior to monitoring to evaluate the quality of fish habitat in the Ruth Falls Reservoir and adjacent wetlands. The review identified six wetlands most likely to provide suitable fish habitat for monitoring purposes.
CI 50518 NSUARB IR-12 Attachment 10 Page 385 of 591 REDACTED (CONFIDENTIAL INFORMATION REMOVED) A B C D E Subsidence or compaction of the wetland's substrate as a result of machinery, livestock, fire, drainage, or off road vehicles. Straig...
AI summary The text outlines a scoring system for assessing the environmental impact of various activities on wetlands, focusing on subsidence, channel modifications, and altered input timing. It includes criteria for evaluating the severity and spatial extent of changes, as well as flashiness or muting of water conditions.
CI 50518 NSUARB IR-12 Attachment 10 Page 465 of 591 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 3 # Indicators Condition Choices Data Definitions/Explanations 136 salmon or other anadromous species or eels and is probably accessed by those...
AI summary The text outlines indicators and condition choices related to wetland assessment and ecological evaluation, focusing on species of conservation concern, habitat types, and data collection protocols. It references specific ecological surveys and regulatory processes in Nova Scotia.
Project Title: Sheet Harbour Area Habitat Offsetting Initiative
AI summary The document outlines the Sheet Harbour Area Habitat Offsetting Initiative, a project aimed at addressing habitat impacts through offsetting measures. It involves the Nova Scotia Utilities and Regulatory Board (NSUARB) and focuses on environmental compliance and regulatory oversight.
Monitoring strategy and techniques: - Visualization: - o Site pictures taken at each survey site and structure site. - Pictures will be taken with the same orientation and matched with the map(s) established in year 1 - o Will document pre...
AI summary The monitoring strategy includes visualization techniques, habitat suitability index assessments, water temperature monitoring, and structure surveys to evaluate the impact of restoration efforts on fish populations and river conditions.
CI 50518 NSUIARB IR-12 Attachment 11 Page 4 of 7 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Fisheries and Oceans Canada Pêches et Océans Canada - x It is noted that NS Power completed tagging studies to assess the downstream movement of A...
AI summary The document requests additional information from NS Power regarding fish passage efficiency at the Ruth Falls Dam, specifically for Atlantic Salmon, and challenges the claim that the bypass system is very effective for pelagic species based on limited data provided.
REFERENCE DESCRIPTION A ×, ×, ×, ×, × ×, ×, ×, ×, ×, ×, ×, × SEAL DEPARTMENTAL APPROVALS SCALE Nova Scotia A. ROSION PROVIDED AND SEDMENT CONTROL SHALL BE IN ACCORDANCE WITH LOCAL AND PROVINCE STANDARDS AND OWNER'S STANDARDS. ALL MEASURES...
AI summary The text outlines requirements for erosion and sediment control during construction projects, referencing local, provincial, and owner standards, as well as the Yor's Sotiol Department of Environment guidelines.
CI 50518 NSUIARB IR-12 Attachment 12 Page 320 of 576 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Ruth Falls Dam Refurbishment S 35(2)(b) Fisheries Act Authorization Monitoring Plan Six wetlands have been selected for monitoring. Figure 3 d...
AI summary The document outlines a monitoring plan for six wetlands near the Ruth Falls Headpond as part of the Ruth Falls Dam Refurbishment S 35(2)(b) Fisheries Act Authorization. The wetlands to be monitored are identified as WL3, WL5, WL6, WL15, WL17, and WL19, with their locations displayed in Figure 3.
Table 5: Residual Harm from Potential Impacts Associated with the Ruth Falls Dam Refurbishment Potential Effect Spatial Extent of Potential Effect Probabil ity of Potenti al Effect Magnitu de of Potential Effect Measures to Mitigate Death...
AI summary Table 5 outlines the residual harm from potential impacts of the Ruth Falls Dam refurbishment, including temporary loss of fish habitat due to lowering the headpond below the minimum operating level. The spatial extent is localized, and mitigation measures are referenced in Section 3.
Ruth Falls Dam Rebuild Fish Entrainment Monitoring Program - Field Plan November 9, 2023 Prepared for: Nova Scotia Power Incorporated Prepared by: Stantec Consulting Ltd. 102-40 Highfield Park Drive Dartmouth NS B3A 0A3
AI summary This document outlines the Fish Entrainment Monitoring Program field plan for the Ruth Falls Dam Rebuild, prepared by Stantec Consulting Ltd. for Nova Scotia Power Incorporated on November 9, 2023.
Desktop Fish Habitat Suitability Review Prior to the commencement of monitoring, a desktop fish habitat suitability review was completed to assess the quality of fish habitat provided by both the Ruth Falls Reservoir and the wetlands conti...
AI summary A desktop fish habitat suitability review was conducted prior to monitoring to evaluate the quality of fish habitat in the Ruth Falls Reservoir and adjacent wetlands. The review identified six wetlands most likely to provide suitable fish habitat for monitoring purposes.
CI 50518 NSUIARB IR-12 Attachment 12 Page 420 of 576 REDACTED (CONFIDENTIAL INFORMATION REMOVED) A B C D E In the last column, place a check mark next to any item present in the CA that is likely to have elevated the load of waterborne or...
AI summary The text outlines a table for assessing potential sediment load impacts on wetlands within a Critical Area (CA). It lists various human-related activities that may contribute to erosion and sedimentation, such as construction, off-road vehicles, and land use changes. The table includes instructions for scoring the impact of these activities on sediment load.