1 (b) This unexpected limitation was identified as E1 and NS Power worked through the details 2 of the evaluation approach as proposed in the April 8, 2024 letter. The data that is available 3 from the existing NS Power CEM evaluation is n...
AI summary EfficiencyOne (E1) and NS Power identified a limitation in the data available from the existing CEM evaluation, which is insufficient for E1 to assess energy savings. These savings would require third-party evaluation and verification by the NSUARB's consultant.