N-1Joint Use Agreement between NS Power and Bell Aliant
5 passages
1.03.01 Joint Use Committee - This Joint Use Agreement will be administered by a Joint Use Committee consisting of two senior managers from each utility. - Each utility shall keep the other informed by letter of the names of its representa...
AI summary The Joint Use Agreement is administered by a Joint Use Committee consisting of two senior managers from each utility. The committee's responsibilities include administering the agreement, promoting long-range planning, recommending amendments, and resolving disputes related to joint use.
Notes: - 1.MT&T normally do not require anchoring facilities to support an unsupported aerial drop wire. - 2.When the owner is unable to meet the required time schedule, the tenant, after consultation with the owner, may place the pole(s)...
AI summary The notes discuss MT&T's policy on anchoring facilities for aerial drop wires and procedures for billing owners when tenants install poles or anchors due to the owner's inability to meet deadlines.
(b) Maintaining Tree Clearing and Trimming - The owner of the line is to assume the cost of maintaining tree clearances on the Joint Use Line, as well as the removal of danger trees, to meet the requirements of both utilities. Where MT&T e...
AI summary The owner of the line is responsible for maintaining tree clearances on the Joint Use Line and removing danger trees, with coordination between MT&T and NSPI when challenges arise. Local operating groups must exchange and schedule their clearing programs annually, with a joint meeting held before July 1 to consolidate plans.
3.10.04 Joint Installation of Poles Where both parties are involved with the installation of a pole, the responsibility of supplying, handling and placement of the pole as well as the supply and installation of pole cover up protection equ...
AI summary The document outlines the responsibilities of the pole owner during the joint installation and removal of poles, including safety procedures and compliance with regulations.
6.03.01 Procedure for Determining Joint Use Pole Ownership - It is a principle of this Agreement that when considering long range joint use planning, one utility should own and maintain all joint use poles within the boundaries of a design...
AI summary This section outlines the procedure for determining joint use pole ownership, emphasizing that one utility should own and maintain all poles within a designated area. Guidelines specify that existing joint use line owners are responsible for extensions and laterals, and in other cases, the dominant pole owner in proximity takes responsibility. Significant new construction requires consultation with Joint Use Coordinators.
101300Board Decision
4 passages
IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF an investigation pursuant to s.19 of the Public Utilities Act into certain matters arising from a Joint Use Agreement between NOVA SCOTIA POWER INCORPORATED and BELL ALIANT...
AI summary The Board has approved a Letter of Intent regarding the Joint Use Agreement between Nova Scotia Power Incorporated and Bell Aliant, provided it is properly implemented. The decision addresses potential issues of unjust discrimination and delays, with reporting directed from NS Power.
- [1] NS Power and Maritime Telegraph & Telephone Company Ltd. (MT&T) entered into a Joint Use Agreement for utility poles dated March 31, 1993. Bell Canada, through its subsidiary, Bell Aliant (jointly referred to as Bell), is a successor...
AI summary NS Power and Bell have a 1993 Joint Use Agreement for shared utility poles, administered collaboratively. The agreement aims to reduce infrastructure costs by avoiding duplication. As of June 2025, NS Power owns 70.92% of the poles, while Bell owns 29.08%. The NSUARB initiated a proceeding based on two customer complaints related to service handling and rebate schemes.
Request IR-8: Board staff understands NS Power's May 8, 2025, letter envisages a different approach to pole ownership under the JUA but would like NS Power's views on whether there is a rationale for maintaining distinct rebate schemes bas...
AI summary NS Power argues there is no rationale for maintaining distinct rebate schemes based on pole ownership, as future rebates will follow the NS Power scheme regardless of ownership after reconciliation with Bell. The Board agrees, noting that the Regulations were not designed for the Joint Use Agreement structure, leading to inequities in rebate treatment.
r the new process, with no reported drawbacks, no backlog of customer requests, and shorter timelines based on operational feedback, even though detailed performance metrics are currently unavailable. [21] The Board has little empirical ev...
AI summary The Board acknowledges the new process under the Joint Use Agreement, which is expected to reduce delays and improve coordination, despite limited empirical evidence on prior delays and the absence of detailed performance metrics. NS Power has noted additional initiatives that may further reduce delays.