Matter: Nova Scotia Power Inc. - Natural Gas Report - November 1, 2024 to October 31, 2025
4 passages 2 documents

Regulatory Oversight across all matters →

N-1Report - Redacted 1 passage
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED p. p. 6
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED - 1 NS Power obtained its summer gas supply from imports from M&NP US for the April 1, 2025 to - 2 October 31, 2025 period. During this time, Headwater shut-in pr...

AI summary NS Power sourced summer gas supply from M&NP US imports between April 1, 2025, and October 31, 2025. Headwater shut-in production began on May 1, 2025, to maximize cash flow. A map of the TransCanada Mainline is referenced, showing key locations where the CER tracks daily gas flow.

N-2NSPI (NSEB) RIR 1 to 11 - Redacted 3 passages
November 1, 2024 to October 31, 2025 Natural Gas Report (NSEB M12660) NSPI Responses to NSEB Information Requests p. p. 7
November 1, 2024 to October 31, 2025 Natural Gas Report (NSEB M12660) NSPI Responses to NSEB Information Requests 1 Request IR-5: 2 3 Reference page 61 of the report. 4 5 Lines 18-21 states that 6 7 8 9 10 11 12 13 14 15 Response IR-5: 16...

AI summary The document outlines NSPI's responses to information requests from the NSEB regarding the November 1, 2024 to October 31, 2025 Natural Gas Report (NSEB M12660), specifically referencing page 61 and lines 18-21 of the report.

Pipelines Power America : Pipelines Need Permitting Reform p. p. 77
Pipelines Power America : Pipelines Need Permitting Reform - 1. Policymakers need to empower FERC. Currently, a single activist state can block a proposed interstate natural gas project, regardless of the benefits it would bring, through a...

AI summary The text argues that policymakers should empower FERC by bringing the 401-review process under its jurisdiction to prevent individual states from blocking interstate natural gas projects. It also calls for reforming judicial review standards to ensure federal authorizations are respected unless clearly improper, and limiting NEPA litigation to public disclosure rather than project delays or cancellations.

2025 Natural Gas Report NSEB IR-10 Attachment 5 Page 2 of 11 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 104-105
2025 Natural Gas Report NSEB IR-10 Attachment 5 Page 2 of 11 REDACTED (CONFIDENTIAL INFORMATION REMOVED)

AI summary The document is a redacted page from the 2025 Natural Gas Report attached to NSEB IR-10. It appears to be part of a regulatory proceeding, though the content is confidential and not visible due to redaction.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →