Nova Scotia Energy Board IN THE MATTER OF the More Access to Energy Act , SNS 2024, c. 2, Sch. B, (the "MAEA")
AI summary The document identifies the regulatory body and the specific legislative framework governing the proceeding. It establishes that the matter is being conducted under the More Access to Energy Act (MAEA), which serves as the primary legal authority for the proceeding.
eneration facilities, as well 9 System Impact Studies and 1 Feasibility Study. - Supported the commissioning of three transmission-connected BESS facilities and six transmission-connected wind farms. - Worked with the NS Department of Ener...
AI summary The text outlines the recent activities and accomplishments of IESO-Nova Scotia, focusing on grid infrastructure and resource planning. Key actions include supporting the commissioning of BESS and wind facilities, collaborating on offshore wind studies, and ensuring compliance with NERC and NPCC reliability standards. It highlights ongoing procurement processes for fast-acting and technology-neutral capacity, agreements with New Brunswick Power for capacity, and the progression of interconnection procedures and control center analyses. Finally, it notes the submission and status of recent revenue requirement applications.
1.3 Material Changes in the Application - The Board and parties will note that this Application differs in some respects from the prior - applications for the 2025/2026 and 2026/2027 fiscal years. The material changes or additions - fall u...
AI summary IESO Nova Scotia outlines material changes in its current application compared to prior filings for the 2025/2026 and 2026/2027 fiscal years. Key updates include a revised transition date for Phase 2A to March 2028 based on completed design work. The application also introduces a more functional alignment of OM&A expenditures within the revenue requirements to improve consistency for Board evaluation. Additionally, it details the phased implementation of the Phase 2 Control Centre project to support independent Balancing Authority and Transmission Operator functions.
1.4 Process - This Application reflects a more detailed budgeting process than was possible for IESO Nova - Scotia's first two revenue requirement applications. The organization has developed three - annual budgets within approximately 18...
AI summary IESO Nova Scotia describes the evolution of its budgeting process, moving from high-level estimates to a detailed bottom-up approach for the 2027/2028 budget. The process integrates OM&A budgets with capital plans to ensure the revenue requirement reflects asset timing, amortization, and financing costs. Key improvements include revised OM&A cost categories to align with functional departments and the provision of multi-year indicative outlooks for 2028-2030 in response to Nova Scotia Energy Board requirements.
10 1.5 Update and Compliance with Board Orders and Directives - 11 In its Decision dated February 25, 2026 in Board Matter M12412, the Board provided a number - 12 of specific directives for action by IESO Nova Scotia. The directives and I...
AI summary The document introduces a section regarding the update and compliance status of IESO Nova Scotia with specific directives issued by the Nova Scotia Energy Board. It references a decision from February 25, 2026, in Board Matter M12412, noting that a figure (Figure 1) will outline the specific directives and the company's corresponding responses to each.
"The Net OM&A Deferral and Variance Account is approved. However, specific guidelines and accounting policies must be developed and approved before there is a recovery of Net Ongoing OM&A amounts from the Deferral and Variance Account. IES...
AI summary The Nova Scotia Energy Board has approved the Net OM&A Deferral and Variance Account. However, the Board mandates that IESO Nova Scotia must develop and obtain approval for specific guidelines, accounting policies, and financial controls before any recovery of Net Ongoing OM&A amounts can occur. These requirements must be submitted as part of the 2027/2028 revenue requirement application.
A ttached in Appendix 2 Financial controls are in place at IESO Nova Scotia. The attached description of financial controls provides a reviewable version of those controls.
AI summary The document notes that financial controls are established at IESO Nova Scotia. It refers to an attached description in Appendix 2 which serves as a reviewable version of these specific financial controls.
DVM Guidelines "The Net OM&A Deferral and Variance Account is approved. However, specific guidelines and accounting policies must be developed and approved before there is a recovery of Net Ongoing OM&A amounts from the Deferral and Varian...
AI summary The Nova Scotia Energy Board has approved the Net OM&A Deferral and Variance Account (DVM). However, the Board requires IESO Nova Scotia to develop and submit specific guidelines, accounting policies, and a description of adopted financial controls before any recovery of Net Ongoing OM&A amounts can occur. These documents must be submitted by the time IESO Nova Scotia files its application for the 2027/2028 revenue requirement.
Attached in Appendix 3 The DVM guidelines have been developed and shared with stakeholders for their feedback in advance of the filing of this Application. They are provided herein for the NSEB's review and approval as it relates to approv...
AI summary The document introduces the Net Revenue Requirement Deferral and Variance Mechanism (DVM) guidelines, which were developed and shared with stakeholders for feedback prior to the current application filing. These guidelines are submitted for the Nova Scotia Energy Board's review and approval specifically regarding the approval of variances. They provide detailed treatment for variances stemming from discrepancies between forecast and actual expenditures in previous fiscal years, extending the OM&A Deferral and Variance Account previously approved in proceeding M12412.
Business Plan "The Board directs that minimum filing requirements will apply to IESO Nova Scotia's future applications, including:
AI summary The document introduces the Board's direction regarding the minimum filing requirements for future applications submitted by IESO Nova Scotia. It establishes a framework for what information must be included in upcoming submissions to ensure regulatory oversight and compliance with the Board's standards.
Attached in Appendix 4 IESO Nova Scotia's business plan is attached for the NSEB's review and includes: a detailed workplan of IESO Nova Scotia's planned activities in the period covered by the revenue requirement application connecting ea...
AI summary The document identifies the components of IESO Nova Scotia's business plan submitted for the Nova Scotia Energy Board's review. The plan must include a detailed workplan connecting activities to the objects of the More Access to Energy Act, timelines for multi-year activities, and an analysis of the previous year's results. This includes explanations for any incomplete tasks from the prior plan and justifications for adjustments to long-term activity timelines.
Stakeholder Engagement "The Board directs that minimum filing requirements will apply to IESO Nova Scotia's future applications, including: … • Details of engagement activities with Indigenous groups and stakeholders." Please refer to sect...
AI summary The Nova Scotia Energy Board (NSEB) establishes new regulatory requirements for IESO Nova Scotia regarding future applications. Specifically, the Board mandates that the entity must provide detailed information on its stakeholder engagement activities, with a particular emphasis on interactions with Indigenous groups and other relevant stakeholders.
3 Regulatory Stakeholders - 4 Over the course of the last fiscal year and into fiscal year 2026/2027, IESO Nova Scotia has - 5 accelerated work on regulatory stakeholder engagement. Engagement has occurred both - 6 formally and informally,...
AI summary IESO Nova Scotia outlines its regulatory stakeholder engagement activities for fiscal years 2025/2026 and 2026/2027. The entity highlights formal and informal engagement regarding its 2026/2027 Revenue Requirement Application and specific items such as the Fee Recovery Mechanism Application (M13007). Engagement included providing stakeholders with presentations, models, and budget previews, as well as reviewing DVM Guidelines. IESO Nova Scotia intends to maintain proactive engagement on significant initiatives and quarterly updates.
2.1 Role of the Business Plan - IESO Nova Scotia's 2027/2028 Business Plan (Appendix 4) is filed with this Application in - accordance with the Board's direction in M12412. The Business Plan establishes the work IESO - Nova Scotia intends...
AI summary The text outlines the role of IESO Nova Scotia's 2027/2028 Business Plan in relation to its current Application. While the Business Plan and the 2027/2028 Plan describe the organization's intended work and objectives under the More Access to Energy Act (MAEA), the Application specifically details the capital expenditures, operating costs, and revenue requirements needed to achieve those goals. Together, these documents demonstrate how proposed expenditures support the organization's legislative mandate and annual enterprise priorities.
this section 29 - revenue requirement merely because the Business Plan refers to the underlying procurement - or project. Those costs will be addressed through the applicable statutory cost-recovery - process. The expenditures in this Appl...
AI summary The text clarifies that the revenue requirement in the current application does not include the costs of underlying procurement or specific projects mentioned in the Business Plan. Instead, those costs are subject to separate statutory cost-recovery processes. The expenditures in this specific application are limited to organizational activities, including planning, procurement support prior to contract execution, and the ongoing planning and oversight responsibilities of IESO Nova Scotia.
2.5 Summary - The Business Plan and 2027/2028 Plan establish the operational basis for this Application. It - identifies the work required to continue performing the responsibilities already transferred to - IESO Nova Scotia and to impleme...
AI summary The document outlines that the Business Plan and the 2027/2028 Plan serve as the operational framework for the current Application. These plans identify the necessary work to maintain responsibilities transferred to IESO Nova Scotia and to implement the next phase of the Province's independent system-operator model. The proposed expenditures and revenue requirements are intended to provide the resources required to execute these objectives.
3.2.2 Options Analysis - To develop the option selection process, select an option, and prepare budget estimates, IESO - Nova Scotia engaged the expert support of FTI and IBM. FTI was engaged to develop a value - framework and to quantify...
AI summary The text describes the process for selecting and budgeting options for the Independent Energy System Operator (IESO) Nova Scotia's Control Centre. Nova Scotia engaged FTI Consulting to develop a value framework to quantify the benefits and disbenefits of transitioning from a vertically integrated utility model to an independent system operator model. IBM was engaged to assess five strategic scenarios, ranging from simple models to the construction of a new control facility with new systems, and to provide AACE Class 3 cost estimates for the recommended option.
6 Derived Strategic Scoring Areas Scored dimensions Weight Reliability / Operability / Compliance 20% Independence / Transparency 20% Future Optionality 10% Implementation Risk 15% Technical Score 65% Costs (Present Value) 25% Benefits (Pr...
AI summary The document outlines a scoring framework used to evaluate projects or strategic initiatives based on six derived scoring areas. These areas include reliability, independence, future optionality, implementation risk, technical score, costs, benefits, and net value delivery. Each dimension is assigned a specific percentage weight, culminating in a total weighted score of 100% to facilitate a standardized assessment of project value and feasibility.
Phased Approach - Scenario 4 will be implemented through a phased transition. This is a risk balanced approach - that will help accelerate early deliverables while allowing more time to refine later deliverables - to maximize value. As not...
AI summary The document outlines a phased transition plan for Scenario 4 to balance risk while accelerating early deliverables. The transition involves three phases: Phase 2A (Operational Control), Phase 2B (Settlement), and Phase 2C (Enhanced Independence). These phases progressively transfer operational responsibilities, systems, and capabilities from Nova Scotia Power to IESO Nova Scotia. Phase 2A establishes core dispatch capabilities; Phase 2B transfers market settlement and administration; and Phase 2C provides enhanced technological independence. Phases 2A and 2B together constitute 'Steady State 1'.
Program Integration - Program Integration includes program management, design authority, process development, - change management, quality assurance, and program administration. This category covers the - resources and activities required...
AI summary The document defines Program Integration as the management of design authority, process development, change management, quality assurance, and program administration for the Phase 2 program. It encompasses the resources needed to coordinate various workstreams, oversee vendors and system integrators, and manage dependencies. The cost estimate was developed by IBM using a bottom-up assessment based on detailed design activities, internal resource planning, and experience with similar projects to support the transition from Nova Scotia Power to IESO Nova Scotia.
3.2.7 Project Governance and Risk Management - Given the importance of this Project for IESO Nova Scotia's system dispatch and operation - function under the MAEA, the organization has established a strong governance framework, - including...
AI summary IESO Nova Scotia outlines its governance and risk management framework for the transition of system operator functions from Nova Scotia Power, as mandated by the More Access to Energy Act. The framework includes a Transition Committee under the Board of Directors for oversight, a Project Decision Board for approving key milestones, and a Project Management Office to manage the scope, budget, and schedule of Phase 2. The organization also emphasizes proactive risk identification and mitigation strategies to address the project's complexity.
3. IESO Capacity and Resourcing - Risk: Critical path delays or cost increases due to capacity and resource constraints. - Mitigation: IESO Nova Scotia has developed a project implementation plan that includes work - breakdowns and iterati...
AI summary The text outlines the risks and mitigation strategies associated with the Independent Electricity System Operator Nova Scotia (IESO Nova Scotia) capacity and resourcing for the Project. The primary risk identified is critical path delays or cost increases resulting from resource constraints. To mitigate these, IESO Nova Scotia has developed a project implementation plan featuring work breakdowns and iterative assessments of required skillsets and loading. This data will inform resource acquisition to ensure timely project delivery under a robust governance framework.
4. NS Power Dependency - Risk: This Project has significant impacts on NS Power, and this is one of its many priorities. - Delays or cost increases due to the transition leading to unexpected requirements for NS Power - to reconfigure syst...
AI summary The document outlines the operational dependencies and risks associated with the transition of certain capabilities to IESO Nova Scotia from NS Power. Key risks include potential delays and cost increases resulting from necessary system reconfigurations, process updates, and documentation changes. To mitigate these risks, the project utilizes continued collaboration, an expanded Project Management Office purview to manage shared scope, a Joint Transition Committee for leadership communication, and a phased implementation approach to allow for ongoing reassessment of transfer requirements and costs.
3.4.5 Legal & Regulatory - IESO Nova Scotia is budgeting $3.05M in ongoing costs as part of the Legal and Regulatory OM&A - cost category. This cost category primarily consists of the following subcategories and - associated costs: employe...
AI summary IESO Nova Scotia is budgeting $3.05 million for Legal and Regulatory Operating, Maintenance and Administration (OM&A) costs. These costs encompass employee compensation, Board of Directors governance, regulatory proceedings before the Nova Scotia Electricity Board (NSEB), internal regulatory fees, external legal advice for corporate leadership, and NERC/NPCC compliance. These expenditures are deemed necessary to achieve the organization's strategic priorities and fulfill regulatory functions.
Comparison to 2026/2027 Budget - This cost category increased from IESO Nova Scotia's 2026/2027 Revenue Requirement - Application due to: - Regulatory Proceedings and Assessments and Internal Regulatory Fees have been estimated on an antic...
AI summary IESO Nova Scotia explains the increase in costs for regulatory proceedings and internal regulatory fees compared to the 2026/2027 budget. The increase is attributed to a higher volume of proceedings, more precise estimates for external consulting and legal fees, and the transition to Phase 2. Specifically, costs have risen due to establishing an enterprise risk management function, meeting expanded compliance obligations, and unforeseen legal expenses required to defend procurement decisions related to the Integrated Resource Plan against potential judicial reviews.
4.3 Net Revenue Requirement Deferral and Variance Account - IESO Nova Scotia seeks approval of its 2025/2026 fiscal year variance by way of the net Revenue - Requirement Deferral and Variance Mechanism (DVM). Notwithstanding the fact NSEB...
AI summary IESO Nova Scotia is seeking approval for its 2025/2026 fiscal year variance using the Net Revenue Requirement Deferral and Variance Mechanism (DVM). Although DVM approval is pending under a separate proceeding (M12663), the variance calculation remains consistent with the OM&A Deferral and Variance Account. The DVM is designed to track differences between forecasted and actual revenue requirements—including OM&A and amortization—to ensure market participants pay amounts reflecting actual costs through future true-up fee adjustments.
5 Conclusion In the last 15 months, IESO Nova Scotia has progressed from an organization without employees or officers to a functioning and maturing independent system operator. In that short period, it has completed the Phase 1 transition...
AI summary IESO Nova Scotia concludes that it has successfully transitioned from a nascent entity to a functioning independent system operator over the past 15 months. Key milestones include completing Phase 1 of system planning and procurement, launching generation and energy storage initiatives, and establishing fee recovery mechanisms. The current application represents a maturation of the organization, featuring improved financial controls, accounting policies, and transparency regarding customer expenditure management while committing to ongoing operational improvements.
Lease Term The lease term is the non-cancellable period of a lease, together with periods covered by an option to extend the lease if IESO Nova Scotia is reasonably certain to exercise that option, and periods covered by an option to termi...
AI summary The text defines the 'lease term' as the non-cancellable period of a lease, including extension options if IESO Nova Scotia is reasonably certain to exercise them, and excluding termination options if the entity is reasonably certain not to exercise them. It further specifies that IESO Nova Scotia will reassess the lease term following significant events or changes in circumstances within its control that impact the certainty of exercising such options.
CONTROL ENVIRONMENT The control environment refers to the set of standards, processes, and structures that provide the basis for carrying out internal control across IESO Nova Scotia. As a new organization, this environment was established...
AI summary The text describes the establishment of the control environment at IESO Nova Scotia, which serves as the foundation for its internal control framework. This environment was shaped by the appointment of an experienced Board of Directors who set a 'tone from the top' through the adoption of a Board Code of Conduct and a Procurement Policy. Key governance structures include the creation of an Audit and Risk Committee to oversee risk management and internal controls as the organization scales its operations.
RISK ASSESSMENT The Audit and Risk Committee of the Board of Directors established an Enterprise Risk Management program with regular reviews of the top risks of the organization. The ERM function at IESO NS is continuing to evolve from an...
AI summary The IESO NS Audit and Risk Committee has established an Enterprise Risk Management (ERM) program to oversee the organization's top risks. The ERM function is currently transitioning from a consultant-supported initiative to a mature governance framework aligned with ISO 31000 standards. Key activities during the 2025/26 period included the development of an initial ERM framework, a risk log, and a formal reporting cadence to the Committee.
CONTROL ACTIVITIES Control activities are the business processes and procedures that are commonly referred to as an organization's internal controls. They may be preventative or detective in nature and may encompass a range of manual and a...
AI summary The text defines control activities as the business processes and procedures, known as internal controls, that an organization employs to manage risks. These activities can be either preventative or detective and may involve manual or automated processes. The document notes that IESO Nova Scotia maintains several operational policies that specifically document the control activities integrated into its business processes.
Preventive controls - Board approved budget requirement. All procurement must be included in the Boardapproved annual budget or supported by an approved budget amendment. This control prevents unauthorized and unfunded spending ensuring al...
AI summary The text outlines the preventive controls established within the organization's procurement and financial policies to ensure fiscal accountability and prevent unauthorized spending. Key controls include requiring all procurement to align with Board-approved budgets, establishing clear dollar thresholds for approval authorities, and mandating purchase orders for significant commitments. Additionally, the document highlights segregation of duties, competitive procurement processes, corporate credit card restrictions, and formal employee expense reporting as essential mechanisms to mitigate fraud and ensure value for money.
Preventive Controls - HR and CEO authorization for payroll changes such as new hires, terminations and pay changes. - Payroll system access is restricted by role to prevent unauthorized changes or processing. - Segregation between HR data...
AI summary The document outlines the internal control framework for payroll management, specifically highlighting preventive and detective controls. Preventive measures include requiring HR and CEO authorization for payroll changes, role-based system access restrictions, and the segregation of duties between HR data review and payroll processing. Detective controls focus on variance analysis against approved budgets and the review of system-generated exception reports to identify unauthorized changes or processing errors.
Financial Close & Reporting Procedures Procedures in place to standardize the financial reporting structures and allow for the organized record keeping required for effective oversight.
AI summary The text introduces the procedures established to standardize financial reporting structures. These procedures are designed to ensure organized record-keeping, which is necessary to facilitate effective regulatory oversight of the utility's financial activities.
INFORMATION AND COMMUNICATION The information and communication component of an effective system of internal control acknowledges that consistent and timely information distribution and communications to relevant stakeholders is required....
AI summary The text defines the 'Information and Communication' component of an internal control system, emphasizing that consistent and timely distribution of information to stakeholders is essential. It notes that IESO Nova Scotia has implemented regular reporting mechanisms to communicate with the Board, its committees, regulators, and other relevant stakeholders.
MONITORING ACTIVITIES Monitoring, measuring and reporting on the company's internal controls to determine if it is operating properly is a key part of an effective system of internal control. IESO Nova Scotia has included monitoring activi...
AI summary The text highlights the importance of monitoring, measuring, and reporting on internal controls to ensure proper system operation. IESO Nova Scotia incorporates these monitoring activities into its internal control environment. Specific examples provided include ongoing management reviews of finance procedures, periodic independent external financial audits, and an annual reassessment of financial risks conducted by the Audit and Risk Committee.
1.0 DESCRIPTION This guideline provides details on the administration of the Independent Energy System Operator of Nova Scotia's (IESO Nova Scotia) Net Revenue Requirement Deferral and Variance Mechanism (DVM, Mechanism). IESO Nova Scotia...
AI summary This document describes the administration of the Independent Energy System Operator of Nova Scotia's (IESO Nova Scotia) Net Revenue Requirement Deferral and Variance Mechanism (DVM). The DVM is designed to record, calculate, and defer variances between actual costs and the Nova Scotia Energy Board (NSEB) approved budget for future recovery. It replaces the predecessor OM&A Account and is being reviewed as part of the 2026/2027 Revenue Requirement and Fees Application.
Net Revenue Requirement Deferral and Variance Mechanism Guidelines - applicable market participants. For clarity, this guideline pertains only to the administration of the DVM. - Stakeholders shall have the opportunity to review the varian...
AI summary The document outlines the guidelines for the administration of the Net Revenue Requirement Deferral and Variance Mechanism (DVM). It specifies that these guidelines apply to market participants and establishes that stakeholders will have the opportunity to review variances and their treatment within the fee recovery mechanism. This process is integrated into the annual revenue requirement, proposed expenditures, and fees applications under the More Access to Energy Act.
48 The DVM will calculate variances as follows. Costs Description 1. Budgeted The NSEB approved budgeted revenue requirement for the fiscal Revenue year beginning April 1, 20XX and ending March 31, 20XX+1. Requirement This amount is presen...
AI summary The text outlines the calculation methodology for the Net Revenue Requirement Deferral and Variance Mechanism (DVM). It defines three components: the NSEB-approved budgeted revenue requirement for a fiscal year, the actual costs incurred during that period, and the resulting variance. A positive variance indicates costs exceeded the budget, while a negative variance indicates costs were lower. These variances are addressed in subsequent applications or through the True-Up Option 2 of the Fee Recovery Mechanism.
5.0 RECOVERY/CREDITING OF VARIANCES Pursuant to IESO Nova Scotia's Fee Recovery Mechanism application (M13007) submitted to the NSEB on July 31, 2026, the final over or under expenditure calculated by the DVM and approved by the NSEB will...
AI summary The text outlines the methodology for recovering or crediting variances in IESO Nova Scotia's expenditures. It specifies that final over or under expenditures calculated by the Deferral and Variance Mechanism (DVM) will be adjusted through a fee recovery mechanism via annual true-ups. Two options are presented for the revenue requirement true-up: applying the delta in FY3 or via a compliance filing in FY2. The process relies on audited financial statements and specific accounting controls to prevent duplication.
Net Revenue Requirement Deferral and Variance Mechanism Guidelines 142 fiscal year variance true-ups and actual load allocations. These processes will ensure 143 appropriate vetting of financials year-over-year, eliminating any potential d...
AI summary The document outlines guidelines for the Net Revenue Requirement Deferral and Variance Mechanism (DVM). It emphasizes the importance of conducting fiscal year variance true-ups and actual load allocations to ensure accurate financial vetting year-over-year. The primary objective of these processes is to prevent the double-counting of variances and to maintain alignment with future true-ups within the regulatory framework.
6.0 VARIANCE THRESHOLDS The NSEB provided the following direction in its Decision regarding IESO Nova Scotia's 2025/2026 Revenue Requirement Application (M12412) on February 25, 2026: The Board agrees with the IESO that it would be efficie...
AI summary The text outlines the variance thresholds and prudence review procedures for IESO Nova Scotia's revenue requirement applications. Following the Nova Scotia Energy Board's (NSEB) direction in Decision M12412, IESO Nova Scotia must explain cost category variances exceeding +/-10%. Variances beyond this threshold trigger an automatic reasonableness review by the Board, placing the burden of proof on IESO to demonstrate prudence for cost overruns. Costs within the +/-10% threshold are presumed recoverable or creditable without additional review.
7.0 MATERIAL VARIANCES AND NEW OR UNEXPECTED COSTS Throughout the course of the fiscal year, cost variances from forecast to actual will be tracked and addressed in the manner described within these guidelines. As part of the tracking of v...
AI summary IESO Nova Scotia outlines its procedures for tracking, reporting, and addressing material variances between forecasted and actual costs during the fiscal year. In compliance with Nova Scotia Energy Board (NSEB) directions, the entity will provide quarterly updates on material changes and new or unexpected costs. While regular annual reviews through revenue requirement and expenditure applications are intended to prevent significant variance accumulation, IESO Nova Scotia reserves the right to provide ad hoc reporting and request interim fee adjustments if circumstances warrant.
8.0 ANNUAL SUBMISSIONS IESO Nova Scotia is required under MAEA section 29 to submit to the NSEB its revenue requirements for the next fiscal year by December 31st annually. The DVM and any corresponding variances will be included in each a...
AI summary The text outlines the annual submission requirements for IESO Nova Scotia under section 29 of the MAEA. The entity must submit its revenue requirements to the Nova Scotia Energy Board (NSEB) by December 31st each year. The submission must include the Deferral and Variance Mechanism (DVM) and any corresponding variances for approval. The document notes two pathways for variance treatment: inclusion in the annual revenue requirement application or through a compliance filing as proposed in the Fee Recovery Mechanism application.
Auditor 31 The Board of Directors shall appoint a qualified auditor to audit annually the accounts and transactions of the IESO.
AI summary The document specifies a regulatory requirement for the Board of Directors to appoint a qualified auditor. This auditor is responsible for conducting an annual audit of the accounts and transactions of the Independent Electricity System Operator (IESO).
Annual report - 32 (1) Within six months after the end of every fiscal year, the IESO shall submit an annual report to the Energy Board on its affairs during that fiscal year and shall provide a copy of the report to the Minister. - (2) Th...
AI summary The text outlines the statutory requirements for the Independent Electricity System Operator (IESO) to submit an annual report to the Energy Board and the Minister within six months of the fiscal year-end. This report must include audited financial statements prepared in accordance with IFRS Accounting Standards. IESO Nova Scotia confirms it will comply with these requirements, submitting audited accounts to the Nova Scotia Energy Board (NSEB) by September 30th annually, including the DVM variance amount and relevant MAEA submissions.
10.0 STAKEHOLDER REVIEW AND DISCOVERY Annual review will occur via More Access to Energy Act (MAEA) s.29 Revenue Requirement, Proposed Expenditures, and Fees applications. DVM information is expected to be non-confidential and publicly ava...
AI summary The document outlines the stakeholder review and discovery process for annual revenue requirement, proposed expenditures, and fees applications under Section 29 of the More Access to Energy Act. It specifies that DVM information will be public, while confidential data requires a signed Confidentiality Agreement. Stakeholders are granted access to electronic documents and the opportunity to challenge IESO Nova Scotia's variance calculations and fee incorporations, including the review of historical results against prior forecasts.
Annual reporting will continue beyond the 2027-28 fiscal year. It is anticipated that public engagement activities, including the development and deployment of a public education initiative and the implementation of an Indigenous Relations...
AI summary The text indicates that annual reporting will extend past the 2027-28 fiscal year. It further notes that public engagement activities, specifically the development of a public education initiative and the implementation of an Indigenous Relations Framework, may continue beyond 2027-28 based on ongoing needs assessments conducted through that fiscal year.
Appendix 5 – Letter of Support and Line of Credit Amending Agreement NON-CONFIDENTIAL – Letter of Support Letter of Credit Amending Agreement has been removed for confidentiality purposes 1690 Joseph Howe Building, 11th Floor PO Box 2664 H...
AI summary This document is an appendix containing a non-confidential Letter of Support from Nova Scotia Power Inc. (NSPI) addressed to the President and CEO of the Independent Electricity System Operator (IESO) Nova Scotia. The document also notes that a Letter of Credit Amending Agreement has been removed from the filing for confidentiality purposes.
Why it matters: - Needed to support independent model - Decouples stakeholder commercial discussions from operational cut-over, removing a high-risk dependency - Builds maturity and technical readiness, while rcrJucing 111itial 2A scope -...
AI summary The text outlines the strategic rationale for a phased implementation approach regarding a system transition or operational cut-over. Key objectives include supporting an independent model, decoupling stakeholder commercial discussions from operational execution to mitigate risk, and building technical maturity while reducing initial scope. This approach is intended to improve decision-making, ensure confidentiality and transparency, and provide the flexibility to adapt settlement needs as market and regulatory environments evolve.
2. Purpose of this Report This report has been prepared by IBM for IESO-NS to provide a clear recommendation on the preferred strategic approach for Phase 2 of the transition of BA and TOP functions from NSP to IESO-NS. The report is inten...
AI summary IBM prepared this report for IESO-NS to recommend a strategic approach for Phase 2 of transitioning Balancing Authority (BA) and Transmission Operator (TOP) functions from Nova Scotia Power Inc. (NSP) to IESO-NS. The report serves as a public-facing document for internal decision support, government and stakeholder communication, and as a basis for future regulatory filings. It outlines the recommended delivery pathway, including expected benefits, costs, implementation timing, and risk/reliability management.
5. Options Assessed The assessment considered five operating model options. IBM evaluated these scenarios using a structured assessment framework (described in Section 4) that combined technical and operational criteria with value delivery...
AI summary IBM evaluated five different operating model options for the utility using a structured assessment framework. The framework weighted technical and operational criteria at 65% and value delivery considerations at 35%. Based on this scoring, Scenario 4 – Enhanced Independence received the highest total weighted score. IBM argues that this recommendation is based on a rigorous comparative assessment rather than subjective judgment.
Scenario 5 - Full Market Operations Scenario 5 builds upon Scenario 4 by introducing a full Market Management System, real-time market operations and day-ahead market functionality. While this option maximizes market capabilities, it also...
AI summary The document discusses Scenario 5 of a strategic assessment regarding the transition to full market operations. This scenario involves implementing a full Market Management System with real-time and day-ahead market functionality. While it offers maximum market capabilities, it is noted to have higher costs, delivery complexity, organizational change requirements, and implementation risks compared to other scenarios. The assessment aims to balance statutory compliance, system reliability, and feasibility with long-term value.
5.1.1 Further Considerations Beyond the named assessment criteria above, the evaluation was also informed by the broader legislative and policy context established by the More Access to Energy Act and the Strategic Guiding Principles set o...
AI summary The text clarifies that while the assessment criteria were primary, the evaluation was also influenced by the broader legislative and policy framework of the More Access to Energy Act and the Strategic Guiding Principles established by IESO-NS. These frameworks informed the interpretation and weighting of the core criteria, though they were not treated as independent scoring categories in the evaluation process.
Why it matters: - Needed to support independent model - Decouples stakeholder commercial discussions from operational cll!- over, removing a high-risk dependency - Builds maturity and technical readiness, while reducing initial 2A scope -...
AI summary The text outlines the strategic rationale for a phased approach to developing an independent model. Key benefits include decoupling commercial stakeholder discussions from operational complexities to reduce risk, building technical maturity, and narrowing the initial scope of the 2A phase. The initiative aims to improve decision-making, confidentiality, and transparency while ensuring the system can adapt to evolving market and regulatory settlement needs.
7.4. Why the Phased Pathway is Preferred The phased pathway is recommended because it supports prudency in three ways: - 1. It enables IESO-NS to establish an initial credible operating capability before full build-out; - 2. It allows earl...
AI summary The document argues that a phased pathway for the IESO-NS is preferred because it supports prudency by establishing initial operating capabilities before full build-out, enabling early value realization after Phase 2A, and creating natural decision gates for reassessing risk and performance. This approach allows for a lower-risk transition to statutory responsibilities, ensuring system reliability and cost management while preserving the flexibility to develop a future-ready system operator model based on evolving economic and system needs.
Program Integration Risk The transition of core operational functions involves complex integration between IESO-NS systems, NSP legacy infrastructure, and third-party vendors. The full extent of integration complexity may not be fully know...
AI summary The text addresses the risks associated with integrating core operational functions during the transition between IESO-NS systems and legacy Nova Scotia Power infrastructure. It highlights that the complexity of integrating these systems with third-party vendors may not be fully quantifiable until the detailed design phase of the project commences.
Commercial Arrangements and Market Implementation Risk Phase 2B includes the implementation of settlement processes, participant interfaces, reporting mechanisms, and other commercial functions required for IESO-NS to administer electricit...
AI summary The text discusses the risks associated with the commercial and market implementation of Phase 2B, which involves establishing settlement processes, participant interfaces, and reporting mechanisms for IESO-NS to independently manage electricity market and operational arrangements. A key risk identified is that the timeline and success of these functions depend on external consultations and approvals from various stakeholders, including generators, transmission-connected customers, regulators, and government entities, which are outside of IESO-NS' direct control.
Decision Gate Structure The phased approach creates formal checkpoints between phases. At each decision gate, IESO-NS will assess: - operational performance and reliability outcomes in the preceding phase; - actual costs against the approv...
AI summary The text outlines a phased project approach for IESO-NS, featuring formal decision gates between phases. These gates serve as mandatory checkpoints to evaluate operational performance, reliability, actual costs versus budgets, benefit realization, and updated risk profiles. Authorization for Phase 2B and Phase 2C is contingent upon meeting these specific criteria, which is described as a deliberate design feature of the recommendation rather than a contingency.
Appendix 7 – FTI Value Case Report NON-CONFIDENTIAL The Independent Energy System Operator of Nova Scotia: Value Framework and Business Case A report from FTI Consulting for IESO Nova Scotia May 29, 2026 I
AI summary The document serves as the cover page for Appendix 7 of a regulatory proceeding, titled 'FTI Value Case Report'. It introduces a report prepared by FTI Consulting for the Independent Energy System Operator of Nova Scotia (IESO-NS). The report focuses on the 'Value Framework and Business Case' for IESO-NS and is dated May 29, 2026.
Disclaimer This report has been prepared by FTI Consulting LLP ("FTI") for the Nova Scotia Independent Energy System Operator ("IESO-NS") under the terms of Master Service Agreement between IESO-NS and FTI, dated January 16, 2026 (the "Con...
AI summary This document is a disclaimer for a report prepared by FTI Consulting LLP for the Nova Scotia Independent Energy System Operator (IESO-NS). It specifies that the report was created solely for IESO-NS's value framework and business case. It restricts the use of the report in legal, arbitral, or regulatory proceedings without prior approval and disclaims liability for the content, accuracy, and reliance on the information provided by third-party sources.
created by Nova Scotia's Energy Reform (2024) Act, such as the introduction of more competitive procurement for new energy resources, which are better supported under an ISO structure.[5](#page-21-0) - ES.11 The IESO's broad benefit catego...
AI summary The text outlines the anticipated benefits of establishing an Independent System Operator (ISO) in Nova Scotia as part of the Energy Reform (2024) Act. Key benefits include the removal of perceived bias inherent in Vertically Integrated Utility (VIU) models, increased competition through independent auctions to lower investment costs, and accelerated development timelines. Furthermore, an ISO structure is expected to foster innovation in clean energy and demand-side management while improving operational efficiency and decision-making in the control room.
2. Benchmarking the roles, responsibilities and operating costs of an ISO - 2.1 The objective of this chapter is three-fold: (1) benchmarking IESO-NS among its peers globally; (2) understanding from that benchmark what the typical roles an...
AI summary This chapter outlines the methodology for benchmarking the IESO-NS against global peers to determine typical Independent System Operator (ISO) roles, responsibilities, and operating costs. It acknowledges that while no direct comparable benchmark exists for IESO-NS, a range of international ISOs with shared characteristics will be analyzed. The study aims to identify key cost drivers and map operating costs against metrics like population served and installed capacity, noting that findings are illustrative due to diverse global differences.
to join SPP's Markets+ day-ahead market over CAISO alternative, Utility Dive, 7 March 2025, [(link)](https://www.utilitydive.com/news/bonneville-bpa-spp-markets-day-ahead-market-edam-caiso/741878/). - iii) Jurisdictional footprint: spannin...
AI summary The text discusses the benchmarking of Independent System Operators (ISOs), specifically comparing IESO-NS to other regional and international entities. It evaluates ISOs based on jurisdictional footprint, noting that IESO-NS is similar to provincial-focused operators like AESO and IESO Ontario, whereas others like CAISO, AEMO, and MISO span multiple states or provinces. Additionally, the text addresses the 'age' of ISOs as a factor in their independence, citing the recent unbundling of the UK's NESO as a contemporary example of market evolution.
Roles and responsibilities of the benchmarked ISOs - 2.6 Each of the ISOs introduced in the previous section has its own differing set of roles and responsibilities – each having its own associated costs and benefits. To draw additional va...
AI summary The document introduces a comparison of the roles and responsibilities of various Independent System Operators (ISOs) against the IESO-NS. It notes that each ISO has distinct functions that result in different associated costs and benefits. The text establishes the framework for analyzing these differences to provide context for the operating cost comparisons presented in the benchmarking study.
Benefits overview - 3.7 In its two phases, the different roles transitioned from NSP to IESO-NS are expected to lead to benefits in terms of cost reductions, environmental improvements, and enhanced reliability, but setting up a new entity...
AI summary The text outlines the expected benefits of transitioning roles from Nova Scotia Power (NSP) to the Independent Electricity System Operator Nova Scotia (IESO-NS). These benefits, categorized into cost reductions, environmental improvements, and enhanced reliability, are driven by five key levers: removing perceived bias, increasing competition through auctions, improving regulatory timeliness, fostering technological innovation, and enhancing operational efficiency. While the transition involves incremental setup costs, it aims to create a more competitive and efficient energy market.
Introduction - 4.1 This chapter focuses on a subset of direct, quantifiable benefits of both Phases 1 and 2 of the IESO transition, while the full range of benefits and underlying rationale of the IESO transition are described in Chapter 3...
AI summary This section introduces the framework for analyzing the quantifiable benefits and disbenefits associated with the transition to the Independent Electricity System Operator (IESO) in Nova Scotia. The benefits are categorized into four areas: Phase 1 unbundling benefits (asset owner and planner separation), Phase 1 accelerated deployment benefits (competitive procurement and independent advisory), Phase 2 core roles benefits (control room functions and regained synergies), and the impact of Phase 2 on Phase 1 roles. The analysis acknowledges potential disbenefits, such as lost synergies from unbundling.
(5) Regained synergies from planner and operator 4.39 Re-combining the planner-operator function regains the synergies explained in (5) in Phase 1 above. This simply cancels out the disbenefit above.
AI summary The text addresses the structural organization of the electricity system, specifically the re-combination of the planner and operator functions. It argues that merging these roles restores synergies that were lost when they were separated, thereby nullifying the previously identified disbenefits of a split structure.
s/assembly-65-session-1/house_25sep24#HPage1798). 101 See also potential delays in the interconnection process described in the Market Design role in [¶A1.20.](#page-91-0) - A1.3 However, NSP does not necessarily make self-serving decision...
AI summary The text examines the inherent conflict of interest faced by Nova Scotia Power (NSP) as a vertically integrated utility (VIU). While regulatory frameworks, the Integrated Resource Plan (IRP) process, and legislative mandates like the Electricity Act provide checks and balances, an underlying lack of public trust persists. The discussion highlights that NSP's dual role as both a market participant and a public utility, combined with provincial affordability concerns, creates persistent suspicion regarding the merit of its decisions.
Phase 1 supporting roles : the importance of independence - A1.14 Independence is the fundamental quality of an ISO that underlies most, if not all, benefits. However, many of the direct benefits of independence are less quantifiable. Inde...
AI summary The text discusses the fundamental importance of independence for an Independent System Operator (ISO), specifically the Independent Electricity System Operator Nova Scotia (IESO-NS). Independence is framed as a prerequisite for public trust, transparency, and attracting high-caliber staff. It argues that removing conflicts of interest inherent in Variable Independent Utilities (VIUs) fosters a level playing field for investors and developers. However, the text cautions that the benefits of independence are contingent on avoiding regulatory capture by incumbent utilities and acknowledges that Nova Scotia Power (NSP) retains significant functional decision-making over near-term capital expenditure delivery.
Independence in advice to government - A1.22 Advice given to Government by NSP may be perceived to be in NSP's self-interest, or to not necessarily be in the best interests of consumers. Such a perception of bias, which could undermine the...
AI summary The text discusses the potential for perceived bias in advice provided by Nova Scotia Power (NSP) to the government, noting that even the perception of self-interest can undermine the value of such advice and delay consumer benefits. It emphasizes the critical importance of the Independent Electricity System Operator Nova Scotia (IESO-NS) acting as a neutral, trusted entity to provide unbiased technical and operational expertise, particularly as the province faces increasing decarbonization challenges.
Avoided professional services costs A1.24 Some professional services costs may be avoided with an ISO. For instance, the government can avoid direct hire of consultants if it can rely on ISO expertise, or reduce the amount of auditing and...
AI summary The text discusses the potential for cost savings and improved administrative efficiency through the use of an Independent System Operator (ISO). Key benefits include the avoidance of direct consultant hiring by the government, reduced auditing and investigation costs for policing a Variable Independent Utility (VIU), and a decreased regulatory burden on the board. Additionally, an ISO can provide more consistent advisory support, potentially enhancing the quality of advice while reducing overall labor costs.
Phase 1, as well as incremental costs of implementation. Phase 2 core roles: more efficient operations from control room improvements Scheduler, residual energy system balancer, and settlement - A1.28 In contrast to the more obvious confli...
AI summary The text analyzes the potential conflicts of interest arising from Nova Scotia Power (NSP) acting as both a system operator and an asset owner. While operational expenditures (OpEx) are generally recovered without an additional rate of return, potentially limiting direct financial upside, there is a concern that NSP could favor its own assets during scheduling decisions. Despite functional separation and UARB-approved standards of conduct, a lack of transparency in day-to-day operational decisions may lead to perceptions of bias against independent power producers (IPPs).
Improved application of reliability standards and grid codes A1.43 An ISO taking over the operations role also scales the benefits derived from the supporting roles in Phase 1. With the ISO responsible for operations, it can better set gri...
AI summary The text discusses the operational benefits of an Independent System Operator (ISO) assuming the operations role within a multi-phase framework. It argues that by taking over operations, the ISO can more effectively establish and enforce grid and reliability standards as part of its broader industry governance responsibilities, thereby scaling the benefits derived from supporting roles in Phase 1.
Independence in advice to government and avoided professional services costs - A1.44 Deep technical expertise at the operational level is key to providing advice to government, and the removal of the perception of bias can lead to this adv...
AI summary The text discusses the importance of deep technical expertise in providing reliable advice to the government, emphasizing that removing perceptions of bias is crucial for the advice to be trusted. It highlights that the Market Design role involves creating rules for Schedulers and Balancers. Furthermore, it suggests that the Independent System Operator (ISO) can provide valuable expertise to regulators and the government by gaining a better understanding of operational realities, such as congestion management.
Phase 1 only Source: FTI Consulting analysis
AI summary The provided text is a heading indicating that the subsequent analysis or documentation pertains specifically to 'Phase 1' of a proceeding. The source of the analysis is identified as FTI Consulting.
Phase 1 and Phase 2 Source: FTI Consulting analysis
AI summary The document identifies the existence of Phase 1 and Phase 2 within a report provided by FTI Consulting. However, the provided text is a heading and source citation only, offering no specific details regarding the scope, objectives, or results of these phases.
VIA WEB PORTAL March 31, 2026 Crystal Henwood, Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Assistant's email: [[email protected]](mailto:awhalen@pinklarkin...
AI summary This document is a formal cover letter dated March 31, 2026, addressed to the Clerk of the Nova Scotia Energy Board. It serves as the submission of the 2025 Annual Report from the Nova Scotia Consumer Advocate. The document serves as a procedural filing via the web portal to provide the Board with the Advocate's yearly reporting.
INTRODUCTION The Consumer Advocate (the "CA") represents residential customers of the various regulated utilities in Nova Scotia, including Nova Scotia Power Inc. ("NSP" or "NS Power"), Nova Scotia Power Maritime Link ("NSPML"), the Nova S...
AI summary The Consumer Advocate (CA) provides its annual report for 2025 to the Nova Scotia Energy Board and the Nova Scotia Regulatory and Appeals Board. The CA represents residential customers of various regulated utilities in Nova Scotia, including Nova Scotia Power, IESO NS, and Efficiency One. The report outlines the CA's activities and participation in various regulatory proceedings during the preceding calendar year, emphasizing the mandate to ensure utility services remain reliable and affordable for the residential rate class.
ROLE OF THE CONSUMER ADVOCATE Section 91 of the Public Utilities Act permits the Nova Scotia Energy Board and the Nova Scotia Regulatory and Appeals Board to appoint an advocate in a hearing to represent the interests of residential custom...
AI summary The text outlines the legal authority and mandate of the Consumer Advocate (CA) under the Public Utilities Act and Gas Distribution Act. The CA is appointed to represent the interests of residential customers in hearings, with powers to submit evidence, engage experts, participate in proceedings, and enter into settlement agreements. The document emphasizes that the CA relies heavily on specialized consultants and subject matter experts to navigate the technical complexities of regulatory proceedings and ensure a strong voice for the residential rate class.
ANNUAL REPORTING REQUIREMENT The Public Utilities Act establishes statutory annual reporting obligations for the Consumer Advocate. Specifically, s. 94 requires the CA to file an annual report with the Board covering the CA's activities du...
AI summary The text outlines the statutory annual reporting requirements for the Consumer Advocate (CA) under Section 94 of the Public Utilities Act. The CA is mandated to file an annual report with the Board by March 31st, detailing activities, hours spent, expert consultant involvement, compensation structures, and a detailed accounting of fees and costs for recovery. The Consumer Advocate submits its first annual report for the preceding year, requesting the Board to accept it as filed while offering to provide additional information if required.
(a) General Comments The 2025 regulatory calendar involved the hearing of various significant matters before the Board, and particularly with regards to matters involving NSPI and Halifax Water, which both filed General Rate Applications i...
AI summary The Consumer Advocate (CA) provides general comments on the 2025 regulatory calendar, highlighting significant changes driven by Bill 404, including a new Board structure and an independent energy system operator. The CA notes that Nova Scotia Power Inc. (NSPI) faced a cyberattack in 2025 with ongoing regulatory impacts. The CA participated in over 100 proceedings in 2025, primarily advocating for residential ratepayers in matters involving NSPI, such as General Rate Applications and new Cost of Service methodologies.
(b) Detailed Summary of Relevant Matters As noted above, s. 94 requires the CA to report on the following: - (a) the activities carried out by the advocate and the hours spent by the advocate on each activity; - (b) the name and qualificat...
AI summary The Consumer Advocate (CA) outlines its compliance with section 94 requirements regarding reporting of activities, expert involvement, and costs. The CA confirms that all retained experts and consultants were compensated via hourly rates, consistent with industry standards. Furthermore, the CA asserts that it provides the Board with monthly invoices detailing specific activities, hours spent, and a comprehensive accounting of fees and costs for all matters in which it is engaged, as supported by detailed appendices in its report.
CONFIDENTIAL TREATMENT As with the Annual Report filed for 2024, the CA has enclosed a confidential and non-confidential version of the Consumer Advocate's Annual Report (the "Report"). The Consumer Advocate (the "CA") is requesting confid...
AI summary The Consumer Advocate (CA) is requesting confidential treatment for specific portions of its Annual Report, specifically Appendices A and B. The CA argues that the consultants' hours worked and hourly rates are commercially sensitive and should be protected to prevent competitors from gaining a competitive advantage and to facilitate fair rate negotiations. Additionally, the CA defers to the Board's discretion regarding whether the CA's own hourly rates, which are set by the Board, should also be treated as confidential.
CONCLUSION As set out above, 2025 was a busy year for the Consumer Advocate, and included a number of significant proceedings affecting all ratepayers, including residential ratepayers. Through the CA's advocacy, and with the valuable assi...
AI summary The Consumer Advocate (CA) concludes its 2025 report, highlighting its successful advocacy for residential ratepayers across various significant proceedings. Supported by expert consultants, the CA ensured that residential interests were prioritized by utilities and the Board. The CA expresses satisfaction with the outcomes achieved for its customer class and reaffirms its commitment to continued advocacy in the upcoming calendar year.
Appendix A Sum of Sum of Sum of Sum of Sum of Sum of Sum of Sum of 0490-228 Eastward Energy M12261 - Eastward Energy - RDA Recovery Rate Amendments Application Review Proceeding: Review of all evidence and material filed in matter. Corresp...
AI summary Appendix A provides a table detailing specific regulatory matters and associated costs for various entities. It includes entries for Eastward Energy regarding a RDA Recovery Rate Amendments Application Review Proceeding (M12261) and EfficiencyOne regarding a DSM Advisory Group Behavioural Program Update (M12030). The table lists activities such as attendance at workshops, review of reports, and correspondence with stakeholders, alongside corresponding financial figures and sums.
OVERVIEW Section 92 of the Nova Scotia Public Utilities Act permits the Board to appoint an advocate in a hearing to represent the interests of small business customers, known as the Small Business Advocate. Once appointed, the SBA partici...
AI summary The text outlines the authority and mandate of the Small Business Advocate (SBA) under Section 92 of the Nova Scotia Public Utilities Act. The Board may appoint the SBA to represent small business customers as a full intervenor. The SBA's role includes advocating for appropriate rates, consumer protection, and reliability, as well as participating in all aspects of the regulatory process, including evidence submission, expert engagement, settlement negotiations, and media communications.
(a) General Comments Over the course of 2025, the SBA participated in approximately 67 NSPI matters, 3 E 1 matters, 5 NSPML matters, 1 IESO-NS matter and 1 WTI matter. These included paper and oral hearings as well as Review Proceedings wh...
AI summary The Small Business Advocate (SBA) reports on its regulatory activities in 2025, highlighting participation in approximately 67 Nova Scotia Power Inc. (NSPI) matters, including hearings, Review Proceedings, and information requests. Key activities involved specific assessments for the NSPML 2026 Assessment Application, NSPI FAM Audit, and NSPI 2025 ACE Plan. The SBA also engaged in various working groups and stakeholder sessions covering topics such as the Fuel Adjustment Mechanism, Demand Side Management, ELIADC successor tariff development, and grid interconnection processes.
As noted, the requirement to file this Report came into effect last year. As such, there is the opportunity to provide a comparison between the years, as outlined below. 2024 2025 NSPI Matters 45 67 NSPML Matters 5 5 El Matters 3 3 IESO Ma...
AI summary The text introduces a comparison of regulatory matters and activities between 2024 and 2025, following the implementation of a new reporting requirement last year. It provides a table quantifying the number of matters for various entities—including Nova Scotia Power Inc. (NSPI), Nova Scotia Power Maritime Link (NSPML), Eastward Energy (El), and the Independent Electricity System Operator (IESO)—alongside Small Business Advocate (SBA) hours and consultant fees.
Small Business Advocate Company Total Hours for SBA and Consultants Sum of Fees for SBA Sum of Costs for SBA Sum of HST for SBA Total Sum for SBA Sum of Fees for Consultants (USD) Sum of Costs for Consultants (USD) Total Sum for Consultant...
AI summary The document provides a detailed breakdown of the Small Business Advocate's (SBA) professional activities and associated costs across multiple regulatory proceedings. It lists specific tasks performed, including reviewing Board decisions, responding to Information Requests (IRs), attending court appearances, and conducting expert consultations. The data tracks hours spent, fees, and costs for both the SBA and external consultants for matters such as the DNRR Community Solar PPA, Property & Assets Action Plan, Port Hawkesbury Paper Application, PHP Judicial Review, FAM SWG, and the Cost of Service Study.