Topic/Matter Intersection

Topic:"Residential Energy Affordability Program" in M12795

Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
1 passage 1 document

Residential Energy Affordability Program across all matters →

B-3-(i)Appendices - Redacted 1 passage
p. p. 94
Px 1.1 °C Temperature at snow/rain threshold Base temp 1.1 °C Base temp above which snowmelt occurs Melt rate 3.7 mm/deg-day Rain rate limit 0.5 mm/day (Typ): Discriminates between dry and wet melt ATI melt rate coefficient 0.98 (manual) C...

AI summary This section discusses the parameters related to snowmelt and water capacity, including temperature thresholds, melt rates, and water capacity percentages. It provides technical details for modeling snowmelt and water accumulation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →