Topic/Matter Intersection

Topic:"Residential Solar Pv Program" in M03666

Matter: P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6Enhanced net metering service, in compliance with recent legislative changes to the Electricity Act.
5 passages 4 documents

Residential Solar Pv Program across all matters →

N-1Letter, Application and Evidence filed by NSPI 11/1/2010 2 passages
3.6.2 Availability p. p. 27
3.6.2 Availability - a) Net Metering Service is available to all NSPI customers who are served from NSPI's Distribution system (ie: 24,940 volts or less), who are billed under NSPI's metered service rates, who install a qualifying generati...

AI summary Net Metering Service is available to NSPI customers with qualifying generating facilities up to 100 kW (Class 1) or 1000 kW (Class 2), subject to a total subscription limit of 20 MW. The service is offered on a first-come, first-served basis and not applicable for Unmetered services.

The customer must utilize qualifying generating equipment of up to 100 kW capacity, which meets the requirements c) p. p. 27
The customer must utilize qualifying generating equipment of up to 100 kW capacity, which meets the requirements c) Page 1: [5] Deleted 9/18/2010 11:55:00 AM Net Metering i. Page 1: [5] Deleted 9/18/2010 11:55:00 AM Net Metering ii. Page 1...

AI summary The text outlines a requirement for customers to use qualifying generating equipment with a capacity of up to 100 kW that meets specific requirements. The rest of the text consists of deleted pages and timestamps from a regulatory proceeding.

06870Board Order 1 passage
3.6.2 Availability p. p. 2
3.6.2 Availability - a) Net Metering Service is available to all NSPI customers who are served from NSPI's Distribution system (ie: 24,940 volts or less), who are billed under NSPI's metered service rates, who install a qualifying generati...

AI summary Net Metering Service is available to NSPI customers with qualifying generating facilities up to 1000 kW, provided they meet specific criteria and submit a written request. The service operates on a first-come, first-served basis and is not available for Unmetered services.

06690Revised Regulation 3.6 - Clean Copy 3/31/2011 1 passage
3.6.2 Availability
3.6.2 Availability - a) Net Metering Service is available to all NSPI customers who are served from NSPI's Distribution system (ie: 24,940 volts or less), who are billed under NSPI's metered service rates, who install a qualifying generati...

AI summary The Net Metering Service is available to NSPI customers with generating facilities up to 1000 kW, provided they meet specific criteria and submit a written request. It is not available for Unmetered services and follows a first-come, first-served basis.

06870Board Order 1 passage
3.6.2 Availability p. p. 2
3.6.2 Availability - a) Net Metering Service is available to all NSPI customers who are served from NSPI's Distribution system (ie: 24,940 volts or less), who are billed under NSPI's metered service rates, who install a qualifying generati...

AI summary Net Metering Service is available to NSPI customers with generating facilities up to 1000 kW, provided they meet specific criteria and submit a written request. It is not available for Unmetered services and is offered on a first-come, first-served basis.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →