Matter: Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
4 passages 4 documents

Resource Costs across all matters →

N-4NSPI (SBA) RIR-1 to RIR-6 1 passage
Section 3
1 Request IR-1: 2 3 Refer to the 10-Year System Outlook (the “Report”) Section 2.0 - Load Forecast, Page 7 of 4 67. 5 6 (a) Please provide a comparison between the 2024 Load Forecast with the forecast used 7 in Evergreen IRP scenario CE1-E...

AI summary The document requests a comparison between the 2024 Load Forecast and the Evergreen IRP scenario CE1-E1-R2, including energy and peak demand differences, and asks about necessary resource adjustments. The response includes a table showing increasing energy and peak demand differences over time, implying potential changes in resource planning.

N-6Rebuttal Evidence - NSPI 1 passage
Section 26
of the ECEI and Section 4D battery storage projects into a single 150 MW project 23 application represents a reduction in anticipated energy storage projects through 2029”. 19 24 The Path to 2030 provided the following: 25 16 NS Power Lett...

AI summary The document discusses the consolidation of ECEI and Section 4D battery storage projects into a single 150 MW initiative, noting a reduction in anticipated energy storage projects through 2029. It references the 2024 10-Year System Outlook Report and includes submissions from the Consumer Advocate and NS Power regarding regional dispatch optimization and system outlook.

95183SBA (NSPI) IR-1 to IR-6 1 passage
Section 3
Page 1 of 3 1 Request IR-01 2 Refer to the 10-Year System Outlook (the “Report”) Section 2.0 - Load Forecast, Page 7 of 67. 3 a. Please provide a comparison between the 2024 Load Forecast with the forecast used 4 in Evergreen IRP scenario...

AI summary The document contains three regulatory requests addressing load forecasts, resource buildout discrepancies, and Green Choice Program procurement. It seeks comparisons between 2024 load forecasts and prior IRP scenarios, reconciliation of resource timelines with NSPI’s Path to 2030 Report, and confidence in meeting renewable energy targets through the Green Choice Program.

95513Submissions - SBA 1 passage
Section 1
Blackburn Law Inc. October 4, 2024 VIA EMAIL Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 3S3 Dear Ms. Henwood: Re: Mll 764 - Nova Scotia Power...

AI summary The Small Business Advocate (SBA) reviewed Nova Scotia Power Inc.'s (NSPI) 2024 10-Year System Outlook, finding it consistent with prior planning but noting minor discrepancies in resource forecasts and risks like delays in project timelines and potential impacts on low-income customers. The SBA recommends further consideration of these issues.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →