Matter: Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper
5 passages 5 documents

Resource Costs across all matters →

N-2Evidence of Colin T. Fitzhenry & Michael P Gorman - Brucaker & Associates Inc. on behalf of PHP 1 passage
1 Q HOW SHOULD PHP'S DEMANDS BE REFLECTED IN A 3-CP DEMAND 2 ALLOCATION BASED ON COST CAUSATION PRINCIPLES? p. p. 0
1 Q HOW SHOULD PHP'S DEMANDS BE REFLECTED IN A 3-CP DEMAND 2 ALLOCATION BASED ON COST CAUSATION PRINCIPLES? 3 A PHP's firm peak demand will require NS Power to incur resource capacity costs to 4 reliably serve its ATL customers system coin...

AI summary PHP's firm peak demand requires NS Power to incur resource capacity costs and should be included in the 3-CP allocator, while interruptible demand does not require such costs and should be excluded. Transmission planning also does not require additional investment for PHP's load, supporting minimal allocation. This aligns with cost causation principles.

N-6NSPI (IG) RIR 1 to 31 - Redacted 1 passage
DEVELOPMENT OF ALLOCATION FACTORS p. p. 181
DEVELOPMENT OF ALLOCATION FACTORS (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL PHP MUNICIPAL UNMETERED FACTOR (...

AI summary This section provides a detailed breakdown of allocation factors across various categories, including demand, generation, and customer data. It includes percentages of responsibility and numerical values for different segments such as small, general, and large industrial, as well as municipal and unmetered categories.

N-10NSPI (Synapse) RIR 1 to 30 - Redacted 1 passage
NSPI Responses to Synapse Energy Economics, Inc. Information Requests p. p. 19
NSPI Responses to Synapse Energy Economics, Inc. Information Requests 1 Request IR-7: 16 loss to the power system, worsening the capacity shortfall situation. 17 18 (d) For planning purposes, PHP firm load for each of the last 10 years has...

AI summary NSPI provides responses to Synapse Energy Economics, Inc. regarding information requests, including details about PHP load, the ELID Tariff, and the PHB Generation Facility's designation as a Network Resource. The responses highlight planning assumptions, load classifications, and interconnection designations.

N-13PHP (IG) RIR 1 to 11 1 passage
Request IR-8:
Request IR-8: - Reference: N-3, Evidence of PHP, pages 9-10 (PHP consumption forecast and PHP Wind forecast). - (a) Provide the full workpapers, assumptions, and inputs underlying PHP's 2026 and 2027 consumption forecasts (approximately 77...

AI summary Request IR-8 seeks detailed workpapers and assumptions behind PHP's 2026-2027 energy consumption and PHP Wind production forecasts, reconciliation with NSPI's COSS figures, and analysis of revenue and cost risks from forecast variances. It also asks for modeling of financial responsibilities for discrepancies.

N-25Evidence - IG 1 passage
3.2 Issues Associated With Application of the DR
3.2 Issues Associated With Application of the DR - The DR is a highly accommodating and beneficial aspect of the ELID rate to PHP. It also appears to be - unprecedented in Canada. - Not only does PHP secure the ability to access approximat...

AI summary The Dispatchable Rider (DR) under the ELID rate provides PHP with significant benefits, including compensation for load variation and access to NSP's embedded resources. The DR is unprecedented in Canada and allows PHP to shift load without obligation, though NSP retains dynamic dispatch rights. This arrangement is clarified in a 2026 Technical Conference.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →