Topic:"Resource Costs" in M12795

Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
2 passages 2 documents

Resource Costs across all matters →

B-1-(ii)Appendix 2 - HSV-2024-043-CA02 Additional Costed Option Scenarios - Factorydale 1 passage
CONCLUSION p. p. 23
CONCLUSION Once we see the numbers on different flow water duration scenarios, comparing it with the information available from the quotes received, it is even clearer than the best option is to go with a new unit. The like for like replac...

AI summary The analysis concludes that replacing existing equipment with a new unit offers significant non-financial benefits, including improved reliability, efficiency, and grid stability, despite similar ROI and ROE compared to like-for-like replacements. Key advantages include modern technology, increased energy output, and opportunities for carbon credit sales.

B-3TOB (NSEB) RIR 1 to 42 - Redacted 1 passage
Response: p. p. 27
Factorydale flow records. They were sensitivity scenarios used to test how the project would perform under different possible water-availability conditions. The 10% case represents a very pessimistic

AI summary Factorydale flow records were used in sensitivity scenarios to assess the project's performance under varying water-availability conditions, with the 10% case representing a very pessimistic scenario.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →