102388CA (NSPI) IR 1 to 6 1 passage
40 Request IR-6:
40 Request IR-6: 42 Reference: Section 4.8. NS Power states that its peak forecast is unaffected by the RtR load 43 forecast. With respect to energy, NS Power is responsible for supplying top-up energy above 44 and beyond the 500 GWh of wi...

AI summary NS Power asserts its peak forecast is unaffected by the RtR load forecast, but must supply top-up energy beyond 500 GWh of wind production by 2028. The request asks whether a 20% variance in RtR load forecasts would impact NS Power's planning, investments, or operations, emphasizing resource requirements and generation planning.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →