N-1Application - Redacted
8 passages
6 7.5.1.2 Annually Adjusted Energy Savings Credit 7 - 8 The Annually Adjusted Energy Savings Credit is designed to credit the LRS with any non-fuel - 9 energy-related cost savings arising from freed-up capacity on NS Power's system as a re...
AI summary The text discusses the Annually Adjusted Energy Savings Credit, which is intended to credit the Load Resource System (LRS) for non-fuel energy-related cost savings when bundled service loads depart for the Real-Time (RtR) market. However, Nova Scotia Power argues that these savings are limited because it must maintain generation capacity to accommodate potential customer returns. Consequently, the Company does not project any savings in this category and proposes maintaining the current value of zero for 2027.
Optional Generation Load Following Average incremental cost of generation expressed in cents per kWh as determined by the generation forecast for the rate year plus add on charges as defined for back-up service. This price will be 6.754 ce...
AI summary The text specifies the average incremental cost for optional generation load following, set at 6.754 cents per kWh. This pricing is derived from the generation forecast for the rate year and includes additional charges associated with back-up service.
ENERGY CREDIT Compensation for spill energy delivered to NSPI will be at the Company's forecast average annual marginal energy costs of 6.254 cents per kilowatt hour as approved for use with the GRLF rate.
AI summary The document specifies the compensation rate for spill energy delivered to Nova Scotia Power Inc. (NSPI). The rate is set at the Company's forecast average annual marginal energy costs of 6.254 cents per kilowatt-hour, which was previously approved for use within the Generation, Resource & Load Forecasting (GRLF) rate.
Biomass Calculations ($ in millions) 2027 Capital Fuel Operating Total 54.6 100.0% Data from M05473 Exhibit N-3 CA IR-065P Confidential from the COSS Proceeding
AI summary The document provides a high-level breakdown of biomass fuel capital costs for the year 2027. It specifies that the total capital cost for biomass fuel is $54.6 million, representing 100.0% of the total capital expenditure for that specific category. The data is sourced from the COSS Proceeding and is noted as confidential.
REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Category Plant Fuel Costs Jan-27 $57,665,346 Feb-27 $47,414,297 Mar-27 $37,738,955 Apr-27 $19,947,552 May-27 $17,809,534 Jun-27 $19,048,134 Jul-27 $26,25...
AI summary The document provides a detailed monthly breakdown of plant fuel costs for the year 2027. It includes specific figures for the Maritime Link (ML) NS Block and Surplus Total, alongside a categorized breakdown of Non-Wind Purchases. The data highlights monthly expenditures for biomass-related purchased power and regular biomass purchases, totaling over $45 million for the latter category in the annual projection.
REDACTED 2027 AAR Appendix E3 Page 8 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) $ 80.80 Total Wind Demand 0% PHP wind forecast Goose Harbour Lake GWh 27-Jan 27-Feb 27-Mar 27-Apr 27-May 27-Jun 27-Jul 27-Aug 27-Sep 27-Oct 27-Nov 27-Dec...
AI summary The document provides a detailed monthly production and sales forecast for the Power Heating Plan (PHP) and Goose Harbour Lake for the year 2027. It includes specific data on energy requirements, sales, line losses, and net production for both ATL (Annual Total Load) and BTL (Behind the Meter Load) categories. Additionally, it tracks fuel costs at $80.80 per MWh, calculates spill volumes at the meter, and provides 3rd Consecutive Peak (3CP) load figures before wind generation.
ENERGY CREDIT Compensation for spill energy delivered to NSPI will be at the Company's forecast average annual marginal energy costs of 6.7366.254 cents per kilowatt hour as approved for use with the GRLF rate.
AI summary The document specifies the compensation rate for spill energy delivered to Nova Scotia Power Inc. (NSPI). The rate is established at the Company's forecast average annual marginal energy costs, which is set at 6.7366.254 cents per kilowatt hour. This specific rate is approved for application alongside the GRLF rate.
2027 AAR Appendix G8 (redline) Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) STANDBY SERVICE TARIFF Page 5 of 5 Renewable to Retail - (ii) If the LRS' resource is non-dispatchable, that it makes its full output for which it is pr...
AI summary This section of the Standby Service Tariff outlines the obligations of a Load Resource Supplier (LRS) regarding non-dispatchable renewable resources. It requires the LRS to make energy available to NS Power during resource adequacy needs, coordinate on planned outages, and recall export transactions if necessary. Additionally, it establishes a penalty mechanism where the LRS must compensate NS Power for the costs of procuring replacement capacity if the LRS fails to deliver scheduled energy or capacity as directed by the NSPSO.