Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
5 passages 3 documents

Return On Equity across all matters →

B-1-(i)Appendix 1 - HSV-2024-043-CA01 Condition assessment - Factorydale 1 passage
p. p. 97
Financial parameters Costs Savings Revenue General Initial costs Fuel cost escalation rate 2% Initial cost 100% $ 1,953,000 Inflation rate % 2% 4000/ 4.053.000 Discount rate % 9% Total initial costs 100% $ 1,953,000 Reinvestment rate % 9%...

AI summary The document presents a financial analysis of a project, including parameters such as fuel cost escalation, inflation rate, discount rate, initial costs, and revenue from electricity exports. It evaluates financial viability through metrics like IRR, MIRR, NPV, and payback periods, as well as GHG reduction savings and costs.

B-1-(ii)Appendix 2 - HSV-2024-043-CA02 Additional Costed Option Scenarios - Factorydale 3 passages
Now, let's see the Cornwallis extrapolated model: p. pp. 16-17
Now, let's see the Cornwallis extrapolated model: Figure 19: Financial Analysis – CANYON –Cornwallis extrapolation - 3.39 m3/s at 30% The ROI is 17 years and the equity payback is 11 years. Figure 20: Yearly Cash Flows - CANYON –Cornwallis...

AI summary The Cornwallis extrapolated model presents a financial analysis of the CANYON project, showing a 17-year ROI and 11-year equity payback. Visual aids (Figures 19-20 and Pictures 0-2) illustrate cash flows and key metrics at 3.39 m3/s with 30% capacity.

Table 4: Summary of costs, revenue, ROI and ROE for new units p. p. 21
Table 4: Summary of costs, revenue, ROI and ROE for new units Option to analyze Capacity (kW) Electricity (kWh) Initial costs CAD Electricity export revenue CAD O&M costs (savings) CAD Simple payback YEARS Equity Payback YEARS Factorydale...

AI summary Table 4 presents a summary of costs, revenue, ROI, and ROE for various new unit options, including different capacity levels, electricity generation, initial costs, revenue from electricity exports, O&M costs, and payback periods for different projects like NORCAN, CANYON, and DIVE.

Table 5: Summary of costs, revenue, ROI and ROE for like for like replacement p. pp. 22-23
Table 5: Summary of costs, revenue, ROI and ROE for like for like replacement Option to analyze Capacity (kW) Electricity (kWh) Initial costs CAD Electricity export revenue CAD O&M costs (savings) CAD Simple payback YEARS Equity Payback YE...

AI summary Table 5 presents a summary of costs, revenue, ROI, and ROE for like-for-like replacements of various projects, including the CANYON and NORCAN projects, under different capacity and electricity scenarios. The table includes data on initial costs, electricity export revenue, O&M costs, and payback periods for multiple options.

B-3-(i)Appendices - Redacted 1 passage
RETScreen Financial Analysis Report p. p. 163
RETScreen Financial Analysis Report Financial parameters Costs Savings Revenue Yearly cash flows General Initial costs Year Pre-tax Cumulative Fuel cost escalation rate 2% Initial cost 100% $ 2,472,500 # $ $ Inflation rate % 2% 0 -1,236,25...

AI summary The RETScreen Financial Analysis Report outlines financial parameters, costs, savings, and revenue projections for a project over a 50-year period. It includes initial costs, fuel cost escalation, inflation, discount rates, debt and equity ratios, annual savings, and financial metrics such as IRR, MIRR, NPV, and payback periods.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →