E-4-(i)2019 Plan RBIA Model - Excel Spreadsheet (Electonic Filing Only) 1 passage
Attribution
Revenue Related to Energy Demand Reduction Demand Rate Lost Revenue Related to Demand NaN NaN Average Rate after DSM induced Load Reduction Energy Reduction Lost Revenue Related to Energy Demand Reduction Demand Rate Lost Revenue Related t...

AI summary The text presents a series of revenue and demand-related metrics, including energy reduction, demand rate, lost revenue, and average rate after demand-side management (DSM) induced load reduction. These metrics are repeated in a tabular format, suggesting a focus on financial and operational impacts of DSM programs on revenue and demand.

E-9E1 (SBA) RIRs to IR-1 to IR-21 1 passage
Section 175
Note: this measure may not result in significant energy savings if the system is under-sized or if the evaporator does not use off-cycle or time-off defrost. • The control system contains temperature and pressure sensors to monitor system...

AI summary The text discusses energy efficiency measures for refrigeration systems, including intelligent freezer defrost controls and outside air economizers, with eligibility criteria and rebate amounts. It highlights the importance of proper sizing and system operation for energy savings.

74839Board Order 1 passage
Section 50
COMPENSATION 21 Schedule B (Page 1 of 2) 22 Compensation 23 I. Net Contract Price 24 25 The figure below identifies the net Contract Price to be paid by NSPI allocated for each 26 year of the Term, 2019 UARB Approved 34,050,000.00 $34,050,...

AI summary The document outlines the net contract price to be paid by Nova Scotia Power Inc. (NSPI) to EfficiencyOne under the 2019 DSM Plan. It specifies that any surplus realized by EfficiencyOne in meeting performance targets will be reported to the UARB and credited toward monthly payments for EECA in 2021.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →