Topic/Matter Intersection

Topic:"Revenue Requirement" in M12883

Matter: Nova Scotia Power Inc. - Affiliate Code of Conduct Report for 2025
4 passages 2 documents

Revenue Requirement across all matters →

N-1Affiliate Code of Conduct 2025 Report - Redacted 3 passages
NS Power Affiliate Code of Conduct 2025 Report REDACTED p. pp. 14-15
NS Power Affiliate Code of Conduct 2025 Report REDACTED 1 4.4 Top spending categories – Affiliate charges to NS Power 2 3 Goods & Services was the largest category of charges from affiliates to NS Power at $31.6 million, 4 representing 61...

AI summary The document outlines NS Power's top spending categories from affiliate charges in 2025, with Goods & Services being the largest at $31.6 million, followed by M&A Services and Flow Through transactions. It also mentions NS Power's charges to affiliates totaling $19.9 million. The rent paid to Emera for subleased space is based on fair market value as directed by the Board in Decision letter M09706.

Appendix C 2025 Utility Performance Report p. p. 100
Appendix C 2025 Utility Performance Report Category Measure 2025 2024 2023 Notes Dec-25 3267654 Nova Scotia Limited (Terminal Road) 9S-10-R 9S REVERSE M&A - Nov 25 - IC AR Trade - 3267654 Nova Scotia Ltd ($631) Sale Pricing Exception the C...

AI summary The document discusses various financial and operational transactions related to Nova Scotia Limited, including M&A services, pricing exceptions, and allocations under the CAM. Specific entries include sales, corrections, and references to appendices for detailed information.

Date Nova Scotia Power Energy Marketing Inc. (NSPEMI) p. p. 126
Date Nova Scotia Power Energy Marketing Inc. (NSPEMI) Jan-25 Nova Scotia Power Energy Marketing Inc. (INSPEMI) 1S-25 1S NG Sale Sale Pricing Exception Jan-25 Nova Scotia Power Maritime Link (NSPML) 5068 5S-120 5S CCO NSPML Preventative Mtc...

AI summary The document outlines several sales and pricing exceptions related to Nova Scotia Power Maritime Link (NSPML) and Nova Scotia Power Energy Marketing Inc. (NSPEMI), including costs determined based on the Cost Allocation Manual (CAM) and specific sections related to Corporate Overhead, Non-productive Rate, and M&A Services.

103297IG (NSPI) IR-1 to IR-3 1 passage
Section 5
- 5 Reference: Ex. N-1, Report, Appendix D(9a), Note, pdf. 116; Appendix D(9b), Note, pdf. - 6 117; Appendix D(10a), Note, pdf. 119; Appendix D(10b), Note, pdf. 120. - 7 Preamble: The notes to Appendices D(9a), D(9b), D(10a) and D(10b) dis...

AI summary The document references appendices that discuss the impact of the 2025 cyber incident on the availability of actual data for allocating M&A Services costs, leading to the use of forecasts and estimates. It requests clarification on the financial impact, methodology, true-up timing, and potential over/under-charging of affiliates.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →