HomeRight Of WayM03324Evidence
Topic/Matter Intersection

Topic:"Right Of Way" in M03324

Matter: E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
3 passages 2 documents

Right Of Way across all matters →

N-10Reliability Standards of the North American Electric Reliability Corporation 7/5/2010 2 passages
Matrix of Violation Risk Factors for Approval p. p. 131
Matrix of Violation Risk Factors for Approval Standard Number Requirement Text of Requirement Violation PRC-STD-005-1 WR1. All bulk power transmission elements (i.e. lines, stations and rights of way) included as part of the transmission f...

AI summary The document outlines a Transmission Maintenance Standard (PRC-STD-005-1) that requires Responsible Entities to develop and implement a Transmission Maintenance and Inspection Plan (TMIP) for bulk power transmission elements. The TMIP must account for environmental, climatic, and design factors and can be performance-based, time-based, or conditional-based.

Matrix of Violation Severity Levels for Approval p. p. 131
Matrix of Violation Severity Levels for Approval Standard Number Requirement Number Text of Requirement Lower VSL Moderate VSL High VSL Severe VSL FAC-003-1 R1.1. The TVMP shall define a schedule for and the type (aerial, ground) of ROW ve...

AI summary The document presents a matrix outlining violation severity levels for approval, focusing on the requirement for the Transmission Vegetation Management Plan (TVMP) to define a schedule and type of right-of-way (ROW) vegetation inspections. The matrix shows that failure to define a schedule falls under High and Severe VSL categories.

07810Quarterly Application for Approval of Reliability Standards of the North American Electric Reliability Corporation - September 2, 2011 9/6/2011 1 passage
Glossary of Terms Used in NERC Reliability Standards p. p. 195
Glossary of Terms Used in NERC Reliability Standards Continent-wide Term Acronym BOT Approved Date FERC Approved Date Definition Right-of-Way (ROW) [Archive] 2/7/2006 3/16/2007 A corridor of land on which electric lines may be located. The...

AI summary This section provides a glossary of terms used in NERC Reliability Standards, including definitions for terms such as 'Right-of-Way (ROW)', 'Scenario', 'Schedule', and 'Scheduled Frequency'. The glossary includes dates of approval by the Board of Trustees (BOT) and the Federal Energy Regulatory Commission (FERC).

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →