N-72026-2027 GRA Appendix 8A-G -Depreciation Study - Redacted
5 passages
an River Main Dam (Kelman 2013b:3). REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 Direct Evidence Appendix 8C Page 98 of 129 The 2010 fieldwork associated with site BeCx-01 (A2010NS94), involved geotechnical monitoring of...
AI summary The 2010 fieldwork at the Indian Lake Dam Site (BeCx-01) identified significant intact archaeological resources, including artifacts from the Middle Archaic Period to the historic period. Although the dam has been refurbished, decommissioning impacts within previous work areas may require archaeological reconnaissance.
djacent to the dam is free of archaeological concerns. If potential impacts from decommissioning stay within the previous work areas, the recommended course of action is archaeological reconnaissance. Beyond site BeCx-01, intact and distur...
AI summary The document discusses archaeological considerations related to the decommissioning of Big Indian Lake Dam. It notes that the area has high potential for archaeological resources and recommends archaeological reconnaissance. The 2018 study identified 19 sites, and additional assessments may be required if previous studies are deemed insufficient.
ll Lake Reservoir under Heritage Research Permit A2012NS082. Although an area of high archaeological potential was identified, no archaeological resources were encountered at this time (Garcin 2013c). In the fall of 2012, DMA undertook arc...
AI summary Archaeological assessments were conducted at Mill Lake in 2012, identifying potential historical features and recommending further reconnaissance if lake levels drop. The area near the dam is considered free of archaeological concerns due to recent refurbishment. Further assessments may be needed if prior studies are deemed insufficient for decommissioning.
ommended course of action is archaeological reconnaissance of the lakeshore. The shoreline of Lake Vaughan was reconstructed using bathymetry data provided by NSPI and property data (Property Online). It is estimated that the archaeologica...
AI summary The text discusses archaeological assessments required for several hydroelectric assets in Nova Scotia, including Carleton Dam, Carleton Lake, and Mink Lake Dam. It outlines the need for reconnaissance, shovel testing, and excavation due to high archaeological potential, citing previous studies and recommending actions based on findings.
C Page 116 of 129 It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: D3 – Ingonish 2 Type: Dewatering The results of the 2018 Hydro Asset Archaeology Study indicate that...
AI summary The document discusses archaeological assessments required for three hydro assets in Nova Scotia, including estimated costs for each site. The assessments are based on previous studies and may require additional evaluations depending on the findings.
N-92026-2027 GRA Appendix 12 A-C - Cost of Service Study Process - Redacted
4 passages
Cancellation GRLF and Shore Wed 9-Mar-22 10:25 Advisory GRLF and Shore Mon 14-Mar-22 7:49 Advisory LIIR Mon 14-Mar-22 7:49 Alert GRLF and Shore Mon 14-Mar-22 8:03 Advisory LIIR T and C Mon 14-Mar-22 8:03 Message Time
AI summary The text lists various alerts and advisories related to GRLF, Shore, LIIR, and T and C with timestamps, indicating communication or notifications related to these systems or services.
COSS CA DR-8 Attachment 1 Page 17 of 30 Advisory Cancellation LIIR Tue 9-Aug-22 14:33 Advisory GRLF and Shore Tue 23-Aug-22 16:16 Advisory LIIR Tue 23-Aug-22 16:16 Advisory Cancellation GRLF and Shore Tue 23-Aug-22 18:11 Advisory Cancellat...
AI summary This document contains a series of advisories, alerts, and interruptions related to the Lighthouse Island Integrated Resource (LIIR) and the Grand River Lowland Flood (GRLF) and Shore areas, spanning from August 2022 to October 2022. These advisories include cancellations, restoration notices, and alerts issued on specific dates.
COSS CA DR-27 Attachment 1 Page 3 of 9 Name Section Title J-ED-15M.pdf Section J - Joint Use LOCATION OF REMOTE POWER CABINET FOR CATV J-ED-16M.pdf Section J - Joint Use MIN VERTICAL SEPARATION ON JOINT-USE POLES J-ED-17M.pdf Section J - J...
AI summary This document outlines a series of technical specifications and guidelines related to joint use of utility infrastructure, focusing on the installation and maintenance of power cabinets, cable clearances, pole attachments, and other related standards for electrical services.
2.6 OVERHEAD LINE AND SERVICE EXTENSIONS Line and service extensions shall be erected and owned by the Company. Where it is necessary to build on private property other than the customer's property, the customer is responsible for obtainin...
AI summary The Company is responsible for erecting and owning line and service extensions. Customers must obtain right-of-way on private property and clear vegetation. The Company provides up to 92 metres of extension, with additional provisions for permanent residences. Costs for extensions beyond these limits are shared with the customer, with reduced costs in areas with prior infrastructure.
N-24NSPI (ECC) RIR 1-41
3 passages
ACCOUNT 350.10 LAND RIGHTS - EASEMENTS AVG AGE RET 46.6 PLACEMENT BAND 1930-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1946-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO...
AI summary The text presents a table with statistical data related to the average age, exposure, retirements, and survival rates across various age intervals. It includes numerical values and percentages, likely representing demographic or actuarial analysis. The table appears to be part of a larger document related to land rights and easements, with a reference to a 2026-2027 GRA Emrydia IR-2 Attachment 1.
NOVA SCOTIA POWER, INC. ACCOUNT 350.10 LAND RIGHTS - EASEMENTS SUMMARY OF CURVE FITTING RESULTS - PCT SURV BALANCED AREAS PLACEMENT BAND 1952-2023 005 EXPERIENCE BAND 2020-2023 SURVIVOR RESID RANGE OF SURVIVOR RESID RANGE OF CURVE MEAS FIT...
AI summary The document provides a summary of curve fitting results related to land rights and easements for Nova Scotia Power, Inc., covering the period from 1952 to 2023. It includes placement and experience bands, survivor residue ranges, and curve measurements for fitted and unfitted segments.
ACCOUNT 360.10 LAND RIGHTS - EASEMENTS, SURVEYS & CLEARING AVG AGE RET 0.0 PLACEMENT BAND 1952-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 PCT SURV AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURI...
AI summary The document presents a detailed table of experience analysis for a General Rate Application (GRA) related to land rights, easements, surveys, and clearing. It includes exposure data, retirement rates, and survival ratios across different age intervals.
N-27NSPI (NSEB) RIR 1-152 - Redacted (settlement agreement attached at IR-1)
3 passages
As at December 31 December 31 millions of dollars Classification 2024 2023 Right-of-use asset Other long-term assets $ 20 $ 21 Lease liabilities: Current Other current liabilities - 1 Long-term Other long-term liabilities 21 21 Total lease...
AI summary The document presents a comparison of lease-related financial figures for NSPI as of December 31, 2024, and December 31, 2023, including right-of-use assets and lease liabilities. It also notes a decrease in lease expense from 2023 to 2024, with a significant portion attributed to variable costs for power generation facility finance leases.
1 have ramped up in 2024. A focused effort on setting up project processes and procedures 2 for both teams will continue into the first two quarters of 2025. 3 4 Environmental Assessment (EA) Filing: NS Power received approval for the EA o...
AI summary NS Power has made progress on the Reliability Tie Project, including environmental assessments, Mi'kmaq engagement, engineering, procurement, and stakeholder outreach. The project is on track with key milestones set for late 2024 and early 2025.
ample, the blueberry industry) to provide 27 information about the planned work and how they may be affected. 28 29 Project Right of Way (ROW): Progress on land easements and rights of way in Nova Scotia 30 is progressing as planned and re...
AI summary The text discusses progress on land easements and rights of way for a project in Nova Scotia, noting that NB Power is on track to ramp up the project as planned.